Professional Documents
Culture Documents
Instructions:: Column1
Instructions:: Column1
1 Save the file in the format "AGE_LC" i.e., for ARU with Location code 101 may be saved as AGE_101.
2 Enter Location code in yellow coloured cell (cell B1) in the work sheet ""Abstract.
3 Work sheet "Abstract" is auto filled sheet, no entries other than Location code is necessary.
4 Age wise details are to be furnished in the worksheets "Receivables", "Payables" & "CWIP".
5 Age wise details of the balances pending as on 31/03/2021 and 31/03/2022 are to be furnished
6 Age wise details of balances of Account codes under the account group required only are to be furnished.
7 Five digit account codes are to be entered without any symbols i.e., without decimal point.
8 Net Balance of the Receivables aginst SOP (A/C code. 23) only is to be filled in the fileds provided in the work sheet " Receivables"
9 Total of the age wise details should agree with the balance as per the Trial Balance
12 Receivables are normally debit balance, in case of unnatural balance i.e., Credit balance is to be entered as "-ve".
13 Payables are normally Credit Balance, in case of Unnatural balace i.e., Debit balace is to be enter as "-ve".
14 In the Work sheet "Deeds" additional rows required, if any, can be inserted
15 Details of project included in the CWIP balance whose date of completion has overdue or additional cost,if any, has incurred compared to
the original plan is to be furnished in the work sheet "OVER DUE".
Location code: 0
46.9 Sundry
- - - - - - - - - - - - - -
18 Intangible Assets
- - - - - - - - - - - - - -
18 Intangible Assets
- - - - - - - - - - - - - -
AGE WISE DETAILS OF TRADE RECEIVABLES :
As
Scheduled date
of completion as Original date
SL No Name of Project in which the
per the last
Time extension project was to
be Completed
10
11
12
13
14
15
16
17
18
19
20
DUE OR COST EXCEEDED COMPARED TO THE ORIGINAL PLAN/COMPLETION SCHEDULE
As at
Land: