You are on page 1of 2

Estimation for M/s.

MIRAMAYI project in Hosur

SL RATE per
PARTICULARS QTY UNIT AMOUNT
NO sqft
Basement including Retaining wall & construction of
1 1342 4001844.00
swimming pool –base 2982 sqft

2 1003 3120333.00
Ground Floor Area 3111 sqft

Other
Providing & Constructing RCC underground water
3 12 180000.00
sump with 6" thickness includes concrete flooring 15000 lts
Providing & Constructing RCC Septic Tank with 6"
4 14 98000.00
thickness includes concrete flooring 7000 lts
Providing & Constructing 6" compound wall
5 reinforcement and plastering (3’ foundation & 6’ wall
385000.00
height) LS

6 25000.00
Front Slope work LS

7810177.00
Total Amount

-:SPECIFICATION:-

FOUNDATION:
Depth - 3’0” from the Basement floor level.
P.C.C [1:4:8] – 40mm aggregate at 6” depth.
Footing Mat size – 4’x4’ with 8mm rod
Flooring concrete will be done with P.C.C. 1:4:8 for a thickness of 3”

PLINTH BEAM
RCC 1:1.5:3 will be provided for plinth-beam using 20mm aggregate.
Plinth beam connecting all over the walls with size of 1’x1’x1’ with 3Nos of 16mm rod and 2Nos
of 12mm rod & 8mm stirrups.

COLOUMN
Coloumn size C1 -1’6”x8” -14nos . (8Nos. of 16mm as Main rod & 8mm stirrups) .
C2 – 1’0”x8” – 7nos. (6 Nos. of 16mm as Main rod & 8mm stirrups).
C3– 8”x8” – 4 nos. (4 Nos of 12mm as Main rod & 8mm stirrups).
LINTEL BEAM
Lintel beam of size 8”x6” with 10mm as Main rod & 8mm stirrups

ROOF:-
Roof beam connecting all the coloumn of size 9”x1’6” with 2Nos of 16mm rod and 2Nos of
12mm rod & 8mm stirrups.
Roof concrete of thickness 5” with 10mm as main rod & 8mm as distribution rod with spacing 6”
with c/c distance.

RETAINING WALL:-

Retaining wall of 8” thickness with double mat 10mm as main rod & 8mm as distribution rod.

WALLS & PLASTERING:-

Main wall will be constructed with 8” thickness in solid blocks & Partition walls with 4” solid
blocks.

Interior & Exterior walls plastering with CM mix 1:6 of 20mm thickness.

Terms & Conditions


 For plastering, Block work and concrete, Msand will be used.
 The above quoted does not includes cost of finishing works (like windows, floorings, electrical &
plumbing, etc).
 Electrical & Water supply should be provided from client.