Professional Documents
Culture Documents
322
614
292
K
false ceiling
KRISHNAN+PARVEZ+architects
450
450
AC SHOP NO.5, KRISHNA BLDG., ST. ANTHONY STREET, KALINA, SANTACRUZ (E),
M U M B A I - 4 0 0 0 9 8 , M A H A R A H T R A , I N D I A .
tel:+91 22 6702 4521/4522 fax:+91 22 6702 4522
w w w . k p a . i n p r o j e c t s @ k p a . i n
plywood paneling
plywood on the existing wall ALLIANCE ORGANICS LLP
J
paneling on finished with CORPORATE OFFICE INTERIORS
the existing approved laminate. 406, RAHEJA PLAZA, ANDHERI WEST, MUMBAI
wall
with hidden
plywood paneling MR. KUNAL MEHTA
3984
door
on the existing wall
2100
2100
provision.
with hidden door
3300
provision.
42
working table "
made out of
plywood SB43
150
50
finished with
01. DRAWINGS ARE TO BE READ AND NOT MEASURED.
150
approved 02. ALL DIMENSIONS ARE IN MILLIMETERS AND ARE UNFINISHED UNLESS
130
laminate / OTHERWISE SPECIFIED.
825
20mm plywood shelf 03. PROJECT MANAGEMENT AND CONTRACTOR MUST CHECK DIMENSIONS AT
750
veneer push
700
SITE AND INFORM THE DESIGN TEAM ABOUT ANY DISCREPANCIES.
70 400
400
H PUSH shutter 04. FOR ALL WORKING DETAILS, REFER RELEVANT ARCHITECTURAL DRAWINGS.
SHUTTER 05. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT
CONSULTANTS APPROVED DRAWINGS.
06. FLOOR FINISH SCREED IS 75MM ABOVE SLAB LEVEL (UNLESS OTHERWISE
70
SPECIFIED)
07. THIS DRAWING IS THE PROPERTY OF "KRISHNAN PARVEZ ARCHITECTS". NO
DATA FROM THIS SHALL BE REPLICATED OR USED AT ANY OTHER LOCATION
WITHOUT PRIOR PERMISSION OF THE ARCHITECTS.
SECTIONAL ELEVATION AA SECTIONAL ELEVATION BB
C B
false ceiling
PBF.12 PL21 PL21 PL21
wall finished with paint /
F
wall paper as per selection
PBF.09
MF.04
SB43
MF.03 MF.03
300 100
2700 DRAWER DRAWER
2963
825
750
PRINTER SHELF PUSH DRAWER
BF.09
SB43
PL21A(below side credenza)
238
1000
BF.07
A SB41 A
C 2175
SECTIONAL ELEVATION CC
SB42
294 100 50 50
MF.02
PN02
18mm ply to be
1550
B
BF.08 PBF.08 approv. PN01
INT-104/21/KM 1: R0
A
403 10.11.2021
INT-KM
C B S.D
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14