You are on page 1of 2

GUL 10 Wire Rope Maintenance Service Hoisting

Wire Rope Discard Zlay

WORK COMPLETION REPORT


WORK COMPLETION DETAIL
Work Description Hoisting Wire Rope Discard (Zlay)

Scope of Work Removal of defective wire rope, uncoil of fresh wire rope, resetting and commissioning

Location GUL10
PO Number 4500167272
Start Date 7/6/2022 Time 20:00
Complete Date 8/6/2022 Time 3:20
Remark

DESCRIPTION OF WORK
No. of Manpower 3 manpower
Work Step Remove defective wirerope at the socket pear
uncoil fresh wirerope with new socket pear moaring
clean the wirerope with thinner before use wire lock resin
Curing the wire lock resin for 4 hour before re-install
Reel in new wirerope at drum
Resetting, allignment, and housekeeping
Function test/Commissioning

PART/TOOL/EQUIPMENT
Description Quantity Remark
Grinder 2 set
Hand tool 1 box
Hand glove 3 bag
lever block 4 unit
sling belt 1t & 2t 4 set
wirelock resin 2 set
Cut off machine 1 unit

REPORTING/VERIFICATION
Prepared by Verified by

Signature Signature

Name Mohammad Aiman Name


Designation Engineer Designation
Date 10/4/2022 Date
PROGRESS IMAGE

REPORTING/VERIFICATION
Prepared by Verified by

Signature Signature

Name Mohammad Aiman Name


Designation Engineer Designation
Date 10/6/2022 Date