You are on page 1of 7
[FOR APPROVAL en cunt FoR RE vEW Se RTD Eero MESSRS: ENEXEL ENGINEERING PTE LTD. FOR: COPL, 24 ENGINEER BRIGADE PROJECT: NAME: PUMP DATA SHEET ITEM No. _P-BP-0201 PUMP-IFT NO.: CDPL-RFP-04 aE RES ease TeeOUEGES TF SeneD/ ast RNS ‘Name (MECON LNtonDelh SHIN NIPPON MACHINERY CO.,LTD. PUMP DEPARTMENT DESIGN SECTION |APPROVED BY. PF dy ine REVIEWED BY. DRAWN BY. v [DATE OF DRAWING 2022. 3.18 MFGNa, BANPC-2x~ 47998, DRAWING No, 4PD- 47938 (4 SHEETS COVERING) com peaiba (metenal sprcifrcabs) of St-s3T2 * pleane subre chemiced VERTICAL CENTRIFUGAL PUMP DATA SHEET (TYPE VS6) “GENERAT eau (1VPE v6) | PROJECT: TRANSPORTATION OF Oil THROUGH PIPELINE FROW~[ TOR 1500p [GHATTOGRAM TO DHAKA (CDPL), BANGLADESH | Snnor" rar ENGniceR CONSTRUCTION origxDE—— [CSTE: POOL TERIA AY GHATTOGRAN, EANGUADESH—— URI: ATTOGRANOT ——_UNITNO: or | acs 27 ENGNEER CONSTRUCTION SIGADE — oi REM NO. PaP-0o0IREP-BEOQOTB seve SDI ASK HOE BOOSTER PONS NNO REQUIRED TWO WOEKRGTORE— STANDBY" ONE—| DRIVER TYPE ELECTRIC MOTOR 7” peruano, PROPOSALS © PURCHASE OAS BURT GOOSTER rues: PIPELINE TRANSFER a hs Site: Guartoceut sone: burr asco nose ‘| NOTES: NFORMWATION BELOW TO BE COMPLETED OBVPURGWASER o BYMANUFACTURER tu _ BY MANUFACTURER OR PURCHASER pe OETA SHEETS TEVSONS 7 TERR [ATTACHED | Teno. | ATTACHED | TEN —[-ATTAGRED | NO] ORTE a7 me. 75 Pun — Rapa |e ° 3 7 Parole : 5 | WOTOR < 7 > z Fert eer —|— % 5 z 16-{roree—} © e # [e-APPLICABLE OVEREAY STANDARDS = | [7-| operative conDToNs ssn ery 15 To Ronee ee RATED 451 (mh) ‘LIQUID TYPE OR NAME REFER SHERT2OFS 48 | OTHER =ET2OF 5 @ HAZARDOUS = @ FLAMMABLE =O (5.1.5) FBT SUCTION PRESSURE HAKRATED REFER SHEET? OF 8 mn. | —WORWAL 1 —wax—| [2 otscraroe pressor ETER SHEET OFS puvenorenece) | peren sneer | DRFERENTALPRESSURE REFER SHEETZOF Varourpness Qirs) | tort | Der HEAD (n) REFENGIL.Z OF BADNPSHA.ZoMNC | RELATWE DENSTY SO), | | [ar-| Process VtaTIONS (3.14) REFER SHEET OFS ‘iscosrry (6) L i 35 | STARTING CONDITIONS (610) Seecne HEAT. Koy [27 SeRvice: « conT. O NTERNATTENT(IARTEDAY) Scions CONCENTRATION @Ez4\_—— (not) 1 PARALLEL OPERATION REQD G19) __| or4s concentraTion ina FRACTION WET(S12..412¢) » = CORROSIVE / EROSIVE AGENT (5.42.1.9) [20 CoeRTONIEF30) MATERIALS (5.123) 30"] @ INDOOR OHEATED OUTDOOR OUNHEATED (© ANNEX H CLASS (6.12.1.1) 36 37] SELECTRICAL AREA CLASSIFICATION (2476.14) fen DESIGN METAL TEN 1241) 2 = cringe OWT (© REDUCEDHARONESS MATERLSREGD(G2.192) YES 33] owNTERZATIONREGD © TROPICALZATIN REOD " BARRELCASE_—STPGIT0— IMPELLER Separates) *CASEIMPELLER WEAR NGS Nand NA 35] CALITUDE—ooyn)max BAROMETER _Ps) Sear "E-] ORANGE OF AMBIENT TEMPS: MIN.MAX 8138S) ioeruses Gene — 37] ORELATIVEMUMOMY: N/M EraETaT ‘= PERFORWANGE SE] UNUSUAL CONDON: (120) ©DUST OFUNES PROPOSAL CURVE WOHLISVHIBTEHGE_» GE TRS) ZN So] OOTHER NEAR SEA IMPELLER OW RATED 34a MAX.-998— MINCE) # Ra Ko) EFPIENEY— aT ‘Thiwwow couraluous "ton @ INDUCTION MOTOR © STEAM TURBINE OGEAR = nh) | STABLE____2_(mh) | Somer veo PREFERRED OPER REGION 3087 TO__S282 (nm) TORCH @mareo MNELER — ‘ns POWER @ RATED NPSLLER—sinahRE Oe) POH AT RATED FLOW _ 8 SUEROZAE (90) Tat a 8 MAX. SUCTION SPECIFIC SPEED: 12483M3H.M RPIA(S.1.11) = FRAME__200L__» ENCLOSURE ERC vernon erceaoinal: w senvicecrOn, 1m MX SOUND PRESS. LEVEL REC'D 981.0 (424) (5.1.16) EST. MAX SOUND PRESS. LEVEL 9 _(494)(6.1.10) 1° MOTOR DRIVER (6.11614) 1H NANUFAGTURER — HYUNDAL = te) 7 = a 5 3 2 “ = = i eee ar ro oy a TE Stereum sees 5} ema soaevecnoewa_——— Sa | aa same i este nl eaten | momaoroovare ae ar] noamoneen ns iar rete toe oem ecy a oe = spony PSST ET aa 2 ecmnescrrensen ms Eu e ATER HEATING NA. | ? a sadoavcieg—— seen enereeet are FT seine pee ean ee ees FH nerenucrononneiecr RAST Stetoete | Sencar pment \ [-SANE—[ PREP ey —~ cn 6y ——}-—roxecr} = Tee uns = | VINAY KUMAR oreateRYCOPL) mr | | Das ats 2017 —| EOS Geapasoverenin: "| ae [ween cre] eee s0 rae —} wv Eh er zi a ere MECON LIMITED/Aaia fefhes. {arenrnet ‘GENERAL [CHATTOGRAM TO DHAKA. ‘Ganon Ta urea PROJECT : TRANSPORTATION OF Oi THROUGH PIPELINE FROW (eUinesi - SEENGINEER CONSTRUCTION BRIGADE ————~ TEMG. PEECAIARP RPT} (NOC REQUIRED'TWO_— WORKNCTONE——sranay one —| PROCESS DATA onomon 2: SeRvce |. PUMP TEMPERETURE 4.NO. OF PUMPS {EACH PUMP GapacrTYRATED) 8 'SUCTON PRESSURE TT DISCHARGE PRESSURE 4. FERENTIAL HEAD 8. vecosry So NPSHA a) DENSITY @ 18°C 12, VAPOUR PRESSURE 8) 1.coNOmTION 2 SERvicE $3 PUMP TEMPERETURE StNOLOF PUMPS. EAH PUMe CAPACITYRATED) 8 SUCTION PRESSURE. {DISCHARGE PRESSURE &DirreReNTIAL HEAD ‘S.viscosry SeNDSHA a) -DENSTY @ 18°C 12, VAPOUR PRESSURE glen) As Get ay tieetency 1 woking + sandy 3tauc Section pressure + 70 Me Bees Shue 22s a4 sa1murea HSDMOBCIET-A1tsKO Smo Nesta + 7oMLC youue Bossiosearsnasanase 20 05790-705702.001/785800 RESPECTIVELY Stages ents Nam MECON LIMITED. SECTION OTE Cae ‘OWNERTZ¥ ENGINEER CONSTRUCTION BRIGADE [ae PREP EY, CRON ‘PAOIEGT TRANSPORTATION OF OIL THROUGH ‘OSGN | ASHISH KUWAAT—|-TKMONDAL | PIPELINE FROM CHATTOGRAM TO DHAKA (CPL) NAY KUMAR Date | 25082079 RZ [econ CITED ‘APPROVED BY "KGANGAL | DATA SHEET FOR VERTICAL CENTRIFIGAL PUMP] SCALE (Booster Pump) DTA SHEET No. MEcinePSio28001/0S- {24H (SHEET 20° 8) 107 of 302 {SINGLE VOLUTE _o MULTIPLE VOLUTE m DIFFUSER ‘CASE PRESSURE RATING: ‘0-06 PUMP SUCTION REGION DESIGNED FOR MAWP (5.3.6) SSMAX: ALLOWABLE WORKING PRESSURE o__ss__<) 1 HYOROTEST Pressure = NOZZLE CONNECTIONS: (5.4.3) “GENERA — ‘PROJECT - TRANSPORTATION OF OiL THROUGH PiPELNE FROW OBO HPS {GHATTOGRAM TO DHAKA (CDP), BANGLADESH 4 ST ENGINEER CONSTRUCTION pRiGADE—————Fsre-Posx TeRUaNA-ATCRRTTOGRIC BANGTADESH———| [| Purchaser SY ENGINEER CONSTRUCTION BRIGADE [UNIT CHATTOGRAWOT ——UNITNO: 00 ———] TEMNO. PEP-D2OVAR P-BPLD2OTS ‘SERVICE: SOVIET AVKOT FOBC, BOOSTER PUMPS NO: REQUIRED /TWO_WORRNG ONE STANDBY'ONE | DRIVER TYPE: ELECTRIC OTOR- | ‘CONSTRUCTION ——— [SURFACE PREPARATION AND PaxNT | ‘ROTATION? (VIEWED FROM COUPLING END) = CW ¥ CCW "NMANUFACTURER'S STANDARD ——_O OTHER (SEE BELOW) PUMP TYPE: (1.3) (O SPECIFICATION nO. OVSi mvs2 evs; MVS! mvs mvSé VST Pun CASING MOUNTING: ‘¢ PRIMER _ALKYD RESIN PRIMER — 1D SUMP COVER PLATE ‘SFINISH CORT PHTTHALIC RESIN FINSH COAT — co MeUNE (SEPARATE MOUNTING PLATE(@.2.8.3.1) SEPARATE SOLE PLATE (€.3:8.3.3) casING spuT: sm RADIAL niemesave (6.257) CASING TYPE: BANAL (© PRIMER _ALKYD RESIN PRIMER —__ (FINISH COAT PHTHALIC RESIN FINSH COAT (© DETAILS OF LIFTING DEVICES (6.3.20) _ Stpments (7.4.1) (ODONESTIC @ EXPORT _@ EXPORT BOXING REQUIRED ‘OUTDOOR STORAGE MORE THAN 6 MONTHS. ‘SPARE ROTOR ASSEMBLY PACKAGED FOR: SIZE PRLANGE ——] FREE POSTTTGN™] OHORIZONTAL STORAGE O VERTICAL STORAGE ane O TYPE OF SHIPPING PREPARTAION suction Te —[ soos" Faas —| sive HERTING AND COOLING DISCHARGE © [3008 ARIS —T SIDE EATING IRCKET RED (5.8.9) PRESSURE CASING AUX. CONNECTIONS: (5.4.3) 12 CeuNG REQD. ‘2 COOLING AUATER (C-¥.) PIPING PLAN (6.5.2.1), (SHRINK FIT-LIMITED MOVEMENT IMPELLERS(@.3.2.3) CoupLinas: (6.2.2) (© MANUFACTURER_JOMN CRANE & MODEL FLEXIBLE W/SPACER {RATING (Kw per 100 r/min) LATER 1 SPACER LENGTH__LATER (mm) @ SERVICE FACT 1.5 {© COUPLING BALANCED TO 150 1940-1 65.3 (6.2.3) (COUPLING WITH PROPRIETARY CLAMPING DEVICE (6.2.12) (© COUPLING PER ISO 14691 (6.2.4) (COUPLING PER ISO 10443 (6.2.4) (© COUPLING PER API 671 (6.2.4) (© NON-SPARK COUPLING GUARD (62140) ‘OCOULING GUARD STANDARD PER —__(6,2.148) «© DRIVER HALF COUPLING MOUNTED BY PUMP MANUFACTURER BASEPLATES: (DAPI BASEPLATE NUMBER ‘NON-GROUT CONSTRUCTION (63.13) (© OTHER SklD BASE PLATE MECHANICAL SEAL :( OAsHE 815.3 (ANNEX 0) NO.__[-SIZE(OR)_[—TWPE—| cw. purine = DRAIN i a WVEF | opp tua Firminss aver T cg WHEE C.W, PIPING MATERIALS 1 WARM-UP esse ac. STE (GALVANIZED (COOLING WATER REQUIREMENTS: 1 MACHINED AND STUDDED CONNECTIONS (5.4.3.8) ‘BEARING HOUSING. (orm) (0 CYLINDRICAL THREADS REQUIRED (5.4.3.5) Hes? EXCHANGER, yn) ROTOR: ‘COOLING WATER _————(m (COMPONENT BALANCE TO 1S0 1940 G1.0(5.9.4.4) HEAT WEOTUM: 0 STEAMO OTHER 4) peel Sisee arteaied 180 Si6 eae Berrrtamts 22 S cea ae anid HESING PIPING: 0 TUBING © PIPE BEARINGS AND LUBRICATION BEARING (TYPE/NUMBER) (5.10.1): = Raia pus, = THRUST___Ba LATER LUBRICATION (5.11.3.5.11.4) AS PER MANUFACTURER'S STANDARD GREASE mou. ‘O PURGE OIL MIST 0 PURE OIL MIST {© CONSTANT LEVEL OILER PREFERENCE (5.10.22) _YES MOILVISC. SO GRADE 150.VGEA6 INSTRUMENTATION ‘O ACCELEROMETER (6.4.2.1 CO PROVISION FoR MOUNTING ONLY (5,10,2.14) ‘PROVISION FOR VIBRATION PROBES(S.4.2.2) (9 FLAT SURFACE REQYD (5.10.22) (TEMP. GUAGES (WITH THERMOWELLS) (8.1.3.6) € PRESSURE GAUGE TYPE ‘ASHISH KOWART ‘UINAY KUMAR Dawe | 28082078 aaa [econ mares ‘TERED BY "GANGAL DATA SHEET FOR VERTICAL CENTRIFUGAL PUNP | SOE (BOOSTER PUNE) DTA SHEET NO. mecinePsiosczEPnotNs- Geanon SHEET SOF 8) 108 of 302 tent shall be comduched al ain mm Prapacd PROJECT -TRANGPORTATION OF OIL THROUGH PIPELINE FROM | JOB TOTO=>S tH [SITE POCCTERHINAC AT cRATTOGRAW, BANGLADESH ——— ‘SERVICE: FSDVJET ATISKOTHOBC, BOOSTER PUMPS} [DRIVER TPE"ELECTRIC MOTORS | [SEE Ga InSPHCTION AND VESTN KapoeTT)) — = SHOP SPECTION (La) © FERFORDUNGE CURVE APPROVAL [TEST WITH SUBSTITUTE SEAL 7.3.3.0) EST NOACRET BT DBS HvonosrancTesrorsoms . ° 1" oLin fe wronostarictest (732) 8 : ° 1 PERFORMANCE (7.3) ° . ° (RETEST ON SEAL LEAKAGE ° . ° max RELATIVE DENSITY sn 72.42) ° : ° © ax OIA IMPELLERS ANO/OR NO, OF STAGES 8 Thur fexc vetocrry ° ° ° 1 OPeRATION TO TRIP SEED BATA 73.3.4) -OnS BEARING HS LIFTER (0.1.2.6 OCOMPLETEUNTTTESTIZ343) © ° ° # CONNECTION DESIGN APPROVAL (582.34) SOUND LeveL TEST(7.3.44) ° ° : {TORSIONAL ANALYSIS REQUIRED (5.9.2.1) cueamuness prion To ° ° . ‘TORSIONAL ANALYSIS REPORT (3.9.2.0) FINAL ASSEMBLY (222.2) 1 PROGRESS REPORTS (9.3.3) © nozZiE LOAD TEST (62.8) ° ° © 6 Gurune oF PRoceounes Por OPTIONAL TESTS (2.2.5) © uece ror co-nuan ° ° ° © ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2. oui fab SURFACES G33) VERTICAL PORPS (0 MEGINICAL RUN UNTIL OM. ° ° ° SPoMPTRUST: —GIUF—(-)DOWN ‘Ten. STABLE 7.3.4.1) ° ° ° ATSIC a 0} (04M MECHANICAL RUN AFTER ° ° ° sTRATED FLOW ——W ‘1 TENP. STABLE (73:47. nme, RUN TEST ° ° ° Caan = SOLE ATE REGURED way, (BAG HSG RESONANCE TEST ° ° ° "SEPARATE MOUNTING PLATE REQUIRED (3834) 7349) {NSOLE PLATE THICKNESS LATER (nm TT + anny equirmen rest ° ° . COWMN IPE FLANGED THREADED 2345) _k TE CIANETE CTE in) —wLENGTH 1000 (wR) IMPACT TESTING (6.1243) > ° ° ° wa nuEER > oprREN aa LINE SHAFT GEARING SACING 76 — Tony ovasMem ° ° “OWATER mG GGREASE mPOA 0 BIDDER REP REPAIR ANG FF RzconDS 72110 UNE SHAFT Ww OrEu close «ODER SUBMIT TEST PROCEDURES 73.42829) 15_LNE SHAFT DIAMETER CATER (eo) ‘OBIODER SUBMIT TEST DATA WITHIN 28 h 73.339 TUBE DIAMETER ton ‘OINCLUDE PLOTTED VIBRATION SPECTRA 6933) ‘RECORD FINAL ASSEMBLY TONE SHAFT COUPLING: ‘© SUBMIT INSPECTION CHECK LIST o.m ‘LINE SHAFT DIAMETER SLEEVERKEY — a YHREADED (MATERIAL CERTIFICATION REQUIRED saa. {SUCTION CAN THC cr OcASNG MMU SS (omy aoe DaNETER Tra Omen CLCASTINGREPAIR PROCEDURE APPROVAL RED (5.12.25) ALINSPECTION REQURED FOR CONNECTION 230) ‘BIMPELLER COLLETS ACCEPTBLE waa ‘myc. PARTICLE or LIQUID pesca TBHARDENED SLEEVES UNOER BEARING wee 1 pADIOGRAPHIC sucressoue ssnsPecrion REQUIRED FOR CASTING o2a.1s.215) IMAG. PARTICLE or LIQUID PENETRANT 1 ADIOGRAPHIC ULTRASONIC | aRIFOUD PIPING To SINGUE CORRECTION 6.1.8] 0 HaRONESS TEST REQUIRED: 7223) [VENT BORAIN B COOLING WATER {6 ADDITIONAL SUBSURFACE BUMINATION FOR G23 © NOUNT SEAL RESERVOIR OFF BASERPLATE (6510 | Foe Saou [FLANGES REQD IN RACE OF SOCKET WELD UNIONS (5.28) | sere CE et SHS cy INSTALLATION LST IN PROPOSAL 2a) aR aaa ee og Conneerion Bourne iste ‘ovire contin ast Aisa cAVANizeD © PAINTED. oss [cca ROE Jen SECTION: OF & Ga ‘GWER TH ENGHEER CONST [ane [PRE BY ‘CHRD EY —— PROUECT: TRANSPORTATION OF ‘DSGN_] ASHSHKORART | TKMONDAL —| PIPELNE FROM GHATTOGRAMTO ‘way Kaha Das | 208 mua | APPROVED RY ‘GANGA. DATA SHEET FOR VERTICAL CERTIFICATE “14199 of 300" (@oosTeR PUN) ee ECibgr Sea POI DS. Szanot EET OF 5) fh Acceltremetr FRTD con he trodalleed on accemsible cceltrome Hr aweah af booster pump ft revr. Aitediyly plmect comply note jo4ll Gf dak “SERERA = ‘PROJECT "TRANSPORTATION OF OIL THROUGH PIPELINE FROM | -JG815 06S 7 ‘ATTOGRAM TO DHAKA (COPL}, BANGLADESH Sora ENGINEER CONS UGTiON ade ——————-sre-Pooc TERN ATCHATTOORAN EANSTROEGH————| chaser ENGINEER CONSTRUCTION BRIGADE UNT-cRATTOGRAMOT ——-UNITRO!00) ©. PBPIVIAP-BP.C2OT [[ SERVICE: HSDIIET AVSKOY HOBC. BOOSTER PIMPS | NO-REQUIRED TWO WORRNG"ONE— STANDBY ONE ——|-DRIVER TWPE: ELECTRIC MOTOR ‘APPLICABLE TO: O PROPOSALS. @ PURCHASE OASBULT For : BOOSTER PUNPS - PIPELINE TRANSFER ‘UN oo ‘Se: GHATTOGRAM SERVICE. Isp — [PRESSURE VESSEL DESIGN CODE REF NOTES: INFORMATION BELOW TO BE COMPLETED: 0 BY PURCHASER c BYMANUFACTURER @ BY MANUFACTURER OR PURCHASER (S THESE REFERENCES NUST BE LISTED BY THE WANUFACTURER RES USED IN DESTON (5. Te HURCE OF MATERIAL PROPERTIES [ = WELDING AND REPAIRS (5-12°3-1 THESE REFERENCE’ BYTE i ‘ALTERNATE WELDING CODES AND STANDARDS (5.12.3.1) \WEDLING REQUIREMENT (APPLICBLE CODE OR STANDARD) PURCHASER DI Walder / operator quaticaion | © Welding procedure qualitaton | 0, Non-pressure retaining structural welding such as base plates or supports | 0, Megnetic particle or gud penetrant examination ofthe pate edges | 0 °. . Post weld heat treatment Post weld heat treatment of casting fabrication weld ATERIAC INSPECTION (7.2.2.1) (7-213) THESE REFERENCES HUST BE LISTED BY THE PURCHASER (OEFRULT TO TARLE 13] (ALTERNATIVE MATEIRIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 13) “TYPE OF ISHPECTION METHODS. FOR FABRICA RADIOGRAPHY °. ° ULTRASONIC INSPECTION ou | ee ° =e, MAGNETIC PARTICLE IsHepcTiON | OSs as Laguro Penereavr inspection | 0 ° ©. Ee 4, Bidder shal review te avaliable NPSM atthe flange ofthe pump and select the pump requng low NPSH and dei the vertical can length to provide adguets NBSHA with recuired mari 2. Pump shal be sutaby selected to stor win adequate NPSH margin forall operating condions and fuds properties specfed. Any shortcomings $l be Nghted inte ‘3. Pumps sal be sutabiy selected fora! operating candions and fide properties speclad. Any shortcomings sal be highlighted inthe Bi ‘aractersi curves for verous operating speeds indcatng operating pont hall be rovided with bi fr purchasar revi during bid evahatin, ‘4 Bidder sal furnish duty fled in API 62 dts shact Yor proposed selng system with ss. Mechanical seal eral be carts PE Sal pon setehes| shall be submited inccating all accessories and istrmenaton and connection deta. Siar shal provide compete nfrnation fo csesng ‘Sjstams offered long wth the bd 5. Mechanical seal shal be offered and shal be as er AP1 682. The seal plans shal be selected and approved by sel Bidder forthe present appli "Wepecon an texting requremant sale fred up Gurng Ber Bd eveatnstge. Bde shal urshprelmary ispacton a est an 6. Inspection and eng equcement shal be fed up ding vendor bel evaluation stage, Vener shal uric praia npecon an Test Plan wh the ‘i 7. Bidder to conde: Automatic Minimum Recirculation Valve for each pump, 2s a ree isue fst by others. Sider to sec the vsive stable for stable minimum continues recreuston fm of Ns pups ond sal provide te seactn bse and valve Bidder ata she slong wi the bi ‘The Automatic Minmum Recirculation Valve shal be complete and shal be from eputes manufacturer, and shal be seared such tat tere ‘inimum possible pressure drop acrozs the main fow cretion forthe pum rated fon cider toed th restore Srp tothe spaced erent ead of te pump to arrive et the Pal pump aeerenta head tbe fered” user to Cleary ety the same thelr be valve shal aes {or the pump decharge ange rang. Suge to alco inseate the maximum dstanc the valve can De located fram pump dacharge, 8, Bidder tonae that there se cooling water aval nthe plant. Hence ay cooing recurement shal be met by ar cong 9. The general contguraven of pressure lube o system shal be cans II-PO-R3-H1-OPO-C312-C2-PYO-IV1-08D oe per APL = 614 (ISO 10838-3) However, Bidder shal verty the same based on ther experience and may eponaly afer a beter configuration ard they fel the same tobe mare fultable forthe requires application, Te Ser shall describe in deta he stacad bearing uber systems he id and suis APE 6a fata shee ly fein along we he bs lon es 12, Ke'per the plan rstrumentation phlosophy, transmitters are preferred compared to snitches. Accordingly, posse Bidder shall conser {ronsmitters wherever appeable nthe package Intrumentaton inter Scope, roa 1s, ‘Ste acetaneaYesing (OA) ofeach pn tng wi reo, Yr, and er airs shall be care fot fina scene? br hrepoeriiser to prove pl ex pa forearm a) fate shoud inch 8 as tr tot Sine at aurea tine ne te coats reed acu PARb/ace) Ieee pay eer, Yep and eure son peony sacary ag the se no [Senn EE at sO | RecnonorE oar OWNER ENGR arrow AN DsGN | AIS KOMART™|-FMONDAL—| PEELE Row GrATTCN y , tinny tana fare et ~ Das os Te] Despt NEC CED] TPPROVESBY "GANGA. —| SATA SHEET FOR VERTICAL CENT (BOOSTER PUMP) tT Ua UEEecp6 AOR heed ar murth 09 peaashhe Comment Resolition Sheet fu Oe - fess ea a [een freer: Sere = aster e a WITHOUT PREJUBICE TO CoNTRAgTUAL (OBLIGATIONS AND LIABILTigg Ponit kn

You might also like