You are on page 1of 2
Save trees use e-Question Paper Go green DOWNLOAD THIS FREE AT www.viuresource.com @3GS SCHEME usw ASEES1 Eighth Semester B.E. Degree Examination, Dec.2019/Jan.2020 Power System Operation and Control ‘Time: 3 hrs, Max. Marks: 80 ‘Note: Answer any FIVE full questions, choosing ONE full question from @ 1a. Withaneat dngram desi th mer components of SCADA 5) Explain the spinning reserve and thermal constraints in unit comm ein) Dacus on ilo enereney contol action inte ing nger «ys to prevent degradation of system. (Os Mack oR 2 a Witha flow chart explain the priority lit method of unit (08 Marts) arate, roe £ - 1b What are the diffrent states in which power system gperates? (08 Marts) m 3. Deduve an expression for gradient yeetor in scheduling based on disrete time interval. (08 Marks) b Two generators rated 200 MW end 400. perating in parallel. The droop 3 ively fom no Toad to full load. The feat SOHz when sharing the full load of characteristies of their governor are 4 speed set points are such thatthe {600 MW in proportion to ther rain (0 IF Toad reduces to 400 Miegtho id shared, at what frequency wil system CA ‘heir rating what is yy now? (08 Macks) OR 4 a Deduce an expi ro. power generation and thermal power generation in hyo thermal scheduling. (09 Marks) 00 MW. Each has @ droop characteristic of 4%. Their governors ey is 100% on fll load. Caleuate the load supplied by each unit and thegyeq dmg at his load. The system isa 50 Hz system, (07 Macks) 2 Any seven of ec, lor a eins wrens a2 a and Ay ae intrcomested by a Tie fine Tin. Desve an expression for fioquene eHfage ands line power flow when the led in Are changes (8 Mark) ‘Two areas | and 2 ae nlercomected. The capacity of area 1 1500 MW and area 2 is 20 MY. The incremental regulation and camping torque coeticen foreach are on ts base are 02 pu and 09 pu respectively, Find th steady state eguncy and change i ieaate the ie power, for an increase of 60 MW in acu. Nominal equney i sot, ‘8 Marky Imporan Note: Onesmpleig your snaverscompubechy da goa ers ine onthe omsining Lof2 BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS A Vturesource Go Green initiative Save trees use e-Question Paper Go green DOWNLOAD THIS FREE AT www.viuresource.com 1SKES1 on 6 & Prove that by adding a feedback of proportional integral controller to ALFC, the steady frequency deviation fs 270. (osnidhs b. A control area has following dsta, total gencration capacity = 2000 MW, nofal Jad = 1500 MW, H= 4.85, D= 1.2%, f= 50 Ha, R= 2.5 Helpu MW. (Determine primary ALEC parameter (Gi) For increase of 0.02 pu unload, find fequency drop without governor (Gi) With governor control iD Modute-s 7. 4 Highlight the event of tie line oscillation in inter connected powygi@pie ving necessary equation. (8 Maris) b. Ata 3p, 11 KV bus, @ load drawing (2 +) MVA is connecte LV OB is supplied ¢ fiom a radial line. Total system reactance i 0.5 Qfphase. Cal (Receiving end current (i). Regulation (Gi) Sending end voltage (Gv) Shor circuit eapacty ofthe system ‘Assume system tobe loss less (09 Marts) on 8 4, Prove that voltage at receiving end 1s depe power in power system. (08 Maris) b, Two contol area ofeapacity 1500 MWg re interconnected through the line. ‘The parameters of cach area onfffs oyppcapacity are R = 1 Hzipu MW and D= 0.02 pu MWIHz. There is an in 'MW in load of aren 2, Determine steady state frequency deviation and change iYFE line gBwer. (08 Maris) S 9 a Withan example, explain strained optional paver low i implemented. {@sMark) , Bplain ystem adequagnd systRPMeurity in reliability analysis of power system. (oantars) ©. Discuss on major i imation rman) oR 10 a. Wiha ningeney nals for generator outage (8 Marks) b Obtain ssioMMtate estimator problem by weighted least square tezhngue in DC stat estat (os Maris) « 2082 BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS A Vturesource Go Green initiative

You might also like