Professional Documents
Culture Documents
College of Engineering
In Partial Fulfillment
Presented by:
Name
Section
Presented to:
PME
Republic of the Philippines
College of Engineering
Letter of Transmittal
Dear Sir,
In partial fulfilment of the requirements for the subject MCE23 – Industrial Plant Engineering in
We are certain that you would deny us as we look forward to the mission and vision of this
institution of producing competent professional of the future. Any comments, suggestions and
Respectfully yours,
Name
TABLE OF CONTENTS
TITLE PAGE i
LETTER OF TRANSMITTAL ii
CHAPTER I INTRODUCTION
Related Studies 2
Manufacturing Process 4
Water disposal
Manufacturing cost
Income taxes
Profitability Analysis
Payout Period
Breakeven Analysis
Conclusion 32
Recommendation
Bibliography
MCE 23 INDUSTRIAL PLANT DESIGNER (student’s name) PROJECT TITLE PLANT LAYOUT
ENGINEERING PLANT SITE LOCAT
PRODUCTION ARE
INSTRUCTOR: ENGR. DONA B BUEQUE DATE: