PROJECT :-DETAIL DESIGN SERVICE FOR FACTORY BUILDING AT VIJAPUR.

PROJECT NO:- 1016


DOCUMENT NO:- 1016-
CLIENT:-DEVMETA INDUSTRIES LLP
GEN-BOQ-LB-01
LOCATION:- VIJAPUR REV:-01

BILL OF QUANTITY (BOQ)

SIGN
EDITED CHECKED
RH HK
BY BY
PROJECT :-DETAIL DESIGN SERVICE FOR FACTORY BUILDING AT VIJAPUR. PROJECT NO:- 1016
DOCUMENT NO:-
CLIENT:-DEVMETA INDUSTRIES LLP
1016-GEN-BOQ-LB-01
LOCATION:- VIJAPUR REV:-01

SR NO. QUANTITY UNIT DESCRIPTION RATE AMOUNT

1 17219.00 CFT Excavation up to 5' depth 6 103314


2 9168.00 CFT Excavation 5' to 10' depth 7 64176
3 17055.00 CFT Earth Filling 3.5 59692.5
4 13365.00 SFT Earth Levelling and dressing 7 93555
5 3072.10 SFT P.C.C. in Foundation 4" 8.5 26112.85
6 3023.60 CFT Footing 85 257006
7 1594.30 CFT Plinth beam / pedestal 180 286974
8 1865.60 CFT Beam / Column 180 335808
9 770.95 CFT Slab at 12' height (5" thick) double Jali 60 46257
40.00 RFT Lintel beam (5" thick) 45 1800
10 967.23 SFT R.C.C. Pardi (9" thick) Double Steel Jali 110 106395.3
11 9274.00 SFT 9" from plinth to 10" ht. 18 166932
12 976.00 SFT 4 1/2" from plinth to 10" ht (Partition) 17 16592
13 16.00 NOS Cement Jali Fitting (2' x 2') 400 6400
14 17.00 NOS Door & Window Frame Fixing 400 6800
15 7739.00 SFT Single Coat Smooth PLASTER 14 108346
16 192.00 NOS Foundation Bolt Fixing 120 23040
17 14524.00 SFT I.P.S. (4" thick) with Trimix Finish Simple 14 203336
18 Lumpsum Plumbing (with material) 25000

MATERIAL RATE
18 1820 NOS 50 KG CEMENT BAG (OPC) 360 655200
19 158.704 MT SAND 600 95222.4
69421 NOS Brick 5 347105
20 178.528 MT AGGREGATE (20 MM) 500 89264
21 119.21 MT AGGREGATE (10 MM) 800 95368
22 23.6269 MT TMT STEEL 65000 1535749
23 535 KG 16 DIA FOUNDATION BOLT OF 900 MM LENGTH 78 41730
24 82 MT STRUCTURAL STEEL 75000 6150000

TOTAL AMOUNT IN RUPEE ₹ 10,947,175