Pengawas Lapangan Quality Engineer Quality Control
PROYEK PEMBANGUNAN BENDUNGAN MBAY DI KABUPATEN NAGEKEO (PAKET-1)
Konsultan : PT. Indra Karya (Persero), DE - 1 Construction type : Pekerjaan Jalan
PT. Rancang Semesta Mandiri Tanah Asli digali 1.5m
PT. Sabana
Kontraktor : Waskita Karya - Bumi Indah KSO Lokasi : Akses Jalan 6.3
Tanggal : 04 June 2022
CBR* at this point (%) 202 34.47 CBR* at this point (%) 420 63.56
Notes: 4.97 Notes: 3.47
CP = Cummulative Penetration (cm) CP = Cummulative Penetration (cm)
DN = Dynamic Number (mm/blow) DN = Dynamic Number (mm/blow)
CBR = 10 [2.8135-(1.313*Log DN)] CBR = 10 [2.8135-(1.313*Log DN)]
hi = Thickness of Soil in Strata No, 1,2,……...,n hi = Thickness of Soil in Strata No, 1,2,……...,n
hi = (DN/10) in cm hi = (DN/10) in cm
CBR* = [sum (hi x CBR 1/3 ) / sum (hi)] 3 CBR* = [sum (hi x CBR 1/3 ) / sum (hi)] 3
( ) ( ) ( )
Pengawas Lapangan Quality Engineer Quality Control
PROYEK PEMBANGUNAN BENDUNGAN MBAY DI KABUPATEN NAGEKEO (PAKET-1)
Konsultan : PT. Indra Karya (Persero), DE - 1 Construction type : Pekerjaan Jalan
PT. Rancang Semesta Mandiri Tanah Asli digali 1.5m
PT. Sabana
Kontraktor : Waskita Karya - Bumi Indah KSO Lokasi : Akses Jalan 6.3
Tanggal : 04 June 2022
CBR* at this point (%) 340 56.28 CBR* at this point (%) 325 52.22
Notes: 4.54 Notes: 4.15
CP = Cummulative Penetration (cm) CP = Cummulative Penetration (cm)
DN = Dynamic Number (mm/blow) DN = Dynamic Number (mm/blow)
CBR = 10 [2.8135-(1.313*Log DN)] CBR = 10 [2.8135-(1.313*Log DN)]
hi = Thickness of Soil in Strata No, 1,2,……...,n hi = Thickness of Soil in Strata No, 1,2,……...,n
hi = (DN/10) in cm hi = (DN/10) in cm
CBR* = [sum (hi x CBR 1/3 ) / sum (hi)] 3 CBR* = [sum (hi x CBR 1/3 ) / sum (hi)] 3
( ) ( ) ( )
Pengawas Lapangan Quality Engineer Quality Control
PROYEK PEMBANGUNAN BENDUNGAN MBAY DI KABUPATEN NAGEKEO (PAKET-1)
Konsultan : PT. Indra Karya (Persero), DE - 1 Construction type : Pekerjaan Jalan
PT. Rancang Semesta Mandiri Tanah Asli digali 1.5m
PT. Sabana
Kontraktor : Waskita Karya - Bumi Indah KSO Lokasi : Akses Jalan 6.3
Tanggal : 04 June 2022
CBR* at this point (%) 225 44.18 CBR* at this point (%)
Notes: 7.57 Notes:
CP = Cummulative Penetration (cm) CP = Cummulative Penetration (cm)
DN = Dynamic Number (mm/blow) DN = Dynamic Number (mm/blow)
CBR = 10 [2.8135-(1.313*Log DN)] CBR = 10 [2.8135-(1.313*Log DN)]
hi = Thickness of Soil in Strata No, 1,2,……...,n hi = Thickness of Soil in Strata No, 1,2,……...,n
hi = (DN/10) in cm hi = (DN/10) in cm
CBR* = [sum (hi x CBR 1/3 ) / sum (hi)] 3 CBR* = [sum (hi x CBR 1/3 ) / sum (hi)] 3
( ) ( ) ( )
Pengawas Lapangan Quality Engineer Quality Control