Professional Documents
Culture Documents
Presents
“Cellular Layout”
1) Transportation –
2) Motion –
2) Waiting –
4) Over Processing –
5) Rework
6) Overproduction
7) Inventory
8) Unused creativity (Untapped Human Potential)
Major Paradigm shifts:
• Batch Single piece
• Process layout to Product layout
• Explore new ideas,Standing operations,
• More Handoffs=More Mudas
• Organisation Structure:
• Functional Heads – value Chain Heads
• End to End responsibility.
• Multiskill at all levels:Operators to Heads.
Application of Kaizen tools:
• Problems get exposed which needs attenntion and
solutions(basic philosophy of kaizen)
• Whether
• Machine speed,(Primary data on rated speed and Analysis)
• Changeover time(QCO)
• Frequent breakdowns(TPM)
• Material storage on Station-How,What,How Much (Work
station design).
• Raw Material supply –kanban,Milkman system
• Of Course 5 S is the foundation:Implementation of 5 S is
vital and must in a Cell.
PQ ANALYSIS FORM
Process-Quantity Analysis
Operation
Qty.
Machine
Month
Item
190 * * 6
20
1500 B
Target Demand
The Batch Manufacturing Layout,
Before (schematic)
Line – 3 (~2000 Pcs per day)
Collar
Assembly
Cuff Trim/Exam
&
Front
Finishing,
Assembly
Packing
Back Sleeve
The New Cellular System
(one cell 500 Pcs)
JIT cuff part supply
JIT collar part supply
End
Main assembly start
line
JIT
Back part
supply
JIT Sleeve part supply
JIT front part supply
JIT Assembly
Da te : 20 / 04 / 04
Se ction : Asse mbly
Ma nning for Asse mbly
The point
where the „U‟ turn
Benefits (Cellular Mfg in Sewing)
Before After % improvement
Defects Normally high in Will drop with one Pcs Within finishing
batch Prod flow should be zero
Model sewing cell
Front preparation
Back preparation
Sleeve preparation
Cuff preparation
Collar preparation
Assembly
Gemba
CUTTING FUSING
OLD LAYOUT NEW LAYOUT
Material movement
CHECKING
BACK FRONT SLEEVE
13
TRIMMING
12
3 4 1 9 11
GARMENTS
FINISHED
TROLLEY
READY
FRONT SLEEVE
FRONT PATCH SLEEVE BOTTOM
PATCH ATTACH &
FLATLOCK 6 HEMMING HEMMING
ATTACH SIDE O/L
NECK BINDING
2 5 7 8 10
SHOULDER SLEEVE
LABEL
TAPE & KEY BARTEK ATTACH & FINISH TAKI
ATTACH HOLE O/L SIDE O/L
Benefits
READY CUTTING Targeting to Produce 400 Pcs per Day.
OPERATORS First phase of line balancing compleeted and final trials are on today.
FABRIC FLOW 30 % Space Saving.
0
25
50
75
100
125
150
175
200
51
SLEE VE HEMMING
16
LABE L A TTACH
DATE: 23/09/2004.
PA TCH A TTACH
67
FLAT LOCK ON
129
PA TCH
45
NE CK B INDING
56
BA RTACK
DATE
SLV O/L
69
72
SLV TA KI
BOTTOM
68
HE MMING
TRIMMING
90
CHECK ING
88
AVG. CYCLE TIME
takt
Cycle time (in seconds)
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
SLEEVE HEMMING
51
LABEL ATTACH
16
37
PATCH ATTACH
67
1st level Improvement
FLAT LOCK ON
92
PATCH
NECK BINDING
45
BARTACK
56
SLV O/L
69
AVERAGE CYCLE TIME
SLV TAKI
72
BOTTOM HEMMING
68
TRIMMING
90
CHECKING
88
DATE : 23/09/2004
PRODN.
0
25
50
75
100
125
150
34
LABEL ATTACH
DATE: 24/09/2004
PATCH ATTACH
56
FLAT LOCK ON PATCH
68
2 nd level Improvement
70
O/L
NECK BINDING 36
BARTACK
47
LAGUNA 1
SLEEVE HEMMING
62
GO#4392 M&S TOP IN
AVERAGE CYCLE TIME OF
53
FINISH TAKI
BOTTOM HEMMING
62
TRIMMING
81
CHECKING
84
UNI-CHRO ANALYSIS
GO# 4578 LA SENZA VEST
Part No. B
Part Name
FRONT BODY BACK BODY
Time requited fo r
Process Total pro cessing each
No. time part
4 73 Side overlock
6 40 Bottom hemming
4 THREAD OVERLOCK
FLATLOCK
FLATLOCK CUTTER
MANUALLY
KOHINOOR : A
OPERATION FLOWING OF GO#4578 LA SENZA VEST
1 8
LACE OVER LOCK TRIMMING
FRONT BODY
&
CHECKING
2
LACE TOP
STITCH
MARKING
&
FINISH
Round trolley
TAKI
BACK
BODY
3
FRONT
ELASTIC &
LABEL 6
ATTACH BOTTOM
HEMMING
5
4 R
O BINDING
U
N &
SIDE O/L D
T
R
STRAPE
L
O
CUTTING
L
E
Y
Y
OLD LAYOUT NEW LAYOUT
WIP 40 9
TPT To be Target to be set
measured
Material Movement 6 mtrs 2 mtrs
Station -2
Pressing R
o
STD : C/WS/FIN/PR/01 d
Station -1 R
o
Pressing d
Station - 3 STD : C/WS/FIN/PR/01
Packing
STD :
C/WS/FIN/PK/01
Station -2
Pressing R
o
STD : C/WS/FIN/PR/01 d
New layout (PACKING)
By 30th June
From
pressing
New Ironing Cell
16 feet
12 feet
Opening s-seam Plain to bottom
Pressing
Button
Folding
Poly Bag
FG Trolley
Design of New Finishing Cell‟s
Wash Gar Cell
in
1 2 3 4
Packed Garment
out
4 Finishing Cell = 1800 Pcs / 36 people / in 9 hrs (still improving)
Layout Before – 130 Sq Mtrs.
Starts with
Trim & Exam
Press
Button
Folding
Poly bag
and direct to box
The New Cell created in Finishing Area.
Benefits (Cellular Mfg in Packing)
Before After %
improvement
Productivity Index 2072 pcs / 43 1800 pcs / 36 20%
(pcs/person/day) operators / 10.75 operators / 9 hours
hours = 4.5 = 5.6
T.P.T 9 hrs 12 mins 97 %
(time from trim to
box)
Space for operation 5760 Sq ft 1440 70%
WIP 500 15 97%
Defects Normally high Will drop with one Within finishing
in batch Prod Pcs flow should be zero
Total Activity of Measure width,Match
shade,group,put in trolley is MUDA…which we
may have to stay with for sometime..
One roll
flow,Direct 9 transfers reduced to 3
to
TROLLEY..
MUDA
eliminated…. cut
fabric and waste
75mm width of
fabric per roll.
EXAMPLE OF
STANDARD OPERATIONS FORM
STANDARD
OPERATIONS
CHART
CELL NAME :
A02 A01
PROCESS NAME :
AO3
3 2 1 Raw
DESCRIPTION OF OPERATION :
Materials
\
PREVIOUS NEXT 4
PROCESS: PROCESS:
5 6 7 Finished
goods
CYCLE TIME: TACT TIME :
A04 B01
AMT.OF FREQUENCY:
STANDARD WIP
PROCESS NAME :
DESCRIPTION OF OPERATION :
\
PREVIOUS NEXT
PROCESS: PROCESS:
AMT.OF FREQUENCY.
STANDARD WIP :
Stamping
SP-101 MM-122 HP-657 BR-410 Serial Store for
1/10 Number Incoming
Cleaning
1/1 Material
7 6 5 4 3 2 1
8 9 10 11 12 13
Operators work in
close loop, thus helping
in feedback & team work
Co-Location in Offices or License
Processing …
Before Kaizen After Kaizen
File Movement for Primary School Registration File Movement for Primary School Registration
(Before Kaizen) as on 29th June.2005 (Before Kaizen) as on 29th June.2005
3 8thFloor 8thFloor
9 10 7th 7th
6th 6th
4
5th 7 5th
16
16 16 4 3
13
13 13 2
2 12
15 11 14 10 2
4th 4th
8 7 6 5 6 5
15 14
3rd 3rd
2nd 2nd
11 8 9
12
1st 1st
GF GF
1 1
Process Mapping-job applications. Present
4th 38 2
41 35 3rd 37
31 32 34 2nd
1st 36
33 20 19 18
42 6 5 3 25 1
10 Gr
21 12 8 13 22
7 17 24
4
26 15 11 B 9 14 23 39
40 16
43 27 28 29 30 44
End
Improved TPT For Applications Processing as of 24th June, 2005.
4th 14
11 3rd 13
10 2nd
6 1st 12
Gr 1
9 8 7 5B 4 3 2 15
Voucher
processing
room
Cells at Registration Reduced TPT
Receipt,Search,Registry,Typist,Authority,Stamping,
Issue(Dedicated Team for Birth Cert.)
How are our people in HR Placed?
This will affect the information flow,and Customer Service.
AD/HRD
PHRDO
CHRDO
SHRDO
Spaghetti at Registration of Persons.
Before Kaizen After Kaizen
OUT OUT
IN IN
71 Mtrs.
ADDVALUE Services
Operation
Counselling
Excellence
Team
Therapy
Excellence
Adding Value In Totality !!
Business
Astrology
Excellence
AddValue at a glance
Best Performing Consulting Organization