ADVANTAGE
-ECONOMICAL/ CHEAP
-SAFER- MOST WORK DONE BY CRANES
-AESTHETICS
-FAST CONSTRUCTION
- EASE OF INSTALLATION
- DESIGN VARETY
- SIZE
- ENVORONMENTAL SUSTAINABILITY
DISADVANTAGE
-NEEDS TO BE DESIGNED WELL; LACK OFF FLEXIBILITY
-UPFRONT CONSIDERATION
-SITE CAPACITY/ AREA IS LIMITING
-FINDING A KNOWLEDGEABLE TEAM
-DARK SPLOTCHES ON PANELS AND CRACKING
- LACK OF VERSATILITY
STAGES
1) DESIGN CONSIDERATIONS
A. MAXIMIZE USE OF PANEL FEATURES
B. ORGANIZE THE SITE ACCESS
C. SIZE OF LOT MUST BE BIG ENOUGH
D. BUDGET MUST BE ENOUGH
E. APPROACH OF THE CASTING PROCEEDURE
F. AVAILABILITY OF CRANE SIZES AS DIFF PANELS REQUIRE DIFF CRANES
2) STRUCTURAL CONSIDERATIONS
3) PANELISING BUILDING
4) FINISHING
5) PRE-CONSTRUCTION
6) CONSTRUCTION
PROCESS
1) CASTING SURFACE / FLOOR SLAB IS CURED
-CASTING BED FOR THE PANELS
2) FORMING OF WALL PANELS
- FORMS DONE ON THE FLAT SLAB
3) CHEMICALLY BOND BREAKER IS SPRAYED ON FORM SURFACES
-CAST CONCRETE MUSNT BOND WITH THW FROMS ANDMOULDS
4) REBAR GRID IS CONSTRUCTED ON THE FORM
- BRACING HARDWARE FOR LIFTING
5) CONCRETE POURING
- SANDWHICH INSULATION
- 5-10 DAYS WAITING PERIOD BEFORE LIFTED BY CRANES
6) IS THEN LIFTEN INTO POSTION BY ATTACHING HOOKS OF CRANES ON THE BRACES
7) ROOF AND FINISHES IS ATTACHED
8) GROUTING THE SPACE BETWEEN PANELS FOR JOINING THEM
9) BACKFILLED WITH SAND, COMPACTED SOIL AND/OR AGGREGATES
10) CAULKING
- MAKES SURE ITS WATER PROOF
FINSIHING
1) PAINTING
2) REVEAL PATTERS
3) FORM LINERS
4) EMBEDDED STONE AND BRICKS
TILT UP CONSTRUCTION
WHERE PANELS ARE CASTED
SHOOLS HOTELS HOSPITALS
FALSE
SAVINGS IN CONSTRUCTION COSTS
SAFETY
SPEED
DURABILITY
EASE OF MAINTENANCE
ROBERT AIKEN
-1900S
-DEVELOPMENT OF CRANES BOOSTED THE SYSTEM AND MADE IT MORE
EFFICIENT
-IN THE US 15% INDUSTRIAL BLDNGS ARE MADE OF TILT UP