You are on page 1of 1

1950

duct
385
duct
162 1145 2925

480
0 0 895
215 0 86 272
0 147 5 50
245 14
AC outdoor unit

265 executive lift


45 265
27

OVERALL PLAN
DW-21 1:100 SECOND TO SEVENTH FLOOR

STRUCTURAL GLAZING
60X120X2.8 MM

165 265 325 265 480 230


2745 2150 1470 1620 895 1145 2925 2725 1450 1315 1725
seventh floor
WINDOW SCHEDULE 16

60 60
lvl +25850

500
1580
3200

3200
60
940
60 60 sixth floor
500
lvl +22650
3200

3200
2000
60 60 60
500 520

fifth floor
lvl +19450
3200

3200
2000
60 60 60
500 520

fourth floor
lvl +16250
1980
3600

3600
60
940

third floor
60 60

lvl +12650
500
1980
3600

3600
60
880

second floor
60

lvl +9050

600
STRETCH NORTH ELEVATION
DW-21 1:100 SECOND TO SEVENTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY:SM

110
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019 APPROVED BY: SS
CONFERENCE HALL, SERVICE
DECIDE ON ADJUSTMENTS
APARTMENTS, RETAIL & BASEMENT
B. 28TH APRIL 2022 NORTH STRETCH ELEVATION
COPYRIGHT OUTRÉ DESIGN C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-21

You might also like