LAPORAN PELATIHAN DEPARTEMEN HSE 4PLI (HSE DEPARTEMENT TRAINING REPORT) nceenecayr speci FIRST LAPORAN PELATIHAN (TRAINING REPORT) PUBLISH Doc No :001/HSE_PLI_CORP/XIUTRE/2013 Tanggal Sinulasi 16Desember | Waktu Simulasi 11.00 | Skenario @ate of Simulation) _ | 2013 (Simulation Time) WIB__| LokasiKebakaran | areal Dilaporkan ° ‘Waktu Alarm Berbunyi | 11.15 | Scewario the Fire Tangki (Reported By) ESRON (ime of Alarm Ringing) | WI _ | Leeation) Fenis Sinmulasi Keadaan [fl Simulasi Kebakaran ( Fire Drill Smalation) Darurat MSimulasi Penanganan Korban Kebakaran (Simulation Handling the Vietim of Fire inctdent (Kind of Emergency |] Simulasi Tumpahian Oli (0% spills Simulation) Simulation) (Simulasi Bencana Gempa Bumi arth Quake Disaster Simulation) (CiSimulasi Bencana Tsunami (Tsunami Disaster Simulation) C2Lainnya (The other things) Rencana Skenario (The Scenario Plan) PKL. 11.10 WIB Sirine kebakaran berbunyi (Fire alarm was ringing) PKL. 11.10 WIB Seluruh karyawan, staff, pekerja koutraktor & supir serta kenek berjalan cepat keluar dari areal pabrik dan berkumpul di tempat titik aman berkumpul. (4i! Employees, staffcontractor workers & Driver and also with the helper was out from the inside the plant area and meet atthe assembly point) PKI. 11.10 WIB Petugas keamanan mengamankan sehuruh areal dari orang tersisah didalam pabrik ataupun. mangan kantor. (The security guard secure all area from people whose still inside the plant building and office) ‘Bantuan personil petugas keamanan group dari Absolute dating (Additional personel security group from absolute SMI arrived) PKI. 11.13 WIB Tim Pemadam PT. PLI bergerak menuju Hydrant terdekat dengan titik api berada setelah, mendengar teriakan api dari salah seorang Korban.( The PLY fire team moved to hydrant that most near to the fire afer listen the people that scream FIRE) Kl. 11.14 WIB Security selesai mengamankan areal. (The security guard finished secure the area) PKL. 11.15 WIB Seluruh personil sudah berkumpul di satu tik. (4if peoples gather at the meeting point) Salah seorang Staff bertugas melakukan Telepon Darutat ke : (One from the staff was do the emergency calls 10:) Pemilik (Owner) = Bpk. Herry Defian Pengawas Tempat Kejadian 1 (Incident Place Supervisor ) Pengawas Tempat Kejadian 2 (Incident Place Supervisor } Ambulans dari SMI (Ambulance from SMI) Bantuan Safety Team SMI ( Group) Helped from Safey team SMI (Group)) PKL. 11.15 WIB Tim Pemadam telah selesai melakukan proses pemadaman api ( Fire team was finished secure the fire) PKI, 11.20 WIB Ambulans SMI datang bersama tim Safatey SMI (The SMI Ambulance arrive with SMI safety team) PKL 11.21 WIB Ambulans bersama tim safety SMI mengevakuasi korban dari keluar lokasi ke dalam ambulans dan membawa keluar (Ambulance with safety team from SMI evacuated the vietim out the location to inside the ambulance and bring out ) PKL. 11.25 WIB Tim pemadam api sudah selesai mengamankan sumber kebakaran (Fire feam was finished to secure the fire) PKI, 11.30 WIB Tim pemadam & Safety Officer PLI melaporkan ke Pengawas Tempat Kejadian 1 & 2 Situasi sudah Aman (PLI Fire team & Safety Officer reported to the Incident Place Supervisor I & ? about the situation is P&L 11.33 WIR Sema petsonil balik ke tempat masing ~ masing Kembali bekerja. (Ail personel go back to each of their place to get back work as usual) spk. Andreas TS spk. Tb. Sukonie Proses Simulasi berlangstng (The simulation process action) PK. 11.17 WIB (1J.17 4M) Sitine berbunyi (The sirene ringing) roses pada saat sirine berbunyi semma petsonil yang berada di tempat bergerak menuju titik aman berkumpul (4fter the sirine ringing all personil on board moved to the assembly point): No.Dok ‘HSE_PLI-CORP/TRF/4.15-01 1 y LAPORAN PELATIHAN DEPARTEM HSE YP LI (HSE DEPARTEMENT TRAINING REPORT) a PME SSS BCE sy eS ee ee roy eresiearnts Bae ace Eee ur eS kd ae ee an) Cece aed SUC aad DOr eu uO eo) rere) Jumlah orang yang ada pada Tanggal 16 Desember 2013 s/d pki. 11.15 WIB (The quantity of personel on board on Dec 16-2013 until 11.15 4M 1, Karyawan & Staif Employees & Stafp 89 Orang 2. Stalf Perwakilan TOL (701 Representative Staff 2 Orang 3. Supit & Kenek PT. PLI (PLI Drivers & Conductor) 10 Orang 4. Security Organik PLI & Absolute yang bertugas (PLY Security Guard & Absolute whose incharge) = 4 Orailg 5. Supir & kenek yang sedang memuat / bongkar barang (The Driver & Conducter that do the loading) = 8 Orang 6. Pekerja kontraktor dan pengawas (The Contractors workers & supervisor) 10 Oran; ‘Total jumlah orang di lokasi (Torai Persone! On Board ) = 123 Orang No.Dok ‘HSE_PLI-CORP/TRF/4.15-01 LAPORAN PELATIHAN DEPARTEMEN HSE (HSE DEPARTEMENT TRAINING REPORT) nceenecayr speci FIRST DRILL SIMULATION MTN UU RRS BY Sa CaN CNC Wee aca Sau Cea a eae ts ct Meee ye cot No.Dok ‘HSE_PLI-CORP/TRF/4.15-01 3 LAPORAN PELATIHAN DEPARTEMEN HSE 4PLI (HSE DEPARTEMENT TRAINING REPORT) nceenecayr speci FIRST et ee eee ‘Tim Pemadam ( Fire Team ) Sumamo (Emergency Coordinator ) Iskandar ( Fite Leader ) Pant ‘Ng Boon tong Saryanto Amir Masari Sulhi Security ( Additional ) Aapeene ee HANDLING THE FIRE INCIDENTS VICTIM SIMULATION PN TEU Se ET) No.Dok ‘HSE_PLI-CORP/TRF/4.15-01 4 LAPORAN PELATIHAN DEPARTEMEN HSE 5, (HSE DEPARTEMENT TRAINING REPORT) . gE al) No.Dok ‘HSE_PLI-CORP/TRF/4.15-01 5 LAPORAN PELATIHAN DEPARTEMEN HSE 5, LI (HSE DEPARTEMENT TRAINING REPORT) bs B ‘No.Dok ‘HSE_PLI-CORP/TRF/4.15-01 6 LAPORAN PELATIHAN DEPARTEMEN HSE (HSE DEPARTEMENT TRAINING REPORT) nceenecayr speci FIRST After all Properly SAFE according from the PLI Fire Ree re Reem km Side Nr sd ee Rea) work Thank You For All the Team Work Reported By HSE Officer No.Dok ‘HSE_PLI-CORP/TRF/4.15-01 7

You might also like