CHITRADURGA -PWD PACKAGE 1500 MET

Physical & Financial Progress

BOQ
Quantity
Sl.No. Short Description of Items Unit Quantity
claimed
(Estimated)

1 KSRRB300-50. Scarifying bituminous course 50mm Sqm 17100.00 12958.63


2 to 75mm thick
KSRRBM300-14. Excavation for road work in all Cum 22459.54 17720.33
3 types of soil
KSRRB300- Compaction KSRRB 300- Sqm 30000.00 26297.08
58.Compaction
Construction Of of
GSBoriginal groundas
Grading-V with maximum
Sub-base andof
4 Cum 6600.00
drainage layer 5773.69
5 KSRRB M400- Wet Mix Macadam KSRRB M400- Cum 990.00 261.83
KSRB 14.6-2 :Providing and laying heavy duty
6 Sqm 4500.00
cobble stones 75mm thick interlock pavers, 2181.82
7 KSRRB M600-DLC Cum 3960.00 3200.67
8 KSRRB M600-2 PQC Cum 7140.00 5696.32
11 Providing and laying Designmix M20 Cum 11.28 52.45
KSRRB M300-55. Construction of sub-grade and
12 Cum 9325.72 8009.25
earthen shoulders
13 KSRB 14.6-1 : cobble stones 60mm thick interlock Sqm 6000 3194.6
14 pavers, using
Supplying PVC cement
ringtiteand course Sqm 520 640
15 pre cast solid cement concrete kerb stones Nos 7000 2779
PWD PACKAGE 1500 METERS
& Financial Progress

Quantity Financial Progress TOTAL


paid to Rate in Rs Amount
EXPENSES
labour
MATERIAL LABOUR
55.00 712724.65
150.00 2658049.65
6.00 157782.48
2300.00
13279487
2300.00 602209.575

1000.00
2181820
6000.00 19204020
9800.00 55823936
6500.00 340925
350.00
2803238.06875
1000 3194600
600 384000
300 833700
102176492.424