6. Pay back period of the Project will by a process known as winding. These
be after the initial gestation period bobbins are placed on Hand-operated
of one and a half year, it will Circular Knitting Machines and Yarn is
require 2 years to pay back the converted into knitted cloth. This knitted
loans. cloth is cut into pieces as per length of
7. The rental value of the workshed mufflers required. Both end of these cut
and other built up/covered area pieces are stitched or overlooked and
has been taken at the rate of fringes are attached with hand process
Rs. 20 per square meter. by ladies. The mufflers are then pressed
8. The rates quoted in respect of and packed in card board boxes and
machines, equipments and raw marketed.
materials are those prevailing at
the time of preparation of this Quality Control and Standards
Project Profile and are likely to The product proposed for
vary from supplier to supplier and manufacturing is a fashioned item
place to place. When a tailor made and having different designs and
Project Profile is prepared, necessary colour combinations depending upon
changes are to be made. the demand of the consumers. So,
proper quality control on the product
IMPLEMENTATION SCHEDULE is not possible to be maintained.
Sl.No. Activity Period H o w e v e r, f o r q u a l i t y g o o d s , t h e
quality of yarn in respect of evenness
1. Preparation of Project Report:
and correct counts and colour
a) Calling quotations 1 month fastness can be maintained. For this
b) Preparation 2 weeks proposed items the specification IS
2. Provisional Registration 1 week 2422:1963 may be followed.
as SSI
3. Financial arrangements 3 months Production Capacity (per annum)
4. Purchase and 2 months a. Quantity (Dozen) 3600
Procurement of b. Value in (Rs.) 15,12,000
machinery
5. Installation of machines 1 month Motive Power 5 HP.
6. Electrification 1 month
Pollution Control
7. Recruitment of staff and 1 month
labour There are no pollution control
measures required as this industry does
TECHNICAL ASPECTS not involve any pollution.