You are on page 1of 5

TESTANA ENGINEERING, INC.

Soil Testings & Research Administration.

ER.ABJ-05/ AB.04-30/ 2019

HASIL UJI DYNAMIC CONE PENETRATION COPY


04.15.19.
Proyek : Peningkatan Jalan Sumokali – Durungbedug.
TESTANA
Lokasi : Kec. Candi, Sidoarjo.
Relasi : CV. Adhitya Bregas Jaya, Surabaya.
Jenis uji : Dynamic Cone Penetration Test (ASTM D-6951).
Tanggal uji : 12 April 2019.
Material uji : Subgrade.
Diuji oleh : Slt. & Dms.
Kesimpulan :

 Estimasi nilai CBR lapangan (%) thd. kedalaman (m) sbb. :

No. Titik Uji


Kedalaman
(m)
1 2 3 4 5 6
0.0 - 0.2 9 - 14 17 - 25 5-6 22 - 36 28 - 42 6 - 12
0.2 - 0.4 11 - 14 24 - 26 3-4 9 - 16 20 10 - 12
0.4 - 0.6 8 19 - 6 14 7
0.6 - 0.8 5-6 10 3 5 10 6
0.8 - 1.0 5 - 2 4 - 15 8 4-5

 Letak titik-titik uji ditentukan pihak pemberi kerja (lihat Lampiran A.1.). Selama proses pengujian
berlangsung pihak pemberi kerja dan pengawas proyek menyaksikan (mengawasi) secara langsung.
 Data hasil-hasil Dynamic Cone Penetration Test disajikan dalam Lampiran A.2.

Surabaya, 15 April 2019.


Testana Engineering, Inc.

Dimas Anggraito S.T, M.T.


Manajer Teknik

Jl. Opak 66, Surabaya. Telp. (031) 5678329 (Hunting) Fax. (031) 5678329 E-mail. testana_sby@yahoo.com
TESTANA ENGINEERING, INC.
Soil Testings & Research Administration

COPY
04.15.19.
TESTANA

1●

2●

3●

4●

6●
● 5●

A.1. Sketsa Letak Titik-titik Uji Dynamic Cone Penetrometer Test


TESTANA ENGINEERING, INC.
Soil Testings & Research Administration.

A.2.1. DYNAMIC CONE PENETRATION TEST

Project : Peningkatan Jalan Sumokali - Durungbedug.


Location : Kec. Candi, Sidoarjo.

Gambar Hubungan nilai DCP - CBR (AJ Skala 1959)


COPY

Date : April 12, 2019.


04.15.19.
TESTANA
DCP-1 Analysis CBR, %
Measurement Blows A.J. Scala, 1959
Blows Penetration DCP Index Metode A.J. Scala, 1959
Reading Per CBR >100
0 20 40 60 80
(N) (mm) (mm) (mm/blow) (25 mm) (%) 0

2 40 40 20.00 1.25 9.8 100


4 70 70 17.50 1.43 11.5
6 100 100 16.67 1.50 12.2 200
8 130 130 16.25 1.54 12.6
10 160 160 16.00 1.56 12.8 300
Penetration, mm

12 180 180 15.00 1.67 13.8


400
14 210 210 15.00 1.67 13.8
16 290 290 18.13 1.38 11.0
500
18 440 440 24.44 1.02 7.8
20 650 650 32.50 0.77 5.5 600
22 780 780 35.45 0.71 5.0
24 870 870 36.25 0.69 4.9 700
26 990 990 38.08 0.66 4.6
800

900

1000

DCP-2 Analysis CBR, %


Measurement Blows A.J. Scala, 1959 Metode A.J. Scala, 1959
Blows Penetration DCP Index
Reading Per CBR
0 20 40 60 80 >100
(N) (mm) (mm) (mm/blow) (25 mm) (%) 0

4 50 50 12.50 2.00 17.1 100


8 90 90 11.25 2.22 19.4
12 130 130 10.83 2.31 20.3 200
16 160 160 10.00 2.50 22.3
20 180 180 9.00 2.78 25.2 300
Penetration, mm

24 210 210 8.75 2.86 26.1


400
28 250 250 8.93 2.80 25.5
32 300 300 9.38 2.67 24.1
500
36 410 410 11.39 2.20 19.1
40 770 770 19.25 1.30 10.3 600

700

800

900

1000
TESTANA ENGINEERING, INC.
Soil Testings & Research Administration.

A.2.2. DYNAMIC CONE PENETRATION COPY


TEST
04.15.19.
Project : Peningkatan Jalan Sumokali - Durungbedug.
Location : Kec. Candi, Sidoarjo. TESTANA

Gambar Hubungan nilai DCP - CBR (AJ Skala 1959)

Date : April 12, 2019.


DCP-3 Analysis CBR, %
Measurement Blows A.J. Scala, 1959
Blows Penetration DCP Index Metode A.J. Scala, 1959
Reading Per CBR >100
0 20 40 60 80
(N) (mm) (mm) (mm/blow) (25 mm) (%) 0

2 60 60 30.00 0.83 6.1 100


4 140 140 35.00 0.71 5.1
6 260 260 43.33 0.58 3.9 200
8 400 400 50.00 0.50 3.3
10 660 660 66.00 0.38 2.5 300
Penetration, mm

12 820 820 68.33 0.37 2.4


400
14 1000 1000 71.43 0.35 2.3
500

600

700

800

900

1000

DCP-4 Analysis CBR, %


Measurement Blows A.J. Scala, 1959 Metode A.J. Scala, 1959
Blows Penetration DCP Index
Reading Per CBR
0 20 40 60 80 >100
(N) (mm) (mm) (mm/blow) (25 mm) (%) 0

2 20 20 10.00 2.50 22.3 100


4 30 30 7.50 3.33 31.3
6 40 40 6.67 3.75 36.0 200
8 60 60 7.50 3.33 31.3
10 80 80 8.00 3.13 29.0 300
Penetration, mm

12 110 110 9.17 2.73 24.7


400
14 140 140 10.00 2.50 22.3
16 210 210 13.13 1.90 16.2
500
18 390 390 21.67 1.15 8.9
20 580 580 29.00 0.86 6.3 600
22 760 760 34.55 0.72 5.2
24 900 900 37.50 0.67 4.7 700
26 1000 1000 38.46 0.65 4.5
800

900

1000
TESTANA ENGINEERING, INC.
Soil Testings & Research Administration.

COPY
A.2.3. DYNAMIC CONE PENETRATION TEST
04.15.19.
Project : Peningkatan Jalan Sumokali - Durungbedug.
TESTANA
Location : Kec. Candi, Sidoarjo.

Gambar Hubungan nilai DCP - CBR (AJ Skala 1959)

Date : April 12, 2019.


DCP-5 Analysis CBR, %
Measurement Blows A.J. Scala, 1959
Blows Penetration DCP Index Metode A.J. Scala, 1959
Reading Per CBR >100
0 20 40 60 80
(N) (mm) (mm) (mm/blow) (25 mm) (%) 0

4 30 30 7.50 3.33 31.3 100


8 50 50 6.25 4.00 38.8
12 70 70 5.83 4.29 42.1 200
16 100 100 6.25 4.00 38.8
20 130 130 6.50 3.85 37.1 300
Penetration, mm

24 200 200 8.33 3.00 27.6


400
28 310 310 11.07 2.26 19.8
32 470 470 14.69 1.70 14.2
500
36 690 690 19.17 1.30 10.3
40 1000 1000 25.00 1.00 7.6 600

700

800

900

1000

DCP-6 Analysis CBR, %


Measurement Blows A.J. Scala, 1959 Metode A.J. Scala, 1959
Blows Penetration DCP Index
Reading Per CBR
0 20 40 60 80 >100
(N) (mm) (mm) (mm/blow) (25 mm) (%) 0

2 60 60 30.00 0.83 6.1 100


4 110 110 27.50 0.91 6.8
6 130 130 21.67 1.15 8.9 200
8 140 140 17.50 1.43 11.5
10 170 170 17.00 1.47 11.9 300
Penetration, mm

12 200 200 16.67 1.50 12.2


400
14 240 240 17.14 1.46 11.8
16 320 320 20.00 1.25 9.8
500
18 480 480 26.67 0.94 7.0
20 640 640 32.00 0.78 5.6 600
22 860 860 39.09 0.64 4.5
24 1000 1000 41.67 0.60 4.1 700

800

900

1000