You are on page 1of 1

1 2 2' 2'' 3 4 5 6 7 8 9 10

50900
1200 1775 1500 2225 7500 7500 7500 7500 7500 5500 1200
3875 2550 4175 3900 7475 18550 3950 2550 3875

A'

2500
2500

2500
2500
TRANSFER PUMP
FOR PROPERTY & SUPPLY STORAGE ROOM
POTABLE 80 SQM.

A FRESH LINEN SOILED LINEN


D13

1200

1200
1850

1850
D13 SS D13
B FHC FHC
UTILITY MAINT. UTILITY

LINEN LAUNDRY OFFICE PUMP RM. 1


LINEN HANDLING FOR FIRE PUMP
3000 HOUSE-

3000
& DISTRIBUTION (OUTSOURCE)
W10 D13 MAINTENANCE / JOCKEY PUMP
34.2 SQM
5500

5500
70 SQM
W9 MAINTENANCE WORK AREA KEEPING
103 SQM
38 SQM W21
SERVICE ELEV. D17 SERVICE ELEV.
UP DN DN UP
HANDLING W10
2125

2125
DRY STAND PIPE OFFICE AREA OFFICE WET STAND PIPE
BLOCK OUT BLOCK OUT
D17
D33
C D4
FIRE EXIT ELEV. W10 D6 W10
CYCLONE WIRE ON STEEL FRAME PARTITION

ELEV.
D4
FIRE EXIT

2200
2500

D6
DRIVEWAY
6000

6000
3250
RECEPTION
3 W10 &
WAITING AREA
RECEPTION

W22 D17 W10 W10

D WATER LINE RISER


& DISTRIB. LAYOUT
D12
D22
D6

MAIN STAIR
ENGINEERING CR RECORDS
33900

33900
DN UP M. CR
4 1 SERVICE ELEV. OFFICE W10

HALLWAY
6000

6000
SS
CONSULT.
JAN. D23 RM.
ELEV.

8525
14925

5 DRIVEWAY 2 SECURITY

DRIVEWAY
LOBBY W10

HALLWAY
SERVICE ELEV. F. CR
OFFICE EXAMINATION
ROOM
D22
E W22 D17 W10 W10
& EXCERCISE RM

6 TREADMILLS
6000

6000
RAMP DN.
STORAGE
TO LOWER GROUND
SUPPLY ROOM

3450
7
D6
F CONTROL COMP.
6600 ROOM ROOM
4300

CATH.
MEDICAL GAS D6 WORK RM.
CATHLAB
5500

5500
7000
DRIVEWAY 82.5 SQM

PROCEDURE ROOM 1

PUMP FILM
2700

G RM. 2
1200

1200
TRANSFER PUMP FOR RECYCLE WATER
RAMP

H TO GF

RAMP
FROM GF

6975 10875 15200 3925 6875 7050


1200 1775 1500 2225 7500 7500 7500 7500 7500 5500 1200

8939
50900

1 BASEMENT 1 LEVEL FLOOR PLAN


A 2a SCALE 1:100M
0 1 2 3 4 5M
TOTAL FLOOR AREA = 1,641 SQM

CONSTRUCTION BULLETIN
6950 DATE ISSUED: AUGUST 10, 2019
ARCHITECT ENGINEER/ STRUCTURAL ENGINEER PROJECT TITLE/LOCATION: PROJECT OWNER: OWNER REPRESENTATIVE: APPROVED BY: SHEET CONTENTS: REVISION: SHEET NO.
REG. NO.: 13388 REG. NO.: 82613 LOWER GROUND FLOOR LEVEL PLAN

TIN: 181246932 TIN: 201-045-910


ALLIED CARE EXPERTS
PROPOSED 8-STOREY WITH TWO BASEMENT LEVELS & A
ALVIENTO + IGNACIO & ASSOCIATES FERDINAND A. IGNACIO JR. PTR NO.: 1698698 GARRY G. ALVIENTO PTR NO.: 1692687
ACE ROOF DECK WITH HELIPAD HOSPITAL BUILDING (132 BEDS)
MEDICAL CENTER
ALLIED CARE EXPERTS MEDICAL CENTER (ACEMC) - PALAWAN
ALLIED CARE EXPERTS MEDICAL CENTER AMADO MANUEL C. ENRIQUEZ JR., M.D. -
PALAWAN
PALAWAN
ARCHITECT ENGINEER CHAIRMAN OF THE BOARD - ACE GROUP OF HOSPITALS
2a 58
A member of ACE Group of Hospitals

DATE: 03-07-19 DATE: 01-16-19 TINIGUIBAN, PUERTO PRINCESA, PALAWAN


3F NETHSQUARE BLDG. 2, ADDAS II, MOLINO II, BACOOR BLVD., BACOOR CITY DRAWN/DESIGN BY: FAIJR CHECKED BY:
gmail: alviento.ignacio.associates@gmail.com contact nos.: 09266467494 / 09064669531
PLACE: BACOOR PLACE: BACOOR FILE: DATE:

You might also like