Quotation for 1350KG Modernization (12 Floors-2,5m/s)

Total Price
No. Product Spec Unit Qty. Remark
(USD)
Order board SM-03-D pcs 1
Display board SM.04VL16/Y pcs 1
Display board TL/T LCD Display pcs 12
Inspection box
pcs 1
above cabin
24*0.75+2*2P*0.75
Travelling cable m 76
+1*2.0
RVVP4/2*2P*0.75(S
Communication
emiconductor m 105
cable
shield)
Door lock cable 2*0.75+1*2.0 m 105
RVV19/18*0.75+1*
shaft switch cable m 67
2.0
shaft light cable RVV5/4*0,75+1*2 85
Other cable 2*0.75+1*2.0 m 10
Other cable 2*0.75+1*2 m 10
Other cable 4*6 m 10
Other cable 2.0.75+1*2 m 10
1 Controller AS380 Integrated $8.900

Control cabinet Inverter Unit 1


3 phase 200V/22KW

Cabin roof board SM-02-H pcs 1


Cabin board SM-02-G pcs 1
CEA300, LCD
LOP pcs 12
Indicator
Hall Lantern & Gong / pcs 11
LSC300, LCD
COP pcs 1
Indicator
on main floor with
Horizontal display pcs 1
gong
Fire box Wall hanging type pcs 1
plug in each floor / floor 12
5-way intercom Zhuhai Lingde unit 1
Inspection box in pit / unit 1
Door 1000*2100,Center
2 VVVF unit 1 $957
operator opening
Door 1000*2100,Center
3 VVVF unit 12 $1.800 USD150/pcs
hanger opening
GTW10-132P5, 2:1,
1350KG, 2.5M/S,
485*8*10*16,
22,1KW, 220V,
4 Machine / unit 1 $3.950
BRAKE
VOLTAGE=DC110VG
with Heidenhain
1387 encoder
Roller guideshoe, for
/ PCS 4 $788
Cabin
Guideshoe
Roller guideshoe, for
5 / PCS 4 $630
C.W
Traction
10mm m / $2.514
Rope
6 Speed
governor 13mm m / $235
rope
TOTAL $19.774

Note:
1 The quotation based on FOB price.
2 The exchange rate in the quotation is 1USD=6.4RMB, if the exchange rate changed, should update the price accordingly.
3 50% down payment should be paid after sign the contract.
4 50% of the amount should be paid before shipment.
5 The quotation will be validity in 30 days.
6 The production time is 60 days after confirmed the order and get the down payment.