You are on page 1of 2

Weekly Schedule - Gifari

Week of: 2022-06-13

Weekly Objectives To Do Items Deadlines This Week

Build reliable cyclic test analysis models ✔ Analyze normal & BRB diagrid in SAP2000
to compare with previous experimental ✔ Analyze normal & BRB diagrid in Perform3D
Normal & BRB Diagrid (2D Frame) ✔ Analyze normal & BRB diagrid in OpenSees
✔ Compare with experimental result

13 Monday
June 14
Tuesday
June 15
Wednesday
June 16
Thursday
June 17
Friday
June 18
Shabbat
June 19
Sunday
June
✔ Start writing thesis ✔ Compare SAP2000 ✔ Make and analyze ✔ Make coding of ✔ Compare OpenSees
✔ Make and analyze analysis and normal & BRB diagrid diagrid model analysis and
BRB diagrid cyclic model experiment of cyclic model using in OpenSees experiment of
using link element in BRB diagrid: buckling element ✔ Make coding of BRB diagrid:
SAP2000 results are match in Perform3D cyclic loading results are match
✔ Make and analyze ✔ Compare Perform3D in OpenSees
normal diagrid analysis and ✔ Make coding of
cyclic model experiment of BRB element in
using link element normal diagrid: OpenSees
in SAP20001 results are match

Notes

It is found that SAP2000 doesn't support multilinear link element with negative stiffness (strength loss), the analysis failed to converge. Therefore, Perform3D is tried.
1

You might also like