riser duct

duct
6140 4900 1365 2085
balcony 5
975 164 224
5

110Ø Rain water

OVERALL PLAN
DW-24 1:100 SECOND TO SEVENTH FLOOR

STRUCTURAL GLAZING
60X120X2.8 MM
260
570 140 365 145 135 230
1195 975 6140 700 4900 700 1365 2085 1010 1645 1500 2245 2645
seventh floor
WINDOW SCHEDULE 15 lvl +25850

600
485 500 1170 1000 700

2600
1240 500 2115 sixth floor
lvl +22650

500

3200
300 600 1200
600 600
2655

fifth floor
985 1170 1700 lvl +19450

3200
2650 500
705

16200
1850

385
fourth floor
300 lvl +16250
1000 650 750 1155

3600
2450

third floor
lvl +12650

3600
second floor
lvl +9050

600
STRETCH SOUTH ELEVATION
DW-24 1:100 SECOND TO SEVENTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

113
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 SOUTH STRETCH ELEVATION
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-24