CUT OFF PRODUCTIVITY BASED ON 31 AUGUST 2023 (SSA DAILY PROGRESS MONITORING)
7 Plastic Sheet & Lean Concrete 17.32 m3 151,920 2,631,558 300,000 5,196,600
15 Cast Iron Manhole Cover 0.50 unit 229,152 114,576 200,000 100,000
A.1 ZONE 1
1 MH-01 100% 100% 100% 100% 100% 100% 100% 100% 0% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
2 MH-02 100% 100% 100% 100% 100% 100% 100% 100% 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
3 MH-03 100% 100% 100% 100% 50% 100% 100% 100% 0% 50% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
A.2 ZONE 2
4 MH-25 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
5 MH-26 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
6 MH-22 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
7 MH-29 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
8 MH-30 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
A.3 ZONE 3
9 MH-15 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
10 MH-16 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
11 MH-17 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
12 MH-18 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
A.4 ZONE 4
13 MH-11 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
14 MH-12 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
15 MH-13 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
16 MH-14 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
17 MH-20 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
A.5 ZONE 5
18 MH-23 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
19 MH-24 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
A.6 ZONE 6
20 MH-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
21 MH-05 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
22 MH-21 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
23 MH-19 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
A.7 ZONE 7
24 MH-09 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
25 MH-10 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
26 MH-06 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
27 MH-07 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
28 MH-08 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
A.8 ZONE 8
29 MH-27 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 0% 0%
30 MH-28
31 MH-31 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
32 MH-32 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
GLOBAL PROGRESS FOR STORM WATER MANHOLE 87% 87% 87% 87% 85% 87% 87% 87% 77% 84% 81% 81% 0% 0% 0% 0% 81% 0% 29% 0%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Manhole Progress Monitoring by ZONE PROGRESS MONITORING FORM Progress Date
SEWAGE MANHOLE 002 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
A.3 ZONE 3
10 SM-12 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
11 SM-16 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
12 SM-B8 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
13 SM-B7 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
14 SM-B6 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
A.4 ZONE 4
15 SM-B3 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
16 SM-14 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
17 SM-07 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
18 SM-06 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
19 SM-05 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
20 SM-04 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%
A.5 ZONE 5
21 SM-A1 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
22 SM-01 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
23 SM-02 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
24 SM-13 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%
25 SM-A2 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0%
A.6 ZONE 6
26 SM-03 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
27 SM-B1 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
28 SM-B2 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 0% 100% 0%
GLOBAL PROGRESS FOR SEWAGE MANHOLE 100% 100% 100% 100% 100% 100% 100% 100% 93% 93% 93% 93% 0% 0% 0% 0% 82% 0% 82% 0%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Manhole Progress Monitoring PROGRESS MONITORING FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
GLOBAL PROGRESS FOR SEWAGE WORKS SECTION 2 AREA 78% 61% 61% 50% 44% 50% 50% 39% 39% 39% 39% 39% 0% 0% 0% 0% 17% 0% 0% 0%
14.00 11.00 7.00 7.00 - -
31/08/2023 50% for fabrication 50% for fabrication
50% for fabrication 50% for fabrication
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Monitoring PROGRESS MONITORING FORM Progress Date
SEWAGE TANK 003 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
A SEWAGE TANK SECTION 1 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 50% 100% 100% 100% 50% 100% 100% 0% 90%
GLOBAL PROGRESS FOR SEWAGE TANK 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 25% 50% 50% 50% 25% 50% 50% 0% 45%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Monitoring PROGRESS MONITORING FORM Progress Date
SEPTIC TANK 004 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
GLOBAL PROGRESS FOR SEPTIC TANK 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 100%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Monitoring PROGRESS MONITORING FORM Progress Date
Hume RC Pipe Installation 005 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
1 2 3 4 5 6
HUME RC PIPE 500 mm (CCO From
A
450 mm to 500 mm)
#
1 MH.01 - MH.02 100% 100% 100% 100% 100% 100%
#
2 MH.02 - MH.03 ##### ## 100% 100% 0% 100% 100% 0%
3 MH.03 - MH.04 ##### ## 100% 100% 100% 100% 100% 100%
4 MH.04 - MH.05 ##### ## 100% 100% 100% 100% 100% 100%
5 MH.09 - MH.10 ##### ## 100% 100% 100% 100% 100% 100%
6 MH.10 - MH.06 ##### ## 100% 100% 100% 100% 100% 100%
7 MH.11 - MH.12 ##### ## 100% 100% 100% 100% 100% 100%
8 MH.12 - MH.13 ##### ## 100% 100% 100% 100% 100% 100%
9 MH.13 - MH.14 ##### ## 100% 100% 100% 100% 100% 100%
10 MH.20 - MH.14 ##### ## 100% 100% 100% 100% 100% 100%
11 MH.14 - MH.15 ##### ## 100% 100% 100% 100% 100% 100%
12 MH.15 - MH.16 ##### ## 100% 100% 100% 100% 100% 100%
13 MH.22 - MH.23 ##### ## 100% 100% 100% 100% 100% 100%
14 MH.23 - MH.24 ##### ## 100% 100% 100% 100% 100% 100%
15 MH.24 - MH.07 ##### ## 100% 100% 100% 100% 100% 100%
16 MH.25 - MH.26 ##### ## 100% 100% 100% 100% 100% 100%
17 MH.26 - MH.27 ##### ## 100% 100% 100% 100% 100% 100%
18 MH.27 - MH.28 ##### ## 0% 0% 0% 0% 0% 0%
19 MH.29 - MH.30 ##### ## 100% 100% 100% 100% 100% 100%
20 MH.30 - MH.26 #### ### 100% 100% 100% 100% 100% 100%
21 MH.31 - MH.32 ##### ## 0% 0% 0% 0% 0% 0%
22 MH.32 - MH.28 #### ### 0% 0% 0% 0% 0% 0%
23 MH.19 - MH.21 ##### ## 100% 100% 100% 100% 100% 100%
B HUME RC PIPE 600 mm
1 MH.16 - MH.17 ##### ## 100% 100% 100% 100% 100% 100%
2 MH.17 - MH.18 ##### ## 100% 100% 100% 100% 100% 100%
3 MH.18 - MH.19 ##### ## 100% 100% 100% 100% 100% 100%
4 MH.19 - MH.05 ##### ## 100% 100% 100% 100% 100% 100%
5 MH.28 - River #### ### 0% 0% 0% 0% 0% 0%
C HUME RC PIPE 800 mm
1 MH.05 - MH.06 ##### ## 100% 100% 100% 100% 100% 100%
2 MH.06 - MH.07 ##### ## 100% 100% 100% 100% 100% 100%
3 MH.07 - MH.08 ##### ## 0% 0% 0% 0% 0% 0%
4 MH.07 - END #### ### 0% 0% 0% 0% 0% 0%
GLOBAL PROGRESS FOR Hume RC Pipe Installation 81% 81% 78% 81% 81% 78%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Monitoring PROGRESS MONITORING FORM Progress Date
HDPE 200 mm Installation 006 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
1 CB.1 4.50 0% 0% 0%
2 CB.2 5.50 0% 0% 0%
3 CB.3 10.30 0% 0% 0%
4 CB.4 10.80 0% 0% 0%
5 CB.5 3.50 0% 0% 0%
6 CB.6 10.00 0% 0% 0%
7 CB.7 3.00 0% 0% 0%
8 CB.8 3.90 0% 0% 0%
9 CB.9 6.10 0% 0% 0%
10 CB.10 6.90 0% 0% 0%
11 CB.11 10.00 0% 0% 0%
12 CB.12 10.00 0% 0% 0%
13 CB.13 6.70 0% 0% 0%
14 CB.14 5.90 0% 0% 0%
15 CB.15 3.30 0% 0% 0%
16 CB.16 10.00 0% 0% 0%
17 CB.17 3.50 0% 0% 0%
18 CB.18 10.00 0% 0% 0%
19 CB.19 9.70 0% 0% 0%
20 CB.20 7.20 0% 0% 0%
21 CB.21 7.20 0% 0% 0%
22 CB.22 13.40 0% 0% 0%
23 CB.23 2.80 0% 0% 0%
24 CB.24 4.70 0% 0% 0%
25 CB.25 9.80 0% 0% 0%
26 CB.26 3.70 0% 0% 0%
27 CB.27 4.70 0% 0% 0%
28 CB.28 9.50 0% 0% 0%
29 CB.29 8.60 0% 0% 0%
30 CB.30 10.00 0% 0% 0%
31 CB.31 11.40 0% 0% 0%
32 CB.32 6.90 0% 0% 0%
33 CB.33 7.30 0% 0% 0%
34 CB.34 7.50 0% 0% 0%
35 CB.35 12.10 0% 0% 0%
36 CB.36 7.50 0% 0% 0%
Progress Monitoring PROGRESS MONITORING FORM Progress Date
HDPE 200 mm Installation 006 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
38 CB.38 6.70 0% 0% 0%
39 CB.39 7.50 0% 0% 0%
40 CB.40 7.50 0% 0% 0%
41 CB.41 4.80 0% 0% 0%
42 CB.42 7.50 0% 0% 0%
43 CB.43 7.50 0% 0% 0%
44 CB.44 6.80 0% 0% 0%
45 CB.45 3.20 0% 0% 0%
46 CB.46 11.50 0% 0% 0%
47 CB.47 11.50 0% 0% 0%
48 CB.48 11.50 0% 0% 0%
49 CB.49 7.50 0% 0% 0%
50 CB.50 7.50 0% 0% 0%
51 CB.51 11.50 0% 0% 0%
52 CB.52 2.70 0% 0% 0%
53 CB.53 7.50 0% 0% 0%
54 CB.54 6.20 0% 0% 0%
55 CB.55 6.80 0% 0% 0%
56 CB.56 7.40 0% 0% 0%
57 CB.57 7.30 0% 0% 0%
58 CB.58 6.70 0% 0% 0%
59 CB.59 4.50 0% 0% 0%
60 CB.60 8.70 0% 0% 0%
61 CB.61 3.00 0% 0% 0%
62 CB.62 3.00 0% 0% 0%
63 CB.63 8.70 0% 0% 0%
64 CB.64 8.70 0% 0% 0%
65 CB.65 3.00 0% 0% 0%
66 CB.66 2.40 0% 0% 0%
67 CB.67 8.10 0% 0% 0%
68 CB.68 8.70 0% 0% 0%
69 CB.69 3.00 0% 0% 0%
70 CB.70 7.60 0% 0% 0%
71 CB.71 8.70 0% 0% 0%
72 CB.72 8.20 0% 0% 0%
73 CB.73 7.20 0% 0% 0%
Progress Monitoring PROGRESS MONITORING FORM Progress Date
HDPE 200 mm Installation 006 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
75 CB.75 8.20 0% 0% 0%
76 CB.76 7.20 0% 0% 0%
77 CB.77 9.90 0% 0% 0%
78 CB.77 9.90 0% 0% 0%
79 CB.78 7.20 0% 0% 0%
80 CB.79 8.20 0% 0% 0%
81 CB.80 9.90 0% 0% 0%
82 CB.81 7.20 0% 0% 0%
83 CB.82 8.20 0% 0% 0%
84 CB.83 9.90 0% 0% 0%
85 CB.84 7.20 0% 0% 0%
86 CB.85 8.20 0% 0% 0%
87 CB.86 9.90 0% 0% 0%
88 CB.87 7.90 0% 0% 0%
89 CB.88 8.80 0% 0% 0%
90 CB.89 5.50 0% 0% 0%
91 CB.90 2.70 0% 0% 0%
92 CB.91 10.60 0% 0% 0%
93 CB.92 7.70 0% 0% 0%
94 CB.93 3.50 0% 0% 0%
95 CB.94 3.70 0% 0% 0%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Monitoring PROGRESS MONITORING FORM Progress Date
CATCH BASIN (PRECAST) 008 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
GLOBAL PROGRESS FOR CATCH BASIN (PRECAST) 28% 28% 28% 28% 0% 0% 0% 0% 0%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
STORM WATER MANHOLE (SECTION
A 0.70
1 AREA)
A.1 ZONE 1
1 MH-01 Lean Concrete X & Y = 2.4 m Follow Drawing Before Wall Thickness Have Changed
Excavation 5.52 5.52 1.60 0.70 23.85 1.00 1.00 1.00 1.00 23.85 m3 100% 23.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
D16 Bottom Slab Rebar 2.10 2.10 1.19 1.58 8.00 2.00 2.00 32.00 106.06 kg 100% 106.06
Wall Rebar (Horizontal) 2.02 2.02 0.79 6.40 1.58 4.00 2.00 1.00 8.00 80.81 kg 100% 80.81
Wall Rebar (Vertical) + u bar 2.08 6.40 1.58 64.00 1.00 1.00 64.00 209.89 kg 100% 209.89
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.50 9.60 1.00 2.00 1.00 2.00 19.20 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.79 1.01 1.00 1.00 1.00 1.00 1.01 m3 100% 1.01
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 0.79 9.60 1.00 1.00 1.00 1.00 9.60 m2 0% -
Epoxy Coating 1.20 1.20 0.79 5.22 1.00 1.00 1.00 1.00 5.22 m2 0% -
Soil Backfill 1.60 1.60 1.60 19.75 1.00 1.00 1.00 1.00 19.75 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
2 MH-02 Lean Concrete X & Y = 2.4 m Follow Drawing Before Wall Thickness Have Changed
Excavation 5.59 5.59 1.66 0.70 25.06 1.00 1.00 1.00 1.00 25.06 m3 100% 25.06
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
D16 Bottom Slab Rebar 2.10 2.10 1.25 1.58 8.00 2.00 2.00 32.00 106.06 kg 100% 106.06
Wall Rebar (Horizontal) 2.02 2.02 0.85 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.14 6.40 1.58 8.00 2.00 4.00 64.00 215.95 kg 100% 215.95
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.46 9.34 1.00 2.00 1.00 2.00 18.69 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.85 1.09 1.00 1.00 1.00 1.00 1.09 m3 0% -
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.61 0.85 10.30 1.00 1.00 1.00 1.00 10.30 m2 0% -
Epoxy Coating 1.20 1.20 0.85 5.51 1.00 1.00 1.00 1.00 5.51 m2 0% -
Soil Backfill 1.60 1.60 1.66 20.81 1.00 1.00 1.00 1.00 20.81 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
3 MH-03 Lean Concrete X & Y = 2.4 m Follow Drawing Before Wall Thickness Have Changed
Excavation 5.66 5.66 1.72 0.70 26.30 1.00 1.00 1.00 1.00 26.30 m3 100% 26.30
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.10 2.10 1.31 1.58 8.00 2.00 2.00 32.00 106.06 kg 100% 106.06
Wall Rebar (Horizontal) 2.02 2.02 0.91 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 50% 50.50
Wall Rebar (Vertical) + u bar 2.20 6.40 1.58 8.00 2.00 4.00 64.00 222.01 kg 50% 111.01
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.52 9.73 1.00 2.00 1.00 2.00 19.46 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.91 1.16 1.00 1.00 1.00 1.00 1.16 m3 0% -
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.67 0.91 10.69 1.00 1.00 1.00 1.00 10.69 m2 0% -
Epoxy Coating 1.20 1.20 0.91 5.80 1.00 1.00 1.00 1.00 5.80 m2 0% -
Soil Backfill 1.60 1.60 1.72 21.90 1.00 1.00 1.00 1.00 21.90 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
A.2 ZONE 2
4 MH-25
Excavation 5.46 5.46 1.55 0.70 22.85 1.00 1.00 1.00 1.00 22.85 m3 100% 22.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.14 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.79 6.40 1.58 4.00 2.00 1.00 8.00 80.81 kg 100% 80.81
Wall Rebar (Vertical) + u bar 2.03 6.40 1.58 8.00 2.00 4.00 64.00 204.84 kg 100% 204.84
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.40 8.96 1.00 2.00 1.00 2.00 17.92 m2 100% 17.92
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.79 1.01 1.00 1.00 1.00 1.00 1.01 m3 100% 1.01
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 0.79 9.60 1.00 1.00 1.00 1.00 9.60 m2 100% 9.60
Epoxy Coating 1.20 1.20 0.79 5.22 1.00 1.00 1.00 1.00 5.22 m2 0% -
Soil Backfill 1.60 1.60 1.55 18.88 1.00 1.00 1.00 1.00 18.88 m3 100% 18.88
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
5 MH-26
Excavation 5.51 5.51 1.59 0.70 23.65 1.00 1.00 1.00 1.00 23.65 m3 100% 23.65
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.18 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.83 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.07 6.40 1.58 8.00 2.00 4.00 64.00 208.88 kg 100% 208.88
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.39 8.90 1.00 2.00 1.00 2.00 17.79 m2 100% 17.79
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.83 1.06 1.00 1.00 1.00 1.00 1.06 m3 100% 1.06
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.54 0.83 9.86 1.00 1.00 1.00 1.00 9.86 m2 100% 9.86
Epoxy Coating 1.20 1.20 0.83 5.41 1.00 1.00 1.00 1.00 5.41 m2 0% -
Soil Backfill 1.60 1.60 1.59 19.58 1.00 1.00 1.00 1.00 19.58 m3 100% 19.58
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
6 MH-22
Excavation 5.46 5.46 1.55 0.70 22.85 1.00 1.00 1.00 1.00 22.85 m3 100% 22.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.14 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.79 6.40 1.58 4.00 2.00 1.00 8.00 80.81 kg 100% 80.81
Wall Rebar (Vertical) + u bar 2.03 6.40 1.58 8.00 2.00 4.00 64.00 204.84 kg 100% 204.84
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.35 8.64 1.00 2.00 1.00 2.00 17.28 m2 100% 17.28
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.79 1.01 1.00 1.00 1.00 1.00 1.01 m3 100% 1.01
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 0.79 9.60 1.00 1.00 1.00 1.00 9.60 m2 100% 9.60
Epoxy Coating 1.20 1.20 0.79 5.22 1.00 1.00 1.00 1.00 5.22 m2 0% -
Soil Backfill 1.60 1.60 1.55 18.88 1.00 1.00 1.00 1.00 18.88 m3 100% 18.88
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
7 MH-29
Excavation 5.46 5.46 1.55 0.70 22.85 1.00 1.00 1.00 1.00 22.85 m3 100% 22.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.14 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.79 6.40 1.58 4.00 2.00 1.00 8.00 80.81 kg 100% 80.81
Wall Rebar (Vertical) + u bar 2.03 6.40 1.58 8.00 2.00 4.00 64.00 204.84 kg 100% 204.84
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.35 8.64 1.00 2.00 1.00 2.00 17.28 m2 100% 17.28
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.79 1.01 1.00 1.00 1.00 1.00 1.01 m3 100% 1.01
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 0.79 9.60 1.00 1.00 1.00 1.00 9.60 m2 100% 9.60
Epoxy Coating 1.20 1.20 0.79 5.22 1.00 1.00 1.00 1.00 5.22 m2 0% -
Soil Backfill 1.60 1.60 1.55 18.88 1.00 1.00 1.00 1.00 18.88 m3 100% 18.88
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
8 MH-30
Excavation 5.51 5.51 1.59 0.70 23.65 1.00 1.00 1.00 1.00 23.65 m3 100% 23.65
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.18 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.83 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.07 6.40 1.58 8.00 2.00 4.00 64.00 208.88 kg 100% 208.88
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.39 8.90 1.00 2.00 1.00 2.00 17.79 m2 100% 17.79
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.83 1.06 1.00 1.00 1.00 1.00 1.06 m3 100% 1.06
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.54 0.83 9.86 1.00 1.00 1.00 1.00 9.86 m2 100% 9.86
Epoxy Coating 1.20 1.20 0.83 5.41 1.00 1.00 1.00 1.00 5.41 m2 0% -
Soil Backfill 1.60 1.60 1.59 19.58 1.00 1.00 1.00 1.00 19.58 m3 100% 19.58
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A.3 ZONE 3
9 MH-15
Excavation 5.42 5.42 1.52 0.70 22.22 1.00 1.00 1.00 1.00 22.22 m3 100% 22.22
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.32 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.97 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.21 6.40 1.58 8.00 2.00 4.00 64.00 223.02 kg 100% 223.02
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.32 8.44 1.00 2.00 1.00 2.00 16.87 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.97 1.24 1.00 1.00 1.00 1.00 1.24 m3 100% 1.24
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.47 0.97 9.40 1.00 1.00 1.00 1.00 9.40 m2 0% -
Epoxy Coating 1.20 1.20 0.97 6.09 1.00 1.00 1.00 1.00 6.09 m2 0% -
Soil Backfill 1.60 1.60 1.52 18.33 1.00 1.00 1.00 1.00 18.33 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
10 MH-16
Excavation 5.37 5.37 1.48 0.70 21.44 1.00 1.00 1.00 1.00 21.44 m3 100% 21.44
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.28 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.93 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.17 6.40 1.58 8.00 2.00 4.00 64.00 218.98 kg 100% 218.98
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.28 8.18 1.00 2.00 1.00 2.00 16.36 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.93 1.19 1.00 1.00 1.00 1.00 1.19 m3 100% 1.19
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.43 0.93 9.14 1.00 1.00 1.00 1.00 9.14 m2 0% -
Epoxy Coating 1.20 1.20 0.93 5.89 1.00 1.00 1.00 1.00 5.89 m2 0% -
Soil Backfill 1.60 1.60 1.48 17.66 1.00 1.00 1.00 1.00 17.66 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
11 MH-17
Excavation 5.45 5.45 1.54 0.70 22.61 1.00 1.00 1.00 1.00 22.61 m3 100% 22.61
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.34 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.99 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.23 6.40 1.58 8.00 2.00 4.00 64.00 225.04 kg 100% 225.04
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.34 8.56 1.00 2.00 1.00 2.00 17.13 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.99 1.26 1.00 1.00 1.00 1.00 1.26 m3 100% 1.26
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.43 0.99 9.14 1.00 1.00 1.00 1.00 9.14 m2 0% -
Epoxy Coating 1.20 1.20 0.99 6.18 1.00 1.00 1.00 1.00 6.18 m2 0% -
Soil Backfill 1.60 1.60 1.54 18.68 1.00 1.00 1.00 1.00 18.68 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
12 MH-18
Excavation 5.49 5.49 1.58 0.70 23.41 1.00 1.00 1.00 1.00 23.41 m3 100% 23.41
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.38 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 1.03 6.40 1.58 6.00 2.00 1.00 12.00 121.21 kg 100% 121.21
Wall Rebar (Vertical) + u bar 2.27 6.40 1.58 8.00 2.00 4.00 64.00 229.08 kg 100% 229.08
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.38 8.82 1.00 2.00 1.00 2.00 17.64 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.03 1.32 1.00 1.00 1.00 1.00 1.32 m3 100% 1.32
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.53 1.03 9.78 1.00 1.00 1.00 1.00 9.78 m2 0% -
Epoxy Coating 1.20 1.20 1.03 6.37 1.00 1.00 1.00 1.00 6.37 m2 0% -
Soil Backfill 1.60 1.60 1.58 19.37 1.00 1.00 1.00 1.00 19.37 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A.4 ZONE 4
13 MH-11
Excavation 5.46 5.46 1.55 0.70 22.85 1.00 1.00 1.00 1.00 22.85 m3 100% 22.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.14 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.79 6.40 1.58 4.00 2.00 1.00 8.00 80.81 kg 100% 80.81
Wall Rebar (Vertical) + u bar 2.03 6.40 1.58 8.00 2.00 4.00 64.00 204.84 kg 100% 204.84
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.40 8.96 1.00 2.00 1.00 2.00 17.92 m2 100% 17.92
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.79 1.01 1.00 1.00 1.00 1.00 1.01 m3 100% 1.01
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 0.79 9.60 1.00 1.00 1.00 1.00 9.60 m2 0% -
Epoxy Coating 1.20 1.20 0.79 5.22 1.00 1.00 1.00 1.00 5.22 m2 0% -
Soil Backfill 1.60 1.60 1.55 18.88 1.00 1.00 1.00 1.00 18.88 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
14 MH-12
Excavation 5.50 5.50 1.58 0.70 23.45 1.00 1.00 1.00 1.00 23.45 m3 100% 23.45
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.14 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.82 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.06 6.40 1.58 8.00 2.00 4.00 64.00 207.87 kg 100% 207.87
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.53 9.79 1.00 2.00 1.00 2.00 19.58 m2 100% 19.58
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.82 1.05 1.00 1.00 1.00 1.00 1.05 m3 100% 1.05
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.53 0.82 9.79 1.00 1.00 1.00 1.00 9.79 m2 0% -
Epoxy Coating 1.20 1.20 0.82 5.37 1.00 1.00 1.00 1.00 5.37 m2 0% -
Soil Backfill 1.60 1.60 1.58 19.40 1.00 1.00 1.00 1.00 19.40 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15 MH-13
Excavation 5.56 5.56 1.63 0.70 24.45 1.00 1.00 1.00 1.00 24.45 m3 100% 24.45
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.14 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.87 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.11 6.40 1.58 8.00 2.00 4.00 64.00 212.92 kg 100% 212.92
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.58 10.11 1.00 2.00 1.00 2.00 20.22 m2 100% 20.22
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.87 1.11 1.00 1.00 1.00 1.00 1.11 m3 100% 1.11
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.58 0.87 10.11 1.00 1.00 1.00 1.00 10.11 m2 0% -
Epoxy Coating 1.20 1.20 0.87 5.61 1.00 1.00 1.00 1.00 5.61 m2 0% -
Soil Backfill 1.60 1.60 1.63 20.28 1.00 1.00 1.00 1.00 20.28 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
16 MH-14
Excavation 5.64 5.64 1.70 0.70 25.89 1.00 1.00 1.00 1.00 25.89 m3 100% 25.89
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.29 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.94 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.18 6.40 1.58 8.00 2.00 4.00 64.00 219.99 kg 100% 219.99
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Wall Formwork 1.60 1.60 1.65 10.56 1.00 2.00 1.00 2.00 21.12 m2 100% 21.12
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.94 1.20 1.00 1.00 1.00 1.00 1.20 m3 100% 1.20
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.65 0.94 10.56 1.00 1.00 1.00 1.00 10.56 m2 100% 10.56
Epoxy Coating 1.20 1.20 0.94 5.94 1.00 1.00 1.00 1.00 5.94 m2 0% -
Soil Backfill 1.60 1.60 1.70 21.54 1.00 1.00 1.00 1.00 21.54 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
17 MH-20
Excavation 5.58 5.58 1.65 0.70 24.82 1.00 1.00 1.00 1.00 24.82 m3 100% 24.82
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.45 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 1.10 1.10 6.40 1.58 6.00 2.00 1.00 12.00 121.21 kg 100% 121.21
Wall Rebar (Vertical) + u bar 2.34 6.40 1.58 8.00 2.00 4.00 64.00 236.16 kg 100% 236.16
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.45 9.27 1.00 2.00 1.00 2.00 18.53 m2 100% 18.53
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.10 1.41 1.00 1.00 1.00 1.00 1.41 m3 100% 1.41
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.60 1.10 10.23 1.00 1.00 1.00 1.00 10.23 m2 0% -
Epoxy Coating 1.20 1.20 1.00 6.23 1.00 1.00 1.00 1.00 6.23 m2 0% -
Soil Backfill 1.60 1.60 1.65 20.60 1.00 1.00 1.00 1.00 20.60 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
A.5 ZONE 5
18 MH-23
Excavation 5.53 5.53 1.61 0.70 24.05 1.00 1.00 1.00 1.00 24.05 m3 100% 24.05
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.41 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 1.06 1.06 6.40 1.58 6.00 2.00 1.00 12.00 121.21 kg 100% 121.21
Wall Rebar (Vertical) + u bar 2.09 6.40 1.58 8.00 2.00 4.00 64.00 210.90 kg 100% 210.90
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.56 9.98 1.00 2.00 1.00 2.00 19.97 m2 100% 19.97
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.06 1.36 1.00 1.00 1.00 1.00 1.36 m3 100% 1.36
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.56 1.06 9.98 1.00 1.00 1.00 1.00 9.98 m2 0% -
Epoxy Coating 1.20 1.20 0.85 5.51 1.00 1.00 1.00 1.00 5.51 m2 0% -
Soil Backfill 1.60 1.60 1.61 19.93 1.00 1.00 1.00 1.00 19.93 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
19 MH-24
Excavation 5.62 5.62 1.68 0.70 25.47 1.00 1.00 1.00 1.00 25.47 m3 100% 25.47
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.48 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 1.13 1.13 6.40 1.58 6.00 2.00 1.00 12.00 121.21 kg 100% 121.21
Wall Rebar (Vertical) + u bar 2.16 6.40 1.58 8.00 2.00 4.00 64.00 217.97 kg 100% 217.97
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.63 10.43 1.00 2.00 1.00 2.00 20.86 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.13 1.45 1.00 1.00 1.00 1.00 1.45 m3 100% 1.45
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.56 1.13 9.98 1.00 1.00 1.00 1.00 9.98 m2 0% -
Epoxy Coating 1.20 1.20 0.92 5.85 1.00 1.00 1.00 1.00 5.85 m2 0% -
Soil Backfill 1.60 1.60 1.68 21.17 1.00 1.00 1.00 1.00 21.17 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
A.6 ZONE 6
20 MH-04
Excavation 5.46 5.46 1.55 0.70 22.81 1.00 1.00 1.00 1.00 22.81 m3 100% 22.81
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.35 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 1.00 1.00 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.24 6.40 1.58 8.00 2.00 4.00 64.00 226.05 kg 100% 226.05
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.35 8.63 1.00 2.00 1.00 2.00 17.25 m2 100% 17.25
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.00 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 1.00 9.59 1.00 1.00 1.00 1.00 9.59 m2 0% -
Epoxy Coating 1.20 1.20 1.00 6.23 1.00 1.00 1.00 1.00 6.23 m2 0% -
Soil Backfill 1.60 1.60 1.55 18.85 1.00 1.00 1.00 1.00 18.85 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
21 MH-05
Excavation 5.66 5.66 1.72 0.70 26.26 1.00 1.00 1.00 1.00 26.26 m3 100% 26.26
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.52 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 1.17 1.17 6.40 1.58 6.00 2.00 1.00 12.00 121.21 kg 100% 121.21
Wall Rebar (Vertical) + u bar 2.41 6.40 1.58 8.00 2.00 4.00 64.00 243.23 kg 100% 243.23
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.52 9.72 1.00 2.00 1.00 2.00 19.43 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.17 1.50 1.00 1.00 1.00 1.00 1.50 m3 100% 1.50
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.67 1.17 10.68 1.00 1.00 1.00 1.00 10.68 m2 0% -
Epoxy Coating 1.20 1.20 1.17 7.05 1.00 1.00 1.00 1.00 7.05 m2 0% -
Soil Backfill 1.60 1.60 1.72 21.86 1.00 1.00 1.00 1.00 21.86 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
22 MH-21
Excavation 5.09 5.09 1.24 0.70 17.00 1.00 1.00 1.00 1.00 17.00 m3 0% -
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.00 2.00 1.04 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 2.02 2.02 0.69 0.69 6.40 1.58 4.00 2.00 1.00 8.00 80.81 kg 0% -
Wall Rebar (Vertical) + u bar 1.93 6.40 1.58 8.00 2.00 4.00 64.00 194.74 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
Hume Pipe Connection 1.00 1.00 1.00 1.00 1.00 nos 0% -
Wall Formwork 1.60 1.60 1.04 6.64 1.00 2.00 1.00 2.00 13.29 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.69 0.88 1.00 1.00 1.00 1.00 0.88 m3 0% -
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.19 0.69 7.60 1.00 1.00 1.00 1.00 7.60 m2 0% -
Epoxy Coating 1.20 1.20 0.69 4.74 1.00 1.00 1.00 1.00 4.74 m2 0% -
Soil Backfill 1.60 1.60 1.24 13.83 1.00 1.00 1.00 1.00 13.83 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
23 MH-19
Excavation 5.58 5.58 1.65 0.70 24.82 1.00 1.00 1.00 1.00 24.82 m3 100% 24.82
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.45 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 1.10 1.10 6.40 1.58 6.00 2.00 1.00 12.00 121.21 kg 100% 121.21
Wall Rebar (Vertical) + u bar 2.34 6.40 1.58 8.00 2.00 4.00 64.00 236.16 kg 100% 236.16
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.45 9.27 1.00 2.00 1.00 2.00 18.53 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.10 1.41 1.00 1.00 1.00 1.00 1.41 m3 100% 1.41
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.60 1.10 10.23 1.00 1.00 1.00 1.00 10.23 m2 0% -
Epoxy Coating 1.20 1.20 1.00 6.23 1.00 1.00 1.00 1.00 6.23 m2 0% -
Soil Backfill 1.60 1.60 1.65 20.60 1.00 1.00 1.00 1.00 20.60 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
A.7 ZONE 7
24 MH-09
Excavation 5.46 5.46 1.55 0.70 22.85 1.00 1.00 1.00 1.00 22.85 m3 100% 22.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.14 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.79 6.40 1.58 4.00 2.00 1.00 8.00 80.81 kg 100% 80.81
Wall Rebar (Vertical) + u bar 2.03 6.40 1.58 8.00 2.00 4.00 64.00 204.84 kg 100% 204.84
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.50 9.60 1.00 2.00 1.00 2.00 19.20 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.79 1.01 1.00 1.00 1.00 1.00 1.01 m3 100% 1.01
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 0.79 9.60 1.00 1.00 1.00 1.00 9.60 m2 0% -
Epoxy Coating 1.20 1.20 0.79 5.22 1.00 1.00 1.00 1.00 5.22 m2 0% -
Soil Backfill 1.60 1.60 1.55 18.88 1.00 1.00 1.00 1.00 18.88 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
25 MH-10
Excavation 5.56 5.56 1.63 0.70 24.45 1.00 1.00 1.00 1.00 24.45 m3 100% 24.45
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.22 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.87 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.11 6.40 1.58 8.00 2.00 4.00 64.00 212.92 kg 100% 212.92
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.22 7.80 1.00 2.00 1.00 2.00 15.59 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.87 1.11 1.00 1.00 1.00 1.00 1.11 m3 100% 1.11
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.37 0.87 8.76 1.00 1.00 1.00 1.00 8.76 m2 0% -
Epoxy Coating 1.20 1.20 0.87 5.61 1.00 1.00 1.00 1.00 5.61 m2 0% -
Soil Backfill 1.60 1.60 1.63 20.28 1.00 1.00 1.00 1.00 20.28 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
26 MH-06
Excavation 6.00 6.00 2.00 0.70 32.40 1.00 1.00 1.00 1.00 32.40 m3 100% 32.40
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.74 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 1.24 6.40 1.58 7.00 2.00 1.00 14.00 141.41 kg 100% 141.41
Wall Rebar (Vertical) + u bar 2.48 6.40 1.58 8.00 2.00 4.00 64.00 250.30 kg 100% 250.30
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Wall Formwork 1.60 1.60 1.95 12.48 1.00 2.00 1.00 2.00 24.96 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.24 1.58 1.00 1.00 1.00 1.00 1.58 m3 100% 1.58
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.74 1.24 11.12 1.00 1.00 1.00 1.00 11.12 m2 0% -
Epoxy Coating 1.20 1.20 1.24 7.38 1.00 1.00 1.00 1.00 7.38 m2 0% -
Soil Backfill 1.60 1.60 2.00 27.28 1.00 1.00 1.00 1.00 27.28 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
27 MH-07
Excavation 6.12 6.12 2.10 0.70 34.70 1.00 1.00 1.00 1.00 34.70 m3 100% 34.70
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.10 2.10 1.64 1.58 8.00 2.00 2.00 32.00 106.06 kg 100% 106.06
Wall Rebar (Horizontal) 2.02 2.02 1.29 6.40 1.58 4.00 2.00 1.00 8.00 80.81 kg 100% 80.81
Wall Rebar (Vertical) + u bar 2.58 6.40 1.58 64.00 1.00 1.00 64.00 260.40 kg 100% 260.40
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Wall Formwork 1.60 1.60 2.00 12.80 1.00 2.00 1.00 2.00 25.60 m2 100% 25.60
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.29 1.65 1.00 1.00 1.00 1.00 1.65 m3 100% 1.65
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.00 1.29 12.80 1.00 1.00 1.00 1.00 12.80 m2 100% 12.80
Epoxy Coating 1.20 1.20 1.29 7.62 1.00 1.00 1.00 1.00 7.62 m2 0% -
Soil Backfill 1.60 1.60 2.10 29.32 1.00 1.00 1.00 1.00 29.32 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
28 MH-08
Excavation 6.10 6.10 2.08 0.70 54.11 1.00 1.00 1.00 1.00 54.11 m3 0% -
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.62 2.62 1.58 29.00 1.00 1.00 29.00 119.91 kg 0% -
Wall Rebar (Horizontal) 2.12 6.40 1.58 32.00 1.00 1.00 32.00 107.07 kg 0% -
Wall Rebar (Vertical) + u bar 2.08 6.40 1.58 64.00 1.00 1.00 64.00 209.89 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 3.52 1.00 1.00 1.00 1.00 3.52 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.55 1.41 1.00 1.00 1.00 1.00 1.41 m3 0% -
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 2.08 13.31 1.00 2.00 1.00 2.00 26.62 m2 0% -
Step Iron Installation 6.00 1.00 1.00 6.00 6.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 2.08 2.66 1.00 1.00 1.00 1.00 2.66 m3 0% -
Upper Slab Formwork 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 36.00 1.00 1.00 36.00 102.27 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.08 13.31 1.00 1.00 1.00 1.00 13.31 m2 0% -
Epoxy Coating 1.20 1.20 1.33 7.82 1.00 1.00 1.00 1.00 7.82 m2 0% -
Soil Backfill 1.80 1.80 2.08 48.78 1.00 1.00 1.00 1.00 48.78 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A.8 ZONE 8
29 MH-27
Excavation 5.53 5.53 1.61 0.70 24.05 1.00 1.00 1.00 1.00 24.05 m3 100% 24.05
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.20 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 2.02 2.02 0.85 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 100% 101.01
Wall Rebar (Vertical) + u bar 2.09 6.40 1.58 8.00 2.00 4.00 64.00 210.90 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.20 7.67 1.00 2.00 1.00 2.00 15.33 m2 100% 15.33
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.85 1.09 1.00 1.00 1.00 1.00 1.09 m3 100% 1.09
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.35 0.85 8.63 1.00 1.00 1.00 1.00 8.63 m2 0% -
Epoxy Coating 1.20 1.20 0.85 5.51 1.00 1.00 1.00 1.00 5.51 m2 0% -
Soil Backfill 1.60 1.60 1.61 19.93 1.00 1.00 1.00 1.00 19.93 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
30 MH-28
Excavation 5.58 5.58 1.65 0.70 24.86 1.00 1.00 1.00 1.00 24.86 m3 0% -
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.00 2.00 1.24 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 2.02 2.02 0.89 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 0% -
Wall Rebar (Vertical) + u bar 2.13 6.40 1.58 8.00 2.00 4.00 64.00 214.94 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.24 7.92 1.00 2.00 1.00 2.00 15.85 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.89 1.14 1.00 1.00 1.00 1.00 1.14 m3 0% -
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.60 0.89 10.24 1.00 1.00 1.00 1.00 10.24 m2 0% -
Epoxy Coating 1.20 1.20 0.89 5.70 1.00 1.00 1.00 1.00 5.70 m2 0% -
Soil Backfill 1.60 1.60 1.65 20.63 1.00 1.00 1.00 1.00 20.63 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
31 MH-31
Excavation 5.46 5.46 1.55 0.70 22.85 1.00 1.00 1.00 1.00 22.85 m3 0% -
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.00 2.00 1.14 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 2.02 2.02 0.79 6.40 1.58 4.00 2.00 1.00 8.00 80.81 kg 0% -
Wall Rebar (Vertical) + u bar 2.03 6.40 1.58 8.00 2.00 4.00 64.00 204.84 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.14 7.28 1.00 2.00 1.00 2.00 14.57 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.79 1.01 1.00 1.00 1.00 1.00 1.01 m3 0% -
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 0.79 9.60 1.00 1.00 1.00 1.00 9.60 m2 0% -
Epoxy Coating 1.20 1.20 0.79 5.22 1.00 1.00 1.00 1.00 5.22 m2 0% -
Soil Backfill 1.60 1.60 1.55 18.88 1.00 1.00 1.00 1.00 18.88 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
32 MH-32
Excavation 5.48 5.48 1.57 0.70 23.25 1.00 1.00 1.00 1.00 23.25 m3 0% -
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.00 2.00 1.16 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 2.02 2.02 0.81 6.40 1.58 5.00 2.00 1.00 10.00 101.01 kg 0% -
Wall Rebar (Vertical) + u bar 2.05 6.40 1.58 8.00 2.00 4.00 64.00 206.86 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
Hume Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.16 7.41 1.00 2.00 1.00 2.00 14.82 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.81 1.03 1.00 1.00 1.00 1.00 1.03 m3 0% -
Upper Slab Formwork 1.60 1.60 0.20 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
STORM WATER MANHOLE 001 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Upper Slab Rebar 1.90 1.90 1.58 8.00 2.00 1.00 16.00 47.98 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.52 0.81 9.73 1.00 1.00 1.00 1.00 9.73 m2 0% -
Epoxy Coating 1.20 1.20 0.81 5.32 1.00 1.00 1.00 1.00 5.32 m2 0% -
Soil Backfill 1.60 1.60 1.57 19.23 1.00 1.00 1.00 1.00 19.23 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Progress
No. Description Unit Total Quantity Remarks
Quantity Percentages
1 Excavation m3 806.12 664.06 82.3771%
2 Pile Cut Off nos 32.00 24.00 75.0000%
3 Plastic Sheet & Lean Concrete m3 5.18 4.37 84.3750%
4 Lean Concrete Formwork m2 11.52 9.72 84.3750%
5 Rebar (D16) kg 15,042.09 11,054.14 73.4881%
Bottom Slab Rebar 3,271.34 2,747.40
Wall Rebar (Horizontal) 3,218.09 2,696.90
Wall Rebar (Vertical) + u bar 6,963.04 5,609.85
Upper Slab Rebar 1,589.60 -
6 Formwork m2 817.63 350.00 42.8073%
Ground Slab Formwork 102.72 86.40
Wall Formwork 592.67 263.60
Upper Slab Formwork 122.24 -
7 FC 24 Concrete m3 96.80 64.91 67.0625%
Ground Slab Pouring Concrete 41.09 34.56
Wall Pouring Concrete 39.32 30.35
Upper Slab Pouring Concrete 16.38 -
8 Step Iron Installation nos 99.00 75.00 75.7576%
9 Cast Iron Manhole Cover unit 32.00 - 0.0000%
10 Bitumen Coating m2 318.69 71.87 22.5520%
11 Epoxy Coating m2 186.95 - 0.0000%
12 Soil Backfill m3 672.45 95.80 14.2459% ARITMATH CHECKING
13 Waterstop Installation m 204.80 172.80 84.3750% New Items RECAP 18,596.03
14 Hume Pipe Connection nos 66.00 51.00 77.2727% Method BREAKDOWN 18,596.03
15 Join Sealant m 204.80 - 0.0000% New Items IF ZERO = OK! -
GLOBAL PROGRESS FOR STORM WATER MANHOLE (AVERAGE PRORATE BY ITEMS) 52.2459%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SEWAGE MANHOLE (SECTION 1
A 0.70
AREA)
A.1 ZONE 1
1 SM-B5
Excavation 5.48 5.48 1.57 0.70 23.25 1.00 1.00 1.00 1.00 23.25 m3 100% 23.25
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.81 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.05 2.02 1.58 8.00 2.00 4.00 64.00 206.86 kg 100% 206.86
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.81 10.34 1.00 1.00 1.00 1.00 10.34 m2 100% 10.34
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.81 1.03 1.00 1.00 1.00 1.00 1.03 m3 100% 1.03
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.52 9.73 1.00 1.00 1.00 1.00 9.73 m2 100% 9.73
Epoxy Coating 1.20 1.20 0.81 5.32 1.00 1.00 1.00 1.00 5.32 m2 0% -
Soil Backfill 1.60 1.60 1.57 19.23 1.00 1.00 1.00 1.00 19.23 m3 100% 19.23
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
2 SM-18
Excavation 5.72 5.72 1.77 0.70 27.35 1.00 1.00 1.00 1.00 27.35 m3 100% 27.35
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.01 2.02 1.58 6.00 2.00 4.00 48.00 153.03 kg 100% 153.03
Wall Rebar (Vertical) + u bar 1.60 1.60 2.25 2.02 1.58 8.00 2.00 4.00 64.00 227.06 kg 100% 227.06
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.01 12.90 1.00 1.00 1.00 1.00 12.90 m2 100% 12.90
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.01 1.29 1.00 1.00 1.00 1.00 1.29 m3 100% 1.29
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.72 11.01 1.00 1.00 1.00 1.00 11.01 m2 0% -
Epoxy Coating 1.20 1.20 1.01 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Soil Backfill 1.60 1.60 1.77 22.82 1.00 1.00 1.00 1.00 22.82 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
3 SM-19
Excavation 5.68 5.68 1.73 0.70 26.51 1.00 1.00 1.00 1.00 26.51 m3 100% 26.51
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.97 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.21 2.02 1.58 8.00 2.00 4.00 64.00 223.02 kg 100% 223.02
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 0.97 12.39 1.00 1.00 1.00 1.00 12.39 m2 100% 12.39
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.97 1.24 1.00 1.00 1.00 1.00 1.24 m3 100% 1.24
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.68 10.75 1.00 1.00 1.00 1.00 10.75 m2 0% -
Epoxy Coating 1.20 1.20 0.97 6.09 1.00 1.00 1.00 1.00 6.09 m2 0% -
Soil Backfill 1.60 1.60 1.73 22.08 1.00 1.00 1.00 1.00 22.08 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
4 SM-11
Excavation 6.68 6.68 2.57 0.70 46.38 1.00 1.00 1.00 1.00 46.38 m3 100% 46.38
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.81 2.02 1.58 10.00 2.00 4.00 80.00 255.04 kg 100% 255.04
Wall Rebar (Vertical) + u bar 1.60 1.60 3.05 2.02 1.58 8.00 2.00 4.00 64.00 307.87 kg 100% 307.87
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 3.00 1.00 1.00 3.00 3.00 nos 0% -
Wall Formwork 1.60 1.60 1.81 23.14 1.00 1.00 1.00 1.00 23.14 m2 0% -
Step Iron Installation 6.00 1.00 1.00 6.00 6.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 1.81 2.31 1.00 1.00 1.00 1.00 2.31 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.52 16.13 1.00 1.00 1.00 1.00 16.13 m2 0% -
Epoxy Coating 1.20 1.20 1.81 10.12 1.00 1.00 1.00 1.00 10.12 m2 0% -
Soil Backfill 1.60 1.60 2.57 39.80 1.00 1.00 1.00 1.00 39.80 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
5 SM-10
Excavation 7.25 7.25 3.04 0.70 59.49 1.00 1.00 1.00 1.00 59.49 m3 100% 59.49
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 2.28 2.02 1.58 12.00 2.00 4.00 96.00 306.05 kg 100% 306.05
Wall Rebar (Vertical) + u bar 1.60 1.60 3.52 2.02 1.58 8.00 2.00 4.00 64.00 355.34 kg 100% 355.34
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Wall Formwork 1.60 1.60 2.28 29.16 1.00 1.00 1.00 1.00 29.16 m2 100% 29.16
Step Iron Installation 8.00 1.00 1.00 8.00 8.00 unit 100% 8.00
Wall Pouring Concrete 1.60 1.60 0.20 2.28 2.92 1.00 1.00 1.00 1.00 2.92 m3 100% 2.92
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.99 19.14 1.00 1.00 1.00 1.00 19.14 m2 100% 19.14
Epoxy Coating 1.20 1.20 2.28 12.37 1.00 1.00 1.00 1.00 12.37 m2 0% -
Soil Backfill 1.60 1.60 3.04 51.71 1.00 1.00 1.00 1.00 51.71 m3 100% 51.71
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
A.2 ZONE 2
6 SM-15
Excavation 5.72 5.72 1.77 0.70 27.35 1.00 1.00 1.00 1.00 27.35 m3 100% 27.35
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.01 2.02 1.58 6.00 2.00 4.00 48.00 153.03 kg 100% 153.03
Wall Rebar (Vertical) + u bar 1.60 1.60 2.25 2.02 1.58 8.00 2.00 4.00 64.00 227.06 kg 100% 227.06
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.01 12.90 1.00 1.00 1.00 1.00 12.90 m2 100% 12.90
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.01 1.29 1.00 1.00 1.00 1.00 1.29 m3 100% 1.29
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.72 11.01 1.00 1.00 1.00 1.00 11.01 m2 0% -
Epoxy Coating 1.20 1.20 1.01 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Soil Backfill 1.60 1.60 1.77 22.82 1.00 1.00 1.00 1.00 22.82 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
7 SM-B4
Excavation 5.48 5.48 1.57 0.70 23.25 1.00 1.00 1.00 1.00 23.25 m3 100% 23.25
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.81 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.05 2.02 1.58 8.00 2.00 4.00 64.00 206.86 kg 100% 206.86
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.81 10.34 1.00 1.00 1.00 1.00 10.34 m2 100% 10.34
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.81 1.03 1.00 1.00 1.00 1.00 1.03 m3 100% 1.03
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.52 9.73 1.00 1.00 1.00 1.00 9.73 m2 0% -
Epoxy Coating 1.20 1.20 0.81 5.32 1.00 1.00 1.00 1.00 5.32 m2 0% -
Soil Backfill 1.60 1.60 1.57 19.23 1.00 1.00 1.00 1.00 19.23 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
8 SM-09
Excavation 7.16 7.16 2.97 0.70 57.45 1.00 1.00 1.00 1.00 57.45 m3 100% 57.45
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 2.21 2.02 1.58 12.00 2.00 4.00 96.00 306.05 kg 100% 306.05
Wall Rebar (Vertical) + u bar 1.60 1.60 3.45 2.02 1.58 8.00 2.00 4.00 64.00 348.27 kg 100% 348.27
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 2.21 28.26 1.00 1.00 1.00 1.00 28.26 m2 100% 28.26
Step Iron Installation 7.00 1.00 1.00 7.00 7.00 unit 100% 7.00
Wall Pouring Concrete 1.60 1.60 0.20 2.21 2.83 1.00 1.00 1.00 1.00 2.83 m3 100% 2.83
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.92 18.69 1.00 1.00 1.00 1.00 18.69 m2 0% -
Epoxy Coating 1.20 1.20 2.21 12.04 1.00 1.00 1.00 1.00 12.04 m2 0% -
Soil Backfill 1.60 1.60 2.97 49.84 1.00 1.00 1.00 1.00 49.84 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
9 SM-08
Excavation 6.90 6.90 2.75 0.70 51.23 1.00 1.00 1.00 1.00 51.23 m3 100% 51.23
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.99 2.02 1.58 10.00 2.00 4.00 80.00 255.04 kg 100% 255.04
Wall Rebar (Vertical) + u bar 1.60 1.60 3.23 2.02 1.58 8.00 2.00 4.00 64.00 326.05 kg 100% 326.05
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.99 25.45 1.00 1.00 1.00 1.00 25.45 m2 0% -
Step Iron Installation 7.00 1.00 1.00 7.00 7.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 1.99 2.54 1.00 1.00 1.00 1.00 2.54 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.70 17.28 1.00 1.00 1.00 1.00 17.28 m2 0% -
Epoxy Coating 1.20 1.20 1.99 10.98 1.00 1.00 1.00 1.00 10.98 m2 0% -
Soil Backfill 1.60 1.60 2.75 44.19 1.00 1.00 1.00 1.00 44.19 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A.3 ZONE 3
10 SM-12
Excavation 7.30 7.30 3.08 0.70 60.67 1.00 1.00 1.00 1.00 60.67 m3 100% 60.67
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 2.32 2.02 1.58 12.00 2.00 4.00 96.00 306.05 kg 100% 306.05
Wall Rebar (Vertical) + u bar 1.60 1.60 3.56 2.02 1.58 8.00 2.00 4.00 64.00 359.38 kg 100% 359.38
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Wall Formwork 1.60 1.60 2.32 29.67 1.00 1.00 1.00 1.00 29.67 m2 100% 29.67
Step Iron Installation 8.00 1.00 1.00 8.00 8.00 unit 100% 8.00
Wall Pouring Concrete 1.60 1.60 0.20 2.32 2.97 1.00 1.00 1.00 1.00 2.97 m3 100% 2.97
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 3.03 19.39 1.00 1.00 1.00 1.00 19.39 m2 100% 19.39
Epoxy Coating 1.20 1.20 2.32 12.57 1.00 1.00 1.00 1.00 12.57 m2 0% -
Soil Backfill 1.60 1.60 3.08 52.79 1.00 1.00 1.00 1.00 52.79 m3 100% 52.79
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
11 SM-16
Excavation 5.86 5.86 1.88 0.70 29.73 1.00 1.00 1.00 1.00 29.73 m3 100% 29.73
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
D16 Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
D16 Wall Rebar (Horizontal) 1.60 1.60 1.12 2.02 1.58 6.00 2.00 4.00 48.00 153.03 kg 100% 153.03
D16 Wall Rebar (Vertical) + u bar 1.60 1.60 2.36 2.02 1.58 8.00 2.00 4.00 64.00 238.18 kg 100% 238.18
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.12 14.31 1.00 1.00 1.00 1.00 14.31 m2 0% -
Step Iron Installation 4.00 1.00 1.00 4.00 4.00 unit 100% 4.00
Wall Pouring Concrete 1.60 1.60 0.20 1.12 1.43 1.00 1.00 1.00 1.00 1.43 m3 100% 1.43
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.83 11.71 1.00 1.00 1.00 1.00 11.71 m2 100% 11.71
Epoxy Coating 1.20 1.20 1.12 6.81 1.00 1.00 1.00 1.00 6.81 m2 0% -
Soil Backfill 1.60 1.60 1.88 24.91 1.00 1.00 1.00 1.00 24.91 m3 100% 24.91
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
12 SM-B8
Excavation 5.51 5.51 1.59 0.70 23.65 1.00 1.00 1.00 1.00 23.65 m3 100% 23.65
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.83 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.07 2.02 1.58 8.00 2.00 4.00 64.00 208.88 kg 100% 208.88
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 0.83 10.60 1.00 1.00 1.00 1.00 10.60 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.83 1.06 1.00 1.00 1.00 1.00 1.06 m3 100% 1.06
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.54 9.86 1.00 1.00 1.00 1.00 9.86 m2 100% 9.86
Epoxy Coating 1.20 1.20 0.83 5.41 1.00 1.00 1.00 1.00 5.41 m2 0% -
Soil Backfill 1.60 1.60 1.59 19.58 1.00 1.00 1.00 1.00 19.58 m3 100% 19.58
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 100% 6.40
13 SM-B7
Excavation 5.45 5.45 1.54 0.70 22.65 1.00 1.00 1.00 1.00 22.65 m3 100% 22.65
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
D16 Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
D16 Wall Rebar (Horizontal) 1.60 1.60 0.78 2.02 1.58 4.00 2.00 4.00 32.00 102.02 kg 100% 102.02
D16 Wall Rebar (Vertical) + u bar 1.60 1.60 2.02 2.02 1.58 8.00 2.00 4.00 64.00 203.83 kg 100% 203.83
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 0.78 9.96 1.00 1.00 1.00 1.00 9.96 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.78 1.00 1.00 1.00 1.00 1.00 1.00 m3 100% 1.00
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.49 9.54 1.00 1.00 1.00 1.00 9.54 m2 0% -
Epoxy Coating 1.20 1.20 0.78 5.17 1.00 1.00 1.00 1.00 5.17 m2 0% -
Soil Backfill 1.60 1.60 1.54 18.71 1.00 1.00 1.00 1.00 18.71 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
14 SM-B6
Excavation 5.40 5.40 1.50 0.70 21.87 1.00 1.00 1.00 1.00 21.87 m3 100% 21.87
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
D16 Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
D16 Wall Rebar (Horizontal) 1.60 1.60 0.74 2.02 1.58 4.00 2.00 4.00 32.00 102.02 kg 100% 102.02
D16 Wall Rebar (Vertical) + u bar 1.60 1.60 1.98 2.02 1.58 8.00 2.00 4.00 64.00 199.79 kg 100% 199.79
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.74 9.45 1.00 1.00 1.00 1.00 9.45 m2 0% -
Step Iron Installation 2.00 1.00 1.00 2.00 2.00 unit 100% 2.00
Wall Pouring Concrete 1.60 1.60 0.20 0.74 0.94 1.00 1.00 1.00 1.00 0.94 m3 100% 0.94
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.45 9.28 1.00 1.00 1.00 1.00 9.28 m2 0% -
Epoxy Coating 1.20 1.20 0.74 4.98 1.00 1.00 1.00 1.00 4.98 m2 0% -
Soil Backfill 1.60 1.60 1.50 18.03 1.00 1.00 1.00 1.00 18.03 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
A.4 ZONE 4
15 SM-B3
Excavation 5.48 5.48 1.57 0.70 23.25 1.00 1.00 1.00 1.00 23.25 m3 100% 23.25
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.81 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.05 2.02 1.58 8.00 2.00 4.00 64.00 206.86 kg 100% 206.86
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.81 10.34 1.00 1.00 1.00 1.00 10.34 m2 100% 10.34
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.81 1.03 1.00 1.00 1.00 1.00 1.03 m3 100% 1.03
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.52 9.73 1.00 1.00 1.00 1.00 9.73 m2 0% -
Epoxy Coating 1.20 1.20 0.81 5.32 1.00 1.00 1.00 1.00 5.32 m2 0% -
Soil Backfill 1.60 1.60 1.57 19.23 1.00 1.00 1.00 1.00 19.23 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
16 SM-14
Excavation 5.72 5.72 1.77 0.70 27.35 1.00 1.00 1.00 1.00 27.35 m3 100% 27.35
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.01 2.02 1.58 6.00 2.00 4.00 48.00 153.03 kg 100% 153.03
Wall Rebar (Vertical) + u bar 1.60 1.60 2.25 2.02 1.58 8.00 2.00 4.00 64.00 227.06 kg 100% 227.06
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.01 12.90 1.00 1.00 1.00 1.00 12.90 m2 100% 12.90
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 1.01 1.29 1.00 1.00 1.00 1.00 1.29 m3 100% 1.29
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.72 11.01 1.00 1.00 1.00 1.00 11.01 m2 0% -
Epoxy Coating 1.20 1.20 1.01 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Soil Backfill 1.60 1.60 1.77 22.82 1.00 1.00 1.00 1.00 22.82 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
17 SM-07
Excavation 6.91 6.91 2.76 0.70 51.51 1.00 1.00 1.00 1.00 51.51 m3 100% 51.51
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 2.00 2.02 1.58 10.00 2.00 4.00 80.00 255.04 kg 100% 255.04
Wall Rebar (Vertical) + u bar 1.60 1.60 3.24 2.02 1.58 8.00 2.00 4.00 64.00 327.06 kg 100% 327.06
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Wall Formwork 1.60 1.60 2.00 25.57 1.00 1.00 1.00 1.00 25.57 m2 100% 25.57
Step Iron Installation 7.00 1.00 1.00 7.00 7.00 unit 100% 7.00
Wall Pouring Concrete 1.60 1.60 0.20 2.00 2.56 1.00 1.00 1.00 1.00 2.56 m3 100% 2.56
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.71 17.34 1.00 1.00 1.00 1.00 17.34 m2 100% 17.34
Epoxy Coating 1.20 1.20 2.00 11.03 1.00 1.00 1.00 1.00 11.03 m2 0% -
Soil Backfill 1.60 1.60 2.76 44.44 1.00 1.00 1.00 1.00 44.44 m3 100% 44.44
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
18 SM-06
Excavation 6.84 6.84 2.70 0.70 49.86 1.00 1.00 1.00 1.00 49.86 m3 100% 49.86
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.94 2.02 1.58 10.00 2.00 4.00 80.00 255.04 kg 100% 255.04
Wall Rebar (Vertical) + u bar 1.60 1.60 3.18 2.02 1.58 8.00 2.00 4.00 64.00 321.00 kg 100% 321.00
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.94 24.81 1.00 1.00 1.00 1.00 24.81 m2 100% 24.81
Step Iron Installation 6.00 1.00 1.00 6.00 6.00 unit 100% 6.00
Wall Pouring Concrete 1.60 1.60 0.20 1.94 2.48 1.00 1.00 1.00 1.00 2.48 m3 100% 2.48
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.65 16.96 1.00 1.00 1.00 1.00 16.96 m2 100% 16.96
Epoxy Coating 1.20 1.20 1.94 10.74 1.00 1.00 1.00 1.00 10.74 m2 0% -
Soil Backfill 1.60 1.60 2.70 42.95 1.00 1.00 1.00 1.00 42.95 m3 100% 42.95
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
19 SM-05
Excavation 6.80 6.80 2.67 0.70 49.05 1.00 1.00 1.00 1.00 49.05 m3 100% 49.05
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.91 2.02 1.58 10.00 2.00 4.00 80.00 255.04 kg 100% 255.04
Wall Rebar (Vertical) + u bar 1.60 1.60 3.15 2.02 1.58 8.00 2.00 4.00 64.00 317.97 kg 100% 317.97
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.91 24.42 1.00 1.00 1.00 1.00 24.42 m2 100% 24.42
Step Iron Installation 6.00 1.00 1.00 6.00 6.00 unit 100% 6.00
Wall Pouring Concrete 1.60 1.60 0.20 1.91 2.44 1.00 1.00 1.00 1.00 2.44 m3 100% 2.44
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.62 16.77 1.00 1.00 1.00 1.00 16.77 m2 100% 16.77
Epoxy Coating 1.20 1.20 1.91 10.60 1.00 1.00 1.00 1.00 10.60 m2 0% -
Soil Backfill 1.60 1.60 2.67 42.21 1.00 1.00 1.00 1.00 42.21 m3 100% 42.21
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
20 SM-04
Excavation 6.74 6.74 2.62 0.70 47.71 1.00 1.00 1.00 1.00 47.71 m3 100% 47.71
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.86 2.02 1.58 10.00 2.00 4.00 80.00 255.04 kg 100% 255.04
Wall Rebar (Vertical) + u bar 1.60 1.60 3.10 2.02 1.58 8.00 2.00 4.00 64.00 312.92 kg 100% 312.92
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Wall Formwork 1.60 1.60 1.86 23.78 1.00 1.00 1.00 1.00 23.78 m2 100% 23.78
Step Iron Installation 6.00 1.00 1.00 6.00 6.00 unit 100% 6.00
Wall Pouring Concrete 1.60 1.60 0.20 1.86 2.38 1.00 1.00 1.00 1.00 2.38 m3 100% 2.38
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.57 16.45 1.00 1.00 1.00 1.00 16.45 m2 0% -
Epoxy Coating 1.20 1.20 1.86 10.36 1.00 1.00 1.00 1.00 10.36 m2 0% -
Soil Backfill 1.60 1.60 2.62 41.00 1.00 1.00 1.00 1.00 41.00 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
A.5 ZONE 5
21 SM-A1
Excavation 5.36 5.36 1.47 0.70 21.29 1.00 1.00 1.00 1.00 21.29 m3 100% 21.29
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
D16 Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
D16 Wall Rebar (Horizontal) 1.60 1.60 0.71 2.02 1.58 4.00 2.00 4.00 32.00 102.02 kg 100% 102.02
D16 Wall Rebar (Vertical) + u bar 1.60 1.60 1.95 2.02 1.58 8.00 2.00 4.00 64.00 196.76 kg 100% 196.76
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.71 9.06 1.00 1.00 1.00 1.00 9.06 m2 100% 9.06
Step Iron Installation 2.00 1.00 1.00 2.00 2.00 unit 100% 2.00
Wall Pouring Concrete 1.60 1.60 0.20 0.71 0.91 1.00 1.00 1.00 1.00 0.91 m3 100% 0.91
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.42 9.09 1.00 1.00 1.00 1.00 9.09 m2 0% -
Epoxy Coating 1.20 1.20 0.71 4.84 1.00 1.00 1.00 1.00 4.84 m2 0% -
Soil Backfill 1.60 1.60 1.47 17.53 1.00 1.00 1.00 1.00 17.53 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
22 SM-01
Excavation 5.60 5.60 1.67 0.70 25.27 1.00 1.00 1.00 1.00 25.27 m3 100% 25.27
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
D16 Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
D16 Wall Rebar (Horizontal) 1.60 1.60 0.91 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
D16 Wall Rebar (Vertical) + u bar 1.60 1.60 2.15 2.02 1.58 8.00 2.00 4.00 64.00 216.96 kg 100% 216.96
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 0.91 11.62 1.00 1.00 1.00 1.00 11.62 m2 100% 11.62
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.91 1.16 1.00 1.00 1.00 1.00 1.16 m3 100% 1.16
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.62 10.37 1.00 1.00 1.00 1.00 10.37 m2 100% 10.37
Epoxy Coating 1.20 1.20 0.91 5.80 1.00 1.00 1.00 1.00 5.80 m2 0% -
Soil Backfill 1.60 1.60 1.67 20.99 1.00 1.00 1.00 1.00 20.99 m3 100% 20.99
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
23 SM-02
Excavation 5.81 5.81 1.84 0.70 28.85 1.00 1.00 1.00 1.00 28.85 m3 100% 28.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.08 2.02 1.58 6.00 2.00 4.00 48.00 153.03 kg 100% 153.03
Wall Rebar (Vertical) + u bar 1.60 1.60 2.32 2.02 1.58 8.00 2.00 4.00 64.00 234.14 kg 100% 234.14
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Wall Formwork 1.60 1.60 1.08 13.80 1.00 1.00 1.00 1.00 13.80 m2 100% 13.80
Step Iron Installation 4.00 1.00 1.00 4.00 4.00 unit 100% 4.00
Wall Pouring Concrete 1.60 1.60 0.20 1.08 1.38 1.00 1.00 1.00 1.00 1.38 m3 100% 1.38
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.79 11.46 1.00 1.00 1.00 1.00 11.46 m2 0% -
Epoxy Coating 1.20 1.20 1.08 6.61 1.00 1.00 1.00 1.00 6.61 m2 0% -
Soil Backfill 1.60 1.60 1.84 24.14 1.00 1.00 1.00 1.00 24.14 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
24 SM-13
Excavation 5.60 5.60 1.67 0.70 25.27 1.00 1.00 1.00 1.00 25.27 m3 100% 25.27
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.91 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.15 2.02 1.58 8.00 2.00 4.00 64.00 216.96 kg 100% 216.96
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 0.91 11.62 1.00 1.00 1.00 1.00 11.62 m2 100% 11.62
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.91 1.16 1.00 1.00 1.00 1.00 1.16 m3 100% 1.16
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.62 10.37 1.00 1.00 1.00 1.00 10.37 m2 0% -
Epoxy Coating 1.20 1.20 0.91 5.80 1.00 1.00 1.00 1.00 5.80 m2 0% -
Soil Backfill 1.60 1.60 1.67 20.99 1.00 1.00 1.00 1.00 20.99 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
25 SM-A2
Excavation 5.48 5.48 1.57 0.70 23.25 1.00 1.00 1.00 1.00 23.25 m3 100% 23.25
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.81 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.05 2.02 1.58 8.00 2.00 4.00 64.00 206.86 kg 100% 206.86
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.81 10.34 1.00 1.00 1.00 1.00 10.34 m2 100% 10.34
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.81 1.03 1.00 1.00 1.00 1.00 1.03 m3 100% 1.03
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.52 9.73 1.00 1.00 1.00 1.00 9.73 m2 0% -
Epoxy Coating 1.20 1.20 0.81 5.32 1.00 1.00 1.00 1.00 5.32 m2 0% -
Soil Backfill 1.60 1.60 1.57 19.23 1.00 1.00 1.00 1.00 19.23 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A.6 ZONE 6
26 SM-03
Excavation 6.61 6.61 2.51 0.70 44.81 1.00 1.00 1.00 1.00 44.81 m3 100% 44.81
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 1.75 2.02 1.58 9.00 2.00 4.00 72.00 229.54 kg 100% 229.54
Wall Rebar (Vertical) + u bar 1.60 1.60 2.99 2.02 1.58 8.00 2.00 4.00 64.00 301.81 kg 100% 301.81
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 1.75 22.37 1.00 1.00 1.00 1.00 22.37 m2 0% -
Step Iron Installation 6.00 1.00 1.00 6.00 6.00 unit 100% 6.00
Wall Pouring Concrete 1.60 1.60 0.20 1.75 2.24 1.00 1.00 1.00 1.00 2.24 m3 100% 2.24
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 2.46 15.74 1.00 1.00 1.00 1.00 15.74 m2 100% 15.74
Epoxy Coating 1.20 1.20 1.75 9.83 1.00 1.00 1.00 1.00 9.83 m2 0% -
Soil Backfill 1.60 1.60 2.51 38.38 1.00 1.00 1.00 1.00 38.38 m3 100% 38.38
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
27 SM-B1
Excavation 5.48 5.48 1.57 0.70 23.25 1.00 1.00 1.00 1.00 23.25 m3 100% 23.25
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.81 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.05 2.02 1.58 8.00 2.00 4.00 64.00 206.86 kg 100% 206.86
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.81 10.34 1.00 1.00 1.00 1.00 10.34 m2 100% 10.34
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.81 1.03 1.00 1.00 1.00 1.00 1.03 m3 100% 1.03
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.52 9.73 1.00 1.00 1.00 1.00 9.73 m2 100% 9.73
Epoxy Coating 1.20 1.20 0.81 5.32 1.00 1.00 1.00 1.00 5.32 m2 0% -
Soil Backfill 1.60 1.60 1.57 19.23 1.00 1.00 1.00 1.00 19.23 m3 100% 19.23
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
28 SM-B2
Excavation 5.52 5.52 1.60 0.70 23.85 1.00 1.00 1.00 1.00 23.85 m3 100% 23.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.84 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.08 2.02 1.58 8.00 2.00 4.00 64.00 209.89 kg 100% 209.89
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 0.84 10.73 1.00 1.00 1.00 1.00 10.73 m2 100% 10.73
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.84 1.07 1.00 1.00 1.00 1.00 1.07 m3 100% 1.07
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.55 9.92 1.00 1.00 1.00 1.00 9.92 m2 100% 9.92
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE MANHOLE 13.00 2,500.00 32,500.00 002 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Epoxy Coating 1.20 1.20 0.84 5.46 1.00 1.00 1.00 1.00 5.46 m2 0% -
Soil Backfill 1.60 1.60 1.60 19.75 1.00 1.00 1.00 1.00 19.75 m3 100% 19.75
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A SEWAGE WORKS SECTION 2 AREA 1.00
1 SMH-01
Excavation 5.46 5.46 1.55 1.00 22.85 1.00 1.00 1.00 1.00 22.85 m3 100% 22.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.79 2.02 1.58 4.00 2.00 4.00 32.00 102.02 kg 100% 102.02
Wall Rebar (Vertical) + u bar 1.60 1.60 2.03 2.02 1.58 8.00 2.00 4.00 64.00 204.84 kg 100% 204.84
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 0% -
Wall Formwork 1.60 1.60 0.79 10.09 1.00 1.00 1.00 1.00 10.09 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.79 1.01 1.00 1.00 1.00 1.00 1.01 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 9.60 1.00 1.00 1.00 1.00 9.60 m2 0% -
Epoxy Coating 1.20 1.20 0.79 5.22 1.00 1.00 1.00 1.00 5.22 m2 0% -
Soil Backfill 1.60 1.60 1.55 18.88 1.00 1.00 1.00 1.00 18.88 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
2 SMH-02
Excavation 5.54 5.54 1.62 1.00 24.25 1.00 1.00 1.00 1.00 24.25 m3 100% 24.25
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.86 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.10 2.02 1.58 8.00 2.00 4.00 64.00 211.91 kg 100% 211.91
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 0.86 10.98 1.00 1.00 1.00 1.00 10.98 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.86 1.10 1.00 1.00 1.00 1.00 1.10 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.57 10.05 1.00 1.00 1.00 1.00 10.05 m2 0% -
Epoxy Coating 1.20 1.20 0.86 5.56 1.00 1.00 1.00 1.00 5.56 m2 0% -
Soil Backfill 1.60 1.60 1.62 20.10 1.00 1.00 1.00 1.00 20.10 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
3 SMH-03
Excavation 5.62 5.62 1.68 1.00 25.47 1.00 1.00 1.00 1.00 25.47 m3 100% 25.47
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.92 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 100% 127.52
Wall Rebar (Vertical) + u bar 1.60 1.60 2.16 2.02 1.58 8.00 2.00 4.00 64.00 217.97 kg 100% 217.97
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Wall Formwork 1.60 1.60 0.92 11.75 1.00 1.00 1.00 1.00 11.75 m2 100% 11.75
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.92 1.18 1.00 1.00 1.00 1.00 1.18 m3 100% 1.18
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.63 10.43 1.00 1.00 1.00 1.00 10.43 m2 100% 10.43
Epoxy Coating 1.20 1.20 0.92 5.85 1.00 1.00 1.00 1.00 5.85 m2 0% -
Soil Backfill 1.60 1.60 1.68 21.17 1.00 1.00 1.00 1.00 21.17 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
4 SMH-04
Excavation 5.69 5.69 1.74 1.00 26.72 1.00 1.00 1.00 1.00 26.72 m3 100% 26.72
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 1.60 1.60 0.98 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 0% -
Wall Rebar (Vertical) + u bar 1.60 1.60 2.22 2.02 1.58 8.00 2.00 4.00 64.00 224.03 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
HDPE Connection 3.00 1.00 1.00 3.00 3.00 nos 0% -
Wall Formwork 1.60 1.60 0.98 12.52 1.00 1.00 1.00 1.00 12.52 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.98 1.25 1.00 1.00 1.00 1.00 1.25 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.69 10.82 1.00 1.00 1.00 1.00 10.82 m2 0% -
Epoxy Coating 1.20 1.20 0.98 6.13 1.00 1.00 1.00 1.00 6.13 m2 0% -
Soil Backfill 1.60 1.60 1.74 22.27 1.00 1.00 1.00 1.00 22.27 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
5 SMH-05
Excavation 5.76 5.76 1.80 1.00 27.99 1.00 1.00 1.00 1.00 27.99 m3 100% 27.99
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 1.60 1.60 1.04 2.02 1.58 6.00 2.00 4.00 48.00 153.03 kg 0% -
Wall Rebar (Vertical) + u bar 1.60 1.60 2.28 2.02 1.58 8.00 2.00 4.00 64.00 230.09 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.04 13.29 1.00 1.00 1.00 1.00 13.29 m2 0% -
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 1.04 1.33 1.00 1.00 1.00 1.00 1.33 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.75 11.20 1.00 1.00 1.00 1.00 11.20 m2 0% -
Epoxy Coating 1.20 1.20 1.04 6.42 1.00 1.00 1.00 1.00 6.42 m2 0% -
Soil Backfill 1.60 1.60 1.80 23.39 1.00 1.00 1.00 1.00 23.39 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
6 SMH-06
Excavation 5.84 5.84 1.87 1.00 29.51 1.00 1.00 1.00 1.00 29.51 m3 100% 29.51
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 1.60 1.60 1.11 2.02 1.58 6.00 2.00 4.00 48.00 153.03 kg 0% -
Wall Rebar (Vertical) + u bar 1.60 1.60 2.35 2.02 1.58 8.00 2.00 4.00 64.00 237.17 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.11 14.18 1.00 1.00 1.00 1.00 14.18 m2 0% -
Step Iron Installation 4.00 1.00 1.00 4.00 4.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 1.11 1.42 1.00 1.00 1.00 1.00 1.42 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.82 11.65 1.00 1.00 1.00 1.00 11.65 m2 0% -
Epoxy Coating 1.20 1.20 1.11 6.76 1.00 1.00 1.00 1.00 6.76 m2 0% -
Soil Backfill 1.60 1.60 1.87 24.72 1.00 1.00 1.00 1.00 24.72 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
7 SMH-07
Excavation 5.94 5.94 1.95 1.00 31.27 1.00 1.00 1.00 1.00 31.27 m3 100% 31.27
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 1.60 1.60 1.19 2.02 1.58 6.00 2.00 4.00 48.00 153.03 kg 0% -
Wall Rebar (Vertical) + u bar 1.60 1.60 2.43 2.02 1.58 8.00 2.00 4.00 64.00 245.25 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 1.19 15.21 1.00 1.00 1.00 1.00 15.21 m2 0% -
Step Iron Installation 4.00 1.00 1.00 4.00 4.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 1.19 1.52 1.00 1.00 1.00 1.00 1.52 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.90 12.16 1.00 1.00 1.00 1.00 12.16 m2 0% -
Epoxy Coating 1.20 1.20 1.19 7.14 1.00 1.00 1.00 1.00 7.14 m2 0% -
Soil Backfill 1.60 1.60 1.95 26.28 1.00 1.00 1.00 1.00 26.28 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
8 SMH-08
Excavation 5.22 5.22 1.35 1.00 19.03 1.00 1.00 1.00 1.00 19.03 m3 0% -
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 1.60 1.60 0.59 2.02 1.58 3.00 2.00 4.00 24.00 76.51 kg 0% -
Wall Rebar (Vertical) + u bar 1.60 1.60 1.83 2.02 1.58 8.00 2.00 4.00 64.00 184.64 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 0% -
Wall Formwork 1.60 1.60 0.59 7.53 1.00 1.00 1.00 1.00 7.53 m2 0% -
Step Iron Installation 2.00 1.00 1.00 2.00 2.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.59 0.75 1.00 1.00 1.00 1.00 0.75 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.30 8.32 1.00 1.00 1.00 1.00 8.32 m2 0% -
Epoxy Coating 1.20 1.20 0.59 4.26 1.00 1.00 1.00 1.00 4.26 m2 0% -
Soil Backfill 1.60 1.60 1.35 15.57 1.00 1.00 1.00 1.00 15.57 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
9 SEWAGE TANK
Excavation 2.60 2.80 6.10 1.00 44.41 1.00 1.00 1.00 1.00 44.41 m3 0% -
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.25 2.25 1.58 45.00 1.00 1.00 45.00 159.80 kg 0% -
Wall Rebar (Horizontal) 6.26 6.40 1.58 63.00 1.00 1.00 63.00 636.35 kg 0% -
Wall Rebar (Vertical) + u bar 6.26 6.40 1.58 64.00 1.00 1.00 64.00 632.31 kg 0% -
Waterstop Installation 1.70 1.70 6.80 1.00 1.00 1.00 1.00 6.80 m1 0% -
Ground Slab Formwork 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 6.10 39.04 1.00 2.00 1.00 2.00 78.08 m2 0% -
Step Iron Installation 6.00 1.00 1.00 6.00 6.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 6.10 7.81 1.00 1.00 1.00 1.00 7.81 m3 0% -
Upper Slab Formwork 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 36.00 1.00 1.00 36.00 102.27 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 6.10 39.04 1.00 1.00 1.00 1.00 39.04 m2 0% -
Epoxy Coating 1.20 1.20 5.35 27.12 1.00 1.00 1.00 1.00 27.12 m2 0% -
Soil Backfill 1.80 1.80 6.10 28.79 1.00 1.00 1.00 1.00 28.79 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
10 SMH-10
Excavation 5.22 5.22 1.35 1.00 19.03 1.00 1.00 1.00 1.00 19.03 m3 100% 19.03
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.59 2.02 1.58 3.00 2.00 4.00 24.00 76.51 kg 100% 76.51
Wall Rebar (Vertical) + u bar 1.60 1.60 1.83 2.02 1.58 8.00 2.00 4.00 64.00 184.64 kg 100% 184.64
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.59 7.53 1.00 1.00 1.00 1.00 7.53 m2 100% 7.53
Step Iron Installation 2.00 1.00 1.00 2.00 2.00 unit 100% 2.00
Wall Pouring Concrete 1.60 1.60 0.20 0.59 0.75 1.00 1.00 1.00 1.00 0.75 m3 100% 0.75
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.30 8.32 1.00 1.00 1.00 1.00 8.32 m2 100% 8.32
Epoxy Coating 1.20 1.20 0.59 4.26 1.00 1.00 1.00 1.00 4.26 m2 0% -
Soil Backfill 1.60 1.60 1.35 15.57 1.00 1.00 1.00 1.00 15.57 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
11 SMH-11
Excavation 5.22 5.22 1.35 1.00 19.03 1.00 1.00 1.00 1.00 19.03 m3 100% 19.03
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.59 2.02 1.58 3.00 2.00 4.00 24.00 76.51 kg 100% 76.51
Wall Rebar (Vertical) + u bar 1.60 1.60 1.83 2.02 1.58 8.00 2.00 4.00 64.00 184.64 kg 100% 184.64
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.59 7.53 1.00 1.00 1.00 1.00 7.53 m2 100% 7.53
Step Iron Installation 2.00 1.00 1.00 2.00 2.00 unit 100% 2.00
Wall Pouring Concrete 1.60 1.60 0.20 0.59 0.75 1.00 1.00 1.00 1.00 0.75 m3 100% 0.75
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.30 8.32 1.00 1.00 1.00 1.00 8.32 m2 0% -
Epoxy Coating 1.20 1.20 0.59 4.26 1.00 1.00 1.00 1.00 4.26 m2 0% -
Soil Backfill 1.60 1.60 1.35 15.57 1.00 1.00 1.00 1.00 15.57 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
12 SMH-12
Excavation 5.27 5.27 1.39 1.00 19.77 1.00 1.00 1.00 1.00 19.77 m3 100% 19.77
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.63 2.02 1.58 4.00 2.00 4.00 32.00 102.02 kg 100% 102.02
Wall Rebar (Vertical) + u bar 1.60 1.60 1.87 2.02 1.58 8.00 2.00 4.00 64.00 188.68 kg 100% 188.68
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 0.63 8.04 1.00 1.00 1.00 1.00 8.04 m2 100% 8.04
Step Iron Installation 2.00 1.00 1.00 2.00 2.00 unit 100% 2.00
Wall Pouring Concrete 1.60 1.60 0.20 0.63 0.80 1.00 1.00 1.00 1.00 0.80 m3 100% 0.80
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.34 8.58 1.00 1.00 1.00 1.00 8.58 m2 0% -
Epoxy Coating 1.20 1.20 0.63 4.45 1.00 1.00 1.00 1.00 4.45 m2 0% -
Soil Backfill 1.60 1.60 1.39 16.21 1.00 1.00 1.00 1.00 16.21 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
13 SMH-13
Excavation 5.30 5.30 1.42 1.00 20.34 1.00 1.00 1.00 1.00 20.34 m3 100% 20.34
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 0% -
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 0% -
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 0% -
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 0% -
Wall Rebar (Horizontal) 1.60 1.60 0.66 2.02 1.58 4.00 2.00 4.00 32.00 102.02 kg 0% -
Wall Rebar (Vertical) + u bar 1.60 1.60 1.90 2.02 1.58 8.00 2.00 4.00 64.00 191.71 kg 0% -
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 0% -
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 0% -
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 1.60 1.60 0.66 8.42 1.00 1.00 1.00 1.00 8.42 m2 0% -
Step Iron Installation 2.00 1.00 1.00 2.00 2.00 unit 0% -
Wall Pouring Concrete 1.60 1.60 0.20 0.66 0.84 1.00 1.00 1.00 1.00 0.84 m3 0% -
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.37 8.77 1.00 1.00 1.00 1.00 8.77 m2 0% -
Epoxy Coating 1.20 1.20 0.66 4.60 1.00 1.00 1.00 1.00 4.60 m2 0% -
Soil Backfill 1.60 1.60 1.42 16.70 1.00 1.00 1.00 1.00 16.70 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
14 SMH-14
Excavation 5.46 5.46 1.55 1.00 22.85 1.00 1.00 1.00 1.00 22.85 m3 100% 22.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.79 2.02 1.58 4.00 2.00 4.00 32.00 102.02 kg 50% 51.01
Wall Rebar (Vertical) + u bar 1.60 1.60 2.03 2.02 1.58 8.00 2.00 4.00 64.00 204.84 kg 50% 102.42
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 1.60 1.60 0.79 10.09 1.00 1.00 1.00 1.00 10.09 m2 100% 10.09
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.79 1.01 1.00 1.00 1.00 1.00 1.01 m3 100% 1.01
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.50 9.60 1.00 1.00 1.00 1.00 9.60 m2 0% -
Epoxy Coating 1.20 1.20 0.79 5.22 1.00 1.00 1.00 1.00 5.22 m2 0% -
Soil Backfill 1.60 1.60 1.55 18.88 1.00 1.00 1.00 1.00 18.88 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15 SMH-15
Excavation 5.52 5.52 1.60 1.00 23.85 1.00 1.00 1.00 1.00 23.85 m3 100% 23.85
Pile Cut Off 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Plastic Sheet & Lean Concrete 1.80 1.80 0.05 0.16 1.00 1.00 1.00 1.00 0.16 m3 100% 0.16
Lean Concrete Formwork 1.80 1.80 0.05 0.36 1.00 1.00 1.00 1.00 0.36 m2 100% 0.36
Bottom Slab Rebar 2.00 2.00 1.58 8.00 2.00 2.00 32.00 101.01 kg 100% 101.01
Wall Rebar (Horizontal) 1.60 1.60 0.84 2.02 1.58 5.00 2.00 4.00 40.00 127.52 kg 50% 63.76
Wall Rebar (Vertical) + u bar 1.60 1.60 2.08 2.02 1.58 8.00 2.00 4.00 64.00 209.89 kg 50% 104.95
Waterstop Installation 1.60 1.60 6.40 1.00 1.00 1.00 1.00 6.40 m1 100% 6.40
Ground Slab Formwork 1.60 1.60 0.50 3.20 1.00 1.00 1.00 1.00 3.20 m2 100% 3.20
Ground Slab Pouring Concrete 1.60 1.60 0.50 1.28 1.00 1.00 1.00 1.00 1.28 m3 100% 1.28
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 1.60 1.60 0.84 10.73 1.00 1.00 1.00 1.00 10.73 m2 100% 10.73
Step Iron Installation 3.00 1.00 1.00 3.00 3.00 unit 100% 3.00
Wall Pouring Concrete 1.60 1.60 0.20 0.84 1.07 1.00 1.00 1.00 1.00 1.07 m3 100% 1.07
Upper Slab Formwork 3.84 1.00 1.00 1.00 1.00 3.84 m2 0% -
Upper Slab Rebar 1.80 1.80 1.58 16.00 1.00 1.00 16.00 45.45 kg 0% -
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 1.60 1.60 0.20 0.51 1.00 1.00 1.00 1.00 0.51 m3 0% -
Bitumen Coating 1.60 1.60 1.55 9.92 1.00 1.00 1.00 1.00 9.92 m2 0% -
Epoxy Coating 1.20 1.20 0.84 5.46 1.00 1.00 1.00 1.00 5.46 m2 0% -
Soil Backfill 1.60 1.60 1.60 19.75 1.00 1.00 1.00 1.00 19.75 m3 0% -
Join Sealant 1.60 1.60 1.00 1.00 4.00 4.00 6.40 m1 0% -
16 SEPTIC TANK MS
Excavation 7.30 7.30 3.15 0.76 127.76 1.00 1.00 1.00 1.00 127.76 m3 0% -
Pile Cut Off 6.00 1.00 1.00 6.00 6.00 nos 0% -
Plastic Sheet & Lean Concrete 5.50 5.50 0.05 1.51 1.00 1.00 1.00 1.00 1.51 m3 0% -
Lean Concrete Formwork 5.50 5.50 0.05 1.10 1.00 1.00 1.00 1.00 1.10 m2 0% -
Bottom Slab Rebar 6.05 6.05 1.58 62.00 1.00 1.00 62.00 592.00 kg 0% -
Bottom Slab Rebar 6.05 6.05 1.58 62.00 1.00 1.00 62.00 592.00 kg 0%
Wall Rebar (Horizontal) 3.57 27.56 1.04 36.00 1.00 1.00 36.00 1,033.72 kg 0% -
Wall Rebar (Vertical) + u bar 3.57 27.56 1.04 276.00 1.00 1.00 276.00 1,026.59 kg 0% -
Waterstop Installation 5.30 5.30 21.20 2.00 1.00 1.00 2.00 42.40 m1 0% -
Ground Slab Formwork 10.60 1.00 1.00 1.00 1.00 10.60 m2 0% -
Ground Slab Pouring Concrete 5.30 5.30 0.50 14.05 1.00 1.00 1.00 1.00 14.05 m3 0% -
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 5.30 5.30 3.15 66.78 1.00 2.00 1.00 2.00 133.56 m2 0% -
Wall Pouring Concrete 5.30 5.30 0.30 3.15 20.03 1.00 1.00 1.00 1.00 20.03 m3 0% -
Upper Slab Formwork 5.30 1.00 1.00 1.00 1.00 5.30 m2 0% -
Upper Slab Rebar 6.05 6.05 1.04 62.00 1.00 1.00 62.00 390.81 kg 0% -
Upper Slab Rebar 6.05 6.05 1.04 62.00 1.00 1.00 62.00 390.81 kg 0%
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 5.30 5.30 0.25 7.02 1.00 1.00 1.00 1.00 7.02 m3 0% -
Bitumen Coating 5.30 5.30 3.15 66.78 1.00 1.00 1.00 1.00 66.78 m2 0% -
Soil Backfill 39.28 1.00 1.00 1.00 1.00 39.28 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE WORKS SECTION 2 AREA 002A Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
17 SEPTIC TANK MW
Excavation 4.30 4.30 2.10 0.76 29.55 1.00 1.00 1.00 1.00 29.55 m3 100% 29.55
Pile Cut Off 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Plastic Sheet & Lean Concrete 2.50 2.50 0.05 0.31 1.00 1.00 1.00 1.00 0.31 m3 100% 0.31
Lean Concrete Formwork 2.50 2.50 0.05 0.50 1.00 1.00 1.00 1.00 0.50 m2 100% 0.50
x Bottom Slab Rebar 2.85 2.85 1.58 12.00 2.00 1.00 24.00 107.95 kg 100% 107.95
y Bottom Slab Rebar 2.85 2.85 1.58 12.00 2.00 1.00 24.00 107.95 kg 100% 107.95
Wall Rebar (Horizontal) 2.72 1.04 16.00 4.00 1.00 64.00 181.37 kg 100% 181.37
Wall Rebar (Vertical) + u bar 2.93 1.04 24.00 4.00 1.00 96.00 292.56 kg 100% 292.56
Waterstop Installation 2.30 2.30 9.20 1.00 1.00 1.00 1.00 9.20 m1 100% 9.20
Ground Slab Formwork 2.30 2.30 4.60 1.00 1.00 1.00 1.00 4.60 m2 100% 4.60
Ground Slab Pouring Concrete 2.30 2.30 0.50 2.65 1.00 1.00 1.00 1.00 2.65 m3 100% 2.65
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 2.30 2.30 2.10 38.64 1.00 2.00 1.00 2.00 77.28 m2 100% 77.28
Wall Pouring Concrete 2.30 2.30 0.25 1.55 3.57 1.00 1.00 1.00 1.00 3.57 m3 100% 3.57
Upper Slab Formwork 2.30 2.30 7.59 1.00 1.00 1.00 1.00 7.59 m2 0% -
Upper Slab Rebar 2.85 2.85 1.04 12.00 2.00 1.00 24.00 71.26 kg 0% -
Upper Slab Rebar 2.85 2.85 1.04 12.00 2.00 1.00 24.00 71.26 kg 0%
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 2.30 2.30 0.25 1.32 1.00 1.00 1.00 1.00 1.32 m3 0% -
Bitumen Coating 2.30 2.30 2.10 19.32 1.00 1.00 1.00 1.00 19.32 m2 100% 19.32
Soil Backfill 2.30 2.30 18.44 1.00 1.00 1.00 1.00 18.44 m3 0% -
18 SEPTIC TANK FS
Excavation 5.20 7.30 3.65 0.76 105.45 1.00 1.00 1.00 1.00 105.45 m3 0% -
Pile Cut Off 6.00 1.00 1.00 6.00 6.00 nos 0% -
Plastic Sheet & Lean Concrete 5.50 5.50 0.05 1.51 1.00 1.00 1.00 1.00 1.51 m3 0% -
Lean Concrete Formwork 5.50 5.50 0.05 1.10 1.00 1.00 1.00 1.00 1.10 m2 0% -
Bottom Slab Rebar 6.05 6.05 1.58 62.00 1.00 1.00 62.00 592.00 kg 0% -
Bottom Slab Rebar 6.05 6.05 1.58 62.00 1.00 1.00 62.00 592.00 kg 0%
Wall Rebar (Horizontal) 4.07 27.56 1.04 41.00 1.00 1.00 41.00 1,177.29 kg 0% -
Wall Rebar (Vertical) + u bar 4.07 27.56 1.04 276.00 1.00 1.00 276.00 1,170.37 kg 0% -
Waterstop Installation 5.30 5.30 21.20 2.00 1.00 1.00 2.00 42.40 m1 0% -
Ground Slab Formwork 10.60 1.00 1.00 1.00 1.00 10.60 m2 0% -
Ground Slab Pouring Concrete 5.30 5.30 0.50 14.05 1.00 1.00 1.00 1.00 14.05 m3 0% -
HDPE Connection 2.00 1.00 1.00 2.00 2.00 nos 0% -
Wall Formwork 5.30 5.30 3.65 77.38 1.00 2.00 1.00 2.00 154.76 m2 0% -
Wall Pouring Concrete 5.30 5.30 0.30 3.65 23.21 1.00 1.00 1.00 1.00 23.21 m3 0% -
Upper Slab Formwork 5.30 1.00 1.00 1.00 1.00 5.30 m2 0% -
Upper Slab Rebar 6.05 6.05 1.04 62.00 1.00 1.00 62.00 390.81 kg 0% -
Upper Slab Rebar 6.05 6.05 1.04 62.00 1.00 1.00 62.00 390.81 kg 0%
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 5.30 5.30 0.25 7.02 1.00 1.00 1.00 1.00 7.02 m3 0% -
Bitumen Coating 5.30 5.30 3.65 77.38 1.00 1.00 1.00 1.00 77.38 m2 0% -
Soil Backfill 2.93 1.00 1.00 1.00 1.00 2.93 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Progress Progress
No. Description Unit Total Quantity Remarks
Quantity Percentages
1 Excavation m3 639.13 342.48 53.5853%
2 Pile Cut Off nos 30.00 13.00 43.3333%
3 Plastic Sheet & Lean Concrete m3 5.77 1.93 33.5067%
4 Lean Concrete Formwork m2 8.10 4.10 50.6173%
5 Rebar (D16) kg 17,279.83 3,624.83 20.9772%
Bottom Slab Rebar 4,157.79 1,023.96
Wall Rebar (Horizontal) 4,635.50 908.25
Wall Rebar (Vertical) + u bar 6,042.15 1,692.62
Upper Slab Rebar 2,444.39 -
6 Formwork m2 740.50 163.13 22.0304%
Ground Slab Formwork 73.80 30.20
Wall Formwork 591.55 132.93
Upper Slab Formwork 75.15 -
7 FC 24 Concrete m3 142.39 19.46 13.6635%
Ground Slab Pouring Concrete 49.94 10.33
Wall Pouring Concrete 69.41 9.13
Upper Slab Pouring Concrete 23.05 -
8 Step Iron Installation nos 45.00 15.00 33.3333%
9 Cast Iron Manhole Cover unit 18.00 - 0.0000%
10 Bitumen Coating m2 340.25 38.07 11.1895%
11 Epoxy Coating m2 102.73 - 0.0000%
12 Soil Backfill m3 364.51 - 0.0000% ARITMATH CHECKING
13 Waterstop Installation m 190.40 60.40 31.7227% New Items RECAP 20,035.60
14 HDPE Connection nos 33.00 12.00 36.3636% Method BREAKDOWN 20,035.60
15 Join Sealant m 96.00 - 0.0000% New Items IF ZERO = OK! -
GLOBAL PROGRESS FOR SEWAGE WORKS SECTION 2 AREA (AVERAGE PRORATE BY ITEMS) 23.3549%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEWAGE TANK 5.46 5.46 1.55 - 22.85 003 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A SEWAGE TANK SECTION 1
Excavation 12.70 12.70 5.55 0.67 596.77 1.00 1.00 1.00 1.00 596.77 m3 100% 596.77
Vertical H Beam for Soilslide
6.00 14.00 16.00 2.00 2.00 64.00 5,376.00 kg 100% 5,376.00
Protector (WF 150)
Horizontal H Beam for Soilslide
17.70 17.70 70.80 14.00 3.00 1.00 1.00 3.00 2,973.60 kg Cuma 3 sisi ? 100% 2,973.60
Protector (WF 150)
Thick Plywood for Soilslide Protector 17.70 17.70 4.80 70.80 84.96 1.00 1.00 4.00 339.84 m2 100% 339.84
Pile Cut Off 9.00 1.00 1.00 9.00 9.00 nos 100% 9.00
Plastic Sheet & Lean Concrete 5.50 5.50 0.05 1.51 1.00 1.00 1.00 1.00 1.51 m3 100% 1.51
Lean Concrete Formwork 5.50 5.50 0.05 1.10 1.00 1.00 1.00 1.00 1.10 m2 100% 1.10
D16 Bottom Slab Rebar 5.85 5.85 1.58 30.00 2.00 2.00 120.00 1,107.92 kg 100% 1,107.92
D13 Wall Rebar (Horizontal) 5.00 5.02 1.04 25.00 2.00 4.00 200.00 1,046.05 kg 100% 1,046.05
D13 Wall Rebar (Vertical) 5.65 18.40 1.04 92.00 2.00 1.00 184.00 1,082.19 kg 100% 1,082.19
Waterstop Installation 4.60 4.60 18.40 3.00 1.00 1.00 3.00 55.20 m1 Cuma 3 sisi ? 100% 55.20
Ground Slab Formwork 10.60 1.00 1.00 1.00 1.00 10.60 m2 100% 10.60
Ground Slab Pouring Concrete 5.30 5.30 0.50 14.05 1.00 1.00 1.00 1.00 14.05 m3 100% 14.05
HDPE Connection 1.00 1.00 1.00 1.00 1.00 nos 100% 1.00
Wall Formwork 4.60 4.60 5.00 92.00 1.00 2.00 1.00 2.00 184.00 m2 0% -
Step Iron Installation 6.00 1.00 1.00 6.00 6.00 unit 100% 6.00
Wall Pouring Concrete 4.60 4.60 0.30 5.00 27.60 1.00 1.00 1.00 1.00 27.60 m3 0% -
Upper Slab Formwork (2nd) 4.60 4.60 21.16 1.00 1.00 1.00 1.00 21.16 m2 100% 21.16
Upper Slab Rebar (2nd) 5.02 5.02 1.04 23.00 1.00 2.00 46.00 240.59 kg 100% 240.59
Stainless Steel Manhole 1.00 1.00 1.00 1.00 1.00 unit 50% 0.50
Upper Slab Pouring Concrete (2nd) 4.60 4.60 0.20 4.23 1.00 1.00 1.00 1.00 4.23 m3 100% 4.23
Upper Slab Formwork (3rd) 4.60 4.60 21.16 1.00 1.00 1.00 1.00 21.16 m2 100% 21.16
Upper Slab Rebar (3rd) 5.02 5.02 1.04 23.00 1.00 2.00 46.00 240.59 kg 100% 240.59
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 50% 0.50
Upper Slab Pouring Concrete (3rd) 4.60 4.60 0.20 4.23 1.00 1.00 1.00 1.00 4.23 m3 100% 4.23
Bitumen Coating 4.60 4.60 5.55 102.12 1.00 1.00 1.00 1.00 102.12 m2 100% 102.12
Epoxy Coating 4.00 4.00 4.60 73.60 1.00 1.00 1.00 1.00 73.60 m2 0% -
Soil Backfill 480.39 1.00 1.00 1.00 1.00 480.39 m3 90% 432.35
Progress Progress
No. Description Unit Total Quantity Remarks
Quantity Percentages
1 Excavation m3 1,041.57 596.77 57.2957%
Vertical H Beam for Soilslide Protector
2 kg 10,752.00 5,376.00 50.0000% New Items
(WF 150)
Horizontal H Beam for Soilslide Protector
3 kg 5,947.20 2,973.60 50.0000% New Items
(WF 150)
4 Thick Plywood for Soilslide Protector m2 623.04 339.84 54.5455% New Items
5 Pile Cut Off nos 18.00 9.00 50.0000%
6 Plastic Sheet & Lean Concrete m3 2.13 1.51 71.1765%
7 Lean Concrete Formwork m2 1.80 1.10 61.1111%
8 Rebar (D16) kg 1,594.02 1,107.92 69.5050%
Bottom Slab Rebar 1,594.02 1,107.92
9 Rebar (D13) kg 3,583.39 2,609.42 72.8200%
Wall Rebar (Horizontal) 1,312.88 1,046.05
Wall Rebar (Vertical) 1,648.46 1,082.19
Upper Slab Rebar (2nd) 311.02 240.59
Upper Slab Rebar (3rd) 311.02 240.59
10 Formwork m2 461.06 52.92 11.4779%
Ground Slab Formwork 17.20 10.60
Wall Formwork 388.02 -
Upper Slab Formwork (2nd) 27.92 21.16
Upper Slab Formwork (3rd) 27.92 21.16
11 FC 24 Concrete m3 91.79 22.51 24.5217%
Ground Slab Pouring Concrete 19.49 14.05
Wall Pouring Concrete 58.43 -
Upper Slab Pouring Concrete (2nd) 6.94 4.23
Upper Slab Pouring Concrete (3rd) 6.94 4.23
12 Step Iron Installation unit 12.00 6.00 50.0000%
13 Stainless Steel Manhole unit 2.00 0.50 25.0000% New Items
14 Cast Iron Manhole Cover unit 2.00 0.50 25.0000%
15 Bitumen Coating m2 159.84 102.12 63.8889%
16 Epoxy Coating m2 110.80 - 0.0000% ARITMATH CHECKING
17 Waterstop Installation m1 86.40 55.20 63.8889% New Items RECAP 28,939.71
18 HDPE Connection nos 2.00 1.00 50.0000% Method BREAKDOWN 25,356.32
19 Soil Backfill m3 865.29 432.35 49.9662% NOT OK!! 3,583.39
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEPTIC TANK 004 Calculation 31/08/2023
WP 6 - Civil & Landscape 5.48 5.48 1.57
PT. Sepuluh Sumber Anugerah 13.56 9.86 3.55
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SEPTIC TANK DETAIL 1 (Main
A
Building) ST-01
Excavation 17.82 14.12 3.55 0.76 679.85 1.00 1.00 1.00 1.00 679.85 m3 100% 679.85
Pile Cut Off 6.00 1.00 1.00 6.00 6.00 nos 100% 6.00
Plastic Sheet & Lean Concrete 7.50 3.80 0.05 1.43 1.00 1.00 1.00 1.00 1.43 m3 100% 1.43
Lean Concrete Formwork 7.50 3.80 0.05 1.13 1.00 1.00 1.00 1.00 1.13 m2 100% 1.13
Bottom Slab Rebar (x) 8.05 4.35 1.58 45.00 1.00 1.00 45.00 571.72 kg 100% 571.72
Bottom Slab Rebar (y) 8.05 4.35 1.58 82.00 1.00 1.00 82.00 562.96 kg 100%
Wall Rebar (Horizontal) 3.97 28.16 1.04 40.00 1.00 1.00 40.00 1,173.58 kg 100% 1,173.58
Wall Rebar (Vertical) + u bar 3.97 28.16 1.04 282.00 1.00 1.00 282.00 1,166.43 kg 100% 1,166.43
Waterstop Installation 7.30 3.60 21.80 2.00 1.00 1.00 2.00 43.60 m1 100% 43.60
Ground Slab Formwork 10.90 1.00 1.00 1.00 1.00 10.90 m2 100% 10.90
Ground Slab Pouring Concrete 7.30 3.60 0.50 13.14 1.00 1.00 1.00 1.00 13.14 m3 100% 13.14
Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 7.30 3.60 3.55 77.39 1.00 2.00 1.00 2.00 154.78 m2 100% 154.78
Wall Pouring Concrete 7.30 3.60 0.30 3.55 23.22 1.00 1.00 1.00 1.00 23.22 m3 100% 23.22
Upper Slab Formwork 5.45 1.00 1.00 1.00 1.00 5.45 m2 0% -
Upper Slab Rebar (x) 8.05 4.35 1.04 45.00 1.00 1.00 45.00 377.42 kg 0% -
Upper Slab Rebar (y) 8.05 4.35 1.04 82.00 1.00 1.00 82.00 371.64 kg 0%
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 7.30 3.60 0.25 6.57 1.00 1.00 1.00 1.00 6.57 m3 0% -
Bitumen Coating 7.30 3.60 3.55 103.66 1.00 1.00 1.00 1.00 103.66 m2 100% 103.66
Soil Backfill 586.56 1.00 1.00 1.00 1.00 586.56 m3 100% 586.56
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SEPTIC TANK DETAIL 3 (Masjid
C 6.00 26.10 0.77
Area) ST-04
Excavation 11.60 9.60 2.25 0.77 192.96 1.00 1.00 1.00 1.00 192.96 m3 100% 192.96
Pile Cut Off 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Plastic Sheet & Lean Concrete 4.40 2.40 0.05 0.53 1.00 1.00 1.00 1.00 0.53 m3 100% 0.53
Lean Concrete Formwork 4.40 2.40 0.05 0.68 1.00 1.00 1.00 1.00 0.68 m2 100% 0.68
Bottom Slab Rebar (x) 4.95 2.95 1.58 31.00 1.00 1.00 31.00 242.18 kg 100% 242.18
Bottom Slab Rebar (y) 4.95 2.95 1.58 51.00 1.00 1.00 51.00 237.45 kg 100%
Wall Rebar (Horizontal) 2.67 19.16 1.04 27.00 1.00 1.00 27.00 538.99 kg 100% 538.99
Wall Rebar (Vertical) + u bar 2.67 19.16 1.04 192.00 1.00 1.00 192.00 534.11 kg 100% 534.11
Waterstop Installation 4.20 2.20 12.80 2.00 1.00 1.00 2.00 25.60 m1 100% 25.60
Ground Slab Formwork 6.40 1.00 1.00 1.00 1.00 6.40 m2 100% 6.40
Ground Slab Pouring Concrete 4.20 2.20 0.50 4.62 1.00 1.00 1.00 1.00 4.62 m3 100% 4.62
Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 4.20 2.20 2.25 28.80 1.00 2.00 1.00 2.00 57.60 m2 100% 57.60
Wall Pouring Concrete 4.20 2.20 0.30 2.25 8.64 1.00 1.00 1.00 1.00 8.64 m3 100% 8.64
Upper Slab Formwork 3.20 1.00 1.00 1.00 1.00 3.20 m2 0% -
Upper Slab Rebar (x) 4.95 2.95 1.04 31.00 1.00 1.00 31.00 159.88 kg 0% -
Upper Slab Rebar (y) 4.95 2.95 1.04 51.00 1.00 1.00 51.00 156.75 kg 0%
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 4.20 2.20 0.25 2.31 1.00 1.00 1.00 1.00 2.31 m3 0% -
Bitumen Coating 4.20 2.20 2.25 37.80 1.00 1.00 1.00 1.00 37.80 m2 100% 37.80
Soil Backfill 172.17 1.00 1.00 1.00 1.00 172.17 m3 100% 172.17
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SEPTIC TANK DETAIL 5 (Main Gate
E 6.06 23.62 0.74
Building) ST-06
Excavation 10.50 9.60 2.25 - 168.48 1.00 1.00 1.00 1.00 168.48 m3 100% 168.48
Pile Cut Off 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Plastic Sheet & Lean Concrete 3.30 2.40 0.05 0.40 1.00 1.00 1.00 1.00 0.40 m3 100% 0.40
Lean Concrete Formwork 3.30 2.40 0.05 0.57 1.00 1.00 1.00 1.00 0.57 m2 100% 0.57
Bottom Slab Rebar (x) 3.52 2.62 1.58 11.00 2.00 1.00 22.00 122.22 kg 100% 122.22
Bottom Slab Rebar (y) 3.52 2.62 1.58 16.00 2.00 1.00 32.00 132.32 kg 100% 132.32
Wall Rebar (Horizontal) 2.65 12.28 1.04 12.00 2.00 1.00 24.00 307.06 kg 100% 307.06
Wall Rebar (Vertical) + u bar 2.65 12.28 1.04 53.00 2.00 1.00 106.00 292.11 kg 100% 292.11
Waterstop Installation 3.10 2.20 10.60 2.00 1.00 1.00 2.00 21.20 m1 100% 21.20
Ground Slab Formwork 3.10 2.20 5.30 1.00 1.00 1.00 1.00 12.12 m2 100% 12.12
Ground Slab Pouring Concrete 3.10 2.20 0.50 3.41 1.00 1.00 1.00 1.00 3.41 m3 100% 3.41
Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 3.10 2.20 1.95 20.67 1.00 2.00 1.00 2.00 41.34 m2 100% 41.34
Wall Pouring Concrete 3.10 2.20 0.30 1.95 6.20 1.00 1.00 1.00 1.00 6.20 m3 100% 6.20
Upper Slab Formwork 3.10 2.20 2.65 1.00 1.00 1.00 1.00 9.47 m2 0% -
Upper Slab Rebar (x) 3.52 2.62 1.04 11.00 2.00 1.00 22.00 80.68 kg 0% -
Upper Slab Rebar (y) 3.52 2.62 1.04 16.00 2.00 1.00 32.00 87.35 kg 0%
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 3.10 2.20 0.25 1.71 1.00 1.00 1.00 1.00 1.71 m3 0% -
Bitumen Coating 3.10 2.20 2.45 25.97 1.00 1.00 1.00 1.00 25.97 m2 100% 25.97
Soil Backfill 2.45 151.77 1.00 1.00 1.00 1.00 151.77 m3 100% 151.77
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SEPTIC TANK DETAIL 2 (Canteen
G
Area) ST-02
Excavation 14.86 12.76 3.15 445.35 1.00 1.00 1.00 1.00 445.35 m3 100% 445.35
Pile Cut Off 3.00 1.00 1.00 3.00 3.00 nos 100% 3.00
Plastic Sheet & Lean Concrete 5.50 3.40 0.05 0.94 1.00 1.00 1.00 1.00 0.94 m3 100% 0.94
Lean Concrete Formwork 5.50 3.40 0.05 0.89 1.00 1.00 1.00 1.00 0.89 m2 100% 0.89
Bottom Slab Rebar (x) 5.57 3.47 1.58 36.00 1.00 1.00 36.00 316.47 kg 100% 316.47
Bottom Slab Rebar (y) 5.57 3.47 1.58 57.00 1.00 1.00 57.00 312.16 kg 100% 312.16
Wall Rebar (Horizontal) 3.28 18.38 1.04 17.00 2.00 1.00 34.00 651.09 kg 100% 651.09
Wall Rebar (Vertical) + u bar 3.28 18.38 1.04 170.00 1.00 1.00 170.00 580.07 kg 100% 580.07
Waterstop Installation 5.30 3.20 17.00 2.00 1.00 1.00 2.00 34.00 m1 100% 34.00
Ground Slab Formwork 8.50 1.00 1.00 1.00 1.00 8.50 m2 100% 8.50
Ground Slab Pouring Concrete 5.30 3.20 0.50 8.48 1.00 1.00 1.00 1.00 8.48 m3 100% 8.48
Pipe Connection 2.00 1.00 1.00 2.00 2.00 nos 100% 2.00
Wall Formwork 5.30 3.20 3.35 56.95 1.00 2.00 1.00 2.00 113.90 m2 100% 113.90
Wall Pouring Concrete 5.30 3.20 0.30 3.00 15.30 1.00 1.00 1.00 1.00 15.30 m3 100% 15.30
Upper Slab Formwork 5.30 3.20 4.25 1.00 1.00 1.00 1.00 21.21 m2 0% -
Upper Slab Rebar (x) 5.57 3.47 1.04 32.00 1.00 1.00 32.00 185.71 kg 0% -
Upper Slab Rebar (y) 5.57 3.47 1.04 54.00 1.00 1.00 54.00 195.23 kg 0%
Cast Iron Manhole Cover 1.00 1.00 1.00 1.00 1.00 unit 0% -
Upper Slab Pouring Concrete 5.30 3.20 0.25 4.24 1.00 1.00 1.00 1.00 4.24 m3 0% -
Bitumen Coating 5.30 3.20 3.35 56.95 1.00 1.00 1.00 1.00 56.95 m2 100% 56.95
Soil Backfill 391.93 1.00 1.00 1.00 1.00 391.93 m3 100% 391.93
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Progress Calculation PROGRESS CALCULATION FORM Progress Date
SEPTIC TANK 004 Calculation 31/08/2023
WP 6 - Civil & Landscape 5.48 5.48 1.57
PT. Sepuluh Sumber Anugerah 13.56 9.86 3.55
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Herdy Dwiyana
Quantity Surveyor
Progress Calculation PROGRESS CALCULATION FORM Progress Date
Hume RC Pipe Installation 005 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
HUME RC PIPE 500 mm (CCO From
A
450 mm to 500 mm)
A. 1 MH.01 - MH.02 31.80
Excavation 3.82 1.00 1.30 0.70 31.80 110.54 1.00 1.00 1.00 1.00 110.54 m3 100% 110.54
Lean Concrete 0.70 1.00 0.05 31.80 1.11 1.00 1.00 1.00 1.00 1.11 m3 100% 1.11
Lean Concrete Formwork 0.70 1.00 0.05 31.80 2.23 1.00 1.00 1.00 1.00 2.23 m2 100% 2.23
Sand Fill 3.82 1.00 0.30 31.80 36.44 1.00 1.00 1.00 1.00 36.44 m3 100% 36.44
Hume Pipe 500 mm 31.80 1.00 1.00 1.00 1.00 31.80 m 100% 31.80
Hume Pipe Mortar Grouting 31.80 1.00 1.00 1.00 1.00 31.80 m 100% 31.80
Soil Backfill 104.30 1.00 1.00 1.00 1.00 104.30 m3 100% 104.30
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Lean Concrete 0.70 1.00 0.05 38.30 1.34 1.00 1.00 1.00 1.00 1.34 m3 100% 1.34
Lean Concrete Formwork 0.70 1.00 0.05 38.30 2.68 1.00 1.00 1.00 1.00 2.68 m2 100% 2.68
Sand Fill 3.82 1.00 0.30 38.30 43.89 1.00 1.00 1.00 1.00 43.89 m3 100% 43.89
Hume Pipe 500 mm 38.30 1.00 1.00 1.00 1.00 38.30 m 100% 38.30
Hume Pipe Mortar Grouting 38.30 1.00 1.00 1.00 1.00 38.30 m 100% 38.30
Soil Backfill 122.04 1.00 1.00 1.00 1.00 122.04 m3 100% 122.04
Progress Calculation PROGRESS CALCULATION FORM Progress Date
Hume RC Pipe Installation 005 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 7 MH.11 - MH.12 13.90
Excavation 3.82 1.00 1.03 1.00 13.90 54.69 1.00 1.00 1.00 1.00 54.69 m3 100% 54.69
Lean Concrete 0.70 1.00 0.05 13.90 0.49 1.00 1.00 1.00 1.00 0.49 m3 100% 0.49
Lean Concrete Formwork 0.70 1.00 0.05 13.90 1.39 1.00 1.00 1.00 1.00 1.39 m2 100% 1.39
Sand Fill 3.82 1.00 0.30 13.90 15.93 1.00 1.00 1.00 1.00 15.93 m3 100% 15.93
Hume Pipe 500 mm 13.90 1.00 1.00 1.00 1.00 13.90 m 100% 13.90
Hume Pipe Mortar Grouting 13.90 1.00 1.00 1.00 1.00 13.90 m 100% 13.90
Soil Backfill 51.96 1.00 1.00 1.00 1.00 51.96 m3 100% 51.96
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Lean Concrete Formwork 0.70 1.00 0.05 31.00 2.17 1.00 1.00 1.00 1.00 2.17 m2 100% 2.17
Sand Fill 3.82 1.00 0.30 31.00 35.53 1.00 1.00 1.00 1.00 35.53 m3 100% 35.53
Hume Pipe 500 mm 31.00 1.00 1.00 1.00 1.00 31.00 m 100% 31.00
Hume Pipe Mortar Grouting 31.00 1.00 1.00 1.00 1.00 31.00 m 100% 31.00
Soil Backfill 115.89 1.00 1.00 1.00 1.00 115.89 m3 100% 115.89
Progress Calculation PROGRESS CALCULATION FORM Progress Date
Hume RC Pipe Installation 005 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 13 MH.22 - MH.23 32.00
Excavation 3.82 1.00 1.03 1.00 32.00 125.91 1.00 1.00 1.00 1.00 125.91 m3 100% 125.91
Lean Concrete 0.70 1.00 0.05 32.00 1.12 1.00 1.00 1.00 1.00 1.12 m3 100% 1.12
Lean Concrete Formwork 0.70 1.00 0.05 32.00 2.24 1.00 1.00 1.00 1.00 2.24 m2 100% 2.24
Sand Fill 3.82 1.00 0.30 32.00 36.67 1.00 1.00 1.00 1.00 36.67 m3 100% 36.67
Hume Pipe 500 mm 32.00 1.00 1.00 1.00 1.00 32.00 m 100% 32.00
Hume Pipe Mortar Grouting 32.00 1.00 1.00 1.00 1.00 32.00 m 100% 32.00
Soil Backfill 119.63 1.00 1.00 1.00 1.00 119.63 m3 100% 119.63
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Lean Concrete Formwork 0.70 1.00 0.05 20.20 1.41 1.00 1.00 1.00 1.00 1.41 m2 0% -
Sand Fill 3.82 1.00 0.30 20.20 23.15 1.00 1.00 1.00 1.00 23.15 m3 0% -
Hume Pipe 500 mm 20.20 1.00 1.00 1.00 1.00 20.20 m 0% -
Hume Pipe Mortar Grouting 20.20 1.00 1.00 1.00 1.00 20.20 m 0% -
Soil Backfill 77.06 1.00 1.00 1.00 1.00 77.06 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
Hume RC Pipe Installation 005 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 19 MH.29 - MH.30 20.20
Excavation 3.82 1.00 1.02 1.00 20.20 78.71 1.00 1.00 1.00 1.00 78.71 m3 100% 78.71
Lean Concrete 0.70 1.00 0.05 20.20 0.71 1.00 1.00 1.00 1.00 0.71 m3 100% 0.71
Lean Concrete Formwork 0.70 1.00 0.05 20.20 1.41 1.00 1.00 1.00 1.00 1.41 m2 100% 1.41
Sand Fill 3.82 1.00 0.30 20.20 23.15 1.00 1.00 1.00 1.00 23.15 m3 100% 23.15
Hume Pipe 500 mm 20.20 1.00 1.00 1.00 1.00 20.20 m 100% 20.20
Hume Pipe Mortar Grouting 20.20 1.00 1.00 1.00 1.00 20.20 m 100% 20.20
Soil Backfill 74.74 1.00 1.00 1.00 1.00 74.74 m3 100% 74.74
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Lean Concrete 0.70 1.00 0.05 25.50 0.89 1.00 1.00 1.00 1.00 0.89 m3 100% 0.89
Lean Concrete Formwork 0.70 1.00 0.05 25.50 1.79 1.00 1.00 1.00 1.00 1.79 m2 100% 1.79
Sand Fill 3.82 1.00 0.30 25.50 29.22 1.00 1.00 1.00 1.00 29.22 m3 100% 29.22
Hume Pipe 600 mm 25.50 1.00 1.00 1.00 1.00 25.50 m 100% 25.50
Hume Pipe Mortar Grouting 25.50 1.00 1.00 1.00 1.00 25.50 m 100% 25.50
Soil Backfill 96.30 1.00 1.00 1.00 1.00 96.30 m3 100% 96.30
Progress Calculation PROGRESS CALCULATION FORM Progress Date
Hume RC Pipe Installation 005 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
B. 3 MH.18 - MH.19 32.80
Excavation 3.82 1.00 1.04 1.00 32.80 130.31 1.00 1.00 1.00 1.00 130.31 m3 100% 130.31
Lean Concrete 0.70 1.00 0.05 32.80 1.15 1.00 1.00 1.00 1.00 1.15 m3 100% 1.15
Lean Concrete Formwork 0.70 1.00 0.05 32.80 2.30 1.00 1.00 1.00 1.00 2.30 m2 100% 2.30
Sand Fill 3.82 1.00 0.30 32.80 37.59 1.00 1.00 1.00 1.00 37.59 m3 100% 37.59
Hume Pipe 600 mm 32.80 1.00 1.00 1.00 1.00 32.80 m 100% 32.80
Hume Pipe Mortar Grouting 32.80 1.00 1.00 1.00 1.00 32.80 m 100% 32.80
Soil Backfill 123.87 1.00 1.00 1.00 1.00 123.87 m3 100% 123.87
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Lean Concrete 0.70 1.00 0.05 11.40 0.40 1.00 1.00 1.00 1.00 0.40 m3 0% -
Lean Concrete Formwork 0.70 1.00 0.05 11.40 0.80 1.00 1.00 1.00 1.00 0.80 m2 0% -
Sand Fill 3.82 1.00 0.30 11.40 13.06 1.00 1.00 1.00 1.00 13.06 m3 0% -
Hume Pipe 800 mm 11.40 1.00 1.00 1.00 1.00 11.40 m 0% -
Hume Pipe Mortar Grouting 11.40 1.00 1.00 1.00 1.00 11.40 m 0% -
Soil Backfill 43.05 1.00 1.00 1.00 1.00 43.05 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
Hume RC Pipe Installation 005 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
C. 4 MH.07 - END 7.00
Excavation 3.82 1.00 1.04 1.00 7.00 27.81 1.00 1.00 1.00 1.00 27.81 m3 0% -
Lean Concrete 0.70 1.00 0.05 7.00 0.25 1.00 1.00 1.00 1.00 0.25 m3 0% -
Lean Concrete Formwork 0.70 1.00 0.05 7.00 0.49 1.00 1.00 1.00 1.00 0.49 m2 0% -
Sand Fill 3.82 1.00 0.30 7.00 8.02 1.00 1.00 1.00 1.00 8.02 m3 0% -
Hume Pipe 800 mm 7.00 1.00 1.00 1.00 1.00 7.00 m 0% -
Hume Pipe Mortar Grouting 7.00 1.00 1.00 1.00 1.00 7.00 m 0% -
Soil Backfill 26.44 1.00 1.00 1.00 1.00 26.44 m3 0% -
Progress Progress
No. Description Unit Total Quantity Remarks
Quantity Percentages
1 Excavation m3 3,030.08 2,782.20 91.8194%
2 Lean Concrete m3 27.46 25.28 92.0714%
3 Lean Concrete Formwork m2 55.33 50.98 92.1311%
4 Sand Fill m3 899.04 793.61 88.2728%
5 Hume Pipe 500 mm m 579.30 542.50 93.6475%
6 Hume Pipe 600 mm m 124.30 117.30 94.3685% ARITMATH CHECKING
7 Hume Pipe 800 mm m 80.90 62.50 77.2559% RECAP 8,457.04
8 Hume Pipe Mortar Grouting m 784.50 722.30 92.0714% BREAKDOWN 8,457.04
9 Soil Backfill m3 2,876.13 2,542.71 88.4075% IF ZERO = OK! -
GLOBAL PROGRESS FOR Hume RC Pipe Installation (AVERAGE PRORATE BY ITEMS) 90.0050%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
HDPE FOR STORM WATER (SECTION
A
1)
A. 1 CB.1 4.50
Excavation 3.09 1.00 1.12 0.70 4.50 10.89 1.00 1.00 1.00 1.00 10.89 m3 0% -
Sand Fill 3.09 1.00 0.50 4.50 6.95 1.00 1.00 1.00 1.00 6.95 m3 0% -
HDPE Installation 4.50 1.00 1.00 1.00 1.00 4.50 m 0% -
Soil Backfill 10.01 1.00 1.00 1.00 1.00 10.01 m3 0% -
A. 2 CB.2 5.50
Excavation 3.09 1.00 1.12 0.70 5.50 13.32 1.00 1.00 1.00 1.00 13.32 m3 0% -
Sand Fill 3.09 1.00 0.50 5.50 8.49 1.00 1.00 1.00 1.00 8.49 m3 0% -
HDPE Installation 5.50 1.00 1.00 1.00 1.00 5.50 m 0% -
Soil Backfill 12.24 1.00 1.00 1.00 1.00 12.24 m3 0% -
A. 3 CB.3 10.30
Excavation 3.09 1.00 1.12 0.70 10.30 24.94 1.00 1.00 1.00 1.00 24.94 m3 0% -
Sand Fill 3.09 1.00 0.50 10.30 15.90 1.00 1.00 1.00 1.00 15.90 m3 0% -
HDPE Installation 10.30 1.00 1.00 1.00 1.00 10.30 m 0% -
Soil Backfill 22.91 1.00 1.00 1.00 1.00 22.91 m3 0% -
A. 4 CB.4 10.80
Excavation 3.09 1.00 1.12 0.70 10.80 26.15 1.00 1.00 1.00 1.00 26.15 m3 0% -
Sand Fill 3.09 1.00 0.50 10.80 16.68 1.00 1.00 1.00 1.00 16.68 m3 0% -
HDPE Installation 10.80 1.00 1.00 1.00 1.00 10.80 m 0% -
Soil Backfill 24.03 1.00 1.00 1.00 1.00 24.03 m3 0% -
A. 5 CB.5 3.50
Excavation 3.09 1.00 1.12 0.70 3.50 8.47 1.00 1.00 1.00 1.00 8.47 m3 0% -
Sand Fill 3.09 1.00 0.50 3.50 5.40 1.00 1.00 1.00 1.00 5.40 m3 0% -
HDPE Installation 3.50 1.00 1.00 1.00 1.00 3.50 m 0% -
Soil Backfill 7.79 1.00 1.00 1.00 1.00 7.79 m3 0% -
A. 6 CB.6 10.00
Excavation 3.09 1.00 1.12 0.70 10.00 24.21 1.00 1.00 1.00 1.00 24.21 m3 0% -
Sand Fill 3.09 1.00 0.50 10.00 15.44 1.00 1.00 1.00 1.00 15.44 m3 0% -
HDPE Installation 10.00 1.00 1.00 1.00 1.00 10.00 m 0% -
Soil Backfill 22.25 1.00 1.00 1.00 1.00 22.25 m3 0% -
A. 7 CB.7 3.00
Excavation 3.09 1.00 1.12 0.70 3.00 7.26 1.00 1.00 1.00 1.00 7.26 m3 0% -
Sand Fill 3.09 1.00 0.50 3.00 4.63 1.00 1.00 1.00 1.00 4.63 m3 0% -
HDPE Installation 3.00 1.00 1.00 1.00 1.00 3.00 m 0% -
Soil Backfill 6.67 1.00 1.00 1.00 1.00 6.67 m3 0% -
A. 8 CB.8 3.90
Excavation 3.09 1.00 1.12 0.70 3.90 9.44 1.00 1.00 1.00 1.00 9.44 m3 0% -
Sand Fill 3.09 1.00 0.50 3.90 6.02 1.00 1.00 1.00 1.00 6.02 m3 0% -
HDPE Installation 3.90 1.00 1.00 1.00 1.00 3.90 m 0% -
Soil Backfill 8.68 1.00 1.00 1.00 1.00 8.68 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 9 CB.9 6.10
Excavation 3.09 1.00 1.12 0.70 6.10 14.77 1.00 1.00 1.00 1.00 14.77 m3 0% -
Sand Fill 3.09 1.00 0.50 6.10 9.42 1.00 1.00 1.00 1.00 9.42 m3 0% -
HDPE Installation 6.10 1.00 1.00 1.00 1.00 6.10 m 0% -
Soil Backfill 13.57 1.00 1.00 1.00 1.00 13.57 m3 0% -
A. 10 CB.10 6.90
Excavation 3.09 1.00 1.12 0.70 6.90 16.70 1.00 1.00 1.00 1.00 16.70 m3 0% -
Sand Fill 3.09 1.00 0.50 6.90 10.65 1.00 1.00 1.00 1.00 10.65 m3 0% -
HDPE Installation 6.90 1.00 1.00 1.00 1.00 6.90 m 0% -
Soil Backfill 15.35 1.00 1.00 1.00 1.00 15.35 m3 0% -
A. 11 CB.11 10.00
Excavation 3.09 1.00 1.12 0.70 10.00 24.21 1.00 1.00 1.00 1.00 24.21 m3 0% -
Sand Fill 3.09 1.00 0.50 10.00 15.44 1.00 1.00 1.00 1.00 15.44 m3 0% -
HDPE Installation 10.00 1.00 1.00 1.00 1.00 10.00 m 0% -
Soil Backfill 22.25 1.00 1.00 1.00 1.00 22.25 m3 0% -
A. 12 CB.12 10.00
Excavation 3.09 1.00 1.12 0.70 10.00 24.21 1.00 1.00 1.00 1.00 24.21 m3 0% -
Sand Fill 3.09 1.00 0.50 10.00 15.44 1.00 1.00 1.00 1.00 15.44 m3 0% -
HDPE Installation 10.00 1.00 1.00 1.00 1.00 10.00 m 0% -
Soil Backfill 22.25 1.00 1.00 1.00 1.00 22.25 m3 0% -
A. 13 CB.13 6.70
Excavation 3.09 1.00 1.12 0.70 6.70 16.22 1.00 1.00 1.00 1.00 16.22 m3 0% -
Sand Fill 3.09 1.00 0.50 6.70 10.34 1.00 1.00 1.00 1.00 10.34 m3 0% -
HDPE Installation 6.70 1.00 1.00 1.00 1.00 6.70 m 0% -
Soil Backfill 14.91 1.00 1.00 1.00 1.00 14.91 m3 0% -
A. 14 CB.14 5.90
Excavation 3.09 1.00 1.12 0.70 5.90 14.28 1.00 1.00 1.00 1.00 14.28 m3 0% -
Sand Fill 3.09 1.00 0.50 5.90 9.11 1.00 1.00 1.00 1.00 9.11 m3 0% -
HDPE Installation 5.90 1.00 1.00 1.00 1.00 5.90 m 0% -
Soil Backfill 13.13 1.00 1.00 1.00 1.00 13.13 m3 0% -
A. 15 CB.15 3.30
Excavation 3.09 1.00 1.12 0.70 3.30 7.99 1.00 1.00 1.00 1.00 7.99 m3 0% -
Sand Fill 3.09 1.00 0.50 3.30 5.10 1.00 1.00 1.00 1.00 5.10 m3 0% -
HDPE Installation 3.30 1.00 1.00 1.00 1.00 3.30 m 0% -
Soil Backfill 7.34 1.00 1.00 1.00 1.00 7.34 m3 0% -
A. 16 CB.16 10.00
Excavation 3.09 1.00 1.12 0.70 10.00 24.21 1.00 1.00 1.00 1.00 24.21 m3 0% -
Sand Fill 3.09 1.00 0.50 10.00 15.44 1.00 1.00 1.00 1.00 15.44 m3 0% -
HDPE Installation 10.00 1.00 1.00 1.00 1.00 10.00 m 0% -
Soil Backfill 22.25 1.00 1.00 1.00 1.00 22.25 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 17 CB.17 3.50
Excavation 3.09 1.00 1.12 0.70 3.50 8.47 1.00 1.00 1.00 1.00 8.47 m3 0% -
Sand Fill 3.09 1.00 0.50 3.50 5.40 1.00 1.00 1.00 1.00 5.40 m3 0% -
HDPE Installation 3.50 1.00 1.00 1.00 1.00 3.50 m 0% -
Soil Backfill 7.79 1.00 1.00 1.00 1.00 7.79 m3 0% -
A. 18 CB.18 10.00
Excavation 3.09 1.00 1.12 0.70 10.00 24.21 1.00 1.00 1.00 1.00 24.21 m3 0% -
Sand Fill 3.09 1.00 0.50 10.00 15.44 1.00 1.00 1.00 1.00 15.44 m3 0% -
HDPE Installation 10.00 1.00 1.00 1.00 1.00 10.00 m 0% -
Soil Backfill 22.25 1.00 1.00 1.00 1.00 22.25 m3 0% -
A. 19 CB.19 9.70
Excavation 3.09 1.00 1.12 0.70 9.70 23.48 1.00 1.00 1.00 1.00 23.48 m3 0% -
Sand Fill 3.09 1.00 0.50 9.70 14.98 1.00 1.00 1.00 1.00 14.98 m3 0% -
HDPE Installation 9.70 1.00 1.00 1.00 1.00 9.70 m 0% -
Soil Backfill 21.58 1.00 1.00 1.00 1.00 21.58 m3 0% -
A. 20 CB.20 7.20
Excavation 3.09 1.00 1.12 0.70 7.20 17.43 1.00 1.00 1.00 1.00 17.43 m3 0% -
Sand Fill 3.09 1.00 0.50 7.20 11.12 1.00 1.00 1.00 1.00 11.12 m3 0% -
HDPE Installation 7.20 1.00 1.00 1.00 1.00 7.20 m 0% -
Soil Backfill 16.02 1.00 1.00 1.00 1.00 16.02 m3 0% -
A. 21 CB.21 7.20
Excavation 3.09 1.00 1.12 0.70 7.20 17.43 1.00 1.00 1.00 1.00 17.43 m3 0% -
Sand Fill 3.09 1.00 0.50 7.20 11.12 1.00 1.00 1.00 1.00 11.12 m3 0% -
HDPE Installation 7.20 1.00 1.00 1.00 1.00 7.20 m 0% -
Soil Backfill 16.02 1.00 1.00 1.00 1.00 16.02 m3 0% -
A. 22 CB.22 13.40
Excavation 3.09 1.00 1.12 0.70 13.40 32.44 1.00 1.00 1.00 1.00 32.44 m3 0% -
Sand Fill 3.09 1.00 0.50 13.40 20.69 1.00 1.00 1.00 1.00 20.69 m3 0% -
HDPE Installation 13.40 1.00 1.00 1.00 1.00 13.40 m 0% -
Soil Backfill 29.81 1.00 1.00 1.00 1.00 29.81 m3 0% -
A. 23 CB.23 2.80
Excavation 3.09 1.00 1.12 0.70 2.80 6.78 1.00 1.00 1.00 1.00 6.78 m3 0% -
Sand Fill 3.09 1.00 0.50 2.80 4.32 1.00 1.00 1.00 1.00 4.32 m3 0% -
HDPE Installation 2.80 1.00 1.00 1.00 1.00 2.80 m 0% -
Soil Backfill 6.23 1.00 1.00 1.00 1.00 6.23 m3 0% -
A. 24 CB.24 4.70
Excavation 3.09 1.00 1.12 0.70 4.70 11.38 1.00 1.00 1.00 1.00 11.38 m3 0% -
Sand Fill 3.09 1.00 0.50 4.70 7.26 1.00 1.00 1.00 1.00 7.26 m3 0% -
HDPE Installation 4.70 1.00 1.00 1.00 1.00 4.70 m 0% -
Soil Backfill 10.46 1.00 1.00 1.00 1.00 10.46 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 25 CB.25 9.80
Excavation 3.09 1.00 1.12 0.70 9.80 23.73 1.00 1.00 1.00 1.00 23.73 m3 0% -
Sand Fill 3.09 1.00 0.50 9.80 15.13 1.00 1.00 1.00 1.00 15.13 m3 0% -
HDPE Installation 9.80 1.00 1.00 1.00 1.00 9.80 m 0% -
Soil Backfill 21.80 1.00 1.00 1.00 1.00 21.80 m3 0% -
A. 26 CB.26 3.70
Excavation 3.09 1.00 1.12 0.70 3.70 8.96 1.00 1.00 1.00 1.00 8.96 m3 0% -
Sand Fill 3.09 1.00 0.50 3.70 5.71 1.00 1.00 1.00 1.00 5.71 m3 0% -
HDPE Installation 3.70 1.00 1.00 1.00 1.00 3.70 m 0% -
Soil Backfill 8.23 1.00 1.00 1.00 1.00 8.23 m3 0% -
A. 27 CB.27 4.70
Excavation 3.09 1.00 1.12 0.70 4.70 11.38 1.00 1.00 1.00 1.00 11.38 m3 0% -
Sand Fill 3.09 1.00 0.50 4.70 7.26 1.00 1.00 1.00 1.00 7.26 m3 0% -
HDPE Installation 4.70 1.00 1.00 1.00 1.00 4.70 m 0% -
Soil Backfill 10.46 1.00 1.00 1.00 1.00 10.46 m3 0% -
A. 28 CB.28 9.50
Excavation 3.09 1.00 1.12 0.70 9.50 23.00 1.00 1.00 1.00 1.00 23.00 m3 0% -
Sand Fill 3.09 1.00 0.50 9.50 14.67 1.00 1.00 1.00 1.00 14.67 m3 0% -
HDPE Installation 9.50 1.00 1.00 1.00 1.00 9.50 m 0% -
Soil Backfill 21.14 1.00 1.00 1.00 1.00 21.14 m3 0% -
A. 29 CB.29 8.60
Excavation 3.09 1.00 1.12 0.70 8.60 20.82 1.00 1.00 1.00 1.00 20.82 m3 0% -
Sand Fill 3.09 1.00 0.50 8.60 13.28 1.00 1.00 1.00 1.00 13.28 m3 0% -
HDPE Installation 8.60 1.00 1.00 1.00 1.00 8.60 m 0% -
Soil Backfill 19.13 1.00 1.00 1.00 1.00 19.13 m3 0% -
A. 30 CB.30 10.00
Excavation 3.09 1.00 1.12 0.70 10.00 24.21 1.00 1.00 1.00 1.00 24.21 m3 0% -
Sand Fill 3.09 1.00 0.50 10.00 15.44 1.00 1.00 1.00 1.00 15.44 m3 0% -
HDPE Installation 10.00 1.00 1.00 1.00 1.00 10.00 m 0% -
Soil Backfill 22.25 1.00 1.00 1.00 1.00 22.25 m3 0% -
A. 31 CB.31 11.40
Excavation 3.09 1.00 1.12 0.70 11.40 27.60 1.00 1.00 1.00 1.00 27.60 m3 0% -
Sand Fill 3.09 1.00 0.50 11.40 17.60 1.00 1.00 1.00 1.00 17.60 m3 0% -
HDPE Installation 11.40 1.00 1.00 1.00 1.00 11.40 m 0% -
Soil Backfill 25.36 1.00 1.00 1.00 1.00 25.36 m3 0% -
A. 32 CB.32 6.90
Excavation 3.09 1.00 1.12 0.70 6.90 16.70 1.00 1.00 1.00 1.00 16.70 m3 0% -
Sand Fill 3.09 1.00 0.50 6.90 10.65 1.00 1.00 1.00 1.00 10.65 m3 0% -
HDPE Installation 6.90 1.00 1.00 1.00 1.00 6.90 m 0% -
Soil Backfill 15.35 1.00 1.00 1.00 1.00 15.35 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 33 CB.33 7.30
Excavation 3.09 1.00 1.12 0.70 7.30 17.67 1.00 1.00 1.00 1.00 17.67 m3 0% -
Sand Fill 3.09 1.00 0.50 7.30 11.27 1.00 1.00 1.00 1.00 11.27 m3 0% -
HDPE Installation 7.30 1.00 1.00 1.00 1.00 7.30 m 0% -
Soil Backfill 16.24 1.00 1.00 1.00 1.00 16.24 m3 0% -
A. 34 CB.34 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
A. 35 CB.35 12.10
Excavation 3.09 1.00 1.12 0.70 12.10 29.29 1.00 1.00 1.00 1.00 29.29 m3 0% -
Sand Fill 3.09 1.00 0.50 12.10 18.68 1.00 1.00 1.00 1.00 18.68 m3 0% -
HDPE Installation 12.10 1.00 1.00 1.00 1.00 12.10 m 0% -
Soil Backfill 26.92 1.00 1.00 1.00 1.00 26.92 m3 0% -
A. 36 CB.36 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
A. 37 CB.37 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
A. 38 CB.38 6.70
Excavation 3.09 1.00 1.12 0.70 6.70 16.22 1.00 1.00 1.00 1.00 16.22 m3 0% -
Sand Fill 3.09 1.00 0.50 6.70 10.34 1.00 1.00 1.00 1.00 10.34 m3 0% -
HDPE Installation 6.70 1.00 1.00 1.00 1.00 6.70 m 0% -
Soil Backfill 14.91 1.00 1.00 1.00 1.00 14.91 m3 0% -
A. 39 CB.39 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
A. 40 CB.40 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 41 CB.41 4.80
Excavation 3.09 1.00 1.12 0.70 4.80 11.62 1.00 1.00 1.00 1.00 11.62 m3 0% -
Sand Fill 3.09 1.00 0.50 4.80 7.41 1.00 1.00 1.00 1.00 7.41 m3 0% -
HDPE Installation 4.80 1.00 1.00 1.00 1.00 4.80 m 0% -
Soil Backfill 10.68 1.00 1.00 1.00 1.00 10.68 m3 0% -
A. 42 CB.42 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
A. 43 CB.43 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
A. 44 CB.44 6.80
Excavation 3.09 1.00 1.12 0.70 6.80 16.46 1.00 1.00 1.00 1.00 16.46 m3 0% -
Sand Fill 3.09 1.00 0.50 6.80 10.50 1.00 1.00 1.00 1.00 10.50 m3 0% -
HDPE Installation 6.80 1.00 1.00 1.00 1.00 6.80 m 0% -
Soil Backfill 15.13 1.00 1.00 1.00 1.00 15.13 m3 0% -
A. 45 CB.45 3.20
Excavation 3.09 1.00 1.12 0.70 3.20 7.75 1.00 1.00 1.00 1.00 7.75 m3 0% -
Sand Fill 3.09 1.00 0.50 3.20 4.94 1.00 1.00 1.00 1.00 4.94 m3 0% -
HDPE Installation 3.20 1.00 1.00 1.00 1.00 3.20 m 0% -
Soil Backfill 7.12 1.00 1.00 1.00 1.00 7.12 m3 0% -
A. 46 CB.46 11.50
Excavation 3.09 1.00 1.12 0.70 11.50 27.84 1.00 1.00 1.00 1.00 27.84 m3 0% -
Sand Fill 3.09 1.00 0.50 11.50 17.76 1.00 1.00 1.00 1.00 17.76 m3 0% -
HDPE Installation 11.50 1.00 1.00 1.00 1.00 11.50 m 0% -
Soil Backfill 25.58 1.00 1.00 1.00 1.00 25.58 m3 0% -
A. 47 CB.47 11.50
Excavation 3.09 1.00 1.12 0.70 11.50 27.84 1.00 1.00 1.00 1.00 27.84 m3 0% -
Sand Fill 3.09 1.00 0.50 11.50 17.76 1.00 1.00 1.00 1.00 17.76 m3 0% -
HDPE Installation 11.50 1.00 1.00 1.00 1.00 11.50 m 0% -
Soil Backfill 25.58 1.00 1.00 1.00 1.00 25.58 m3 0% -
A. 48 CB.48 11.50
Excavation 3.09 1.00 1.12 0.70 11.50 27.84 1.00 1.00 1.00 1.00 27.84 m3 0% -
Sand Fill 3.09 1.00 0.50 11.50 17.76 1.00 1.00 1.00 1.00 17.76 m3 0% -
HDPE Installation 11.50 1.00 1.00 1.00 1.00 11.50 m 0% -
Soil Backfill 25.58 1.00 1.00 1.00 1.00 25.58 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 49 CB.49 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
A. 50 CB.50 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
A. 51 CB.51 11.50
Excavation 3.09 1.00 1.12 0.70 11.50 27.84 1.00 1.00 1.00 1.00 27.84 m3 0% -
Sand Fill 3.09 1.00 0.50 11.50 17.76 1.00 1.00 1.00 1.00 17.76 m3 0% -
HDPE Installation 11.50 1.00 1.00 1.00 1.00 11.50 m 0% -
Soil Backfill 25.58 1.00 1.00 1.00 1.00 25.58 m3 0% -
A. 52 CB.52 2.70
Excavation 3.09 1.00 1.12 0.70 2.70 6.54 1.00 1.00 1.00 1.00 6.54 m3 0% -
Sand Fill 3.09 1.00 0.50 2.70 4.17 1.00 1.00 1.00 1.00 4.17 m3 0% -
HDPE Installation 2.70 1.00 1.00 1.00 1.00 2.70 m 0% -
Soil Backfill 6.01 1.00 1.00 1.00 1.00 6.01 m3 0% -
A. 53 CB.53 7.50
Excavation 3.09 1.00 1.12 0.70 7.50 18.16 1.00 1.00 1.00 1.00 18.16 m3 0% -
Sand Fill 3.09 1.00 0.50 7.50 11.58 1.00 1.00 1.00 1.00 11.58 m3 0% -
HDPE Installation 7.50 1.00 1.00 1.00 1.00 7.50 m 0% -
Soil Backfill 16.69 1.00 1.00 1.00 1.00 16.69 m3 0% -
A. 54 CB.54 6.20
Excavation 3.09 1.00 1.12 0.70 6.20 15.01 1.00 1.00 1.00 1.00 15.01 m3 0% -
Sand Fill 3.09 1.00 0.50 6.20 9.57 1.00 1.00 1.00 1.00 9.57 m3 0% -
HDPE Installation 6.20 1.00 1.00 1.00 1.00 6.20 m 0% -
Soil Backfill 13.79 1.00 1.00 1.00 1.00 13.79 m3 0% -
A. 55 CB.55 6.80
Excavation 3.09 1.00 1.12 0.70 6.80 16.46 1.00 1.00 1.00 1.00 16.46 m3 0% -
Sand Fill 3.09 1.00 0.50 6.80 10.50 1.00 1.00 1.00 1.00 10.50 m3 0% -
HDPE Installation 6.80 1.00 1.00 1.00 1.00 6.80 m 0% -
Soil Backfill 15.13 1.00 1.00 1.00 1.00 15.13 m3 0% -
A. 56 CB.56 7.40
Excavation 3.09 1.00 1.12 0.70 7.40 17.92 1.00 1.00 1.00 1.00 17.92 m3 0% -
Sand Fill 3.09 1.00 0.50 7.40 11.43 1.00 1.00 1.00 1.00 11.43 m3 0% -
HDPE Installation 7.40 1.00 1.00 1.00 1.00 7.40 m 0% -
Soil Backfill 16.46 1.00 1.00 1.00 1.00 16.46 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 57 CB.57 7.30
Excavation 3.09 1.00 1.12 0.70 7.30 17.67 1.00 1.00 1.00 1.00 17.67 m3 0% -
Sand Fill 3.09 1.00 0.50 7.30 11.27 1.00 1.00 1.00 1.00 11.27 m3 0% -
HDPE Installation 7.30 1.00 1.00 1.00 1.00 7.30 m 0% -
Soil Backfill 16.24 1.00 1.00 1.00 1.00 16.24 m3 0% -
A. 58 CB.58 6.70
Excavation 3.09 1.00 1.12 0.70 6.70 16.22 1.00 1.00 1.00 1.00 16.22 m3 0% -
Sand Fill 3.09 1.00 0.50 6.70 10.34 1.00 1.00 1.00 1.00 10.34 m3 0% -
HDPE Installation 6.70 1.00 1.00 1.00 1.00 6.70 m 0% -
Soil Backfill 14.91 1.00 1.00 1.00 1.00 14.91 m3 0% -
A. 59 CB.59 4.50
Excavation 3.09 1.00 1.12 0.70 4.50 10.89 1.00 1.00 1.00 1.00 10.89 m3 0% -
Sand Fill 3.09 1.00 0.50 4.50 6.95 1.00 1.00 1.00 1.00 6.95 m3 0% -
HDPE Installation 4.50 1.00 1.00 1.00 1.00 4.50 m 0% -
Soil Backfill 10.01 1.00 1.00 1.00 1.00 10.01 m3 0% -
A. 60 CB.60 8.70
Excavation 3.09 1.00 1.12 0.70 8.70 21.06 1.00 1.00 1.00 1.00 21.06 m3 0% -
Sand Fill 3.09 1.00 0.50 8.70 13.43 1.00 1.00 1.00 1.00 13.43 m3 0% -
HDPE Installation 8.70 1.00 1.00 1.00 1.00 8.70 m 0% -
Soil Backfill 19.36 1.00 1.00 1.00 1.00 19.36 m3 0% -
A. 61 CB.61 3.00
Excavation 3.09 1.00 1.12 0.70 3.00 7.26 1.00 1.00 1.00 1.00 7.26 m3 0% -
Sand Fill 3.09 1.00 0.50 3.00 4.63 1.00 1.00 1.00 1.00 4.63 m3 0% -
HDPE Installation 3.00 1.00 1.00 1.00 1.00 3.00 m 0% -
Soil Backfill 6.67 1.00 1.00 1.00 1.00 6.67 m3 0% -
A. 62 CB.62 3.00
Excavation 3.09 1.00 1.12 0.70 3.00 7.26 1.00 1.00 1.00 1.00 7.26 m3 0% -
Sand Fill 3.09 1.00 0.50 3.00 4.63 1.00 1.00 1.00 1.00 4.63 m3 0% -
HDPE Installation 3.00 1.00 1.00 1.00 1.00 3.00 m 0% -
Soil Backfill 6.67 1.00 1.00 1.00 1.00 6.67 m3 0% -
A. 63 CB.63 8.70
Excavation 3.09 1.00 1.12 0.70 8.70 21.06 1.00 1.00 1.00 1.00 21.06 m3 0% -
Sand Fill 3.09 1.00 0.50 8.70 13.43 1.00 1.00 1.00 1.00 13.43 m3 0% -
HDPE Installation 8.70 1.00 1.00 1.00 1.00 8.70 m 0% -
Soil Backfill 19.36 1.00 1.00 1.00 1.00 19.36 m3 0% -
A. 64 CB.64 8.70
Excavation 3.09 1.00 1.12 0.70 8.70 21.06 1.00 1.00 1.00 1.00 21.06 m3 0% -
Sand Fill 3.09 1.00 0.50 8.70 13.43 1.00 1.00 1.00 1.00 13.43 m3 0% -
HDPE Installation 8.70 1.00 1.00 1.00 1.00 8.70 m 0% -
Soil Backfill 19.36 1.00 1.00 1.00 1.00 19.36 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 65 CB.65 3.00
Excavation 3.09 1.00 1.12 0.70 3.00 7.26 1.00 1.00 1.00 1.00 7.26 m3 0% -
Sand Fill 3.09 1.00 0.50 3.00 4.63 1.00 1.00 1.00 1.00 4.63 m3 0% -
HDPE Installation 3.00 1.00 1.00 1.00 1.00 3.00 m 0% -
Soil Backfill 6.67 1.00 1.00 1.00 1.00 6.67 m3 0% -
A. 66 CB.66 2.40
Excavation 3.09 1.00 1.12 0.70 2.40 5.81 1.00 1.00 1.00 1.00 5.81 m3 0% -
Sand Fill 3.09 1.00 0.50 2.40 3.71 1.00 1.00 1.00 1.00 3.71 m3 0% -
HDPE Installation 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Soil Backfill 5.34 1.00 1.00 1.00 1.00 5.34 m3 0% -
A. 67 CB.67 8.10
Excavation 3.09 1.00 1.12 0.70 8.10 19.61 1.00 1.00 1.00 1.00 19.61 m3 0% -
Sand Fill 3.09 1.00 0.50 8.10 12.51 1.00 1.00 1.00 1.00 12.51 m3 0% -
HDPE Installation 8.10 1.00 1.00 1.00 1.00 8.10 m 0% -
Soil Backfill 18.02 1.00 1.00 1.00 1.00 18.02 m3 0% -
A. 68 CB.68 8.70
Excavation 3.09 1.00 1.12 0.70 8.70 21.06 1.00 1.00 1.00 1.00 21.06 m3 0% -
Sand Fill 3.09 1.00 0.50 8.70 13.43 1.00 1.00 1.00 1.00 13.43 m3 0% -
HDPE Installation 8.70 1.00 1.00 1.00 1.00 8.70 m 0% -
Soil Backfill 19.36 1.00 1.00 1.00 1.00 19.36 m3 0% -
A. 69 CB.69 3.00
Excavation 3.09 1.00 1.12 0.70 3.00 7.26 1.00 1.00 1.00 1.00 7.26 m3 0% -
Sand Fill 3.09 1.00 0.50 3.00 4.63 1.00 1.00 1.00 1.00 4.63 m3 0% -
HDPE Installation 3.00 1.00 1.00 1.00 1.00 3.00 m 0% -
Soil Backfill 6.67 1.00 1.00 1.00 1.00 6.67 m3 0% -
A. 70 CB.70 7.60
Excavation 3.09 1.00 1.12 0.70 7.60 18.40 1.00 1.00 1.00 1.00 18.40 m3 0% -
Sand Fill 3.09 1.00 0.50 7.60 11.73 1.00 1.00 1.00 1.00 11.73 m3 0% -
HDPE Installation 7.60 1.00 1.00 1.00 1.00 7.60 m 0% -
Soil Backfill 16.91 1.00 1.00 1.00 1.00 16.91 m3 0% -
A. 71 CB.71 8.70
Excavation 3.09 1.00 1.12 0.70 8.70 21.06 1.00 1.00 1.00 1.00 21.06 m3 0% -
Sand Fill 3.09 1.00 0.50 8.70 13.43 1.00 1.00 1.00 1.00 13.43 m3 0% -
HDPE Installation 8.70 1.00 1.00 1.00 1.00 8.70 m 0% -
Soil Backfill 19.36 1.00 1.00 1.00 1.00 19.36 m3 0% -
A. 72 CB.72 8.20
Excavation 3.09 1.00 1.12 0.70 8.20 19.85 1.00 1.00 1.00 1.00 19.85 m3 0% -
Sand Fill 3.09 1.00 0.50 8.20 12.66 1.00 1.00 1.00 1.00 12.66 m3 0% -
HDPE Installation 8.20 1.00 1.00 1.00 1.00 8.20 m 0% -
Soil Backfill 18.24 1.00 1.00 1.00 1.00 18.24 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 73 CB.73 7.20
Excavation 3.09 1.00 1.12 0.70 7.20 17.43 1.00 1.00 1.00 1.00 17.43 m3 0% -
Sand Fill 3.09 1.00 0.50 7.20 11.12 1.00 1.00 1.00 1.00 11.12 m3 0% -
HDPE Installation 7.20 1.00 1.00 1.00 1.00 7.20 m 0% -
Soil Backfill 16.02 1.00 1.00 1.00 1.00 16.02 m3 0% -
A. 74 CB.74 9.90
Excavation 3.09 1.00 1.12 0.70 9.90 23.97 1.00 1.00 1.00 1.00 23.97 m3 0% -
Sand Fill 3.09 1.00 0.50 9.90 15.29 1.00 1.00 1.00 1.00 15.29 m3 0% -
HDPE Installation 9.90 1.00 1.00 1.00 1.00 9.90 m 0% -
Soil Backfill 22.02 1.00 1.00 1.00 1.00 22.02 m3 0% -
A. 75 CB.75 8.20
Excavation 3.09 1.00 1.12 0.70 8.20 19.85 1.00 1.00 1.00 1.00 19.85 m3 0% -
Sand Fill 3.09 1.00 0.50 8.20 12.66 1.00 1.00 1.00 1.00 12.66 m3 0% -
HDPE Installation 8.20 1.00 1.00 1.00 1.00 8.20 m 0% -
Soil Backfill 18.24 1.00 1.00 1.00 1.00 18.24 m3 0% -
A. 76 CB.76 7.20
Excavation 3.09 1.00 1.12 0.70 7.20 17.43 1.00 1.00 1.00 1.00 17.43 m3 0% -
Sand Fill 3.09 1.00 0.50 7.20 11.12 1.00 1.00 1.00 1.00 11.12 m3 0% -
HDPE Installation 7.20 1.00 1.00 1.00 1.00 7.20 m 0% -
Soil Backfill 16.02 1.00 1.00 1.00 1.00 16.02 m3 0% -
A. 77 CB.77 9.90
Excavation 3.09 1.00 1.12 0.70 9.90 23.97 1.00 1.00 1.00 1.00 23.97 m3 0% -
Sand Fill 3.09 1.00 0.50 9.90 15.29 1.00 1.00 1.00 1.00 15.29 m3 0% -
HDPE Installation 9.90 1.00 1.00 1.00 1.00 9.90 m 0% -
Soil Backfill 22.02 1.00 1.00 1.00 1.00 22.02 m3 0% -
A. 78 CB.77 9.90
Excavation 3.09 1.00 1.12 0.70 9.90 23.97 1.00 1.00 1.00 1.00 23.97 m3 0% -
Sand Fill 3.09 1.00 0.50 9.90 15.29 1.00 1.00 1.00 1.00 15.29 m3 0% -
HDPE Installation 9.90 1.00 1.00 1.00 1.00 9.90 m 0% -
Soil Backfill 22.02 1.00 1.00 1.00 1.00 22.02 m3 0% -
A. 79 CB.78 7.20
Excavation 3.09 1.00 1.12 0.70 7.20 17.43 1.00 1.00 1.00 1.00 17.43 m3 0% -
Sand Fill 3.09 1.00 0.50 7.20 11.12 1.00 1.00 1.00 1.00 11.12 m3 0% -
HDPE Installation 7.20 1.00 1.00 1.00 1.00 7.20 m 0% -
Soil Backfill 16.02 1.00 1.00 1.00 1.00 16.02 m3 0% -
A. 80 CB.79 8.20
Excavation 3.09 1.00 1.12 0.70 8.20 19.85 1.00 1.00 1.00 1.00 19.85 m3 0% -
Sand Fill 3.09 1.00 0.50 8.20 12.66 1.00 1.00 1.00 1.00 12.66 m3 0% -
HDPE Installation 8.20 1.00 1.00 1.00 1.00 8.20 m 0% -
Soil Backfill 18.24 1.00 1.00 1.00 1.00 18.24 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 81 CB.80 9.90
Excavation 3.09 1.00 1.12 0.70 9.90 23.97 1.00 1.00 1.00 1.00 23.97 m3 0% -
Sand Fill 3.09 1.00 0.50 9.90 15.29 1.00 1.00 1.00 1.00 15.29 m3 0% -
HDPE Installation 9.90 1.00 1.00 1.00 1.00 9.90 m 0% -
Soil Backfill 22.02 1.00 1.00 1.00 1.00 22.02 m3 0% -
A. 82 CB.81 7.20
Excavation 3.09 1.00 1.12 0.70 7.20 17.43 1.00 1.00 1.00 1.00 17.43 m3 0% -
Sand Fill 3.09 1.00 0.50 7.20 11.12 1.00 1.00 1.00 1.00 11.12 m3 0% -
HDPE Installation 7.20 1.00 1.00 1.00 1.00 7.20 m 0% -
Soil Backfill 16.02 1.00 1.00 1.00 1.00 16.02 m3 0% -
A. 83 CB.82 8.20
Excavation 3.09 1.00 1.12 0.70 8.20 19.85 1.00 1.00 1.00 1.00 19.85 m3 0% -
Sand Fill 3.09 1.00 0.50 8.20 12.66 1.00 1.00 1.00 1.00 12.66 m3 0% -
HDPE Installation 8.20 1.00 1.00 1.00 1.00 8.20 m 0% -
Soil Backfill 18.24 1.00 1.00 1.00 1.00 18.24 m3 0% -
A. 84 CB.83 9.90
Excavation 3.09 1.00 1.12 0.70 9.90 23.97 1.00 1.00 1.00 1.00 23.97 m3 0% -
Sand Fill 3.09 1.00 0.50 9.90 15.29 1.00 1.00 1.00 1.00 15.29 m3 0% -
HDPE Installation 9.90 1.00 1.00 1.00 1.00 9.90 m 0% -
Soil Backfill 22.02 1.00 1.00 1.00 1.00 22.02 m3 0% -
A. 85 CB.84 7.20
Excavation 3.09 1.00 1.12 0.70 7.20 17.43 1.00 1.00 1.00 1.00 17.43 m3 0% -
Sand Fill 3.09 1.00 0.50 7.20 11.12 1.00 1.00 1.00 1.00 11.12 m3 0% -
HDPE Installation 7.20 1.00 1.00 1.00 1.00 7.20 m 0% -
Soil Backfill 16.02 1.00 1.00 1.00 1.00 16.02 m3 0% -
A. 86 CB.85 8.20
Excavation 3.09 1.00 1.12 0.70 8.20 19.85 1.00 1.00 1.00 1.00 19.85 m3 0% -
Sand Fill 3.09 1.00 0.50 8.20 12.66 1.00 1.00 1.00 1.00 12.66 m3 0% -
HDPE Installation 8.20 1.00 1.00 1.00 1.00 8.20 m 0% -
Soil Backfill 18.24 1.00 1.00 1.00 1.00 18.24 m3 0% -
A. 87 CB.86 9.90
Excavation 3.09 1.00 1.12 0.70 9.90 23.97 1.00 1.00 1.00 1.00 23.97 m3 0% -
Sand Fill 3.09 1.00 0.50 9.90 15.29 1.00 1.00 1.00 1.00 15.29 m3 0% -
HDPE Installation 9.90 1.00 1.00 1.00 1.00 9.90 m 0% -
Soil Backfill 22.02 1.00 1.00 1.00 1.00 22.02 m3 0% -
A. 88 CB.87 7.90
Excavation 3.09 1.00 1.12 0.70 7.90 19.13 1.00 1.00 1.00 1.00 19.13 m3 0% -
Sand Fill 3.09 1.00 0.50 7.90 12.20 1.00 1.00 1.00 1.00 12.20 m3 0% -
HDPE Installation 7.90 1.00 1.00 1.00 1.00 7.90 m 0% -
Soil Backfill 17.58 1.00 1.00 1.00 1.00 17.58 m3 0% -
Progress Calculation PROGRESS CALCULATION FORM Progress Date
HDPE 200 mm Installation 006 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 89 CB.88 8.80
Excavation 3.09 1.00 1.12 0.70 8.80 21.30 1.00 1.00 1.00 1.00 21.30 m3 0% -
Sand Fill 3.09 1.00 0.50 8.80 13.59 1.00 1.00 1.00 1.00 13.59 m3 0% -
HDPE Installation 8.80 1.00 1.00 1.00 1.00 8.80 m 0% -
Soil Backfill 19.58 1.00 1.00 1.00 1.00 19.58 m3 0% -
A. 90 CB.89 5.50
Excavation 3.09 1.00 1.12 0.70 5.50 13.32 1.00 1.00 1.00 1.00 13.32 m3 0% -
Sand Fill 3.09 1.00 0.50 5.50 8.49 1.00 1.00 1.00 1.00 8.49 m3 0% -
HDPE Installation 5.50 1.00 1.00 1.00 1.00 5.50 m 0% -
Soil Backfill 12.24 1.00 1.00 1.00 1.00 12.24 m3 0% -
A. 91 CB.90 2.70
Excavation 3.09 1.00 1.12 0.70 2.70 6.54 1.00 1.00 1.00 1.00 6.54 m3 0% -
Sand Fill 3.09 1.00 0.50 2.70 4.17 1.00 1.00 1.00 1.00 4.17 m3 0% -
HDPE Installation 2.70 1.00 1.00 1.00 1.00 2.70 m 0% -
Soil Backfill 6.01 1.00 1.00 1.00 1.00 6.01 m3 0% -
A. 92 CB.91 10.60
Excavation 3.09 1.00 1.12 0.70 10.60 25.66 1.00 1.00 1.00 1.00 25.66 m3 0% -
Sand Fill 3.09 1.00 0.50 10.60 16.37 1.00 1.00 1.00 1.00 16.37 m3 0% -
HDPE Installation 10.60 1.00 1.00 1.00 1.00 10.60 m 0% -
Soil Backfill 23.58 1.00 1.00 1.00 1.00 23.58 m3 0% -
A. 93 CB.92 7.70
Excavation 3.09 1.00 1.12 0.70 7.70 18.64 1.00 1.00 1.00 1.00 18.64 m3 0% -
Sand Fill 3.09 1.00 0.50 7.70 11.89 1.00 1.00 1.00 1.00 11.89 m3 0% -
HDPE Installation 7.70 1.00 1.00 1.00 1.00 7.70 m 0% -
Soil Backfill 17.13 1.00 1.00 1.00 1.00 17.13 m3 0% -
A. 94 CB.93 3.50
Excavation 3.09 1.00 1.12 0.70 3.50 8.47 1.00 1.00 1.00 1.00 8.47 m3 0% -
Sand Fill 3.09 1.00 0.50 3.50 5.40 1.00 1.00 1.00 1.00 5.40 m3 0% -
HDPE Installation 3.50 1.00 1.00 1.00 1.00 3.50 m 0% -
Soil Backfill 7.79 1.00 1.00 1.00 1.00 7.79 m3 0% -
A. 95 CB.94 3.70
Excavation 3.09 1.00 1.12 0.70 3.70 8.96 1.00 1.00 1.00 1.00 8.96 m3 0% -
Sand Fill 3.09 1.00 0.50 3.70 5.71 1.00 1.00 1.00 1.00 5.71 m3 0% -
HDPE Installation 3.70 1.00 1.00 1.00 1.00 3.70 m 0% -
Soil Backfill 8.23 1.00 1.00 1.00 1.00 8.23 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 97 CB.A6 - MH.17 7.70
Excavation 3.09 1.00 1.12 0.70 7.70 18.64 1.00 1.00 1.00 1.00 18.64 m3 0% -
Sand Fill 3.09 1.00 0.50 7.70 11.89 1.00 1.00 1.00 1.00 11.89 m3 0% -
HDPE Installation 7.70 1.00 1.00 1.00 1.00 7.70 m 0% -
Soil Backfill 17.13 1.00 1.00 1.00 1.00 17.13 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 105 CB.A1 - MH.03 14.50
Excavation 3.09 1.00 1.12 0.70 14.50 35.10 1.00 1.00 1.00 1.00 35.10 m3 0% -
Sand Fill 3.09 1.00 0.50 14.50 22.39 1.00 1.00 1.00 1.00 22.39 m3 0% -
HDPE Installation 14.50 1.00 1.00 1.00 1.00 14.50 m 0% -
Soil Backfill 32.26 1.00 1.00 1.00 1.00 32.26 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 113 GH-6 6.40
Excavation 3.09 1.00 1.12 0.70 6.40 15.49 1.00 1.00 1.00 1.00 15.49 m3 0% -
Sand Fill 3.09 1.00 0.50 6.40 9.88 1.00 1.00 1.00 1.00 9.88 m3 0% -
HDPE Installation 6.40 1.00 1.00 1.00 1.00 6.40 m 0% -
Soil Backfill 14.24 1.00 1.00 1.00 1.00 14.24 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 121 GH-14 11.70
Excavation 3.09 1.00 1.12 0.70 11.70 28.33 1.00 1.00 1.00 1.00 28.33 m3 0% -
Sand Fill 3.09 1.00 0.50 11.70 18.06 1.00 1.00 1.00 1.00 18.06 m3 0% -
HDPE Installation 11.70 1.00 1.00 1.00 1.00 11.70 m 0% -
Soil Backfill 26.03 1.00 1.00 1.00 1.00 26.03 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
HDPE Installation Sewage 45.80 1.00 1.00 1.00 1.00 45.80 m 0% -
Soil Backfill Sewage 101.89 1.00 1.00 1.00 1.00 101.89 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
B. 8 SM.05 - SM.06 5.30
Excavation Sewage 3.09 1.00 1.12 0.70 5.30 12.83 1.00 1.00 1.00 1.00 12.83 m3 0% -
Sand Fill Sewage 3.09 1.00 0.50 5.30 8.18 1.00 1.00 1.00 1.00 8.18 m3 0% -
HDPE Installation Sewage 5.30 1.00 1.00 1.00 1.00 5.30 m 0% -
Soil Backfill Sewage 11.79 1.00 1.00 1.00 1.00 11.79 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
B. 16 SM.15 - SM.11 14.40
Excavation Sewage 3.09 1.00 1.12 0.70 14.40 34.86 1.00 1.00 1.00 1.00 34.86 m3 0% -
Sand Fill Sewage 3.09 1.00 0.50 14.40 22.23 1.00 1.00 1.00 1.00 22.23 m3 0% -
HDPE Installation Sewage 14.40 1.00 1.00 1.00 1.00 14.40 m 0% -
Soil Backfill Sewage 32.04 1.00 1.00 1.00 1.00 32.04 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
B. 24 SM.16 - SM.12 4.20
Excavation Sewage 3.09 1.00 1.12 0.70 4.20 10.17 1.00 1.00 1.00 1.00 10.17 m3 0% -
Sand Fill Sewage 3.09 1.00 0.50 4.20 6.48 1.00 1.00 1.00 1.00 6.48 m3 0% -
HDPE Installation Sewage 4.20 1.00 1.00 1.00 1.00 4.20 m 0% -
Soil Backfill Sewage 9.34 1.00 1.00 1.00 1.00 9.34 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
C. 7 SMH.13 - SMH.04 4.10
Excavation Sewage 3.09 1.00 1.12 0.70 4.10 9.93 1.00 1.00 1.00 1.00 9.93 m3 0% -
Sand Fill Sewage 3.09 1.00 0.50 4.10 6.33 1.00 1.00 1.00 1.00 6.33 m3 0% -
HDPE Installation Sewage 4.10 1.00 1.00 1.00 1.00 4.10 m 0% -
Soil Backfill Sewage 9.12 1.00 1.00 1.00 1.00 9.12 m3 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
D HDPE FOR SEWAGE (SECTION 3)
C. 1 SMH.01 - SMH.02 8.70
Excavation Sewage 3.09 1.00 1.12 0.70 8.70 21.06 1.00 1.00 1.00 1.00 21.06 m3 0% -
Sand Fill Sewage 3.09 1.00 0.50 8.70 13.43 1.00 1.00 1.00 1.00 13.43 m3 0% -
HDPE Installation Sewage 8.70 1.00 1.00 1.00 1.00 8.70 m 0% -
Soil Backfill Sewage 19.36 1.00 1.00 1.00 1.00 19.36 m3 0% -
Progress Progress
No. Description Unit Total Quantity Remarks
Quantity Percentages
1 Excavation m3 2,181.80 - 0.0000%
2 Sand Fill m3 1,391.45 - 0.0000%
3 HDPE Installation m 901.20 - 0.0000%
4 Soil Backfill m3 2,004.94 - 0.0000%
5 Excavation Sewage m3 1,735.37 82.07 4.7294% ARITMATH CHECKING
6 Sand Fill Sewage m3 1,106.74 - 0.0000% RECAP 11,632.99
7 HDPE Installation Sewage m 716.80 33.90 4.7294% BREAKDOWN 11,632.99
8 Soil Backfill Sewage m3 1,594.70 75.42 4.7294% IF ZERO = OK! -
GLOBAL PROGRESS FOR HDPE 200 mm Installation (AVERAGE PRORATE BY ITEMS) 1.7735%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor
Progress Calculation PROGRESS CALCULATION FORM Progress Date
CATCH BASIN (PRECAST) 008 Calculation 31/08/2023
WP 6 - Civil & Landscape
PT. Sepuluh Sumber Anugerah
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A CATCH BASIN PRECAST
A. 1 Catch Basin CB-01
Precast Formwork 0.80 0.80 0.75 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Bottom Slab Rebar 1.10 1.10 1.04 6.00 2.00 1.00 12.00 13.75 kg 0% -
Wall Rebar (Horizontal) 1.22 1.04 3.00 4.00 1.00 12.00 15.25 kg 0% -
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Wall Rebar (Horizontal) 1.22 1.04 3.00 4.00 1.00 12.00 15.25 kg 0% -
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 16 Catch Basin CB-16
Precast Formwork 0.80 0.80 0.75 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Bottom Slab Rebar 1.10 1.10 1.04 6.00 2.00 1.00 12.00 13.75 kg 0% -
Wall Rebar (Horizontal) 1.22 1.04 3.00 4.00 1.00 12.00 15.25 kg 0% -
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 31 Catch Basin CB-31
Precast Formwork 0.80 0.80 0.75 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Bottom Slab Rebar 1.10 1.10 1.04 6.00 2.00 1.00 12.00 13.75 kg 0% -
Wall Rebar (Horizontal) 1.22 1.04 3.00 4.00 1.00 12.00 15.25 kg 0% -
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 46 Catch Basin CB-46
Precast Formwork 0.80 0.80 0.75 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Bottom Slab Rebar 1.10 1.10 1.04 6.00 2.00 1.00 12.00 13.75 kg 0% -
Wall Rebar (Horizontal) 1.22 1.04 3.00 4.00 1.00 12.00 15.25 kg 0% -
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 61 Catch Basin CB-61
Precast Formwork 0.80 0.80 0.75 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Bottom Slab Rebar 1.10 1.10 1.04 6.00 2.00 1.00 12.00 13.75 kg 0% -
Wall Rebar (Horizontal) 1.22 1.04 3.00 4.00 1.00 12.00 15.25 kg 0% -
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 76 Catch Basin CB-76
Precast Formwork 0.80 0.80 0.75 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Bottom Slab Rebar 1.10 1.10 1.04 6.00 2.00 1.00 12.00 13.75 kg 0% -
Wall Rebar (Horizontal) 1.22 1.04 3.00 4.00 1.00 12.00 15.25 kg 0% -
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 91 Catch Basin CB-91
Precast Formwork 0.80 0.80 0.75 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Bottom Slab Rebar 1.10 1.10 1.04 6.00 2.00 1.00 12.00 13.75 kg 0% -
Wall Rebar (Horizontal) 1.22 1.04 3.00 4.00 1.00 12.00 15.25 kg 0% -
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Quantity
Cummulative
No. Description x (m) y (m) z (m) Shape Factor perim. (m) area (m2) cubic (m3) kg/m kg/m2 n1 n2 n3 n Total Total Unit Remarks Progress Qty
Progress
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A. 106 Catch Basin CB-106
Precast Formwork 0.80 0.80 0.75 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Bottom Slab Rebar 1.10 1.10 1.04 6.00 2.00 1.00 12.00 13.75 kg 0% -
Wall Rebar (Horizontal) 1.22 1.04 3.00 4.00 1.00 12.00 15.25 kg 0% -
Wall Rebar (Vertical) 0.98 1.04 4.00 4.00 1.00 16.00 16.25 kg 0% -
L Angle Galvanized Install 0.60 0.60 2.40 1.00 1.00 1.00 1.00 2.40 m 0% -
Pouring Concrete 0.80 0.80 0.60 0.44 1.00 1.00 1.00 1.00 0.44 m3 0% -
Precast Formwork Dismantle 6.28 1.00 1.00 1.00 1.00 6.28 m2 0% -
Excavation 3.30 3.30 0.90 0.80 7.84 1.00 1.00 1.00 1.00 7.84 m3 0% -
Put Catch Basin in Hole 1.00 1.00 1.00 1.00 1.00 unit 0% -
Backfill 7.36 1.00 1.00 1.00 1.00 7.36 m3 0% -
Steel Grating Instalation 1.00 1.00 1.00 1.00 1.00 unit 0% -
Progress Progress
No. Description Unit Total Quantity Remarks
Quantity Percentages
1 Precast Formwork m2 671.96 - 0.0000%
2 Bottom Slab Rebar kg 1,471.56 - 0.0000%
3 Rebar kg 3,371.21 - 0.0000%
Wall Rebar (Horizontal) kg 1,632.09 -
Wall Rebar (Vertical) kg 1,739.11 -
4 L Angle Galvanized Install m 256.80 - 0.0000%
5 Pouring Concrete m3 46.87 - 0.0000%
6 Precast Formwork Dismantle m2 671.96 - 0.0000% Method
7 Excavation m3 838.97 - 0.0000% ARITMATH CHECKING
8 Put Catch Basin in Hole unit 107.00 - 0.0000% Method RECAP 8,330.92
9 Backfill m3 787.61 - 0.0000% BREAKDOWN 8,330.92
10 Steel Grating Instalation unit 107.00 - 0.0000% NOT OK!! - 0.00
GLOBAL PROGRESS FOR CATCH BASIN (PRECAST) (AVERAGE PRORATE BY ITEMS) 0.0000%
31/08/2023
Checked by,
PT. Sepuluh Sumber Anugerah
Herdy Dwiyana
Quantity Surveyor