You are on page 1of 6

Duration Delay

S.N. Date
From To Hrs:Mins
1 04/03/2022 8:00 9:00 1:00
2 05/03/2022 3:15 13:34 10:19
3 30/03/2022 9:40 10:20 0:40
4 05/04/2022 12:35 14:07 1:32
5 09/04/2022 15:22 15:33 0:11
6 12/04/2022 4:00 14:30 10:30
7 16/04/2022 13:15 15:00 1:45
8 20/04/2022 19:46 20:30 0:44
9 25/04/2022 8:00 9:11 1:11
10 28/04/2022 19:10 20:20 1:10
11 29/04/2022 18:55 19:25 0:30
12 02/05/2022 10:25 10:40 0:15
13 14/05/2022 17:32 17:44 0:12
14 16/05/2022 19:12 19:17 0:05
15 21/05/2022 2:20 5:30 3:10
16 22/05/2022 8:38 9:47 1:09
17 22/05/2022 11:50 12:40 0:50
18 24/05/2022 18:33 18:40 0:07
19 26/05/2022 8:00 9:45 1:45
20 27/05/2022 12:25 12:40 0:15
21 28/05/2022 17:20 17:35 0:15
22 29/05/2022 9:15 15:25 6:10
23 30/05/2022 13:10 13:19 0:09

24 01/06/2022 11:20 14:12 2:52


25 02/06/2022 11:10 13:10 2:00
26 0:00
27 0:00
28 0:00
29 0:00
30 0:00
31 0:00
32 0:00
33 0:00
34 0:00
35 0:00
Reason

Power off from Dharmeta by Linemen.


11kv line Breakdown near truck yard (PCC Pole & Conductor Damaged)
Power off From Maukhampura.
Power off from Dharmeta due to AVVNL 11 KV line VCB replacement.
Power trip from Dharmeta
Single Phasing from Dharmeta, DP Point 11KV cable termination fail.
Power cut 11 KV line for CTPT unit replacement work
Power off from Sapol Due to heavy wind & rain.
Power shutdown from Dharmeta 11kv line fault
Voltage Fluctuation & Single Phasing From Dharmeta, DP Point 2 Nos LA Fail.
Voltage Fluctuation & Single Phasing From Dharmeta.
Power shutdown from Dharmeta 11kv line fault
Power off from Dharmeta by Linemen.
Power off from Dharmeta by Linemen.
Tower Feeder all three DO fuse blown from Dharmeta.
Power trip from Dharmeta due to ACSR conductor broken near Mandir
Power trip from Dharmeta due to ACSR conductor broken near Mandir
Power off from Dharmeta by Linemen.
Power off due 11KV ACSR conductor broken near GSS
Power off from Dharmeta by Linemen.
Power Off From Dharmeta, due to Line fault as per Lineman
Single Phasing From Dharmeta due to Line fault, Our 11KV termination Kit fail.
Power off From Sapol

Power Off due to AVVNL 11KV Line Jumper Fault.


Power Shutdown for AVVNL 11KV Line rout shifting near truck yard.
5 KVA DG Set
Duration Delay
S.N. Date
START STOP Hrs:Mins
1 12/09/2021 19:30 22:00 2:30
2 16/09/2021 22:00 22:30 0:30
3 23/09/2021 18:55 19:40 0:45
4 24/09/2021 18:50 22:30 3:40
5 25/09/2021 18:30 22:30 4:00
6 26/09/2021 18:30 23:00 4:30
7 27/09/2021 20:30 21:15 0:45
125 KVA DG Set
1 02/11/2021 15:35 16:35 1:00
2 17/11/2021 18:00 18:45 0:45
3 28/12/2021 9:46 10:40 0:54
4 02/01/2022 13:55 14:40 0:45
5 22/01/2022 19:35 19:45 0:10
6 24/01/2022 15:36 16:12 0:36
7 25/01/2022 16:33 17:02 0:29
8 27/01/2022 16:22 17:00 0:38
9 29/01/2022 15:20 15:40 0:20
10 29/01/2022 16:05 17:08 1:03
11 03/02/2022 14:15 14:30 0:15
12 14/02/2022 11:06 11:28 0:22
13 03/03/2022 14:51 17:30 2:23
14 05/03/2022 8:30 13:41 5:11
15 06/03/2022 9:54 12:47 2:41
16 06/03/2022 13:37 14:04 0:21
17 07/03/2022 8:38 9:01 0:23
18 08/03/2022 9:00 10:00 1:00
8:20 9:00 0:40
19 14/03/2022
12:15 14:20 2:05
20 30/03/2022 10:05 10:20 0:15
21 03/04/2022 10:08 10:14 0:06
22 05/04/2022 12:35 14:07 1:32
23 08/04/2022 17:26 18:07 0:41
24 09/04/2022 2:13 2:20 0:07
25 09/04/2022 15:29 15:34 0:05
26 12/04/2022 9:38 14:50 5:12
27 16/04/2022 14:19 15:08 0:49
28 20/04/2022 19:48 20:28 0:40
29 26/04/2022 7:55 9:11 1:16
30 28/04/2022 19:18 20:20 1:02
31 29/04/2022 19:13 19:24 0:11
32 14/05/2022 17:34 17:43 0:09
33 22/05/2022 9:38 9:47 0:09
34 22/05/2022 11:59 12:40 0:41
35 26/05/2022 9:30 9:45 0:15
37 30/05/2022 10:00 13:00 3:00
38 30/05/2022 13:50 14:50 1:00

39 01/06/2022 11:33 14:12 2:39


40 02/06/2022 11:10 13:15 2:05
41 0:00
42 0:00
43 0:00
44 0:00
45 0:00
46 0:00
47 0:00
Reason

Power cut from M/s R.K. Marble


Power cut from M/s R.K. Marble
Power cut from M/s R.K. Marble
Power cut from M/s R.K. Marble & 33KV Line Fault
Power cut from M/s R.K. Marble & 33KV Line Fault
Power cut from M/s R.K. Marble & 33KV Line Fault
Power cut from M/s R.K. Marble

Power cut for 33KV Line Fault


Power cut in temporary connection transformer HV side cable short
Power cut for 33KV Line Fault
Power cut for 33KV Line Fault
Power cut for 33KV Line Fault
Temporary connection shutdown for WWPL 33KV lattice tower erection
Temporary connection shutdown for WWPL 33KV lattice tower erection
Temporary connection shutdown for WWPL 33KV lattice tower erection
Temporary connection shutdown for WWPL 33KV lattice tower erection
Temporary connection shutdown for WWPL 33KV lattice tower erection
Temporary connection shutdown for WWPL 33KV lattice tower erection
Temporary connection shutdown for WWPL 33KV lattice tower erection
Power cut for 33KV Line Fault
11kv line Breakdown near truck yard (PCC Pole & Conductor Damaged)
Temporary connection shutdown for WWPL 33KV lattice tower erection
Temporary connection shutdown for WWPL 33KV lattice tower erection
Temporary connection shutdown for WWPL 33KV lattice tower erection
Shutdown for WWPL 33KV Dog Conductor Laying Job.
Shutdown for WWPL 33KV Line Guarding Work.
Shutdown for WWPL 33KV Dog Conductor Stringing Work.
Power Off From Mokhampura for AVVNL Work.
Power Off From Dharmeta for AVVNL Work.
Power Off From Dharmeta for S/S VCB Replacement Work.
Power Off For Our Distribution Transformer Replacement.
Power Off From Dharmeta for AVVNL Work.
Power Off From Dharmeta for AVVNL Work.
Power Off due to WWPL DP Point B phase cable terimination fail.
Power Off for WWPL AVVNL Meter Panel CTPT replacement.
Power off from Sapol Due to heavy wind & rain.
Power off For 33kv transmission line guarding work.
Power off due to Voltage fluctuation observed in 11kv line.
Power off due to Voltage fluctuation observed in 11kv line.
Power Off From Dharmeta for AVVNL Work.
Power Off From Dharmeta for AVVNL Work.
Power Off From Dharmeta for AVVNL Work.
Power off due 11kv ACSR conductor broken near GSS
Power off due to 11KV cable terimination kit fail at DP Point.
Power off due to 11KV cable terimination kit fail at DP Point.

AVVNL 11KV Line Jumper Fault.


Power Shutdown for AVVNL 11KV Line rout shifting near truck yard.