You are on page 1of 5

Sector Group Sub - Group

Provisional Sum #[XXX0001]


Air transport services Aerial and related services Aerial forest-firefighting
#[62000000] #[62400000] services #[62420000]
Title First Custom Level(optional) Second Custom Level(optional)
(Provide Description) (Provide Description)
Third Custom Level(optional) Item Name & Description Unit
(Provide Description)

0 0

11m PSC Pole Errection work Nos.


9m PSC Pole Errection work Nos.
Stringing of 0.1 sq.inch ACSR CoMtr.
Stringing of 0.1 sq.inch ACSR CoMtr.
Errection of Stay Set Set
Dismantling & Re-installation of Set
Errection of Earthing Set Set
Dismantling of 11m Steel TubularNos.
Dismantling of 9m Steel Tubular PNos.
Dismantling of 11m PSC Pole andNos.
Dismantling of 9m PSC Pole and sNos.
Dismantling of 0.05 sq.inch ACS Mtr.
Dismantling of 50sq.mm ABC CaMtr.
Dismantling & Re-stringing of Mtr.
Dismantling of 0.05sq.inch ACSRMtr.
Dismantling of 0.1 sq.inch ACSR Mtr.
Dismantling & Re-stringing of 1 Mtr.
Dismantling & Re-laying of XLP Mtr.
Dismantling & Re-stringing of Mtr.
3-ph consumer service cable dismNos.
1-ph consumer service cable dismNos.
Quantity Official Rate

1 1

50 6647
10 4654.63
3220 68.52
7000 25.56
10 1921.94
2 27789.75
3 7756.75
35 2226.69
10 2226.69
10 3323.5
5 2327.32
700 11.21
140 27.06
800 100.85
275 27.65
800 34.26
100 102.78
180 1562.85
175 77.08
10 1685.32
100 842.67

You might also like