LG2 Framing/RC detail required

LG2 Framing/RC detail required


(URGENT!)
(URGENT!)

x .
00 dp
40 200
1

(P.C.T.L.=-3.00)
(P.C.B.L.=-7.75)

x .
00 dp
40 200
1

Sheet pile cannot be cut (corner strut installed)


x .
00 dp
40 200
Starter to be reserve at cap side?
1

2250
FPC C1-1B
x .
00 dp
40 200 (P.C.T.L.=-3.00)
1
(P.C.B.L.=-7.75)
(P.C.T.L.=-5.250)
(P.C.B.L.=-7.750)

FPC C1-1H

-1F

50
5.2 p
0d
20
x1 -3.00
00
15 .. =
T.L

15 T.L
00 . =
x1 -3
20 .00
0d
p
C25
)
LL
WA
HK
0T
(60

-1K0
C1

1500 = -0
5

T.L.
C 5.2

.0 p
-3 00d
C25
FP

x200 .00

0
. = 12
T.L 00x
0dp

15
C48 (P.C.T.L. = -3.00)
(P.C.B.L. = -5.00)

(P.C.T.L. = -0.00)
(P.C.B.L. = -2.00)
0dp
x200
2000 = -0.00
T.L.

-9.450

1720 1700

670

(400 THK WALL)


(P.C.B.L. = -10.350)

4760
1130 1170

10.350)

LG1/GF Slab reinforcement


Staircase to be construct or not?
detail required

Tunnel connection detail/ Section


level required (LG2 to GF)