Professional Documents
Culture Documents
AUCTION NOTICE
Conditions for the auction of Timber of various species lying in various HSD of Forest Working Division,
Swarghat of H.P. State Forest Corpn. Ltd; will be held on http://www.valuejunction.in/forest Dated
22.06.2022 from 11:00 am onwards.
All the results declared will be intimated to the winner by email and SMS.
Eligibility deposit of INR 10,000/- shall be required to be deposit in favour of HSD Dhanotu before
participation in the auction.
Conditions for the e-auction of Shisham log, bl.log, Khairwood, fuelwood, pulpwood and Chil charcoal
in H.P. State forest Development Corporation limited to be held on 22.06.2022 on
http://www.valuejunction.in/forest from 11:00 am onwards
This online auction is being held on behalf of the H.P. State Forest Development Corporation Limited for
sale of Shisham log, BL.log, Khairwood, Fuelwood, Pulpwood and Chil charcoal on this
http://www.valuejunction.in/forest
Contact Master:
Sl Contact
FSD Base location Indicative Territory Email Id
No Details
Varun Subba Maharashtra, Goa,
1 Mumbai 9920516150 Billava.Varun@mjunction.in
Billava Rajasthan
Mandi Punjab, Haryana, Himachal
2 Kamlesh Verma 7605090375 verma.kamlesh@mjunction.in
Govindgarh Pradesh, Jammu & Kashmir
Chhattisgarh, Madhya
3 Mitesh Giradakar Bhilai 7596040406 Mitesh.Giradkar@mjunction.in
Pradesh
Delhi, Uttar Pradesh,
4 Prabhat Singh Delhi 7596059533 Prabhat.Singh@mjunction.in
Uttarkhand
5 Satish Kumar Rourkella Orissa, Jharkhand 9147074862 satish.kumar1@mjunction.in
6 Anirban Sukul Kolkata All location 7596058565 anirban.sukul@mjunction.in
Conditions for the e-auction of timber in H.P.State Forest Development Corporation limited to be held at
Himkasth sale depot Dhanotu on 22-06-2022.
This online auction is being held on behalf of the H.P. State Forest Development Corporation Limited
(hereinafter to be called as Corporation) for the timber and/or Forest Produce in Himkasth sale Depot
Dhanotu on dated 22-06-2022.
1. The material inspection will take place at Dhanotu Depot, HPSFDCL. Authority shall assist and
facilitate the inspection.
2. GENERAL CONDITION:
2.1. The above Forest Produce is auctioned on the basis of “As IT IS WHERE IT IS AND IN WHAT
SO EVER CONDITION IT IS”.
2.2. The bidder (s) shall be deemed to have inspected the forest produce/lots. The bidder (s)
accepts/accept as correct the No, kind, measurement, weight, bundles, classifications and
calculations of volume/weight etc. of forest produce put up for sale as given in the sale list(s) and
Forest Working Division’s record. Any clerical mistake in the sale lists will of course be corrected
and payment will be due/received accordingly.
2.3. In case of any doubt in Khair lots (billets only), re-measurement can be requested within one week
of auction on depositing 1% of the highest bid amount. If the variations are upto, 3% in volume of
the total billets in the whole lot, no change will be made in measurement and the amount of 1%
deposited shall be forfeited. If this variation is more than 3%, rebate/credit for the short fall in volume
on the basis of volume auctioned in the lot shall be given and the amount of 1% deposited shall be
refunded.
2.4. The auction sales in Himkasth Sale Depots are subject to such restriction as may be imposed by the
Govt. of H.P. from time to time. The purchaser is at liberty, either to utilize Khair wood (Billets)
within the State or to export the same outside the State of HP after obtaining export permit from
concerned DFO by paying prescribed export permit fee. However, fuel wood which is listed for sale
in the auction can also be transported out of state as per instruction of the Deputy Secretary (Forests)
to the Govt. of HP Shimla vide letter No. FFE-B-A (4)-2/2004-Vol.II dated 1.9.2014 received from
Head Office vide letter No.HPSFDC/Wks/Sale-65/Vol.1/16594-16610 dated 15.9.2014.
The auctioning authority reserves the right to withdraw club or split any lots specified in the sale list(s).
· AUTHORISATION OF BID
· The auctioning Authority shall have the right to check whether any particulars bidder is duly and
properly authorized by the firm for whom he is bidding and reserve the right to permit bidding
or not by any individual/ firm at his sole discretion.
· The purchaser (s) who is /are found have indulged in any kind of malpractice in the HSD at any
stage directly or in connivance with the staff of HPSFDC, will be debarred from participating in
any future online auction of timber conducted by HPSFDC.
· BID
The bid by the bidder shall be inclusive of all taxes whether GST as applicable and TDS under
section 206-C read with Section 44 AC of the income Tax Act 1961 and Market Fee @ 1%.
Provided further that the auctioning authority shall announce on the spot the purchase price payable,
the GST, Market fee and TDS applicable to be deposited as stated above.
· DURATION OF BID
· 4.1. Bid once offered shall remain open for 15 days from the date of auction. The auctioning
authority/sanctioning authority without assigning any reason may not accept any final bid given
at the time of the auction in which case the earnest money referred to in condition 8 shall be
refunded forth with.
· 4.2. The auctioning authority reserves the right to withdraw, combine or split any lot(s)
specified in the sale list (s).
· 5. ELIGIBILITY:
§ 5.1. PAN and GST/Aadhar no. Eligibility: Every bidder must have a PAN number and
either GST Certificate or Aadhar number. Photo copy of PAN and GST number/Aadhar
number needs be submitted as a proof to mjunction official at the time of registration.
Those who fail to provide the required documents cannot participate in the online auction".
§ The intending bidder(s) is/are required to deposit a sum of Rs. 10,000/- or more at
the discretion of the auctioning authority to become eligible for bidding in the
auction/sale. Those who do not deposit this amount cannot participate in the
suction/sale
§ MODE OF PAYMENT: The eligibility deposit may be paid in cash or by demand draft
or by NEFT/RTGS in favour of concerned Forest Working Division.
§ ADJUSTMENT: The eligibility deposit may be adjusted towards earnest money due
from a successful bidder(s) in whose favour the auction of a lot’s/ Forest Produce has
been concluded.
§ Refund: The eligibility deposit shall be refunded to such bidder(s) who are not liable
to deposit any earnest
· Forfeiture: If the highest bidder does not deposit earnest money at the fall of hammer or within
such extended period as the case may be, eligibility deposit shall stand forfeited for the HP State
Forest Development Corporation Limited.
The earnest money deposit payable by the highest bidder(s) shall be 8.5% of the total purchase price. The
Auctioning Authority may, however raise the earnest money during the auction at his discretion.
In respect of “C” Class timber, resale lots, 30% and K to Q timber lots, 20% of the total sale amount will be
realized as earnest money.
TIME OF PAYMENT OF EMD: Post completion of auction, the highest bidder(s) shall deposit the earnest
money in cash or by bank drafts or NEFT/RTGS within two working days from the date of lot confirmation
by HPSFDC. Pay order/Banker Cheque of local station (Where HPSFDC or concerned HSD has a bank
A/c) shall also be accepted. Any bidder who gets his eligibility deposit adjusted against the earnest money
due from him/them, shall not bid for any other lot(s) unless he / they has/have made a fresh eligibility
deposit.
EXTENTION FOR PAYMENT OF EMD: The Auctioning Authority may at his discretion allow the
earnest money in whole or part to be deposited within two days of the date of online auction instead of at
the fall of the hammer without charging any extension fee.
The Divisional Manager/ Depot Officer may allow a further extension of 7 days from the date of online
auction for deposit of earnest money extension charging @ 50% P.A on earnest money deposit unpaid.
A The Director concerned may grant extension in depositing of earnest money beyond 7 days, with
extension charges @ 50% PA on full /remaining amount of EMD from the date of auction till actual date of
its deposit, under exceptional circumstances and for bona-fide reasons.
FORFEITURE: In case of highest bidder fail to pay the total bid money/ price within the specified period or
within such extended period as the case may be, the earnest money deposit shall stand forfeited to the
HPSFDC and the HPSFDC shall have the right to re-sell / re auction the said lot.
· MODE OF PAYMENT:-
All demand drafts shall be on any scheduled bank in favour of HP State Forest Development
Corporation Limited and payable either at Shimla or the nearest Town/City/Village where the
Himkashth Sale Depot has a bank account. Pay Orders/Banker Cheques of local station (where HPSFDC
or concerned HSD has a Bank Account) shall also be accepted. The successful purchasers shall tender
one Bank Draft or through R.T.G.S/NEFT towards sale price payable either at Shimla or the nearest
Town/City/Village where the Himkashth Sale Depot has a bank account. The other Bank Draft towards
taxes/market fee shall be payable only at nearest Town/City/Village where the Himkashth Sale
Depot has its bank account drawn in favour of the H.P. State Forest Development Corporation Limited.
· SANCTION OF BID:
The bid sanction will be given right after the conclusion of auction for lots sold at or above upset
price. For all other lots sanction will be conveyed after the approval of sanctioning authority
within 10 days. Provided that such sanction shall always be subject to condition of deposit of the
taxes due from the purchasers as per the provision under various acts along with the sale proceeds.
Provided further that the deposit of taxes payable by the Purchaser within the stipulated time as
aforesaid, shall be a condition precedent to the sale and failure to do so shall be deemed to
constitute retraction of the bid by the bidder and make him liable to the forfeiture of earnest
money deposit and give the Corporation the right to re-online auction the resiled lots afresh.
The purchaser (s) shall pay the price of timber purchased within 45 days of sanction as stated in para 10
above and shall also lift the entire timber sold to him /them within this period of 45 days.
Divisional Manager, HSD concerned under exceptional circumstances and on application by the
purchaser (s) may allow an extension up to 30 days in making payment subject to the payment of interest
@ 27% PA on the belated amount in the manner prescribed for making payment.
(a) Beyond the period specified in 11.2 Director concerned may give extension in period of payment on
payment of interest @ 2.5 % PM on belated payment.
PART PAYMENT AND REMOVAL: While applying for extension under clause 11.2 the purchaser
will deposit 10% of the total sale value of the timber purchased by him with the concerned Divisional
Manager to qualify for extension beyond 45 days. The Divisional Manager may recommend the
extension with 27% interest on the belated sale amount in the manner prescribed for making payment.
This 10 % security amount will be adjusted against the value of the total timber purchased by the bidder
at the time of making final payment of the timber purchased. However, if he fails to make the payment
within the extended period, the amounts so deposited by him will be forfeited to the Corporation and
no further extension will be granted.
If the entire payment of the sold lot of timber is made within 24 days from the effective date of sanction,
the rebate will be allowed following rates:-
REBATE;
MODE OF PAYMENT: Payment of sale price within the period of 45 days shall be made by crossed
demand drafts/ NEFT/RTGS only drawn as stated in para supra.
GRACE PERIOD: In case of payment by demand draft as stated in para 11.4, a grace period of 3 days
will be allowed for receipt of the drafts at Sale Depots, provided the date of issue of the demand draft
is within the period specified above. In case the last day on which any payment is to be made to the
Corporation is a holiday either in the Himkashth Sate Depot of the Corporation or in the Banks in HP
Punjab and Haryana then the date shall automatically stand extended to the next working day.
ADJUSTMENT OF EMD: The earnest money deposit for a particulars lot will be adjusted only when
the final payment of the lot is made by the purchaser in the period mentioned above.
FAILURE TO PAY: In case any purchaser fail to pay the whole or in part the price for the sold lot
within the prescribed time of 45 days as stated in sale condition 11.1 above and the timber is not lifted
by the party within the stipulated period as well as within extended period covered under the sale
condition NO. 11.2 and 11.2 (a) the entire earnest money or purchase price received shall be forfeited
and the Corporation shall have the right to resale the timber.
The purchased timber shall be lifted only against a release permit issued by the Depot Officer.
PERIOD FOR LIFTING: The purchaser shall lift the purchase timber within 45 days from the date of
sanction. However, if after full payment of the lot has been made and the entire quantity can- not be
lifted for want of Truck load, such timber may be allowed to be kept in the Depot up-to the 20 days
after the date of next online auction without any Depot rent. The quantity which may be detained under
this concession will not be exceed 8m3. In case the purchaser fails to lift this timber within the period
specified above, depot rent as provided herein after shall by payable from the date of expiry 45 days
from the date of sanction in respect of that lot.
EXTENSION OF 30 DAYS: The Divisional Manager or Depot Officer may allow extension up-to 30
days beyond the time specified for lifting in clause in 12.2 above on payment of Depot rent @ 22% P.A
on pro rata value of timber un-lifted.
FURTHER EXTENSION: The Director (Central) may under exceptional circumstances and on an
application by the purchaser allow a further extension for 30 days or payment of Depot rent @ 22%
P.A. on the pro rata value of un-lifted timber. Director (Central) may give further extension on charging
depot rent @ 3% per month. No extension will be granting in respect of C Class timber beyond the
period as mentioned in condition 12.3.
STACKING: All timber as per para 12.2 to 12.4 at the discretion of the Depot Officer/ Divisional
Manager will be removed and stacked in a separate portion of the depot at the cost of purchaser. Such
cost will be deposited in cash before the issue of the release order by the Depot Officer/ Divisional
Manager.
PALTAI: Paltai of timber of the sold lot may be allowed to the purchaser provided this is done in the
presence of Divisional Manager/ Depot Officer and no disturbance is caused to the adjoining stacks and
the full payment of the stacks in question has been made.
No purchaser shall sell timber purchased by him to another party while such timber is lying in the
Corporation depot. No sawing or conversion of timber is to be permitted in the depot premises under
any circumstances what so ever.
As per govt. decision, the supplier of labour (LSM) in HSDs. Should not be allowed participate in the
auction process.
No timber shall be allowed to be removed from the sale Depot without the issue of proper release order
to be issued by the Depot Officer as per Corporation rules and without timber having been marked with
export sale hammer and presentation of the release order, challan and Gate pass as per Corporation
Rules& Regulation in force from time to time.
ARBITRATION:
All or any dispute arising out of the auction sale of interpretation of any of the sale condition contained
herein shall be referred to the Managing Director, HP State Forest Development Corporation Limited
and his decision shall be final and binding on the purchaser.
JURISDICTION:
Court proceeding if any connected with the sale shall be subject to the jurisdiction of Himachal Pradesh
Courts only.
The auction sale in HSDs are subject to such restriction as may be imposed by the Govt. of H.P. from
time to time.
These conditions of sale shall also from the terms of the Agreement Deed between the seller (HPSFDC)
on the one side and buyer on other side.
HIMKASHTH SALE DEPOT DHANOTU
D A T E O F E- A U C T I O N 22.06.2022
Lot Stack
Sr. No. NO. No. Size No. Vol. Cft.
1 3 4 5 6 7 8 9
RE- SALE TIMBER FOREST
WORKING DIVISION
KULLU.(COMMITTEE TIMBER)
KAIL/AXE/ K TO Q
1 1 233 305 18 18 9 0.891 3.50
305 16 16 3 0.234 2.75
305 13 13 1 0.052 1.84
244 18 18 5 0.395 2.79
214 18 18 1 0.069 2.44
183 18 18 4 0.236 2.08
183 16 16 2 0.094 1.66
183 13 13 1 0.031 1.09
26 2.002 2.72
UN SOLD TIMBER FOREST
WORKING DIVISION KULLU.
(COMMITTEE TIMBER)
KAIL/S/ K TO Q
2 2 4129 244 26 13 27 2.214 2.90
244 26 10 2 0.126 2.22
244 21 13 10 0.670 2.37
244 21 10 2 0.102 1.80
244 16 10 1 0.039 1.38
4130 214 26 13 2 0.144 2.54
183 26 13 26 1.612 2.19
183 21 13 11 0.550 1.77
183 26 10 2 0.096 1.70
183 21 10 3 0.114 1.34
152 26 13 2 0.102 1.80
152 21 13 2 0.082 1.45
92 21 13 2 0.050 0.88
92 5.901 2.27
KAIL/AXE/ BC
3 3 4046 305 21 21 1 0.135 4.77
305 18 18 1 0.099 3.50
305 16 16 5 0.390 2.75
KAIL/AXE/ K TO Q
4191 305 21 21 1 0.135 4.77
305 18 18 3 0.297 3.50
305 16 16 3 0.234 2.75
244 23 23 1 0.129 4.56
244 21 21 2 0.216 3.81
244 18 18 1 0.079 2.79
18 1.714 3.36
4 4 3730 305 21 21 1 0.135 4.77
305 18 18 13 1.287 3.50
305 16 16 7 0.546 2.75
305 13 13 12 0.624 1.84
305 10 10 1 0.031 1.09
34 2.623 2.72
5 5 3993 305 18 18 1 0.099 3.50
305 16 16 12 0.936 2.75
305 13 13 1 0.052 1.84
305 10 10 3 0.093 1.09
3819 244 18 18 6 0.474 2.79
244 16 16 7 0.434 2.19
244 13 13 5 0.205 1.45
35 2.293 2.31
KAIL/LOG/RB/P.ROTTEN
6 6 4060 305 75 1 0.107 3.78
305 65 6 0.486 2.86
305 55 13 0.754 2.05
305 45 6 0.234 1.38
305 35 4 0.092 0.81
4059 244 75 5 0.430 3.04
244 65 8 0.512 2.26
244 55 19 0.874 1.62
244 45 4 0.124 1.09
244 35 2 0.038 0.67
183 85 1 0.083 2.93
183 75 3 0.192 2.26
183 65 4 0.192 1.70
183 55 2 0.070 1.24
183 45 1 0.023 0.81
79 4.211 1.88
FIR/AXE/ K TO Q
56 56 822 305 16 16 1 0.078 2.75
KAIL/S/BPS/ K TO Q
C
107 107 303 305 M 2 0.102 1.80
244 21 13 2 0.134 2.37
183 26 13 1 0.062 2.19
152 21 13 2 0.082 1.45
7 0.380 1.92
KAIL/AXE/BC
108 108 1772 305 16 16 5 0.390 2.75
305 13 13 7 0.364 1.84
305 10 10 6 0.186 1.09
244 18 18 6 0.474 2.79
244 16 16 3 0.186 2.19
244 13 13 2 0.082 1.45
183 18 18 2 0.118 2.08
183 16 16 1 0.047 1.66
183 13 13 2 0.062 1.09
34 1.909 1.98
KAIL/AXE/ K TO Q
109 109 1656 305 18 18 6 0.594 3.50
305 16 16 2 0.156 2.75
244 18 18 1 0.079 2.79
244 16 16 2 0.124 2.19
11 0.953 3.06
110 110 1773 305 18 18 3 0.297 3.50
305 16 16 4 0.312 2.75
305 13 13 10 0.520 1.84
244 13 13 2 0.082 1.45
244 10 10 2 0.048 0.85
183 18 18 3 0.177 2.08
24 1.436 2.11
111 111 128 305 18 18 5 0.495 3.50
305 16 16 7 0.546 2.75
244 18 18 4 0.316 2.79
244 16 16 1 0.062 2.19
17 1.419 2.95
KAIL/DD/P.ROTTEN
113 113 227 152 31 31 1 0.146 5.16
152 28 28 3 0.357 4.20
152 26 26 2 0.206 3.64
152 23 23 1 0.080 2.83
122 26 26 3 0.246 2.90
122 23 23 2 0.130 2.30
92 26 26 1 0.062 2.19
92 23 23 2 0.098 1.73
15 1.325 3.12
KAIL/LOG/RB/BC
114 114 1638 305 65 3 0.243 2.86
305 55 12 0.696 2.05
305 45 9 0.351 1.38
305 35 10 0.230 0.81
244 55 2 0.092 1.62
244 35 5 0.095 0.67
183 35 1 0.014 0.49
KAIL/LOG/RB/P.ROTTEN
1776 305 65 4 0.324 2.86
305 55 7 0.406 2.05
305 45 11 0.429 1.38
305 35 5 0.115 0.81
244 55 4 0.184 1.62
244 45 3 0.093 1.09
244 35 4 0.076 0.67
80 3.348 1.48
KAIL/LOG/RB/PR.
115 115 228 305 65 4 0.324 2.86
305 55 7 0.406 2.05
305 45 2 0.078 1.38
244 55 1 0.046 1.62
183 55 2 0.070 1.24
16 0.924 2.04
FIR/S/ K TO Q
116 116 250 305 26 13 56 5.768 3.64
305 21 13 17 1.411 2.93
73 7.179 3.47
10.19
117 117 286 305 26 13 99 7 3.64
305 21 13 20 1.660 2.93
305 21 10 2 0.128 2.26
12 11.98
1 5 3.50
118 118 330 275 21 13 2 0.150 2.65
244 26 13 44 3.608 2.90
244 21 13 8 0.536 2.37
244 21 10 8 0.408 1.80
331 183 31 10 1 0.057 2.01
214 26 13 3 0.216 2.54
183 26 13 32 1.984 2.19
183 21 13 22 1.100 1.77
183 21 10 1 0.038 1.34
12
1 8.097 2.36
FIR/S/ K TO Q /BPS
119 119 333 305 26 13 1 0.103 3.64
305 21 13 1 0.083 2.93
244 26 13 2 0.164 2.90
244 21 13 1 0.067 2.37
183 26 13 1 0.062 2.19
183 21 13 1 0.050 1.77
152 26 13 2 0.102 1.80
122 26 13 1 0.041 1.45
122 21 13 1 0.033 1.17
92 26 13 2 0.062 1.09
13 0.767 2.08
120 120 1630 305 65 7 0.567 2.86
305 55 7 0.406 2.05
305 45 16 0.624 1.38
305 35 3 0.069 0.81
244 55 2 0.092 1.62
244 45 2 0.067 1.18
37 1.825 1.74
UN-SOLD Timber Govt. R.A. G
.H.N.P.Unit Saraj Lot No.1/2018-19
Athad to Shill Sharungeer FWD
Kullu.
KAIL/S/BC
121 121 208 305 26 10 8 0.632 2.79
305 21 10 4 0.256 2.26
244 26 10 1 0.063 2.22
244 21 10 3 0.153 1.80
KAIL/S/BC/WW
209 305 26 13 2 0.206 3.64
305 21 13 1 0.083 2.93
244 26 13 3 0.246 2.90
244 21 13 1 0.067 2.37
23 1.706 2.62
KAIL/S/ K TO Q
122 122 210 305 26 13 56 5.768 3.64
305 21 13 24 1.992 2.93
211 244 26 13 20 1.640 2.90
244 21 13 4 0.268 2.37
244 26 10 1 0.063 2.22
214 26 13 2 0.144 2.54
183 26 13 17 1.054 2.19
183 21 13 13 0.650 1.77
183 26 10 1 0.048 1.70
KAIL/AXE/ K TO Q
212 244 16 16 1 0.062 2.19
13 11.68
9 9 2.97
RE SALE TIMBER FOREST
WORKING DIVISION CHAMBA
KAIL/RB/P.ROTTEN
123 123 82 305 55 5 0.290 2.05
305 45 9 0.351 1.38
305 35 4 0.092 0.81
18 0.733 1.44
UN-SOLD TIMBER FOREST
WORKING DIVISION CHAMBA.
KAIL/S/ K TO Q
124 124 5182 305 26 13 11 1.133 3.64
305 21 13 16 1.328 2.93
305 26 10 4 0.316 2.79
305 21 10 6 0.384 2.26
183 26 13 6 0.372 2.19
183 26 10 3 0.144 1.70
5175 244 26 13 12 0.984 2.90
244 26 10 4 0.252 2.22
244 21 13 13 0.871 2.37
244 21 10 7 0.357 1.80
5163 183 26 13 12 0.744 2.19
183 21 13 6 0.300 1.77
183 26 10 3 0.144 1.70
183 21 10 2 0.076 1.34
10
5 7.405 2.49
KAIL/AXE/BC
125 125 5174 244 21 21 8 0.864 3.81
244 18 18 26 2.054 2.79
244 16 16 6 0.372 2.19
244 13 13 4 0.164 1.45
5172 183 21 21 4 0.324 2.86
183 18 18 19 1.121 2.08
183 16 16 4 0.188 1.66
183 13 13 3 0.093 1.09
74 5.180 2.47
KAIL/AXE/K TO Q
126 126 5173 305 21 21 4 0.540 4.77
305 18 18 9 0.891 3.50
305 16 16 1 0.078 2.75
244 18 18 1 0.079 2.79
15 1.588 3.74
KAIL/LOG/RB/P.ROTTEN
127 127 5169 305 75 2 0.214 3.78
305 65 3 0.243 2.86
305 55 26 1.508 2.05
305 45 7 0.273 1.38
305 35 5 0.115 0.81
244 55 4 0.184 1.62
244 35 2 0.038 0.67
49 2.575 1.86
KAIL/S/BC
150 150 3345 305 26 13 39 4.017 3.64
KAIL/AXE/K TO Q
163 163 234 305 18 18 20 1.980 3.50
305 16 16 21 1.638 2.75
305 13 13 5 0.260 1.84
305 10 10 4 0.124 1.09
244 18 18 8 0.632 2.79
244 16 16 5 0.310 2.19
244 13 13 1 0.041 1.45
183 18 18 1 0.059 2.08
183 16 16 5 0.235 1.66
70 5.279 2.66
164 164 391 305 18 18 21 2.079 3.50
305 16 16 26 2.028 2.75
305 13 13 12 0.624 1.84
305 10 10 10 0.310 1.09
244 18 18 5 0.395 2.79
244 16 16 17 1.054 2.19
244 13 13 4 0.164 1.45
183 18 18 8 0.472 2.08
183 16 16 6 0.282 1.66
10
9 7.408 2.40
165 165 3244 305 18 18 15 1.485 3.50
305 16 16 25 1.950 2.75
305 13 13 5 0.260 1.84
244 18 18 9 0.711 2.79
244 16 16 12 0.744 2.19
244 13 13 3 0.123 1.45
69 5.273 2.70
166 166 3413 305 18 18 3 0.297 3.50
305 16 16 8 0.624 2.75
305 13 13 4 0.208 1.84
244 18 18 1 0.079 2.79
244 16 16 2 0.124 2.19
244 13 13 1 0.041 1.45
3415 183 18 18 4 0.236 2.08
183 16 16 8 0.376 1.66
183 13 13 6 0.186 1.09
152 13 13 1 0.026 0.92
38 2.197 2.04
KAIL/LOG/RB/BC
167 167 3213 305 65 9 0.729 2.86
305 55 26 1.508 2.05
305 45 3 0.117 1.38
38 2.354 2.19
168 168 3420 305 65 2 0.162 2.86
305 55 23 1.334 2.05
305 45 18 0.702 1.38
305 35 12 0.276 0.81
3432 244 65 2 0.128 2.26
244 55 13 0.598 1.62
244 45 2 0.062 1.09
183 65 3 0.144 1.70
183 55 9 0.315 1.24
84 3.721 1.56
169 169 381 305 65 2 0.162 2.86
305 55 19 1.102 2.05
305 45 6 0.234 1.38
305 35 8 0.184 0.81
244 55 3 0.138 1.62
183 65 2 0.096 1.70
183 55 2 0.070 1.24
KAIL/LOG/RB/P.ROTTEN
382 305 65 1 0.081 2.86
305 55 12 0.696 2.05
305 45 3 0.117 1.38
183 65 1 0.048 1.70
152 45 1 0.019 0.67
60 2.947 1.73
170 170 3180 305 55 38 2.204 2.05
305 45 5 0.195 1.38
244 65 4 0.256 2.26
244 55 9 0.414 1.62
244 45 2 0.062 1.09
183 55 3 0.105 1.24
61 3.236 1.87
171 171 3421 305 55 1 0.058 2.05
305 45 2 0.078 1.38
244 55 1 0.046 1.62
183 55 2 0.070 1.24
183 45 3 0.069 0.81
9 0.321 1.26
FIR/S/BC
172 172 3328 305 26 10 24 1.896 2.79
305 21 10 23 1.472 2.26
47 3.368 2.53
173 173 3442 305 26 10 17 1.343 2.79
305 21 10 19 1.216 2.26
36 2.559 2.51
174 174 3443 244 26 13 13 1.066 2.90
244 21 13 10 0.670 2.37
3435 183 26 13 12 0.744 2.19
183 21 13 6 0.300 1.77
183 21 10 2 0.076 1.34
43 2.856 2.35
FIR/AXE/ K TO Q
175 175 3445 305 18 18 10 0.990 3.50
305 16 16 13 1.014 2.75
305 13 13 2 0.104 1.84
244 18 18 4 0.316 2.79
244 16 16 3 0.186 2.19
183 18 18 1 0.059 2.08
33 2.669 2.86
FIR/DD/P.ROTTEN
176 176 3446 152 18 18 1 0.049 1.73
122 26 26 1 0.082 2.90
92 21 21 3 0.123 1.45
5 0.254 1.79
FIR/LOG/RB/P.ROTTEN
177 177 3447 305 65 9 0.729 2.86
305 55 30 1.740 2.05
305 45 14 0.546 1.38
305 35 11 0.253 0.81
244 65 2 0.128 2.26
244 55 3 0.138 1.62
244 45 3 0.093 1.09
72 3.627 1.78
CHIL /S/BC/BPS
178 178 166 305 26 13 2 0.206 3.64
305 21 13 1 0.083 2.93
C
305 M 3 0.153 1.80
244 21 13 2 0.134 2.37
244 21 10 2 0.102 1.80
183 21 13 2 0.100 1.77
92 21 13 8 0.200 0.88
20 0.978 1.73
CHIL /AXE/ K TO Q
179 179 208 244 18 18 11 0.869 2.79
CHIL/RB/BPS/P.ROTTEN
180 180 144 183 55 3 0.105 1.24
183 45 4 0.092 0.81
183 35 2 0.028 0.49
122 55 1 0.023 0.81
10 0.248 0.88
DEO/S/BC/ESSB
240 240 4051 305 26 13 1 0.103 3.64
305 21 13 2 0.166 2.93
214 21 13 1 0.058 2.05
183 26 13 2 0.124 2.19
183 21 13 1 0.050 1.77
7 0.501 2.53
DEO/S/K TO Q
241 241 4052 305 26 13 3 0.309 3.64
183 26 13 1 0.062 2.19
152 31 18 4 0.340 3.00
152 26 13 1 0.051 1.80
9 0.762 2.99
DEO/AXE/BC
242 242 4053 305 21 21 5 0.675 4.77
305 18 18 12 1.188 3.50
305 16 16 10 0.780 2.75
27 2.643 3.46
243 243 4054 244 18 18 2 0.158 2.79
244 16 16 3 0.186 2.19
244 13 13 2 0.082 1.45
214 18 18 1 0.069 2.44
8 0.495 2.19
DEO/DD/BC
244 244 4055 122 21 21 1 0.054 1.91
DEO/RB/BC
245 245 4056 305 55 6 0.348 2.05
305 45 11 0.429 1.38
305 35 6 0.138 0.81
244 55 1 0.046 1.62
244 45 2 0.062 1.09
244 35 1 0.019 0.67
27 1.042 1.36
KAIL/S/BC
246 246 4057 305 26 13 5 0.515 3.64
305 26 8 1 0.063 2.22
214 21 13 2 0.116 2.05
8 0.694 3.06
KAIL/S/BC/WW
247 247 4058 305 26 13 5 0.515 3.64
KAIL/S/BC/DW
248 248 4059 305 26 13 3 0.309 3.64
305 21 13 2 0.166 2.93
5 0.475 3.35
KAIL/S/BC/ESSB
249 249 4060 305 26 13 2 0.206 3.64
305 21 13 1 0.083 2.93
244 21 13 1 0.067 2.37
4 0.356 3.14
KAIL/AXE/BC
250 250 4061 305 21 21 1 0.135 4.77
305 18 18 2 0.198 3.50
305 16 16 1 0.078 2.75
305 13 13 1 0.052 1.84
183 18 18 1 0.059 2.08
6 0.522 3.07
KAIL/DD/BC
251 251 4062 92 26 26 1 0.062 2.19
PRIVATE TIMBER
RE-SALE TIMBER P VT. SH. CHET
RAM LOT NO. 1/RK/13-14 MANDI
DEO/RB/BC
252 252 5674 305 45 1 0.039 1.38
305 35 5 0.115 0.81
244 45 1 0.031 1.09
DEO/RB/BC/PBS
5675 305 55 1 0.058 2.05
8 0.243 1.07
UN-SOLD TIMBER PVT.SALE SH.
CHET RAM LOT NO. 6/RK/13-14
FWD MANDI.
KAIL/S/BC/KNOTTY
253 253 6550 305 26 13 8 0.824 3.64
305 21 13 4 0.332 2.93
12 1.156 3.40
KAIL/S/ K TO Q
254 254 6551 305 26 13 2 0.206 3.64
305 21 13 2 0.166 2.93
275 21 13 3 0.225 2.65
275 21 10 1 0.058 2.05
8 0.655 2.89
KAIL/AXE/BC
255 255 6552 305 13 13 1 0.052 1.84
183 18 18 1 0.059 2.08
183 13 13 1 0.031 1.09
KAIL/AXE/K TO Q
6553 305 18 18 1 0.099 3.50
4 0.241 2.13
FIR/S/ K TO Q
256 256 6525 244 26 13 10 0.820 2.90
244 21 13 10 0.670 2.37
183 26 13 15 0.930 2.19
183 21 13 1 0.050 1.77
183 21 10 2 0.076 1.34
38 2.546 2.37
257 257 6178 244 26 13 3 0.246 2.90
183 26 13 1 0.062 2.19
4 0.308 2.72
UN-SOLD TIMBER PVT. LOT NO. 5/2019-20
COMMUNITY CENTER THUNAG
TOURISUM C/O DM MANDI
DEO/RB/BC
258 258 5520 305 55 2 0.116 2.05
305 45 1 0.039 1.38
305 35 1 0.023 0.81
4 0.178 1.57