LONGJIAN-KEC Uv KEG Date: 13% Jan 2020 Ref : LONG-KECJV/CIVIL/OMRC/DC02/14 To: Chief Project Manager-4, Delhi Metro Rail Corporation Ltd, Seed Bed park, Near BSES office, ‘Opp Gurudwara, Shakarpur, Delhi -1 10092 Sub. Contract DC-02: Part Design and Construction of Elevated Viaduct from Maujpur (excluding) to Majlis Park (excluding) inciuding Bridge across river Yamuna, Integrated Elevated Viaduct with PWD fiyover at lower deck & metro line at upper deck from Yamuna Vihar to Bhajanpura and 08 Elevated Stations viz. Yamuna Vihar, Bhajanpura, Khajuri Khas, Sonia Vihar, Soorghat, Jagatpur Village, Jharoda Majraa and Burari (including Entry & Exit structures at stations but excluding Architectural finishing, Pre-engineered steel roof structure and roof sheeting of stations) from Chainage 0.0 M to 12098.520 M of Majlis Park - Maujpur Corridor of Delhi MRTS. Phase-IV project ‘Subject: Method Statement for Barrication works Ref: 1) DMRC/20/IV-011/2019 ~ LOA dated 20"Dec 2019, Dear Sir ‘The Contractor enclosed herewith the Method Statement for the Barrication works for DMRC's review and consent please. ‘Assuring you of our continued cooperation at all the times, we remain. Yours faithfully, For LONGJIAN ~ KEC JV Jaldep Rajestvarkar (Authdrised Signatory) Encl: As above 1 Floor, RPG House, 463, Dr. Annie Besant Road, Worl, Mumbai ~ 400030, (Tel: 022 68670200 [Emil Id: svpcivil@keerpg.com ve feech da Yar Bizalreror ferfsares: Delhi Metro Rail Corporation Limited PHASE IV DC-02 PROJECT Contractor “ LONGIIAN- KEcV Ml C METHOD STATEME BARRICATION WORKS Document Name: Method Statement for Barrication Works Document Code: LONGJIAN-KEC/DMRC-DC02/MS/01/REV-0 Initiated by Dy Project Manager ;—— (farkeshwar Singh) — Reviewed by SHE Manager : (Debasish Mazumder) Approved by Project Leader oa \ A Pi = er (Arvind Tingloo) SLNO | REVIEW NO | DATE OF REVIEW, REVIEWED SECTION/PAGE NO LONGJIAN-KEC (JV) DELHI METRO RAIL PROJECT, PHASE - 4, DC- 2 02 (Part Design and Construction of Elevated net 9p canawine, | Viaduct, Bridge across river Yamuna with PWD Bai Mein Ral'Cneporeson Laie flyover and 8 Stations of Yamuna Vihar to Burari. Document Name | Method Statement for Barrication Works Document Code LONGJIAN-KEC/DMRC-DC03/MS/o1__| Revision No: 0 | Date: 13/01/2020 Project Title: Contract DC-02: Part Design and Construction of Elevated Viaduct from Maujpur (excluding) to Majlis Park (excluding) including Bridge across river Yamuna, Integrated Elevated Viaduct with PWD flyover at lower deck & metro line at upper deck from Yamuna Vihar to Bhajanpura and 08 Elevated Stations viz, Yamuna Vihar, Bhajanpura, Khajuri Khas, Sonia Vihar, Soorghat, Jagatpur Village, Jharoda Majraa and Burari (including Entry & Exit structures at stations but excluding Architectural finishing, Pre-engineered steel roof structure and roof sheeting of stations) from Chainage 0.0 M to 12098.520 M of Majlis Park ~ Maujpur Corridor of Delhi MRTS Phase-IV project METHOD STATEMENT FOR BARRICATION WORKS DISCIPLINE Civil ‘Mechanical | Electrical General 7 Contact Document control LONGJTAN-KEC/ NAME: MSS for Barrication Works DMRC- DC02/MS/01/REV-0 Tel: Action Required For information For Approval] ¥ Page 2 of 21 \~ ~~ LONGJTAN-KE DELHI METRO RAIL PROJECT, PHASE - 4, DC- 02 (Part Design and Construction of Elevated ee KEC Viaduct, Bridge across river Yamuna with PWD | flyover and 8 Stations of Yamuna Vihar to Burari. "Document Name is Document Gode LONGJIAN-KEC/DMRC-DCOYMS/01 | Revision Nor0 | Date: 13/01/3020 1d Statement for Barrication Works INDEX Sr PAGE No, | TEM DESCRIPTION a 1 | PURPOSE 5 2 | APPLICABILITY / AREA OF APPLICATION 5 3 | REFERENCE 5 4 | RESPONSIBILITY 3 3 | MATERIAL 9 [6 | MANPOWER 10 | 7 | MACHINE, EQUIMENT, TOOLS AND TACKELS 10 8 | WORK PROCEDURE i 9 | WEATHER LIMITATIONS 13 0) SAFETY 13 i | SHE RISK ASSESSMENT B ANNEXURET DRAWINGS ANNEXURE-2 CHECKLIST Page 3 of 21 LONGJIAN-KEC (JV) | DELHI METRO RAIL PROJECT, PHASE - 4, DC- | 02 (Part Design and Construction of Elevated KEC Viaduct, Bridge across river Yamuna with PWD. df flyover and § Stations of Yamuna Vihar to Burari. Document Name | Method Statement for Barrication Works Document Code LONGJIAN-KEC/DMRC-DC0YMS/01___| Revision No:0 | Date: 13/01/2020 1.0 Purpose ‘The scope of this document includes procedure for fixing of barricades for permanent works on road to provide adequate safety fo the general public, workmen, traffic and personnel from any external agency against all the construction activities undertaken for the DC 02 package of DMRC. 2.0 Applicability / Area of Application Valid for placing of different types of barrication boards (as approved) DC 02 package of DMRC. 3.0 Reference IRC: SP:55-2001- Guidelines on Safety in Road Construction Zones. IRC: 67-2001- Code of Practice For Road Signs Contract Document Drawing reference ~ EIRAIDE005-DMRC-TD-DC02-VD-GN - ST005 EIRA1DE005-DMRC-TD-DC02-VD-GN - ST004 4.0 — Responsibility Reporting structure of personnel involved in installation of Barrication shall be as below: Project Manager Shall be responsible for the overall execution] barrication activity. Dy. Project! - Shall report to the Project Manager Manager - Shall be responsible for control, supervision & direction for (Viaduct) implementation & execution of construction plans = Shall also be responsible for supervision of construction Records. ~ Develop construction schedules, construction method statements &prepare progress & accomplishment reports Shall communicate to client representative day to day activities Page 4 of 21 Remap erecta tes DELHI ME 02 (Part Design and Construction of Elevated Viaduct, Bridge across river Yamuna with PWD nesinaniniconermatines | flyover and 8 Stations of Yamuna Vihar to Burari. Document Name | Method Statement for Barrication Works LONGJIAN-KEC (JV) RO RAIL PROJECT, PHASE - 4, DC- 7 KEC Document Code LONG)IAN-KEC/DMRC-DC0Z/MS/01_| Revision No: 0 | Date: 12/01/2020 Engineer = Shall report to Dy. Project Manager _ - Shall be responsible for day to day planning at site - Barrication activities and preparation of construction records as per approved Method Statement and sub-contractor’s QC activities compliance. - Shall assist to evaluate the sub-contractor’s performance - Shall communicate to client representative day to day activities Surveyor = Shall report to the Project Manager ~ Shall give location of Barrication Boards at site as per approved scheme, ‘QA/QC Manager ~ Shall report to the Project Manager - Shall ensure overall control of QC activities - Implementation of Project Quality Plan. - Shall be responsible for implementation of Inspection and Testing Plan - Custodian of approved construction methodology P&M in Charge = Ensure continuous availability of PEM at the site. - Ensure periodic preventive maintenance & timely breakdown repairs of all machinery & electrical equipment as per their inspection manuals, - Ensure operation of P&M as per company norms Chief SHE Manager - Shall report to Project Manager. - Shall be responsible for overall control of SHE Activity as per approved Safety Methodology. - Ensuring the approval of Method statement by the client. Page 5 of 2 DELHI METRO RAIL PROJECT, PHASE - 4, DC- &. 02 (Part Design and Construction of Elevated Ee KEC Viaduct, Bridge across river Yamuna with PWD | A _flyover and 8 Stations of Yamuna Vihar to Burari. LONGJIAN-KEC (JV) Document Name | Method Statement for Barrication Works | Document Code LONGJIAN-KEC/DMRC-DCOYMS/01___| Revision No: 0 | Date: 13/01/2020 Responsible to Ensure to provide Risk Assessment involved in Barricading activities Monitoring of safety requirement and its compliances from time to time. Barrication Manager Reports to Chief SHE Manager. Responsible for proper barrication, Closely monitors alignment, stability of barricades. Ensures fixing of solar blinkers, retro-reflective tapes on barricades. Barricading Squad Reports to Barrication Manager. Follow the instruction to fix barricades. Follow safety measures while working. ‘Scheduled maintenance of barricades. Se. Salety Traffic ‘Shall report to Chief SHE Manager. Engineer Shall ensure traffic management at site. Shall ensure accident prevention Shall ensure daily HSE activities fully complied Safety Manager Shaill report to Chief SHE Manager. Shall observe all safety aspects in all the activities, Maintenance of board including ensuring proper lighting and reflector over board wherever required. Page 6 of 21 DELHI METRO RAIL PROJECT, PHASE -4, DC- | gy 02 (Part Design and Construction of Elevated a KEC Viaduct, Bridge across river Yamuna with PWD GJIAN-KEC (JV) sen ager es ™ “mami | flyover and 8 Stations of Yamuna Vihar to Burari. Document Name | Method Statement for Barrication Works Document Code LONGJIAN-KEC/DMRC-DCOMS/01__| Revision No: 0 | Date: 13/01/2020 Safety steward ~ Monitor Safety practices, persuade to minimize non compliance - Report incidents beyond control and unsafe occurrences to EHS |) - Responsible for cleaning of board and road from outside. = To ensure access control from inside/outside of board, also ‘ensure adequate traffic marshal wherever required . 4.1 Organization Chart Page 7 of 21 LONGJIAN-KEC (JV) DELHI METRO RAIL PROJECT, PHAS| 02 (Part Design and Construction of Elevated Viaduct, Bridge across river Yamuna with PWD vai flyover and 8 Stations of Yamuna Vihar to Burati. Document Name Method Statement for Barrication Works. [Document Code LONGJIAN-KEC/DMRC-DC07/MS/01__[ Revision No: 0 | Date: 13/01/2020 5.0 Mater Si. + Conforms | Quantity na Name Brand/ Source a Required Safety cones 750mm height, 350mm | AKTION or : 7 Base. =: Equivalent IRCSP:55 100 PVC Traffic barrier 02. | Dimension in mm (LX BX H) = eae 150 1150 x 800 X 500 Peri ; ; LOTUS / ‘On every 03 | Solar/Electrical Blinker/rope light | Frage. oan ae Fabricated at oe ; fabrication _| As per as per traffic 4 | Steet Barsicading boords (Painted) | bier fu Casting vard nae eee Fabricated at | As per As per 05 | Barricading board anchoring nails | <1 eeonke aoe Fluorescent Safety Barricading Net 06 | with height of 1.2mts and supported | UPYOGI — 50 mtr with ledger pin ‘As per 07 | Cautionary Reflective Sign Board | Locally Made [iRcsps5 | Pate : Diversion Plan 08 | Red colour FLAG Locally Made | —— 09 | Safety barrication Tape Locally saat available 10 | Traffic light baton Locally To |_| available esti /esese 11 | Hammer Locally — 02 Available 12 | Drill Machine Hilti/TE rv) 13 |Water container (with tap + glass) cease (one nos.) Fabricated at itd 14 | Movable barricades with roller fitted | fabrication — | ——- ery ae opening Page 8 of 21 LONGJIAN-KEC (JV) ] DELHI METRO RAIL PROJECT, PHASE - 4, DC- S 02 (Part Design and Construction of Elevated Viaduct, Bridge across river Yamuna with PWD | steno flyover and 8 Stations of Yamuna Vihar to Burari, Document Name | Method Statement for Basrication Works Document Code LONGJIAN-KEC/DMRC-DCozMs/01__| Revision No: 0 | Date: 15/01/2020 sl. Conforms | Quantity bc Name Brand / Source ae Reaied 15 | pG62/128KVA Honda/any | __ Atevery other Tocation 6.0 Manpows SLNo Category Nos. Required Remarks 1 | Site Engineer/Supervisor oi 2__| Barricading Squad 06 3__| Truck Driver 1 4_| Truck Helper 5 OL 5 | Survey Helpers mI 6 | Safety steward OL 7__| Flag Man OL ‘8 [Crane operator 1 ‘9__[Signal man OL 7.0 Machine, Equipment, Tools & Tackles SLNo | Type of Machine, Tools | Nos. Calibration Remarks & Tackles Required ‘Available 1 | Total station on Calibrated | with Surveyor 2 | Farana Crane a With third party checked 3 | Truck wT = 4 _| Drilling Machine Ot a 5 | Steel measuring tape ot = 8.0 Work Procedure: ‘¢ Permission from local authorities shall be taken before executing barrication work. ‘* Boards shall be issued from the stock yard in specified numbers. Page 9 of 21 @ agen ~ LONGJTAN-KEC (JV) DELHI METRO RAIL PROJECT, PHASE - 4, DC- & 02 (Part Design and Construction of Elevated 4 KEC Viaduct, Bridge across river Yamuna with PWD df A flyover and 8 Stations of Yamuna Vihar to Burari. [Document Name Method Statement for Barrication Works Document Code TONGJIAN-KEC/DMRC-DCnyMS/01_| Revision No: 0 [ Date: 13/01/2020 Other material such as nails, concrete blocks (counter blocks), reflective tapes, barricading tapes, solar blinkers, flags, cautionary and informatery boards, safety cones, safety barriers shall be issued from the stores. Retro stripes of required size and shape at appropriate angle at the bottom and middle portion of the barricade at a minimum gap of 1000mm should be affixed. In addition, minimum one red light blinker or rope light should be placed at the top of each barricade. For transportation and lifting of small materials like loader cranes (Truck Mounted Cranes) shall be used. 100% PPE compliance shall be ensured for all the workmen engaged. Any un-authorized entry to the workplace shalll be strictly prohibited. ‘A track/trailor shall be engaged to load the boards from stock yard after proper inspection. Boards shall be loaded on the truck/trailor using tool and tackles having third party test certificates and after inspection. 1D & license of the operator is checked. A trained signal man is deployed. Ropes should be tied to the boards while Toading on to the truck/ trailor. One person at a time is engaged in signaling the operator. Boards shall be properly secured with wire ropes on the truck/ trailor. Boards shall be transported to the site without major interruption to the local traffic, ‘Man, material and other required items shall be transported simultaneously to the site using separate vehicle. At any moment before starting the barrication a Tool Box Talk to be conducted at site. Temporary diversion arrangements with safety cones, barriers & signal man on both sides shall be done. Marking for barrication shall be given by the surveyor. Page 10 of 21 6 02 (Part Design and Construction of Elevated HS KEC Viaduct, Bridge across river Yamuna with PWD am | || gonagraieoemae | seinammresmocstnes | flyover and 8 Stations of Yamuna Vihar to Burari. ‘Document Name | Method Statement for Barrication Works A [Revision No: 0 | Date: 13/01/2020 De sument Code ‘+ Boards shall be unloaded at site inside temporary barrication with only one person giving signals to crane operator at a time. ‘© Boards shail be placed on the marking. ‘© Nailing shall be done using drill * Counter weights shall be provided for stability. «All temporary metal structures like barricade board shall be adequately earthen through suitable means. ‘Verticality of the barricades shall be ensured at all time. ‘© Movable barricading boards shall be fixed at every opening to facilitate smooth entry and exit of construction vehicles. All the movable barricades are clearly marked for entry/exit and caution “ONLY FOR CONSTRUCTION VEHICLES’, * Barricading boards shall be provided with signs (reflective tape) showing traffic flow, solar blinkers. © Cautionary and informatory sign boards shall be installed. * View cutter arrangement of sufficient height above barricading board to be made at Najafgath drain location. ‘© Temporary barrrication shall be removed after checking the barrrication for its stability, sign boards, 9.0 Weather Limitations: SEASON RISK CONTROL MEASURES Road accident due to low | Except for little drizzling, work HEAVY pan | “ibility, Manual handling should be stopped. of boards may be dangerous. WINTER _ | Heavy fog in night Ensure proper reflective/ fog light. SUMMER | Excess heat may cause heat | Drink Jot of water, keep body cool, Page 11 of 24 Bytaasrerenes LONGJIAN-KEC (JV) DELHI METRO RAIL PROJECT, PHASE - 4, DC- S 02 (Part Design and Construction of Elevated Viaduct, Bridge across river Yamuna with PWD. flyover and 8 Stations of Yamuna Vihar to Burari. Document Name Method Statement for Barrication Works [Document Code | LONGJIAN-KEC/DMRC-DooyMs/o1 _[ Revision No: 0 [ Date! 13/01/2020 exhaustion and heat stoke | avoid standing in direct sunlight for Jong durations, 10.0Safety «Every workman must be engaged after Screening, Safety induction, medical test & a valid ID. + 100% PPE compliance must be ensured before starting any work, + Competent operator (with valid license), trained signalman, flagman should be deployed. «Certified crane & vehicle shall only be deployed. «All the tools and tackles should have valid third-party test certificates. * Appropriate sign boards to be provided to warn the general public. «First aid box should always be available on site. + Emergency contacts should be available with the site personnel. © Any un-authorized eniry should be strictly prohibited, * Sufficient number of road safety devices like yellow reflect cat eyes, diversion board, “CAUTION” tapes etc. as per Outline specification shall be used. Page 12 of 21 DELHI METRO RAIL PROJECT, PHASE - 4, DC- 02 (Part Design and Construction of Elevated Viaduct, Bridge across river Yamuna with PWD, flyover and $ Stations of Yamuna Vihar to Burari. Document Name Method Statement for Barrication Works. Document Code” -LONGJIAN-KEc/oMRC-Denypasjo1 | Revision No:0 | Dates 3/OiB000 11.SHE Risk Assessment Name of the Project _| DMRC DC-02 Project | Reference No TONGIIAN-KEC/DG02/SHE/01/RA ‘Activities Covered: | Barrication Boards Works Date of Risk Assessment ‘Date of Next Risk Review 13/01/2020 13/02/2020 = SHE Risk Assessment Leader SHE Risk Assessment Team Members Risk Assessment Reviewed By ‘Approved By Leader Name Debashish ‘Arvind Tingloo Mazumder Date 13/01/2020 13/01/2020 13/01/2020 | Signature Page 13 of 21 ~LONGJIAN-1 CIV) DELHI METRO RAIL PROJECT, PHASE - 4, DC- 02 (Part Design and Construction of Elevated Viaduct, Bridge across river Yamuna with PWD ver and 8 Stations of Yamuna Vihar to Burari. | | Document Name. “Method Statement for Barrication Works Document Code LONGJIAN-KEC/DMRC-DCOYMS/O1_— Revision Nor 0 | Date: 13/01/2020 11.1 Risk Analysis: Hazard Consequence Risk Control Measures Line Marking | Hit by vehicle/ Skin For Barrication | infection Fatal / Medical attention = All workmen shail - Area Shall be - Flagman Shall be - Use “of safety be engaged after Screening and Safety Induction. Barricaded with barrier, cones and barrication tapes. provided with red flag at day and traffic light baton during night work. helmets, Shoes, Florescent Jacket, and other relevant PPE’s ensured for all workers. Loading / Unloading of barricading Wrong / improper use of of slinging of loads and signaling, Worn-out / defective lifting gear. equipment, unsafe method Injury to the workmen [Prior to execution inspections shall be done for vehicle/ equipment fitness - All the lifting tools & tackles shall be tested and certified, = Tag rope shall be used for any lifting loads. - Nobody shall work under suspended oad at any time. + Loading/ unloading shall be done under authorized / competent supervision, Page 14 of 21 LONGJIAN-KEC (JV) DELHI METRO RAIL PROJECT, PHASE - 4, DC- zz 02 (Part Design and Construction of Elevated se KEC Viaduct, Bridge across river Yamuna with PWD | |: flyover and 8 Stations of Yamuna Vihar to Burari. Document Name | Method Statement for Barrication Works Document Code LONGJAN-KEGDMRC-DCO2MS/01___| Revision No: 0 | Date: 1:701/2020 Appropriate lifting plan shall be followed. = During positioning & placement of load care shall be taken to avoid injuries due to press in- between. - vehicles shall not be overloaded. - Correct rigging practice shall be followed. - First aid box shall be kept ready at site with all necessary medicines «& Emergency vehicle shall be kept on Nearby area. - Only qualified / approved crane operator shall be engaged for lifting operation. - Signal man with fluorescent jacket shall give the standard ‘signals to cranes, - AD the working personnel shall wear Mandatory PPE. Transportation = Boards shall be of barricading , ‘i properly secured to boards and | TPPling / Falling of Fatal / the transport 3 materials from vehicles. Medical other | nee 7 fone vehicle. materials from | /**!i¢ conBeston ion | - Shortest possible stock yard to and congestion free Page 15 of 21 LONGJIAN-KEC QV) ELHI METRO RAIL PROJECT, PHASE - 4, DC- 2 02 (Part Design and Construction of Elevated Sea oats Viaduct, Bridge across river Yamuna with PWD snaiiirecmmntiecs | flyover and 8 Stations of Yamuna Vihar to Burari. DocumentName | Method Statement for Barrication Works Document Code LONGJIAN-KEC/DMRC-DCDYMS/01_—_| Revision No: 0 site route shail be taken to reach the site. ~ Speed limit and safe distance from other vehicles shall be maintained - Planned site entry and exit points only shall be followed. - All the vehicles/equipment 8 shall be operated by trained licensed drivers. Fatal/ | - All safety features Medical like Brake tyre attention piessure, rear view mirrors, hors, etc. shall be checked prior to movement of vehicles on road. - Speed limits and safe distance from other vehicles shall be maintained. > Sufficient workmen shall be engaged for fixing é shifting on the road. ~ Use of appropriate PPE shalll be Fixing of Fatal / ensured for all Barricading | Unbalancing / toppling Metal workers, board on the | while board fixing attention | F98%™an shall be road (Median) deputed at site with fluorescent jacket, red flag (Day), whistle & red light baton for night times with other relevant PPE’s. Unplanned entry / exit points, Operated by untrained drivers / operators, Wrong parking, vehicle exceeding speed limit resulting collision with other vehicles/structures/ person Worker 4 | transportation to site Page 16 of 21 LONGJIAN-KEC (JV) DELHI METRO RAIL PROJECT, PHASE - 4, DC- 02 (Part Design and Construction of Elevated Viaduct, Bridge across river Yamuna with PWD flyover and 8 Stations of Yamuna Vihar to Burari. ‘Document Code Method Statement urrication Works LONGJIAN-KEC/DMRC-Dw2/MIS/01 "| Date: 13/01/2020 Workplace Barricades shall be secured by proper Nailing with 600 mum length é& 20 dia. Also secured by 70kg concrete block for strengthening the boards (Counter weight). All Barricading boards shall be connected by nut bolts. Traffic safety devices shall be properly kept 15mts buffer zone and advance warning zone shall be 20mts from working zones. Barricading boards shall be fixed with blinkers and reflective tapes showing the traffic flow direction. All barricading boards shall be kept ina straight line for public & vehicle convenience. First aid box shall be kept ready at site with all necessary medicines Emergency vehicle shall be kept on nearby area. ‘Trained worker Page 17 of 21 DELHI METRO RAIL PROJECT, PHASE - 4, DC- B. 6 02 (Part Design and Construction of Elevated ee KEC eae, | Viaduct, Bridge actoss river Yamuna with PWD siiccnnatnees | flyover and 8 Stations of Yamuna Vihar to Burari. Document Name | Method Statement for Barrication Works suseaEEnSEEaEED [Document Code LONGJIAN-KEC/DMRC-DCoYMS/01__| Revision No: 0 | Date: 13/01/2020 shall be deployed for using drill machine, = Allelectric connections shall be routed through ELCB/RCCB. = DG set starting & all electrical connections shall be done by a trained electrician. - Movable barricades shall not be fixed in front of bus stops or any other approach where there is not enough width available. ~ Vehicle shall be kept ‘opposite to the traffic direction at end of work site as, per barrication arrangement. = No vehicle shall be ; parked on road after bart ae 1 | crash with road users, Fatal / completion of work. 6 eee g | Public & workmen / hit Medical | - ‘Traffic rules shall be ere with barricading boards. attention followed at all times. ~ Helper shall be deployed to guide driver/operator for exiting from work zone. = Vehicle shall be kept at Ieast 3M away from working zone. 11.2 Environmental Hazard Analysis: Page 18 of 21 Reaapramietateate LONGJIAN-KEC (JV) = DELHI METRO RAIL PROJECT, PHASE - 4, DC- & 02 (Part Design and Construction of Elevated Viaduct, Bridge across river Yamuna with PWD shinee mesma | flyover and 8 Stations of Yamuna Vihar to Burari. Document Name | Method Statement for Barrication Works Document Code LONGHIAN-KEC/DMRC-DCOYMS/01___| Revision No: 0 | Date: 13/01/2020 SINo Events Hazard Risk Control Measures Sprinkling of water on all access roads to Dust minimize dust nuisance, back gear horn Movements of | o Ae ects Nuisance/ | shall be provided. Accident Location of equipment to minimize ae _noise impact on the community. Vehicles shall not be idled when not in use, 7 : Plant & Equipment shall be maintained Use of Plant | Noise 2 | pquipment Poise regularly as per the maintenance schedule, Tocation of equipment to minimize noise impact on the community. Page 19 of 21 LONG}IAN-KEC GV) DELH] METRO RAIL PROJ) PHASE -4, DC- 02 (Part Design and Construction of Elevated Viaduct, Bridge across river Yamuna with PWD | wn sts _| flyover and 8 Stations of Yamuna Vihar to Burari. Document Name | Method Statement for Barrication Works Document Code LONGJIAN-KEC/DMRC-DcoyMs/01___[ Revision No: 0 ANNEXURE-1 DRAWINGS Page 20 of 21 EGESSETIETS t “ypeaavasnsags pone) 7 | , i ¥ U af LONGJIAN-KEC (JV) DELHI METRO RAIL PROJECT, PHASE - 4, DC- 6 02 (Part Design and Construction of Elevated nctaeccpmetues | Niaduct, Bridge across river Yamuna with PWD [ mattinatirecmettmes | Flyover and 8 Stations of Yamuna Vihar to Burari. Document Name __| Method Statement for Barrication Works Document Code. LONGJIAN-KEC/DMRC-DC0qIMS/01__ | Revision No:0 Date: 13/03/2020 ANNEXURE-2 CHECKLIST Page 21 of 21 LONGJIAN-KEC (JV) DELHI METRO RAIL CORORATION (Checklist for Barrication Board installation ktocarion START [crsnace: ‘COMPLETION DATE [REF. DRAWING NO. & REV. NO. ITEM DESCRIPTION ‘Actual | Required | Accopted (vn) | REMARKS [Gheck orth worlhness coiicate wih vay ained fom 3p of Cranahiyea, loheck othe Ung tools end tackles obtaining be rd ary carticate before commencement of uniading of boards [Check & identity to lcatowpre marked area whee te boats tobe ints Joheck for larance of area Lit fe beicading boars the clear ofthe ground or sabizaton of Bose. (Check ere size of he Boards bo wana ae locaton Joneck wheter the gaps of Baricaing Board plecad esiacent to one anther ar plunged Icheck wheter the gaps of Bercading Board & lrouns plugged ty means of poctied Rebar stud LONGJAN-KEC JY [DHRC Represontative

You might also like