CLIENT: BIEN DONG POC BIEN DONG 1 PROJECT. “TROLEUM TECHNICAL SERVICES ‘CORPORATION conTRAct’ SURFACE PREPARATION AND PAINTING PROCEDURE Document No.: £1001-00-Q-P-0020 PETROLEUM TECHNICAL SERVICES CORPORATION ‘BDPOc a [oe [var aw ro 2 fos [arr [wal oe Eel BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG — 1 PROJECT PCI OF HAI THACH PQP, HAL THACH WHP AND PIPELINES Tiong 20 SURFACE PREPARATION AND at a RevionNes? PAINTING PROCEDURE ar 20 REVISION RECORD SHEET No. | REV.NO. | CONTENT OF REVISION DATE OF REVISION i [Bi Tse fr eview by Company (8, Ma. 2010 2 fo Issued for review by Company 23. uL 2010 a ft Issued fo eview by Company (46. Mar.2012 TicorporiedcammeniTinprovenont as a |e rest ofthe joint ntl gua aut by CliewLR aid PSC, Issued for Approved for Construction Y7-Apsit.2012 BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG~ 1 PROJECT ePCI OF HAT THACH PQP, HAI THACH WHP AND PIPELINES 2.0 CODES AND STANDARDS. 3.0 SURFACE PREPARATION, 3.1 Blasting 3.2 Solvent cleaning and Power tol cleaning, 40 COATING PROCEDURE. 41 Coatings Application and Matai 42 General Applicaton, . 463 Spray Application, 444 Brush and roller appiation. 445 Touchpad Repair of Pai Dare 5.0 INSPECTION! QUALITY CONTROL 51 Inspection 52 Visual Inspection 533 Film Thiekness, 54 Temperature and Relative Hamidi 55 Adhesion, 5.5 Cure Tes of Zin Slate Primer. 5.7 Slt Testof Virgin Bing Abrasive 5.8 Continuity (Holiday) Testing. 59 Surface reparation. 60 SAFETY... 110 COLOR SCHEME... {8.0 IDENTIFICATION SYSTEMS, 81 Colour banding requirements for piping, 82 Colour code. 9.0 APPENDICES. Hino og 00 SURFACE PREPARATION AND #0121 evn Nes PAINTING PROCEDURE Dai FAROE ‘TABLE OF CONTENTS Lascore. . 3 1.1 Execution of work “ 3 8 5 4 1 4 is 1s 16 16 16 16 BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG 1 PROJECT ¢PCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES. Fioae@ 00 SURFACE PREPARATION AND Po Sot 2 Tene Nad PAINTING PROCEDURE Dai Apr 14 SCOPE ‘This procedure covers the requirements for surfce preparation and costing for structural tel piping, vessel, tanks and ther lems nominate for coating by approved drawings and specifeaion. 1.1 Execution of work. Exot of the work sallbe dened a follows: LL Surfaces and mtr hat require coating: + Carbon tel = Lowalloy tel 1+ Other surfaes ofa lssubjet to corsion + Carbon ste piping and supports + Alloser surfaces nomiated for coating on the Project AFC Drawings 1.12 The folowing ries and items shall ot be pinto ond 4 Surces,euipment and appurtnancs located below specified solish zone. + Non-netli surtises + Surtaes tobe fre poof 1+ Uninslated stainless stot with maximum operating surface temperature below 60 degC 1 Galvanised steel except Inder, cages, srs, bandas, stainless sce, and ‘+ Weatherpeofing on insulasion 4+ Machined sufaces 4+ Intemal surfices, coatings end sings BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG 1 PROJECT ePCI OF HAI THACH PQ?, HAI THACH WHP AND PIPELINES. Flowrca.g-hono SURFACE PREPARATION AND | Pseet 2 eon Nos? PAINTING PROCEDURE [ar ao | Tape + Robber tes, belts feble braided connector, nameplates ness sel bing ending, ges aves, ad moter ss + Nameples infomation cing end ine 2.8 CODDS AND STANDARDS ‘The latest edion of flowing Coes and Standards bal apply 'BD-00.4-S-0831 Rey. D2 Speciation for Pintng and Protective Coatings _Amsican Sosisty for Testing and Materials (ASTM) ASTM A780 Standard Practice for Repeic of Damaged and Uncoated Areas of HotDip Galvanized Coatings ASTM D363 Standard Test Method for Fim Hadness by Pen Test ASTM Da2as Standard Test Method for Indicating Oil or Water in Compeesed Ale ASTM pai? Standard Test Methods for Field Mousurement of Surfice Profile of Blast Cleaned Steel ASTM Dass Standard Test Methos for PulLOM Song of Coatings Using Potable Adhesion Testers ASTM D064 ‘Standard Prctce for Conducting a Patch Testo Assess Coating Compatibility ASTM Dss02 Standard Practice for Assessing the Solvent Resistance of Organic Coatings Using Soveat Rubs ASTM E376 Standard Practice for Measuring Coating Thickness by Magnetic Field or Eady-Current (Gleeiomagntie) Exaniation Methods 0 for Provetive SsPC PAL Paint Applicaton Specification No. I, Shop, Feld and Maintenance Painting of Stel BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG~1 PROJECT ePCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES osu Nez Elonag.0020 SURFACE PREPARATION AND | Pass 0¢ 21 ‘oven Nes 2 | PAINTING PROCEDURE, aie Apr 2 SPC PAZ Print Application Specification No. 2, Measurement of Dry Coating Thickness with Magnetic Gauges SSPC PAS Paint Application Guile No.3, A Guide to Safety in Paint Applications ssPC VIS L Guide and Referene Photographs for Stel Surfces Prepared by Dry Abrasive Blast Cleaning ssPcsP 1 Solvent Cleaning ssresp2 and Tool Cleaning sspc-sP3 Posse Tool Cleaning SSPC-SP 5/NACENo.1 ‘White Meta Blast Chaning SSPCSP 6 (Commercial Blast Clening SSPC-SPT/NACE ND. 4 Bish-Of Blast Cleaning SSPC-SP 8/ NACE No.3 Picking SSPC-SP 10 /NACE No.2 ‘Near-White Blas Cleaning SsPC-sP 11 Power Too! Cleaningto Bare Metal SSPC-SP 12 /NACE No.5 Surfice Preparation and Cleaning of Metals by Water jting prior to Recoating BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG 1 PROJECT ¢PCI OF HAI THACH PQP, HAITHACH WHP AND PIPELINES, Pioorano-hone SURFACE PREPARATION AND Peo ‘elon Nas? PAINTING PROCEDURE [bac Tapa National Association of Corrosion Engineers (NACE Rp os? Feld Measorment of Surfice Profile of Abmsive Blast Cleaned Stcel Sufies Using & Replica Tape RP 0188-85 Discontinuity (Holiday) Testing of New Procective Coatings on Conductive Substrates Others 150 8803 Part 1,2,2,4 and S Preparation of Sttel Subsvates before Applicaton of Pains and Related Products ~ Surface Roughness Characterises of Bits-Cleanod Stee Subsvats ‘30 SURFACE PREPARATION “The surface preparation foreach coating sytem stall comply with the requirements dead in Appendix A Projet Painting Mate 3.1 Blasting ‘Suitable abrasives for use in blast cleaning are: 1+ PS Ball (it size 0.6mm ~ Imm & Imm ~ 2mm) or or suitable abrasive basing ps approved by the Company ‘© Garnet 3080, Garnet 1630 Setwp procedure bist caning equipmeat i allowing Check fitings and hose fer wer. Safey-wie couplings tether. (Check helnet ites and al supply. (Check popup vale for alignmeat Test remo contr Make sr blast machin is adequately grounded, lasing abrasive shal be dy, clean and ie from contaminates sal be of type an size ‘adequate to give reqsited surface profile or anchor patter, The abrasive sll contain 20 ‘more than 50 pars pe million chlocde by weight BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG ~ 1 PROJECT ePCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES Eiounasg'ho0 SURFACE PREPARATION AND "#7042! Tet Na? PAINTING PROCEDURE baw iiapetao | ‘To achieve the requéed anchor profile, abrasive pale size shall follow the surface ‘preparation commentary of the SSPC manual as necessary 10 comply with SSPC-SP 10, Surface Preparation Speciation ~ Near White Metal Blast Cleaning, Surface preparation fo oatingappiction wil be carried out afterall tract, mechanical, Dining and welding verks have Boe completed onthe equipment. Before any cleaning cperton commences, ll ough edges shall be reduce, surface ives ad aps shal bo grotnd out (all comers and edges are to be rounded ta 3am misimum radius} and weld spar and welds exiting excessive surface roughness shall be smoothed to ensure proper pintadesion ad vi hikes [efor and after blating, all wekdments shall be closely inspected for the presence of welding fx and spate, silvers. inclusions, mination, abi undecying mill scale Imperfections shal bemecbancally removed and the immediate area re-base, Working pars of machinery and valves, instruments, glass faces of gauges, light ft contol panes and consoles, ec shll be proecied (masked) against dame during bras blasting and from the ingress of blasting abrasives end osdue, and ftom pat overspeay Prior t blasting, all ol, grease, mill varnish, soi, salt, and oser contaminants shall be removed by solvent cleaning in accordance with SSPC-SP 1, Surface Preparation Speciation ~ Solvert Cleaning and/or wet steam and detergent cleaning ‘lasing isnot permed i the relative humility is greater than 8S perer, or ithe surface ‘temperature ess than 3"C above tear dew poi. “The compressed sir sippy for lasting shal be ee of devimensal amounts of ol and wate, adequate separators and aps shal be provided and sal e frequently checked cleaned and empties ‘Stiniss stool and aluminium suface which ate coated shall be solvent cleaned, Stainless steel surfce shall be abraded by abrasive last cleaning using non-metalc abrasives with a ‘horde evel less sa $0 pm No aid washes clearing solutions, solvents, or inhibited washes intended 1 prevent rusting shall be epplied to sunfces afer abrasive blasting and prior to the fist primer coat application. ‘Sarfie finshed with splash 20a coating system shall Have an anchor pater of 75 — 125, microns, Surfaces excep plas zone ares and upper deck pate, shall have anchor pattems ‘between a minimum cf 35 mierone and a maximum of 6S microns, bul sietace profile have to satisfy recommended by pitt manufacture, Srfaes shall be thoroughly cleaned of dust ‘and contamination before new costings are applied Afler basting, all Batng residues and spent gis shal be blown down with compressed ir for visual inepestion. Any unsasfactry ares shall bere-blasted BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG ~1 PROJECT ¢PCI OF HAI THACH PQP, HAL THACH WHP AND PIPELINES SURFACE PREPARATION AND | Pt of 21 Revlon Nas? |_ PAINTING PROCEDURE ‘Bre. Ape B02 ‘32 Solvent Cleaning and Peer tool lensing If surfaces on machisry and equipment cannot be abrasive blasted witout damage ot sontamination of mcving parts or other eral surfaces, the surfaces shall be solvent ‘leaned as specified in SSPC-SP I, AMlr solvent clearing, the surfaces shall be cleaned by hand / ce power tool as specified in SSPC-SP 2 Surface Preparation Speifeation ~ Hand ‘Tool Cleaning. Prior approval shall be obisined fom the Company before caying out this power tol cleaning 40 COATING PROCEDURE 4.1 Coatings Application ard Ma S11 Coating Mutesas Coating and sher consumable materials shall be new. Materials shal be supplied ‘unopened inthe coating manilactuers container, Th unopened corsets shal be ‘leary identied, Labels and tags shall be inact and no coating shall be used afice ‘the manufactrer’s recommend sb life has expired Al coating msterias or punt shall be approved by COMPANY peloe to aplication Submission of Teshnia! Date Shoes (TDS and MSDS) and details of succesia performance history shall be provided for approval 412 Coating systems ‘The costing stems andthe required surface preparations ar listed in Appendix A ~ Projet Painting Matrix. 41.3 Packing and Storage {A punt and costing materials shall be furnished inthe manufacturer's unopened ‘containers, which sal be identifiable and protected. [Batch number and date of manufactere shal be clearly marked onthe contsines. “The commended shel lif and the "use by dat” shal be clearly identified. All materials shal be stored out of diet sunight in well ventilated, areas and aay {fom heat soure, in acordance With manufacturer recommendations. 414 Mining Prior to sppiston al coating meter shall be vigorously stied and/or agitated in spray pots unt pigments, vehicles, ang catalysis are thoroughly mixed. During BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG ~ 1 PROJECT ePCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES osama Nas ea SURFACE PREPARATION AND | P*s"?00 2! PAINTING PROCEDURE ater Apa 30 424 422 42 General Coating Application pplication, ccatings shall bo continously sted by mechanical spray pot agators ‘or oter approved means Coating material shall not be mixed or kept in suspension by using a babbling air stream, If seing has ocurred it must be remlsed mediately before using. No ‘hinner shall ke add unless necessary for proper application. The typeof thinner sed shall comply withthe manufacturers instructions. All omponens shal ke thoroughly mixed by mechanical meas, ‘Mining shall be done in clan containers fee rom traces of grease, oer psine or contamina. ‘Mul-componsnt coatings, such as inorganic zine, epoxy and polyurethane shall Ihave the components accurately measuyed under he manufacturer diection Pot Life ‘The coating wanufacuers recommended pot life shall not be exceeded. When this lit is reehed, the spray pot shall be emptied and cleaned, and new material shall, be mixed Application Painting shall be carved cu by sires spray andor conventional air spray according to the manuficurer resommensaton, Applicaton Conditions ‘Coatings shal be applied under the vironmental conditions established by the coating manulcture. No coating sal be epled under following eicumstances On wet sutices ‘When the Relative Humidity is above 85% When the Surface Temperatures less thas 3"C above the dew point When the wind speed encees tis ‘When ambient or Surfce Temperatures ure blow minis 15°C ‘The Contractor shall very that these conditions are met before coating begins, on a ly basis, with lastuments in his possession, and keep records of these ‘Wherever painting is cared out in the field and poor weather condition preva adequate precautions shall be taken to protect the activity ffom adverse effets of BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG ~ 1 PROJECT ¢PCI OF HAI THACH PQP, HAI'THACH WHP AND PIPELINES SURFACE PREPARATION AND PAINTING PROCEDURE, ‘wind, contamination and rain shall be covered by sitble material or canvas which donot absorb ater 423, Dust Every possible prscauton shall be taken to oiminate dst before and during painting process. Cleaning down prior to painting is recommended by manufacturer following feng peiods between coats and flowing inclement weather. Cleaning dows may be done by wish water spaying, sanding paper or by oer approved metas 424 Primer coating ‘The tial primer coat shal be applied as soon as posible afer surface preparation. In all eases the primer coat shall be applied during daylight hows onthe same day ‘he surface Is reared, bat in no case ltr than 4 hours afer basing, ‘When cut anc coped ste srectural items are bastcleaned ara costed with zine silicate primera second coat of epoxy sealer cot shal be applied before Hit-up and ‘welding at conseuction sie of ui items. ‘Ay surfaces accessible for proper coating application and/or inspetion, stall be ‘coated prior to final assembly. Specifically, anges faces and bolt hoes shall be ‘coated pir tena installation, 425 Dryness Prot © applying a succesive coat, all coatings shall be allowed t dey at site fmbient cendions for at least the minimum time specified by the coxting ‘manufacture nd ot longer than the maximum tne forse ambient conditions "No coating shall be applied wver «provious cating that ic el throughly dy. 426° Recoating ach coat shal be in a proper suite of eure or dryness before the application of the ‘ext cot. Mari shal be dry for re-coating when an adiional coat can be applied Without de development of any detrimental Mm regulars, such siting ols of adhesion ofthe underoat ‘The maximum and minimum re-ompleted coling shall be visually inspected for appearance. Costing shall be fee from excessive sagging, dry spay, pinholes, blisters and ther types of coating ‘pplication detects and shall bern coating damages 53 Film Thickness 53.1 Measurement BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG ~ 1 PROJECT ePCI OF HAI THACH PQP, HAITHACH WHP AND PIPELINES. ‘Document Nas Elncag-ean20 Revlon Nos? SURFACE PREPARATION AND "#50121 PAINTING PROCEDURE Dae 17-Apnc™ | During coating the wet fim thickness shall be spot checked, thickness ofeach coat shall be measred DFT by means ofa magnetic ype thickness gauge EAS, 53.2 WPT Measurements ‘The comb-ype gauge shall be usc. The surice selected for measurement should be smooth. The comb i placed inthe newly applied wet paint fm, The WET will be indicated wher the tooth has touched the paint WPT (DFTHIG0)"%Volume solid $3.3 Dry Film Thekness (DFT) Value “The thickness ofeach coa! shal be determined prior fo the application of subsequent coat in accorsance with SSPC PA-2 withthe alloted spot average masinum and ‘minimum coadng thickness a sted or clare in Appencx A. ‘At least three gauge readings shall be taken foreach thicknes determination. Atleast five separate thickness determinations shal be taken foreach 10 square meves of coated surfice, On coated surfices less than 0 square metres in ae, at last hoe thickness deeminaons shal be ken, The resus of the coating thickness chosk shal be reoréed onthe “Blasting and Painting Inspection Report" ~ Appendix B, Particular atetion should be made to comers of pated surface. Where mii thickness levis are not reched, the comers vill be cepanted to achieve the ‘minimum DFT requireeat resistance gauge or eddy curtent principe, such a Eeometer 486, ec the gauges for DET checks sal be eaitraod hfe conducting fm thickness measurement for at least vice day in accordance withthe manufrs zeommcndaion DDFT= (WET % Volume sog/100 ‘5.4 Temperature and Rdative Hum Temperature and relative humidity sall be measured with a calibrated temperature gauge snd a hygrometr, Readings shall be tshen prior © the commencement of blasting andlor panting and at regular intervals ichee are caanges in cliatie conditions ‘SS Adhesion BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG 1 PROJECT ePCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES Eran SURFACE PREPARATION AND Pe 60t2t — PAINTING PROCEDURE [Bx Tray 56 87 58 59. A Coatings may be tested by the COMPANY for adhesion when deficiencies inthe surface [reparion or puatcg system are suspected. Where adhesion isnot sufiiet to provide ‘Sound prosetion, te coating shall be removed and the area recoste as specified. Adhesion ‘willbe checked with an hydraulic adhesion tester ELCOMETER 108 in accordance with [ASTM DASH at locations seloctod by the COMPANY. Acceptance erieria stall be per ‘manufacturer recomendations and corelaed with dhe ype of equipment tht i used (Cure Test of Zine Sticate Primer ‘Cure test in accordance with ASTM 4752 sal be performed on inorganic zine silicate primero ensure its eared for second coating. Salt Test of Virgl Blasting Abrasives Chloride contamination shall be determined using ast conductivity meter Operation of the conductivity metor shall be in aecontanve with the equipment manor, Conti ity Holiday) testing ‘Where specified coating continty test shall be cary out in according with NACE ~ POS ‘Surface preparation ‘The blas-ceanad surfaces stall be Inspected o ensure the the areas surfaces comply to the specification requirement In one Jot of blast-cleaned materials he sufece peoflle and surface roughness shall be randomly ehockod using Testes replicate andl Surface profile comparator “G" ype. ‘The reading shal ke recorded at leas once daly. ‘Additional readings shall be made and recorded in the event tat blast cleaning operation parameters are change, “The above Testex replica tape shal be atached togeter inthe dally blasting and Pasting Inspection Report corespording 1 the item tested As the surface roughness measurement by testex replica tape is done on a represeraive lot of blasted surfacesnembers, the comespending daily blsting report ofthe oer bested members shall make reference 1 the report number where the tse relia tape is each. BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG ~ | PROJECT ePCI OF HAI THACH PQP, HAL THACH WHP AND PIPELINES, SURFACE PREPARATION AND _ | Pate 170621 Review Ros? PAINTING PROCEDURE Dae Fp 30 Go Savery Materia! Safety Datasheets (MSDS) shall slays be avalable for review during transport snd prior tothe appliation ofthe oduct. Manufacturer's instructions forthe safe handing ‘of products shall be lowed to minimize the tisk of injury or eretion of health hazards petsonel ‘Storage, mixing and application ofthe pant and coating materials sal be performed sity in aoordance with he manuTatuer’s recommendations. ‘The correct use of personal protection equipment (PPE) shall be employed daring the coating preparation and application, ‘Abrasive basing ard spray coating shall be performed with approved equipment by ‘experienced operators. ‘The SUPPLIER shal. provide al operators with hoods for protection agaist abrasive ang With paint masks that are OSHA approved for extended service. The hoods and masks shall, be wor at ll times when wor eben done, Pressure vessels, sch as sand hoppers and compressd-ar volume tanks, sal be protected fiom over-ressrizaton with automat pressure relieving devices. Pressure nozle cont shal be ofthe fille, deadman pe. Pressure hoses shall be pressure tested and cerifed and hose connections shal incorporate a positive locking mestaniam to prevent acidental disconnection (For example, qick-connect ‘Connections shal ave safety wis place). ‘Adequate venilatir, shall be provided in confined areas with blowers capable of a ‘minimum of 1 az changes per hour ‘Spray and blasting ecuipment in confined areas shal be securely grounded to dissipate sic clecteal charges. Work permit shall be obined peor to any blasting or coating activites insige a confined space Hand tool sll be mae of spark proof material Approptiawe aitfed asks should be used during basting and cocting operations. Other Personne! in the viinty shall wear suitable protective mass o espiafors when necessary. ‘Adequate ventilation mast be provided in confined spaces and when using sed masks i these areas tenor should be paid to the possiblity of explosive vapour bulléup. As a ‘minimum, das, rst and vapour should be’ directed away from the opemtor by wind er eration fa, BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG ~1 PROJECT PCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES Borsa Re Eroerano 20 Revisor Nas? SURFACE PREPARATION AND Fost #8s¢21 PAINTING PROCEDURE, ‘Dae Apna 70 COLOR SCHEME, ial colours shall bes follows All equipment, pariclrly nozzles, tanks, piping and cable trays and cable ladders shall be cathe to prevent spring ad electric shoks fom sai electricity. Colour |_RALCode Equipment) Area iver Thave ey = |Meat a piping) Oise Red 3009 [Deck up surface pework exci Tale (ih our Band) Saket dock sacral set ‘Allsuppor, skids, and bseplaes (except Srepamp equipment) Signa Yetw | 1003 | Bspumpe Walkways outline o desk) Canes iy eqlpmet = Fire bting equipment ad piping for Hrewater sigratned | 3ooi | Fis iain y Sigua wie [anna | Usiamlated vee i __| ute Gave exert Signal Gress qealie 6032 | Wakays elideck = Colors spe the Project drawings Sina Re 3001 | Acute valves, fil closed Signal Gremn | 6032 | Actuated valves. il open Sigal Yellow —| 1003 | Actuated valves. fills poston eat exchanges, pumps, compressors nie Peal Grey 7028 | andeeetral pals and equipment, and __| mechani equipment packages BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG - 1 PROJECT ePCI OF HAI THACH PQP, HAL THACH WHP AND PIPELINES 8.1 Colour Banding For Piping coding Hist [Dera Nas OREPARATIONAND |rupan Bint a pon SURFACE PREPARATION AND | Pot Revisor 802 PAINTING PROCEDURE Bate Apa BO {80 IDENTIFICATION SYSTEMS Piping wil be ident scconding tothe avid Hud as stipulated inthe following colour 1. ‘The Bud identi colour sal be plied by means ofa sprayed band "X" mm ‘wide around the ppe at amaxinint of 3 mses intervals and on ele side of ech valve iting, wal penetration, deck penetration and anyother place where the emtfcaion of te Dud is newer 2, The flow direction shall be indieated wit lack pained arrow Fig = ie Xmm 180, 250 82 Calor cos seven Desraon | __ coeur | GALS roe La [om sa free at Fo alo Oe i ness Ve ae) | vi —[ veo ia Tow Presi Verte) | FL [voce ia Arosa Ta [Yai “m Felis oF [yet eve ro BIEN DONGPETROLEUM OPERATING COMPANY BIEN DONG ~1 PROJECT ¢PCI OF HAI THACH PQP, HAI THACH WHP AND PIPELINES SURFACE PREPARATION AND PAINTING PROCEDURE, Date Apa 30 inset Gas G__[Yetow-oaive 7 Unity Gas ‘cu [vetow-Oetve 4 Eshacst Gas (engines) ce [NA WA. Closed Dain De__| Black 006 ‘pen Oran DO | lock 006 Producel Process Wat We [Broun Black 0049006 Uaioe vu [Green aia Piaie Watt we [Green oa ‘Sea Water WS [Green | ‘Coating Mean we | Geen cy Fre Wier FW [Fes 00] Bese Fue OF [Bows Bo 3000 Travan [Ta [pre e an Pant AU [baht Bie ani Sean X__[SherGrey Tot ‘Steam Condenesia SW [Oak bive 0 ‘iyo! L___[BoweBte Bo01 6016 one 13 _[ghtBiue-Seon | 5012/0024 lube Ot “cL__| Biow-ceeen ‘50016024 Chile ser Pu Green ae Hypertonic ec__[wagenta 4010 [Fe Fin Shei ce __/ Re 2000) Corrosion hier cl | Mage 4010 ‘Chemicals, Sohne P| agent 010 Washdoun Water VO | Green i Trpeion Water vl | Gre om Treiea Water wt [reen 24 ‘Sewage ‘yw | Brewen 9005 6024 BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG ~ 1 PROJECT ¢PCI OF HAI THACH POP, HAI THACH WHP AND PIPELINES Fiorano one SURFACE PREPARATION AND | 24002! er PAINTING PROCEDURE |= Fx 90 APPENDICES APPENDIX A: Pint Matti |APPENDIX'B: Bling and pining inspection repo [APPENDIX.C: Request for specton (RET) APPENDIXD: Holiday testreut APPENDIC E: Chloe Test Report Form APPENDIX: MEK Solvent Rub Test Repor Fm, APPENDIXG: Organization Chat-Predution Costing and QC Costing APPENDIX Ht: BlastClening & Coatings Applicaton Equipment List APPENDIX: ListofCaivated Comings Inspection and Testing Tools Equipment APPENDIX: Work Instron in Mining and Application Teshniqu when Hi Build Epoxy iso be Applied as Sealer Coat Jane] > [om | me [am] om |= | feta} anStn|enesizize! «| |S] | a fommeennmee ns west |e ane || aun msc anal» fom | ow [amon fe |u|» cel tan ena] [ISS] © [eee] aire, elblelé 3 z = {199POUd 1 9NOG NATE +HES Tee | as 2825-3-8 [3FH3- ie if ue ine Hie elelilia P| 68) 68/68] 2 e]al- Hel Bel elele Hiele [ees elelelele “Hb3 tt Ele [eles iH BE Hi ve [oe fase] oe [os ul | sors 7 vn [oe fase oe fo fel [mee faatag] mrmew |e ||| ee fate lmlce| Sr laos wav cr] [ow fs nen tig] meme i so [wea [on Lo oe verve |e | PE] | a i 2 lac abe 3 1 ' é z = H ESE | wn |S. ce] oe ein mamas | ee ote Sa esky me Sie eae ct "ote al 1 tl iE h i a He in #58 | 8 | 3 248-3 3785-3 | | ne fesse a ses perm e | shel ey tees eat cm as] | meme oY a — “arumoe a mi cmon] aad ‘and ave} sel TTTHOT a “nian 48 ONO ‘voxsamoano | anmmunvassanoae | 2laAeRomKo els AB SUVA 7a er ar aoa a Ge cconTRact xo. CONTRACTOR DPROIEEEFITLE = LocaTion DESCRIPTION Sundar Sree Finis Speciesion “sive Manas BIEN DONG PETROLEUM OPERATING COMPANY BIEN DONG 1 PROJECT BLASTING AND PAINTING INSPECTION REPORT REPORT NO, RATION Sires Profile a “Tipe Gris of Ate Saree Clie ‘Asie Site Sze Cling Maid Feet ste ber PSINT PREPARATION. Pas Nassar Tesi T ait Type & Cae No Applian Sane TipeatSokeat Ul Ager No Psion) Tine Ratio 2) anion Pai Caner Method of Application: Ales Spray Y Conventional Spray ter Brash OPAINT APPLICATION: 1 coar | F¥Coar [cour | a Cour PAINT TYPE DeBaTenp- (Des) ‘Wet Bub Temp. (Des. © [Sel Temp. eg.) Raliis H ro) Dev Poin Dep ‘Wester ‘in| Max {Min [Nain] Maxie [Mia ‘Wer Fin Tein age (0 Dats DFT Taken Dy Fi Ts L T I L DYDESCRIPTION: Prapared By PTSC Gish y Fan Woowcer | yoncwea ny wooe Rep. » Name Siqnacure Dave APPENDIX PETROLEUM TECHNICAL SERVICES COMPANY REQUEST FORINSPECTION ee REQUEST NO. (wea) Sten vor fssencrow pate vocaron ate 0 TIME ct cas: st a Hide Nabe evEW rospucron WEnGSS HOLD Jie aint frre coco PISC BDPOT oro CO CO CD C7 [gceatae: lignan: rane TSUN OT SAC HOW TACT ens _(Aach Drawings, Reports and Other necessary documnests if any) 1 TO oe | : REMARKS Co — | TeROWTL ERENT Sr Rema) TESS og T Bom oN = soe cet on se = oe eee me oa ps 0 Co _Kerctaent T equa fr hopocion (RF) bs sno BDPOCS QAIQC at st 20s etre npecton 1 Forapetn work on Sturdy or Say he RI be sutra to BDPOC oe Fda rar te weekend 5 toronto wom Public Holy Rf bei BDPOC a est 4 ys bee the inspec, eee] APPENDIED BIEN DONG 1 PROJECT HOLIDAY TEST RESULT Pret ala mapate iat Teste Na De of ia tat pescrurnion | prriam| YOUTACE | wesuut | aeManks | comment tame in toons commas batt Dare: DATE BIEN DONG 1 PROJECT ‘C1 OF HAITHACH PQP, HAITHACH WHP AND PIPELINES, APPENDIX (CHLORIDE TEST RESULT Projet “Abrasive Manufacturer - Job No: ‘Type of Abmsive: Cleat ‘Size of Abrasive: Date of Chloride Test ‘Testing Standard ‘nvironmental condition a he time of testing: Dry temp: ‘Wot emp: oR: Dew point: ‘CHLORIDE TEST DETAILS: No.of Conductivity ~ Location oftest a : teat sien) emacs 1 2 ‘Mean and range of sts Pho Photo ‘Remarks. REPRESENTATIVE ‘ecneressesrarive aN: ane: wane DATE: DATE DATE: ‘e201 OF HALTHACH PQP, HAITHACH WHP AND PIPELINES BIEN DONG 1 PROJECT. APPENDIX MEK ~ SOLVENT RUB TEST REPORT Prec Pain Manto Lobo. Suhsate: int Coun system: ase of punt aplication: “Thickness Require: ate of MEK Tost “Testing Stade: MEK-TEST DETAILS: Cure time DPF Gnierons) Description before | Before “Aller Rest MEKTest | ebbing | Kabbing Date Date: Date APPENDIX ORGANIZATION CHART - PRODUCTION COATING AND QC COATING Sarmame Position ‘Work rope Gif Ping Inspector ining nape io Paling nspecor ‘DOF por Ping spesoe ‘abOT Poston Workscape Saperisensen | POPE ise bo, a BA Soper PORTS Sepeintenden HWA. Sipene PA Fas bom, RB Sipe OPTS, Sager TWH, ore SDA fore Twi Ta Lede Forts Teun Leader —| POPE, Fee boon Hak eas leer DO Bless DAE Bisse a ‘DOr Bll ‘BDF Ble ‘DOT Ble BDO BlenHelper ‘BDOT Bisetiper DOL BlateHelger ‘BDI Bist Heer BDI Blaser per BDO Bist ‘DIE ine a BDO AlateHllr abar Blste-Heler ‘DAL Bist BDA Blt ‘Dar Bline-Hel DIL Blatt DOr Ble ‘BOOT Ble BDL Bites ‘BBOr Biaies He DOL Biase He DAL lata DAL Bhatti} BDO Bll ‘UDOT Bll ‘DAE tot Remarks APPENDIX G Sega Baio oa a0 [Le Trgng fT Bisel BDI a ven Ni Blaser DST 2 Nguyen Van [Ni Blip wD 3 [Nguyla Vin [Tw Blaser BDA [oh Bia 8a BlseHeler BDI 45 iin cro |Cuing—| — Basel DAL 46 [Ngula Vin [Mn BleseHle DAT aT LAV Hoyse Bieler BDA a8 [sat vin [i Bieler BDA INST (Cunmg | — ise DST 30-|Vé Quang [ag Bisel D1 St pis vas — [Ty Ble ie Di 32 [New tt fs Disesiler HD 3a aa] Blase HDs St |Lam Vin —— [Th Bistrteer ca 5 [Ptan van [Tul Blase D1 36 [Bi Vin Hing Ble lle BD: ST [Ngyla Vin ro Bisbee BDL 38 fein Vin [Cute sere BD Fig Kuta [ta Bisel DSL eo [Ngsyis Dish fr Blatter Bar et fis ira Bisse BDL lian Bist Hee DST [Tala Vin Tio Bieler BO fis Vie Is Bier Heer Ds 65 [Nant Neos [Out Blase BO. 66 [Nawis Vin [ BksterHlege D1 1 [Pt Van [ii Biter ‘Dai 66 |Pham Tis [Min Bist BDL 6 [Nanie Vin [Ta Bisteriee Ear “ifpb Xin oi Biers ‘BD [bing Tag Ti Busters EDT 72 [Nguyen Vm (Tien Bisste-feper BDO [BS Vie Mis Bisley BD.ar 76 [Piam Anko Bieri abr 75 Nita ube [aia Blister maT 76_fna8 Van [Neo BbatrHeyer ‘BO. 77_[Nans Bio ata Blister BOS 78_ [DA Vin laste Bist Bar 257 [Pos via Fa Biereys Boa 30-|Pigm Hing TP Baectege Bar i]t Van [Lang Bisel Boar 2 |Nayta Vin [Na Biscay BDa1 ‘57 Nps evan [Ti Blseecege BST | iang Tung — Thin Biswereke BDOT 35 [fa Van ink Bistrale BDA 36 [Dio Vin | Bisteceye DST ar fos ua Tan Bisteceke BDaT 36 [Dieh Vining Distt Dar in Tia Blaeoker EDT 2of? APPENDIX ewe Bisa cc Bisel [iin Vin Bite [Lions Vi Blasts Helper : INasita Van Diasec Heer [Nano Vin Blaser [pu Ti Blaser Heer [Naya Fata Ani Bist Helper [eujan Van [Khor Blase Helge [Nata Dick [Dita Bleep Pram Hea [Naa Blase elper [boin Que [Hi Blt tam Van [Bes ile [pis iu [Dig Bisel [pg Boas Tice Blase Hele [psy Iki Blaser [Nanéo Disha Blase Heer IHaing Tang [Chin Blaser Heer 5 INgnts Vin [Ma Blues fia Dish [Tin Buster Heer (anda Ngge [ln later per INanéa Fase [Diag Bluvercger i Vin Pie laser Helper [Nain Vin [Dung BlsecHelr INguyéa Tiém [Ding Ble Helper [pu Van Dong Bleek Vi Din BhsesHelper [pu Via IM Blt [Ts Vin Dou Bieter INanta fia —(Cuing Bieler a Vas las Ble tevin (Gang Bisel = [Bim van ———[Cutng Diasec i Vin Binh Blase Helper Vin [ohis Buster Helge ‘anda Vin [ei Blase per a6 NS Vin Hing Blaser Helper 17 Nuybe Ha |Hoe laser ta [Diah Van [Chr Blase Helger 129" | Naw Hy IK Ble Hl 130 |r Yan Ton Bases Hur 131 [fea Thank [Sem Paster 152 |leNane sen Paster 153 [L&D Ta Pair 134 [va Kuso Hida Par 135 [DU Xan fra Paster = 136 [Ds Van—_[Dng Pater 137 fNewyla Van [Tot Pater 138 [Binh Hing [Chink alter 159" Nguyta Duy [Ta Paster ED aad ‘APPENDIX J sIoMa COATING TIECOAT APPLICATION PROCEDURE SYSTEMNO, 8001 COATING ‘Structres 1) Surface Proparation: Blest Cleaning to Sa 2.5 {ISO 8501-1:1988 ) Roughness: GRIT-MEDIUM (G) (ISO 8503-2:1960 COATING SYSTEM Zne sieate primer SigmaZine 168 @ 65 microns Modited Epoxy Tlecoat SigmaCover 410 @ 35 microns odiied Epoxy ‘SigmaCover 410 @ 165 microns Poywethane trish ‘SigmaGover 188 @ 40 mierons I APPLICATION PROCEDURE Prior palnting altho surfaco shall be dry and free fom any for Allpaint must be thorough stires fore use with mecharical sive. ‘These ate solvent based paint and care should be taken to avoid inhalaton of spray mst or vapour as wel as crtact between the wet pant and exposed sin or eyes, 41) For the fist coat Siamazine 158 ‘Ad the zine powder gradually fo the container with binder, whist the mechanical miser is stil siting. Str the 2ne powder thoroughly hrough the binéer and do not ‘niin reverse order, in orér fe avoid lumps inthe paint. The maxsmum thiesness ‘pplied shall be not nore than 100 mlccons wit min 65 microns on rough or peg ‘teas. While paiting ‘he paint shall bo power agitated to uniform consistancy. 2) For e440 = Before overcoating the zinc scat primer the painted surface must te fully cuted and curing i tested by MEK test according fo ASTM D 6402 = Surface on Inerganie’ Zine must be fee ‘rom zine Salt and any contamination ‘fore applying he 2 coat- Sigmacover 410. Sigmacover 410 must be thinned dawn with Sigma thinner 91-92 at approx 20- 40% depends on ie surface temperatura to seal the potosty of the Inorganic Zine andthe sare tine eiminate buvbing and pin Hong. ‘aides spray is used sma tip sizes aro racommended (preferred are 0,01 0.15") - For beter rosut,conventiorsl spray pots recommenced ‘Apply with 02 passes of consistence mavemert spray gun (quck speed). It is ‘ecommended to appy 01 pass at frst on the angular bars, comers or areas Wh are prone to have thick fm due to overapping. These areas wil be check for rospray afer painting work for teem ie completed, F necessary to sigma, CORtNGs MINSPECTION (CHECK UST: 1) MEK test for curing ezine sieat primer 2) Gleaning ofthe primer before overcoating with the ecost 3) Pump cleaning 4) Mixing with core ato of thinner 8) Corret tp size are used 8) Correct spray technicue 7) Check for pales ard marked for repair if found raed and neces Fé tence Nanopor APPENDIX S

You might also like