You are on page 1of 33

ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF CARDIOLOGY

CONTRACTOR: M/S ZAHIR KHAN & BROTHERS


DEMAND FOR DOORS
S.N Door name Description Unit Size Basement G.F 1st F 2nd F 3rd F Remarks Mumty Total no.s QTY Type

1-Main Building
1 D1 Swing-Double Leaf SFT 6'-0"x7'-0" 1 9 9 6 25 1050 Vision Panel Flush Door

2 D1 Double Leaf SFT 6'-0"x7'-0" 2 2 84 Vision Panel Flush Door

3 D2 Swing-Single Leaf SFT 3'-0"x7'-0" 1 1 21 Vision Panel Flush Door

4 D2 Double Leaf SFT 6'-0"x7'-0" 1 1 1 1 1 5 210 Vision Panel Flush Door

5 D3 Swing-Double Leaf SFT 5'-0"x7'-0" 1 4 2 7 245 Vision Panel Flush Door

6 D4 Double Leaf SFT 5'-0"x7'-0" 1 1 35 Vision Panel Flush Door


Direction
7 D5 Swing-Single Leaf SFT 3'-6"x7'-0" 1 1 4 1 1 change in BF- 8 196 Vision Panel Flush Door
05G
8 D5 Single Leaf SFT 3'-6"x7'-0" 1 1 24.5 Vision Panel Flush Door

9 D6 Double Leaf SFT 4'-0"x7'-0" 10 10 280 Vision Panel Flush Door


Direction
change in BF
10 D7 Single Leaf SFT 3'-6"x7'-0" 3 21 5 9 3
near Dumb 41 1004.5 Vision Panel Flush Door
Water
11 D8 Swing-Single Leaf SFT 3'-0"x7'-0" 2 4 6 126 Vision Panel Flush Door

12 D9 Single Leaf SFT 3'-0"x7'-0" 4 6 6 16 336 Vision Panel Flush Door

13 D10 Double Leaf SFT 6'-0"x7'-0" 0 0 Solid Wood Vision Panel Door

14 D10 Swing Double Leaf SFT 6'-0"x7'-0" 1 1 42 Solid Wood Vision Panel Door

15 D11 Double Leaf SFT 6'-0"x7'-0" 1 1 42 Flush Door

16 D11A Double Leaf SFT 5'-0"x7'-0" 1 2 3 105 Flush Door

17 D12 Double Leaf SFT 4'-0"x7'-0" 2 1 11 14 392 Flush Door

18 D13 Single Leaf SFT 3'-6"x7'-0" 1 6 2 9 220.5 Flush Door


Direction
19 D14 Single Leaf SFT 3'-0"x7'-0" 7 13 14 9 2 change in GF- 45 945 Flush Door
22
20 D15 Single Leaf SFT 3'-0"x7'-0" 3 5 2 2 2 2 16 336 Louvered Wooden Door

21 D16 Single Leaf SFT 2'-6"x7'-0" 3 25 13 12 18 71 1242.5 Flush Door

22 D17 Double Leaf SFT 6'-0"x7'-0" 8 2 1 1 1 13 546 Plain Metal Door

23 D18 Double Leaf SFT 6'-0"x7'-0" 3 1 1 1 6 252 Louvered Metal Door

24 D19 Double Leaf SFT 5'-0"x7'-0" 10 3 2 2 2 19 665 Plain Metal Door

25 D19 Swing Double Leaf SFT 5'-0"x7'-0" 1 1 35 Plain Metal Door

26 D19A Double Leaf SFT 4'-6"x7'-0" 1 1 31.5 Plain Metal Door

27 D20 Single Leaf SFT 3'-6"x7'-0" 1 3 4 98 Plain Metal Door

28 D21 Single Leaf SFT 3'-0"x7'-0" 2 2 42 Plain Metal Door


Direction
29 D22 Single Leaf SFT 3'-6"x7'-0" 2 3 2 2 2 change in TF- 11 269.5 Fire Rated Door
61
30 D23 Single Leaf SFT 3'-0"x7'-0" 4 2 6 2 14 294 PVC Door

31 D24 Single Leaf SFT 2'-6"x7'-0" 4 25 14 11 4 58 1015 PVC Door


Automatic Sliding Double
32 D25 Leaf
SFT 6'-0"x8'-0" 2 1 3 144 Automatic Glass Door

33 D26 Swing-Double Leaf SFT 6'-0"x7'-0" 7 7 294 Aluminum Glass Door

34 D27 Swing-Double Leaf SFT 6'-0"x7'-0" 2 2 84 Aluminum Glass Door

35 D28 Swing-Double Leaf SFT 5'-0"x7'-0" 1 1 35 Aluminum Glass Door

36 D29 Swing-Double Leaf SFT 5'-0"x7'-0" 2 1 3 105 Glass Door

37 D29 Double Leaf SFT 5'-0"x7'-0" 4 4 140 Glass Door

38 D30 Swing-Single Leaf SFT 3'-0"x7'-0" 2 1 18 21 441 Glass Door

39 D30 Single Leaf SFT 3'-0"x7'-0" 1 2 3 1 7 147 Glass Door

40 D31 Double Leaf SFT 18'-0"x10'-0" 1 1 2 360 Louvered Metal Door

41 D32 Slide Single Leaf SFT 5'-0"x7'-0" 4 4 140 Glass Door

42 D33 Double Leaf SFT 4'-0"x7'-0" 1 1 28


TOTAL 59 156 89 72 84 0 7 467 12103
2-CANTEEN BUILDING
Swing-Single Leaf 2 Solid Core Flush Door With Ply Vision
1 A1 SFT 3'-6"X7'-0" 2 49.00 Panel
Double Leaf 1 Solid Core Flush Door With Ply Vision
2 B1 SFT 4'-0"X7'-0" 1 28.00 Panel
Single Leaf 1 Solid Core Flush Door With Ply Vision
3 B2 SFT 3'-0"X7'-0" 1 21.00 Panel
UPVC Door
Single Leaf 2
4 D1 SFT 3'-0"X7'-0" 2 42.00
UPVC Door
Single Leaf 6
5 D2 SFT 2'-6"X7'-0" 6 105.00

Double Leaf 1 12mm Glass Door (Tempered with


6 GD01 SFT 6'-0"X7'-0" 1 42.00 Beveled Edges) Glazed Door

Single Leaf 2 12mm Glass Door (Tempered with


7 GD02 SFT 4'-0"X7'-0" 2 56.00 Beveled Edges )Glazed Door

Single Leaf 1 12mm Glass Door (Tempered with


8 GD03 SFT 3'-6"X7'-0" 1 24.50 Beveled Edges) Glazed Door
TOTAL 0.00 16.00 0.00 0.00 0.00 0.00 0.00 16.00 367.50
3-WAITING AREA BUILDING
Double Leaf 2 Solid Core Flush Door With Ply Vision
1 A1 SFT 6'-0"X7'-0" 2 84.00 Panel
Single Leaf 4 Solid Core Flush Door With Ply Vision
2 B1 SFT 3'-6"X7'-0" 4 98.00 Panel
UPVC Door
Single Leaf 2
3 D1 SFT 3'-6"X7'-0" 2 49.00
UPVC Door
Single Leaf 8
4 D2 SFT 2'-6"X7'-0" 8 140.00
UPVC Door
Single Leaf 2
5 D3 SFT 2'-3"X7'-0" 2 31.50
TOTAL 0 18 0 0 0 0 0 18 403
4-ANCILARY BUILDINGS
GUARD ROOMS
1 D1 Single Leaf
SFT 3'-0"X7'-0"
2 2 42 Aluminum Glass Door

METERING ROOM

1 D1 Double Leaf
SFT
6'-0"x8'-0" 1 1 48 MS Door

L.T ROOM & PUMP ROOM

1 D1 Double Leaf
SFT
8'-0"x8'-0" 1 1 64 MS Door

2 D2 Double Leaf
SFT
7'-0"x8'-0" 1 1 56 MS Door

3 D3 Double Leaf (Pump room)


SFT
6'-0"x8'-0" 1 1 48 MS Door

H.T ROOM

1 D1 Double Leaf
SFT
7'-0"x8'-0" 1 1 56 MS Louvared Door

2 x Single Leaf SFT 3'-0"X8'-0"


1 1 0 Glass Door

YELLOW/SHREDER ROOM

1 D1 Double Leaf SFT


6'-0"x8'-0" 1 1 48 MS Door

2 D2 Double Leaf SFT 4'-0"X7'-0"


1 1 28 MS Door

3 D3 Single Leaf
SFT 3'-0"X7'-0"
1 1 21 Wooden Door

4 D4 Single Leaf
SFT 3'-0"X7'-0"
1 1 21 MS Door

5 D5 Single Leaf
SFT 2'-6"X7'-0"
3 3 52.5 PVC Door

6 D6 Single Leaf
SFT 3'-0"X7'-0"
1 1 21 Aluminum Glass Door

PUBLIC PARKING TOILETS

1 D1 Single Leaf SFT 3'-0"X7'-0"


1 1 21 Aluminum Glass Door

2 D2 Single Leaf SFT 2'-6"X7'-0"


2 2 35 UPVC Door

TUBE-WELL ROOM

1 D2 Single Leaf SFT 2'-6"X


1 1 0 NO add

TOTAL 0 20 0 0 0 0 20 562

GRAND TOTAL DOORS 521 13435


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
DEMAND FOR DOORS
S.N Door name Description Unit Size Basement G.F 1st F 2nd F 3rd F Mumty Total no.s QTY Remarks

1-Main Building
1 D1 Swing-Double Leaf SFT 6'-0"x7'-0" 1 9 11 6 1 28 1176 Vision Panel Flush Door
2 D2 Double Leaf SFT 6'-0"x7'-0" 1 1 1 1 1 5 210 Vision Panel Flush Door
3 D3 Swing-Double Leaf SFT 5'-0"x7'-0" 4 2 6 210 Vision Panel Flush Door

4 D4 Double Leaf SFT 5'-0"x7'-0" 1 1 35 Vision Panel Flush Door

5 D5 Swing-Single Leaf SFT 3'-6"x7'-0" 2 1 5 1 1 10 245 Vision Panel Flush Door

6 D6 Double Leaf SFT 4'-0"x7'-0" 10 10 280 Vision Panel Flush Door

7 D7 Single Leaf SFT 3'-6"x7'-0" 3 19 4 7 2 35 857.5 Vision Panel Flush Door

8 D8 Swing-Single Leaf SFT 3'-0"x7'-0" 1 2 4 7 147 Vision Panel Flush Door

D9 Single Leaf SFT 3'-0"x7'-0" 5 7 7 1 1 21 441 Vision Panel Flush Door

D10 Double Leaf SFT 6'-0"x7'-0" 0 0 Solid Wood Vision Panel Door

D11 Double Leaf SFT 6'-0"x7'-0" 1 1 42 Flush Door

D11 Swing-Double Leaf SFT 6'-0"x7'-0" 2 2 84 Flush Door

D11A Double Leaf SFT 5'-0"x7'-0" 0 0 Flush Door

D12 Double Leaf SFT 4'-0"x7'-0" 1 1 11 13 364 Flush Door

D13 Single Leaf SFT 3'-6"x7'-0" 7 3 10 245 Flush Door

D14 Single Leaf SFT 3'-0"x7'-0" 7 13 13 9 2 44 924 Flush Door

D15 Single Leaf SFT 3'-0"x7'-0" 3 6 3 3 3 2 20 420 Louvered Wooden Door

D16 Single Leaf SFT 2'-6"x7'-0" 3 24 12 11 17 67 1172.5 Flush Door

D17 Double Leaf SFT 6'-0"x7'-0" 10 1 11 462 Plain Metal Door

D18 Double Leaf SFT 6'-0"x7'-0" 1 2 1 1 2 1 8 336 Louvered Metal Door

D19 Double Leaf SFT 5'-0"x7'-0" 10 3 2 2 2 19 665 Plain Metal Door

D19A Double Leaf SFT 4'-6"x7'-0" 2 2 63 Plain Metal Door

D20 Single Leaf SFT 3'-6"x7'-0" 1 1 1 3 6 147 Plain Metal Door

D21 Single Leaf SFT 3'-0"x7'-0" 2 2 42 Plain Metal Door

D22 Single Leaf SFT 3'-6"x7'-0" 2 2 2 2 1 9 220.5 Fire Rated Door

D23 Single Leaf SFT 3'-0"x7'-0" 4 2 5 2 13 273 PVC Door

D24 Single Leaf SFT 2'-6"x7'-0" 4 25 14 11 4 58 1015 PVC Door

D25 Automatic Sliding Double Leaf SFT 6'-0"x8'-0" 2 2 96 Automatic Glass Door

D26 Swing-Double Leaf SFT 6'-0"x7'-0" 7 7 294 Aluminum Glass Door

D27 Swing-Double Leaf SFT 6'-0"x7'-0" 2 2 84 Aluminum Glass Door

D28 Swing-Double Leaf SFT 5'-0"x7'-0" 1 1 35 Aluminum Glass Door

D29 Swing-Double Leaf SFT 5'-0"x7'-0" 2 1 3 105 Glass Door

D29 Double Leaf SFT 5'-0"x7'-0" 4 4 140 Glass Door

D29 Single Leaf SFT 3'-6"x7'-0" 1 1 2 70 Glass Door

D29 Slide Single Leaf SFT 5'-0"x7'-0" 4 4 140 Glass Door

D30 Swing-Single Leaf SFT 3'-0"x7'-0" 2 1 18 21 441 Glass Door

D30 Single Leaf SFT 3'-0"x7'-0" 1 2 3 1 7 147 Glass Door

D31 Double Leaf SFT 18'-0"x10'-0" 1 1 2 360 Louvered Metal Door

D32 SFT 5'-0"x7'-0" 0 0 Sliding Glass Door

D33 Double Leaf SFT 1 1 35


TOTAL 58 157 88 71 83 7 464 12024
2-CANTEEN BUILDING
Solid Core Flushed door With Ply
Swing-Single Leaf 2 VISION PANEL
1 A1 SFT 3'-6"X7'-0" 2 49.00
Double Leaf 1
2 B1 SFT 4'-0"X7'-0" 1 28.00 Solid Core Flushed door With Ply
Single Leaf 1
3 B2 SFT 3'-0"X7'-0" 1 21.00 Solid Core Flushed door With Ply
Single Leaf 2
4 D1 SFT 3'-0"X7'-0" 2 42.00 uPVC Door

5 Single Leaf SFT 2'-6"X7'-0" 6 6 105.00 uPVC Door


D2

Double Leaf 1 12mm Glass Door (Tempered


6 GD01 SFT 6'-0"X7'-0" 1 42.00 with Beveled Edges
Single Leaf 2 12mm Glass Door (Tempered
7 GD02 SFT 4'-0"X7'-0" 2 56.00 with Beveled Edges
Single Leaf 1 12mm Glass Door (Tempered
8 GD03 SFT 3'-6"X7'-0" 1 24.50 with Beveled Edges
TOTAL 0 16 0 0 0 0 16 367.5
3-WAITING AREA BUILDING
Double Leaf 2 Solid Core Flushed door With Ply
1 A1 SFT 6'-0"X7'-0" 2 84.00 VISION PANEL
Single Leaf 4
2 B1 SFT 3'-6"X7'-0" 4 98.00 Solid Core Flushed door With Ply

3 Single Leaf SFT 3'-6"X7'-0" 2 2 49.00 uPVC Door


PD1

4 Single Leaf SFT 2'-6"X7'-0" 8 8 140.00 uPVC Door


PD2

5 Single Leaf SFT 2'-3"X7'-0" 2 2 31.50 uPVC Door


PD3
TOTAL 0 18 0 0 0 0 18 403
4-ANCILARY BUILDINGS
GUARD ROOMS
1 D1 Single Leaf SFT 3'-0"X7'-0" 2 2 42 Aluminum Glass Door

METERING ROOM
1 D1 Double Leaf SFT 6'-0"x8'-0" 1 1 48 MS Door

L.T ROOM & PUMP ROOM


1 D1 Double Leaf SFT 8'-0"x8'-0" 1 1 64 MS Door

2 D2 Double Leaf SFT 7'-0"x8'-0" 1 1 56 MS Door

3 D3 Double Leaf SFT 6'-0"x8'-0" 1 1 56 MS Door

H.T ROOM
1 D1 Double Leaf SFT 7'-0"x8'-0" 1 1 56 MS Louvared Door

2 x Single Leaf SFT 3'-0"X'-0" 1 1 0 Nothing

YELLOW/SHREDER ROOM
1 D1 Double Leaf SFT 6'-0"x8'-0" 1 1 48 MS Door

2 D2 Double Leaf SFT 4'-0"X7'-0" 1 1 28 MS Door

3 D3 Single Leaf SFT 3'-0"X7'-0" 1 1 21 Wooden Door

4 D4 Single Leaf SFT 3'-0"X7'-0" 1 1 21 MS Door

5 D5 Single Leaf SFT 2'-6"X7'-0" 3 3 52.5 PVC Door

6 D6 Single Leaf SFT 3'-0"X7'-0" 1 1 21 Aluminum Glass Door

PUBLIC PARKING TOILETS


1 D1 Single Leaf SFT 3'-0"X7'-0" 1 1 21 Aluminum Glass Door

2 D2 Single Leaf SFT 2'-6"X7'-0" 2 2 35 PVC Door

TUBE-WELL ROOM
1 D2 Single Leaf SFT 2'-6"X 1 1 0 NO add

TOTAL 0 20 0 0 0 0 20 570

GRAND TOTAL GLASS DOORS 518 13363


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
Glass Door
S.N Door name Description Unit Size Basement G.F 1st F 2nd F 3rd F Mumty Total no.s QTY Remarks

1-Main Building
1 D25 SFT 6'-0"x8'-0" 2 2 96 Automatic Glass Door

2 D26 SFT 6'-0"x7'-0" 7 7 294 Aluminum Glass Door

3 D27 SFT 6'-0"x7'-0" 2 2 84 Aluminum Glass Door

4 D28 SFT 5'-0"x7'-0" 1 1 35 Aluminum Glass Door

5 D29 SFT 5'-0"x7'-0" 3 4 6 13 455 Glass Door

6 D30 SFT 3'-0"x7'-0" 3 3 3 19 28 588 Glass Door

7 D30 Single Leaf SFT 3'-0"x7'-0" 1 2 3 1 7 147 Glass Door

8 D32 SFT 5'-0"x7'-0" 0 0 Sliding Glass Door

TOTAL 5 17 0 10 28 0 60 1699
2-CANTEEN BUILDING
1 1 12mm Glass Door (Tempered
GD01 SFT 6'-0"X7'-0" 1 42.00 with Beveled Edges
2 2 12mm Glass Door (Tempered
GD02 SFT 4'-0"X7'-0" 2 56.00 with Beveled Edges
3 1 12mm Glass Door (Tempered
GD03 SFT 3'-6"X7'-0" 1 24.50 with Beveled Edges
TOTAL 0 4 0 0 0 0 4 122.5
4-ANCILARY BUILDINGS
1 D1 Guard Room 1&2 SFT 3'-0"X7'-0" 2 2 42 Aluminum Glass Door

2 x H.T Room (UPS Area) SFT 3'-0"X'-0" 1 1 0 Nothing

3 D6 // // // SFT 3'-0"X7'-0" 1 1 21 Aluminum Glass Door

4 D1 Public Parking Toilets SFT 3'-0"X7'-0" 1 1 21 Aluminum Glass Door

TOTAL 0 5 0 0 0 0 5 84

GRAND TOTAL GLASS DOORS 69 1906


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
MS Doors
S.N Door name Description Unit Size Basement G.F 1st F 2nd F 3rd F Mumty Total no.s QTY Remarks

1-Main Building
1 D17 Double Leaf SFT 6'-0"x7'-0" 10 1 11 462 Plain Metal Door

2 D18 Double Leaf SFT 6'-0"x7'-0" 1 2 1 1 2 1 8 336 Louvered Metal Door

3 D19 Double Leaf SFT 5'-0"x7'-0" 10 3 2 2 2 19 665 Plain Metal Door

4 D19A Double Leaf SFT 4'-6"x7'-0" 2 2 63 Plain Metal Door

5 D20 Single Leaf SFT 3'-6"x7'-0" 1 1 1 1 3 7 171.5 Plain Metal Door

6 D21 Single Leaf SFT 3'-0"x7'-0" 2 2 42 Plain Metal Door

7 D22 Single Leaf SFT 3'-6"x7'-0" 2 2 2 2 1 9 220.5 Fire Rated Door

8 D31 Double Leaf SFT 18'-0"x10'-0" 1 1 2 360 Louvered Metal Door

TOTAL 25 11 6 6 7 5 60 2320
4-ANCILARY BUILDINGS
METERING ROOM
1 D1 Double Leaf SFT 6'-0"x8'-0" 1 1 48 MS Door

L.T ROOM & PUMP ROOM


1 D1 Double Leaf SFT 8'-0"x8'-0" 1 1 64 MS Door

2 D2 Double Leaf SFT 7'-0"x8'-0" 1 1 56 MS Door

3 D3 Double Leaf SFT 6'-0"x8'-0" 1 1 56 MS Door

H.T ROOM
1 D1 Double Leaf SFT 7'-0"x8'-0" 1 1 56 MS Louvared Door

1 D1 Double Leaf SFT 6'-0"x8'-0" 1 1 48 MS Door

2 D2 Double Leaf SFT 4'-0"X7'-0" 1 1 28 MS Door

4 D4 Single Leaf SFT 3'-0"X7'-0" 1 1 21 MS Door

TOTAL 0 8 0 0 0 0 8 377

GRAND TOTAL MS DOORS 68 2697


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
Vision Panel Flush Doors
S.N Door name Description Unit Size Basement G.F 1st F 2nd F 3rd F Mumty Total no.s QTY Remarks

1-Main Building
1 D1 Swing-Double Leaf SFT 6'-0"x7'-0" 1 9 11 6 1 28 1176 Vision Panel Flush Door
2 D2 Double Leaf SFT 6'-0"x7'-0" 1 1 1 1 1 5 210 Vision Panel Flush Door
3 D3 Swing-Double Leaf SFT 5'-0"x7'-0" 4 3 7 245 Vision Panel Flush Door

4 D4 Double Leaf SFT 5'-0"x7'-0" 1 1 35 Vision Panel Flush Door

5 D5 Swing-Single Leaf SFT 3'-6"x7'-0" 2 1 5 1 1 10 245 Vision Panel Flush Door

6 D6 Double Leaf SFT 4'-0"x7'-0" 10 10 280 Vision Panel Flush Door

7 D7 Single Leaf SFT 3'-6"x7'-0" 3 19 3 7 2 34 833 Vision Panel Flush Door

8 D8 Swing-Single Leaf SFT 3'-0"x7'-0" 1 2 4 7 147 Vision Panel Flush Door

9 D9 Single Leaf SFT 3'-0"x7'-0" 5 7 7 1 1 21 441 Vision Panel Flush Door

10 D10 Double Leaf SFT 6'-0"x7'-0" 0 0 Solid Wood Vision Panel Door

11 D11 Double Leaf SFT 6'-0"x7'-0" 1 2 3 126 Flush Door

12 D11A Double Leaf SFT 5'-0"x7'-0" 0 0 Flush Door

13 D12 Double Leaf SFT 4'-0"x7'-0" 1 1 11 13 364 Flush Door

14 D13 Single Leaf SFT 3'-6"x7'-0" 7 3 10 245 Flush Door

15 D14 Single Leaf SFT 3'-0"x7'-0" 8 13 13 9 2 45 945 Flush Door

16 D15 Single Leaf SFT 3'-0"x7'-0" 3 6 3 3 3 2 20 420 Louvered Wooden Door

17 D16 Single Leaf SFT 2'-6"x7'-0" 2 24 12 11 17 66 1155 Flush Door

TOTAL 25 102 66 42 43 2 280 6867


2-CANTEEN BUILDING
Solid Core Flushed door With Ply
Swing-Single Leaf 2 VISION PANEL
1 A1 SFT 3'-6"X7'-0" 2 49.00
Double Leaf 1
2 B1 SFT 4'-0"X7'-0" 1 28.00 Solid Core Flushed door With Ply
Single Leaf 1
3 B2 SFT 3'-0"X7'-0" 1 21.00 Solid Core Flushed door With Ply
TOTAL 0 4 0 0 0 0 4 98
3-WAITING AREA BUILDING
Double Leaf 2 Solid Core Flushed door With Ply
1 A1 SFT 6'-0"X7'-0" 2 84.00 VISION PANEL
Single Leaf 4
2 B1 SFT 3'-6"X7'-0" 4 98.00 Solid Core Flushed door With Ply
TOTAL 0 6 0 0 0 0 6 182
4-ANCILARY BUILDINGS
Yellow Room/Shredder
1 D3 Single Leaf SFT 3'-0"X7'-0" 1 1 21 Wooden Door

TOTAL 0 1 0 0 0 0 1 21

GRAND TOTAL VISION PANEL FLUSH DOORS 291 7168


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
DEMAND FOR DOORS
S.N Door name Description Unit Size Basement G.F 1st F 2nd F 3rd F Mumty Total no.s QTY B.O.Q Rate Remarks

1-Main Building
1 D1 SFT 6'-0"x7'-0" 1 9 11 6 1 28 1176 Vision Panel Flush Door
2 D2 SFT 6'-0"x7'-0" 2 1 1 1 1 6 252 Vision Panel Flush Door
3 D3 SFT 5'-0"x7'-0" 4 3 7 245 Vision Panel Flush Door

4 D4 SFT 5'-0"x7'-0" 1 1 35 Vision Panel Flush Door

5 D5 SFT 3'-6"x7'-0" 2 1 5 1 1 10 245 Vision Panel Flush Door

6 D6 SFT 4'-0"x7'-0" 10 10 280 Vision Panel Flush Door

7 D7 SFT 3'-6"x7'-0" 19 3 6 2 30 735 Vision Panel Flush Door

8 D8 SFT 3'-0"x7'-0" 1 2 4 7 147 Vision Panel Flush Door

9 D9 SFT 3'-0"x7'-0" 5 7 7 1 1 21 441 Vision Panel Flush Door

10 D10 SFT 6'-0"x7'-0" 0 0 Solid Wood Vision Panel Door

11 D11 SFT 6'-0"x7'-0" 1 2 3 126 Flush Door

12 D11A SFT 5'-0"x7'-0" 0 0 Flush Door

13 D12 SFT 4'-0"x7'-0" 1 1 11 13 364 Flush Door

14 D13 SFT 3'-6"x7'-0" 7 3 10 245 Flush Door

15 D14 SFT 3'-0"x7'-0" 8 13 13 9 2 45 945 Flush Door

16 D15 SFT 3'-0"x7'-0" 4 6 3 3 3 2 21 441 Louvered Wooden Door

17 D16 SFT 2'-6"x7'-0" 3 24 12 11 17 67 1172.5 Flush Door

18 D17 SFT 6'-0"x7'-0" 9 1 10 420 Plain Metal Door

19 D18 SFT 6'-0"x7'-0" 1 2 1 1 2 1 8 336 Louvered Metal Door

20 D19 SFT 5'-0"x7'-0" 8 3 2 2 2 17 595 Plain Metal Door

21 D19A SFT 4'-6"x7'-0" 1 1 31.5 Plain Metal Door

22 D20 SFT 3'-6"x7'-0" 1 1 1 1 1 3 8 196 Plain Metal Door

23 D21 SFT 3'-0"x7'-0" 2 2 42 Plain Metal Door

24 D22 SFT 3'-6"x7'-0" 2 2 2 2 1 9 220.5 Fire Rated Door

25 D23 SFT 3'-0"x7'-0" 4 2 5 2 13 273 PVC Door

26 D24 SFT 2'-6"x7'-0" 4 25 14 11 4 58 1015 PVC Door

27 D25 SFT 6'-0"x8'-0" 2 2 96 Automatic Glass Door

28 D26 SFT 6'-0"x7'-0" 7 7 294 Aluminum Glass Door

29 D27 SFT 6'-0"x7'-0" 1 2 3 126 Aluminum Glass Door

30 D28 SFT 5'-0"x7'-0" 0 0 Aluminum Glass Door

31 D29 SFT 5'-0"x7'-0" 3 4 6 13 455 Glass Door

32 D30 SFT 3'-0"x7'-0" 3 3 3 19 28 588 Glass Door

33 D31 SFT 18'-0"x10'-0" 1 1 2 360 Louvered Metal Door

34 D32 SFT 5'-0"x7'-0" 0 0 Sliding Glass Door

TOTAL 55 157 88 70 83 7 460 11898


2-Canteen Building
Solid Core Flushed door With Ply
2 VISION PANEL
1 A1 SFT 3'-6"X7'-0" 2 49.00
1
2 B1 SFT 4'-0"X7'-0" 1 28.00 Solid Core Flushed door With Ply
1
3 B2 SFT 3'-0"X7'-0" 1 21.00 Solid Core Flushed door With Ply
4 D1 SFT 3'-0"X7'-0" 2 2 42.00 uPVC Door
5 D2 SFT 2'-6"X7'-0" 6 6 105.00 uPVC Door
1 12mm Glass Door (Tempered
6 GD01 SFT 6'-0"X7'-0" 1 42.00 with Beveled Edges
2 12mm Glass Door (Tempered
7 GD02 SFT 4'-0"X7'-0" 2 56.00 with Beveled Edges

1 12mm Glass Door (Tempered


8 GD03 SFT 3'-6"X7'-0" 1 24.50 with Beveled Edges
TOTAL 0 16 0 0 0 0 16 367.5
3-WAITING AREA BUILDING
2 Solid Core Flushed door With Ply
1 A1 SFT 6'-0"X7'-0" 2 84.00 VISION PANEL
4
2 B1 SFT 3'-6"X7'-0" 4 98.00 Solid Core Flushed door With Ply

3 SFT 3'-6"X7'-0" 2 2 49.00 uPVC Door


PD1

4 SFT 2'-6"X7'-0" 8 8 140.00 uPVC Door


PD2

5 SFT 2'-3"X7'-0" 2 2 31.50 uPVC Door


PD3
TOTAL 0 18 0 0 0 0 18 403
4-ANCILARY BUILDINGS
1 D1 Guard Room 1&2 SFT 3'-0"X7'-0" 2 2 42 Aluminum Glass Door

2 D1 Metering Room SFT 6'-0"x8'-0" 1 1 48 MS Door

3 D1 L.T Room SFT 8'-0"x8'-0" 1 1 64 MS Door

4 D2 // // // SFT 7'-0"x8'-0" 1 1 56 MS Door

5 D3 L.T Room/ Pump Room SFT 6'-0"x8'-0" 1 1 56 MS Door

6 D1 H.T Room SFT 7'-0"x8'-0" 1 1 56 MS Louvared Door

7 x H.T Room (UPS Area) SFT 3'-0"X'-0" 1 1 0 Nothing

8 D1 Yellow Room/Shredder SFT 6'-0"x8'-0" 1 1 48 MS Door

9 D2 // // // SFT 4'-0"X7'-0" 1 1 28 MS Door

10 D3 // // // SFT 3'-0"X7'-0" 1 1 21 Wooden Door

11 D4 // // // SFT 3'-0"X7'-0" 1 1 21 MS Door

12 D5 // // // SFT 2'-6"X7'-0" 3 3 52.5 PVC Door

13 D6 // // // SFT 3'-0"X7'-0" 1 1 21 Aluminum Glass Door

14 D1 Public Parking Toilets SFT 3'-0"X7'-0" 1 1 21 Aluminum Glass Door

15 D2 // // // SFT 2'-6"X7'-0" 2 2 35 PVC Door

TOTAL 0 19 0 0 0 0 19 570

GRAND TOTAL GLASS DOORS 513 13237


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
DEMAND FOR WINDOWS
S.N Door name Description Unit Size Basement G.F 1st F 2nd F 3rd F Mumty Total no.s QTY Remarks

1-Main Building
1 SFT 6'-0"x7'-0" 0
2 SFT 6'-0"x7'-0" 0
3 SFT 5'-0"x7'-0" 0
4 SFT 5'-0"x7'-0" 0
5 SFT 3'-6"x7'-0" 0
6 SFT 4'-0"x7'-0" 0
7 SFT 3'-6"x7'-0" 0
8 SFT 3'-0"x7'-0" 0
9 SFT 3'-0"x7'-0" 0
10 SFT 6'-0"x7'-0" 0
11 SFT 6'-0"x7'-0" 0
12 SFT 5'-0"x7'-0" 0
13 SFT 4'-0"x7'-0" 0
14 SFT 3'-6"x7'-0" 0
15 SFT 3'-0"x7'-0" 0
16 SFT 3'-0"x7'-0" 0
17 SFT 2'-6"x7'-0" 0
18 SFT 6'-0"x7'-0" 0
19 SFT 6'-0"x7'-0" 0
20 SFT 5'-0"x7'-0" 0
21 SFT 4'-6"x7'-0" 0
22 SFT 3'-6"x7'-0" 0
23 SFT 3'-0"x7'-0" 0
24 SFT 3'-6"x7'-0" 0
25 SFT 3'-0"x7'-0" 0
26 SFT 2'-6"x7'-0" 0
27 SFT 6'-0"x8'-0" 0
28 SFT 6'-0"x7'-0" 0
29 SFT 6'-0"x7'-0" 0
30 SFT 5'-0"x7'-0" 0
31 SFT 5'-0"x7'-0" 0
32 SFT 3'-0"x7'-0" 0
33 SFT 18'-0"x10'-0" 0
34 SFT 5'-0"x7'-0" 0

TOTAL 0 0 0 0 0 0 0 0
2-Canteen Building
Solid Core Flushed
door With Ply VISION
1 SFT 3'-6"X7'-0" 0 0.00 PANEL

Solid Core Flushed


2 SFT 4'-0"X7'-0" 0 0.00 door With Ply
Solid Core Flushed
3 SFT 3'-0"X7'-0" 0 0.00 door With Ply
4 SFT 3'-0"X7'-0" 0 0.00 uPVC Door
5 SFT 2'-6"X7'-0" 0 0.00 uPVC Door

12mm Glass Door


(Tempered with
6 SFT 6'-0"X7'-0" 0 0.00 Beveled Edges

12mm Glass Door


(Tempered with
7 SFT 4'-0"X7'-0" 0 0.00 Beveled Edges

12mm Glass Door


(Tempered with
8 SFT 3'-6"X7'-0" 0 0.00 Beveled Edges
TOTAL 0 0 0 0 0 0 0 0
3-WAITING AREA BUILDING
Solid Core Flushed
door With Ply VISION
1 SFT 6'-0"X7'-0" 0 0.00 PANEL
Solid Core Flushed
2 SFT 3'-6"X7'-0" 0 0.00 door With Ply

3 SFT 3'-6"X7'-0" 0 0.00 uPVC Door

4 SFT 2'-6"X7'-0" 0 0.00 uPVC Door

5 SFT 2'-3"X7'-0" 0 0.00 uPVC Door


TOTAL 0 0 0 0 0 0 0 0.00
4-ANCILARY BUILDINGS
D1 Guard Room 1&2 SFT 3'-0"X7'-0"
D1 Metering Room SFT 6'-0"x8'-0"
D1 L.T Room SFT 6'-0"x8'-0"
D2 // // // SFT 7'-0"x8'-0"
D1 H.T Room SFT 7'-0"x8'-0"
x H.T Room (UPS Area) SFT 3'-0"X'-0"
D1 Yellow Room/Shredder SFT 6'-0"x8'-0"
D2 // // // SFT 4'-0"X7'-0"
D3 // // // SFT 3'-0"X7'-0"
D4 // // // SFT 3'-0"X7'-0"
D5 // // // SFT 2'-6"X7'-0"
D6 // // // SFT 3'-0"X7'-0"
D1 Public Parking Toilets SFT 3'-0"X7'-0"
D2 // // // SFT 2'-6"X7'-0"
ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS

Demand Summary

Main Building

S.No Description Unit Total QTY Available Required REMARKS

Basement , Ground Floor and Third Floor


1 Tile Spacer 2mm Packet 500 500.00 0.00 2mm

Porcelain Tile floor and Dado

1 Stile Beige Tile snd-62-001-t21=24"x24" SFT 27259.68 15940.00 11319.68 Shabir

2 DARK Beige Tile 90-1013-30md =24" x 24" SFT 6834.56 15587.00 Master/Chinees imported

3 Dark Grey tile 65-001-40md=24" x 24" SFT 1990.80 370.00 1620.80 Master/master 16" x16"

4 Light Biege Tile 24"x24" GT-01 SFT 14266.25 25385.00 Granito/RAK

5 Dark Beige Tile 24"x24" GT-05 SFT 4396.98 11460.00 Granito/RAK

6 16"x16" VFT-1616-017-AI Grey SFT 14025.80 3960.00 10065.80 Vetrified

7 16"x16" VFT-1616-017-AI Rustic Brown SFT 5433.86 2066.00 3367.86 Vetrified

8 External Tile Gm-011 SFT 5673.26 5820.00 GM-011

9 Kitchen Shelf Tile SFT 301.14 301.14 ceramic

10 Wooden Texture Sft 950.27 950.27

Floor and dado Tiles SFt 81132.58 80588.00 27625.54


11 Tile BOND floor Bages 638.75 150.00 488.75 Shabir

12 Tile BOND Dado Bages 1980.68 150.00 1830.68 Shabir

Total Tile BOND 2619.44 300.00 2319.44


Ceiling

23 Gypsum Board 24"x24" SFT 41560.47 16000.00 25560.47

24 Seamless SFT 3502.00 256.00 3246.00

25 Wooden Texture SFT 3189.00 0.00 3189.00

26 Fiber cement Board 9mm 722.00 0.00 722.00

Total ceilling 48973.47 16256.00 32717.47

27 Emulsion Paint Wall SFT 136500.00 21840.00 114660.00 Wall

28 Emaulsion Paint ceiling SFT 30199.00 30199.00 Ceiling

29 Weather Sheild 0.00

30 Enamel Paint All floor SFT 16256.00 5700.00 10556.00 1 Coat Area

31 PVC Door NOS 39.00 39.00

32 MS Door NOS 30.00 10.00 20.00

33 Fire Rated Door NOS 7.00 7.00


34 Aluminim Window/Ventilator NOS 83.00 83.00

35 Aluminum & Glass Door NOS 35.00 35.00 Swing Double Leaf

36 Automatic glass door NOS 2.00 2.00

37 Flush Door NOS 105.00 70.00 35.00 Vision Panel

38 Vison Glass For flush Door (10"x31") No.s 60.00 60.00 5mm Thick

39 Door Mortice Lock No.s 129.00 129.00

40 Door Sliding Bolt 10" No.s 158.00 158.00 Chitkhni L=10"

41 Door Hinges 4" No.s 477.00 450.00 27.00 4" L

42 Door Aluminum Kick Plate 6" 22SWG RFT 907.00 907.00 6" H (22-SWG)

43 Door Finger Plate No.s 258.00 258.00 6"x6"

44 Fixed Partition Wall SFT 3653.00 3653.00 Without Door

46 Marble Boticena 3/4" Thick All stair SFT 3894.00 3894.00 Tread and Riser

47 """"""Ditto"""""" 12"x12" stair landing SFT 2500.00 2500.00

48 """"""Ditto"""""" Door Sill SFT 798.00 798.00

49 Marble Boticena 3/4" Thick Vanity SFT 483.52 483.52

50 Epoxy Floor SFT 241.00 241.00

51 Epoxy Wall SFT 1096.00 1096.00

52 SS Railing RFT 519.00 519.00

53 Grab Bars RFT 1555.00 1555.00

54 Wooden Bupmer Rail RFT 747.00 747.00

55 Column Corner Guard 2" x 2" Angle RFT 668.32 668.32

56 Geomatric Structure SFT 834.00 834.00 Job

57 Reception Counter No.s 6.00 6.00

58 Internal Signage No.s 269.00 269.00

59 Looking Mirror For Wash Basin No.s 17.00 17.00 Size=2'x4'

60 Looking Mirror For Bath Vanity No.s 20.00 20.00 Size=3'-9"x5'

61 Coat Hook SS No.s 46.00 46.00

62 Soap Dish No.s 48.00 48.00

63 Tissu Role Holder No.s 34.00 34.00

64 Towel Bar No.s 17.00 17.00 SS 1.5" Dia

65 Bath Vanity No.s 20.00 20.00

66 Plastic shelf No.s 17.00 17.00

67 Grab Bar for Handi cap No.s 14.00 14.00

68 Door Stopper No.s 158.00 158.00

External works

69 Color Crete SFT 75943.00 75943.00 0.00

70 Clad Stone SFT 7850.85 7850.00 0.85


71 Wash Terrazo External SFT 12876.00 12876.00 0.00

72 Curtain Wall CW1,CW2 & CW5 SFT 5848.00 5848.00

74 Bricks for Tube well Nos 8295.00 8295.00

75 Girder ( pump station & tubwell) Rft 25.50 25.50 24kg/ft

76 Catchbasin Cover Remaining Nos 12.00 12.00

77 Manhole Cover Remaining Nos 8.00 8.00


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS

Floor and Dado Tile Demand Summary

Main Building
S.No Description Unit No. Total QTY Received Amount REMARKS

Basement Floor
Porcelain Tile
1 Stile Beige Tile snd-62-001-t21=24"x24" SFT 1 16241.55 Shabir

2 DARK Beige Tile 90-1013-30md =24" x 24" SFT 1 3318.65 Master/Chinees imported

3 Dark Grey tile 65-001-40md=24" x 24" SFT 1 1488.35 Master/master 16" x16"

4 Light Biege Tile 24"x24" GT-01 SFT 1 10323.15 Granito/RAK

5 Dark Beige Tile 24"x24" GT-05 SFT 1 4468.40 Granito/RAK

6 16"x16" VFT-1616-017-AI Grey SFT 1 9409.05 Vetrified

7 16"x16" VFT-1616-017-AI Rustic Brown SFT 1 3723.55 Vetrified

8 External Tile SFT 1 5615 GM-011

9 Kitchen Shelf Tile SFT 1 71.40 ceramic

Terrazo Tile
1 4" Marble Pati SFT 1 25

2 TFT-01 White (L) SFT 1 23490 Floor Tile+dado

3 TFT-02 White (S) SFT 1 2239 Floor Tile+dado

4 TFT-03 Grey SFT 1 6841 Floor Tile+dado

5 Wash Terrazo on ramp floor SFT 1 3658


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS

Demand Summary

Main Building

S.No Description Unit Total QTY Basement Ground Ist Floor 2nd floor 3rd Floor Mumty Waiting Area Canteen Ancillary REMARKS

Basement and Ground Floor

1 Tile Spacer 2mm Packet 500 2mm

Porcelain Tile floor and Dado

1 Stile Beige Tile snd-62-001- SFT 54288.15 3631.11 12827.01 11372.03 13472.45 12985.56 Shabir
t21=24"x24"
2 DARK Beige Tile 90-1013-30md =24" x SFT 15587.36 517.13 2801.19 2811.27 5941.53 3516.24 Master/Chinees imported

3 Dark Grey tile 65-001-40md=24" x 24" SFT 2471.70 132.83 1355.03 184.28 296.63 502.95 Master/master 16" x16"

4 Light Biege Tile 24"x24" GT-01 SFT 25939.31 6656.69 4936.16 5540.01 6133.05 2673.41 Granito/RAK

5 Dark Beige Tile 24"x24" GT-05 SFT 10392.48 619.92 2360.40 2723.18 3272.33 1416.66 Granito/RAK

6 16"x16" VFT-1616-017-AI Grey SFT 28388.58 1219.58 8189.48 5736.36 4849.43 4616.75 2071.00 1706.00 Vetrified

7 16"x16" VFT-1616-017-AI Rustic Brow SFT 10497.65 262.71 3460.28 1350.93 1735.86 1710.87 653.00 1324.00 Vetrified

8 External Tile Gm-011 SFT 5673.26 5673.255 GM-011

9 Kitchen Shelf Tile SFT 495.92 70.67 51.45 143.33 230.48 ceramic

10 Wooden Texture Sft 950.27 950.27

Tile Filler

11 Stile Beige Tile snd-62-001-


t21=24"x24" Kg 678.60 45.39 160.34 142.15 168.41 162.32 0.00 0.00 0.00 0.00 Shabir

12 DARK Beige Tile 90-1013-30md Kg 194.84 6.46 35.01 35.14 74.27 43.95 0.00 0.00 0.00 0.00 Master

13 Dark Grey tile 65-001-40md Kg 30.90 1.66 16.94 2.30 3.71 6.29 0.00 0.00 0.00 0.00 Master

14 Light Biege Tile 24"x24" GT-01 Kg 324.24 83.21 61.70 69.25 76.66 33.42 0.00 0.00 0.00 0.00 Granito

15 Dark Beige Tile 24"x24" GT-05 Kg 129.91 7.75 29.51 34.04 40.90 17.71 0.00 0.00 0.00 0.00 Granito

16 16"x16" VFT-1616-017-AI Grey Kg 354.86 15.24 102.37 71.70 60.62 57.71 0.00 25.89 21.33 0.00 Vetrified

17 16"x16" VFT-1616-017-AI Rustic Brow Kg 131.22 3.28 43.25 16.89 21.70 21.39 0.00 8.16 16.55 0.00 Vetrified

18 External Tile Gm-011 Kg 70.92 70.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 GM-011

19 Kitchen Shelf Tile Kg 6.20 0.00 0.88 0.64 1.79 2.88 0.00 0.00 0.00 0.00 ceramic

20 White Cement For Terrazo Tile Filling Bages 100.00

21 Tile BOND floor Bages 1274.54 70 315 242 330 288 0 10 20 0 Shabir

22 Tile BOND Dado Bages 3591.99 708 778 703 720 494 0 104 85 0 Shabir

Ceiling

23 Gypsum Board 24"x24" SFT 77059.74 9696 17283.47 15181.27 20318 14581

24 Seamless SFT 5143.00 262 930 1032 609 2310

25 Wooden Texture SFT 5228.00 568 1263 1141 898 1358

26 Fiber cement Board 9mm 912.00 190 722

27 Emulsion Paint Wall SFT 237393.00 49546 40200 38545 36129 46754 17672 4926 3621 Wall

28 Emaulsion Paint ceiling SFT 54040.00 18417 5338 5627 4998 6444 6383 4218 2615 Ceiling

29 Weather Sheild 2452

30 Enamel Paint All floor SFT 16256.00 3114 3382 3704 2324 2465 528 738 1 Coat Area

31 PVC Door NOS 72.00 4 29 16 17 6

32 MS Door NOS 51.00 21 3 3 3 6 7 8

33 Fire Rated Door NOS 11.00 2 3 2 2 2

34 Aluminim Window/Ventilator NOS 166.00 7 24 21 21 52 16 16 9

35 Aluminum & Glass Door NOS 42.00 4 5 7 26 Swing Double Leaf

36 Automatic glass door NOS 2.00 2

37 Flush Door NOS 226.00 22 40 66 43 43 1 6 4 1 Vision Panel

38 Vison Glass For flush Door (10"x31") No.s 138.00 14 34 44 26 12 6 2 5mm Thick

39 Door Mortice Lock No.s 250.00 26 60 66 43 43 1 6 4 1

40 Door Sliding Bolt 10" No.s 309.00 30 72 84 51 56 1 8 6 1 Chitkhni L=10"

41 Door Hinges 4" No.s 830.00 90 219 152 153 168 3 24 18 3 4" L

42 Door Aluminum Kick Plate 6" 22SWG RFT 1796.00 182 441 497 300 284 6 52 28 6 6" H (22-SWG)

43 Door Finger Plate No.s 500.00 52 120 132 86 86 2 12 8 2 6"x6"

44 Fixed Partition Wall SFT 5100.00 427 200 1447 3026 Without Door

45 Dry Wall SFT 3024.00 237 81 1040 1666

46 Marble Boticena 3/4" Thick All stair SFT 3894.00 Tread and Riser

47 """"""Ditto"""""" 12"x12" stair landi SFT 2500.00

48 """"""Ditto"""""" Door Sill SFT 1150.14 168.00 176.00 163.00 189.14 454.00

49 Marble Boticena 3/4" Thick Vanity SFT 753.50 20.00 218.00 95.16 174.82 245.52

50 Epoxy Floor SFT 988.00 241.00 281.00 466.00

51 Epoxy Wall SFT 2862.00 1096 945 821

52 SS Railing RFT 893.00 194.00 199.00 162.00 156.00 126.00 56.00

53 Grab Bars RFT 2589.00 474.00 607.00 509.00 525.00 474.00

54 Wooden Bupmer Rail RFT 1737.00 67.00 440.00 555.00 435.00 240.00
55 Column Corner Guard 2" x 2" Angle RFT 1381.24 300.6 266.44 328.74 384.18 101.28

56 Geomatric Structure SFT 834.00 834 Job

57 Reception Counter No.s 13.00 2 4 3 4

58 Internal Signage No.s 469.00 73 108 114 86 88

59 Looking Mirror For Wash Basin No.s 51.00 8 11 23 9 Size=2'x4'

60 Looking Mirror For Bath Vanity No.s 30.00 2 9 6 4 9 Size=3'-9"x5'

61 Coat Hook SS No.s 60.00 4 25 9 5 17

62 Soap Dish No.s 89.00 2 26 14 27 20

63 Tissu Role Holder No.s 51.00 2 15 10 7 17

64 Towel Bar No.s 29.00 2 9 8 4 6 SS 1.5" Dia

65 Bath Vanity No.s 30.00 2 9 6 4 9

66 Plastic shelf No.s 51.00 8 11 23 9

67 Grab Bar for Handi cap No.s 32.00 10 4 14 4

68 Door Stopper No.s 309.00 30 72 84 51 56 1 8 6 1

External works

69 Color Crete SFT 75943.00 75943

70 Clad Stone SFT 7850.85 7850.85

71 Wash Terrazo External SFT 12876.00 12876

72 Curtain Wall CW1,CW2 & CW5 SFT 5848.00 5848

73 ROAD-3 Tuff Tile SFT 20000.00

74 Bricks for Tube well Nos 8295.00

75 Girder ( pump station & tubwell) Rft 25.50 24kg/ft

76 Catchbasin Cover Remaining Nos 6.00

77 Catchbasin Pending Nos 10.00

78 Manhole Cover Remaining Nos 12.00

79 Drain cover (Typ. 50'c/c) Male&Femal Nos 20

80 Drain Male cover Nos 19.00

81 Nos

82 Nos
ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS

Floor and Dado Tile Demand Summary

Main Building
S.No Description Unit No. Total QTY Received Amount REMARKS

Basement Floor
Porcelain Tile
1 Stile Beige Tile snd-62-001-t21=24"x24" SFT 1 16241.55 Shabir

2 DARK Beige Tile 90-1013-30md SFT 1 3318.65 Master

3 Dark Grey tile 65-001-40md SFT 1 1488.35 Master

4 Light Biege Tile 24"x24" GT-01 SFT 1 10105.15 Granito

5 Dark Beige Tile 24"x24" GT-05 SFT 1 4468.40 Granito

6 12"x12" Porcelain Tile SFT 1 218.40

7 16"x16" VFT-1616-017-AI Grey SFT 1 9409.05 Vetrified

8 16"x16" VFT-1616-017-AI Rustic Brown SFT 1 3723.55 Vetrified

Terrazo Tile
1 Skirting Tile SFT 1 83 TFT-01 White (L)

2 Dado Tile SFT 1 6585 TFT-01 White (L)

3 Skirting Tile SFT 1 85 TFT-02 White (S)

4 Skirting Tile SFT 1 174 TFT-03 Grey

5 Dado Tile SFT 1 1022 TFT-03 Grey

6 4" Marble Pati SFT 1 25

7 TFT-01 White (L) SFT 1 10596 Floor Tile

8 TFT-02 White (S) SFT 1 1289 Floor Tile

9 TFT-03 Grey SFT 1 5645 Floor Tile

10 Wash Terrazo SFT 1 1829

Ground Floor
Porcelain Tile
1 Stile Beige Tile snd-62-001-t21=24"x24" SFT 1 12826.80 Shabir

2 DARK Beige Tile 90-1013-30md SFT 1 2801.40 Master

3 Dark Grey tile 65-001-40md SFT 1 1355.55 Master

4 Light Biege Tile 24"x24" GT-01 SFT 1 3760.05 Granito

5 Dark Beige Tile 24"x24" GT-05 SFT 1 3536.40 Granito

6 16"x16" VFT-1616-017-AI Grey SFT 1 8190.00 Vetrified

7 16"x16" VFT-1616-017-AI Rustic Brown SFT 1 3460.80 Vetrified

8 Kitchen Shelf Tile SFT 1 71.40 ceramic

9 External Tile SFT 1 5615 GM-011

Terrazo Tile
1 Cove Skirting Tile SFT 1 14 TFT-01 White (L)

2 Skirting Tile SFT 1 102 TFT-01 White (L)

3 Dado Tile SFT 1 2762 TFT-01 White (L)


4 Skirting Tile SFT 1 24 TFT-02 White (S)

5 TFT-01 White (L) SFT 1 3348 Floor Tile

6 TFT-02 White (S) SFT 1 841 Floor Tile

7 Wash Terrazo SFT 1 1829


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS

False Ceiling Demand Summary

Main Building
S.No Description Unit No. Total QTY Received Amount REMARKS

Basement Floor
1 Gypsum Board 24"x24" SFT 1 27519.6

2 Seamless SFT 1 1216.24

3 Wooden Texture SFT 1 1868.38

Ground Floor
1 Gypsum Board 24"x24" SFT 1 17629.68

2 Seamless SFT 1 948.6

3 Wooden Texture SFT 1 1288.26


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS

Demand Summary

Main Building

Work done
S.No Description Unit Total QTY Basement Ground 3rd Floor
upto Eid
Amount REMARKS

Basement , Ground Floor and Third Floor


1 Tile Spacer 2mm Packet 500 2mm

Porcelain Tile floor and Dado

1 Stile Beige Tile snd-62-001-t21=24"x24" SFT 27259.68 3631.11 10643.01 12985.56 Shabir

2 DARK Beige Tile 90-1013-30md =24" x 24" SFT 6834.56 517.13 2801.19 3516.24 Master/Chinees imported

3 Dark Grey tile 65-001-40md=24" x 24" SFT 1990.80 132.83 1355.03 502.95 Master/master 16" x16"

4 Light Biege Tile 24"x24" GT-01 SFT 14266.25 6656.69 4936.16 2673.41 Granito/RAK

5 Dark Beige Tile 24"x24" GT-05 SFT 4396.98 619.92 2360.40 1416.66 Granito/RAK

6 16"x16" VFT-1616-017-AI Grey SFT 14025.80 1219.58 8189.48 4616.75 Vetrified

7 16"x16" VFT-1616-017-AI Rustic Brown SFT 5433.86 262.71 3460.28 1710.87 Vetrified

8 External Tile Gm-011 SFT 5673.26 5673.255 GM-011

9 Kitchen Shelf Tile SFT 301.14 70.67 230.48 ceramic

10 Wooden Texture Sft 950.27 950.27

Tile Filler

11 Stile Beige Tile snd-62-001-t21=24"x24" Kg 340.75 45.39 133.04 162.32 Shabir

12 DARK Beige Tile 90-1013-30md Kg 85.43 6.46 35.01 43.95 Master

13 Dark Grey tile 65-001-40md Kg 24.89 1.66 16.94 6.29 Master

14 Light Biege Tile 24"x24" GT-01 Kg 178.33 83.21 61.70 33.42 Granito

15 Dark Beige Tile 24"x24" GT-05 Kg 54.96 7.75 29.51 17.71 Granito

16 16"x16" VFT-1616-017-AI Grey Kg 175.32 15.24 102.37 57.71 Vetrified

17 16"x16" VFT-1616-017-AI Rustic Brown Kg 67.92 3.28 43.25 21.39 Vetrified

18 External Tile Gm-011 Kg 70.92 70.92 0.00 0.00 GM-011

19 Kitchen Shelf Tile Kg 3.76 0.00 0.88 2.88 ceramic

20 White Cement For Terrazo Tile Filling Bages 100.00

21 Tile BOND floor Bages 638.75 70 281 288 Shabir

22 Tile BOND Dado Bages 1980.68 708 778 494 Shabir

Ceiling

23 Gypsum Board 24"x24" SFT 41560.47 9696 17283.47 14581

24 Seamless SFT 3502.00 262 930 2310

25 Wooden Texture SFT 3189.00 568 1263 1358


40% work done
26 Fiber cement Board 9mm 722.00 722
after eid

27 Emulsion Paint Wall SFT 136500.00 49546 40200 46754 Wall

28 Emaulsion Paint ceiling SFT 30199.00 18417 5338 6444 Ceiling

29 Weather Sheild

30 Enamel Paint All floor SFT 16256.00 3114 3382 2465 1 Coat Area

31 PVC Door NOS 39.00 4 29 6

32 MS Door NOS 30.00 21 3 6

33 Fire Rated Door NOS 7.00 2 3 2

34 Aluminim Window/Ventilator NOS 83.00 7 24 52

35 Aluminum & Glass Door NOS 35.00 4 5 26 Swing Double Leaf

36 Automatic glass door NOS 2.00 2

37 Flush Door NOS 105.00 22 40 43 Vision Panel

38 Vison Glass For flush Door (10"x31") No.s 60.00 14 34 12 5mm Thick

39 Door Mortice Lock No.s 129.00 26 60 43


40 Door Sliding Bolt 10" No.s 158.00 30 72 56 Chitkhni L=10"

41 Door Hinges 4" No.s 477.00 90 219 168 4" L

42 Door Aluminum Kick Plate 6" 22SWG RFT 907.00 182 441 284 not required yet 6" H (22-SWG)

43 Door Finger Plate No.s 258.00 52 120 86 6"x6"

44 Fixed Partition Wall SFT 3653.00 427 200 3026 Without Door
Work done
46 Marble Boticena 3/4" Thick All stair SFT 3894.00 after Eid Tread and Riser

47 """"""Ditto"""""" 12"x12" stair landing SFT 2500.00 Work done


after Eid
48 """"""Ditto"""""" Door Sill SFT 798.00 168.00 176.00 454.00

49 Marble Boticena 3/4" Thick Vanity SFT 483.52 20.00 218.00 245.52

50 Epoxy Floor SFT 241.00 241.00

51 Epoxy Wall SFT 1096.00 1096


Work done
52 SS Railing RFT 519.00 194.00 199.00 126.00
after Eid
53 Grab Bars RFT 1555.00 474.00 607.00 474.00 Work done
after Eid
50% work done
54 Wooden Bupmer Rail RFT 747.00 67.00 440.00 240.00
after eid
55 Column Corner Guard 2" x 2" Angle RFT 668.32 300.6 266.44 101.28

56 Geomatric Structure SFT 834.00 834 Job

57 Reception Counter No.s 6.00 2 4

58 Internal Signage No.s 269.00 73 108 88

59 Looking Mirror For Wash Basin No.s 17.00 8 9 Size=2'x4'

60 Looking Mirror For Bath Vanity No.s 20.00 2 9 9 Size=3'-9"x5'

61 Coat Hook SS No.s 46.00 4 25 17

62 Soap Dish No.s 48.00 2 26 20

63 Tissu Role Holder No.s 34.00 2 15 17

64 Towel Bar No.s 17.00 2 9 6 SS 1.5" Dia

65 Bath Vanity No.s 20.00 2 9 9

66 Plastic shelf No.s 17.00 8 9

67 Grab Bar for Handi cap No.s 14.00 10 4

68 Door Stopper No.s 158.00 30 72 56

External works
20% work done
69 Color Crete SFT 75943.00 75943 before eid
30% work done
70 Clad Stone SFT 7850.85 7850.85 before eid

71 Wash Terrazo External SFT 12876.00 12876

72 Curtain Wall CW1,CW2 & CW5 SFT 5848.00 5848

73 ROAD-3 Tuff Tile SFT 20000.00

74 Bricks for Tube well Nos 8295.00

75 Girder ( pump station & tubwell) Rft 25.50 24kg/ft

76 Catchbasin Cover Remaining Nos 12.00

77 Manhole Cover Remaining Nos 8.00


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CONTRACTOR: M/SCARDIOLOGY
ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS
Construction of Main Building

Marble 3/4" Marble


S/Nos Description Unit Nos L B H Remarks
Thick 12"x12"
Stair Marble

Basement
Stair No-01 Grid 3-4/D-E

1 Riser SFT 28 6.50 0.50 91

2 Treads SFT 28 6.50 1.08 196.56


Marble size
3 Marble on landing Area SFT 1 15.00 5.50 82.5 12"X12"
Marble size
4 " " Ditto " " SFT 1 9.00 1.00 9 12"X12"
Marble size
5 " " Ditto " " SFT 1 97.00 Area 97.00 12"X12"
Marble size
6 Marble Under Stair SFT 1 401.50 Area 401.50 12"X12"
Stair No-02 Grid 12-13/M-N

1 Riser SFT 28 5.00 0.50 70

2 Treads SFT 28 5.00 1.08 151.2


Marble size
3 Marble on landing Area SFT 1 14.00 4.00 56 12"X12"
Marble size
4 " " Ditto " " SFT 1 13.50 4.00 54 12"X12"
Marble size
5 " " Ditto " " SFT 1 8.50 1.00 8.5 12"X12"
Marble size
6 Marble Under Stair SFT 1 317.02 Area 317.02 12"X12"
Stair No-03 Grid 3-4/H'-J

1 Riser SFT 27 7.00 0.50 94.5

2 Treads SFT 27 7.00 1.08 204.12


Marble size
3 Marble on landing Area SFT 2 49.00 Area 98.00 12"X12"
Basement Extra Stair Grid(J~K/1)

1 Treads SFT 20 3.00 1.08 64.8

2 Riser SFT 20 3.00 0.50 30

3 Marble on landing Area SFT 1 3.50 3.33 11.655

Basement Extra Stair Grid(D/5~6)

1 Treads SFT 25 5.00 1.08 135

2 Riser SFT 25 5.00 0.50 62.5

3 Marble on landing Area SFT 1 3.50 5.00 17.5

Total Qty= 1128.84 1123.52


Ground Floor
Stair No-01 Grid 3-4/D-E

1 Riser SFT 28 6.50 0.50 91

2 Treads SFT 28 6.50 1.08 196.56


Marble size
3 Marble on landing Area SFT 1 15.00 5.50 82.5 12"X12"
Marble size
4 " " Ditto " " SFT 1 9.00 1.00 9 12"X12"
Marble size
5 " " Ditto " " SFT 1 97.00 Area 97.00 12"X12"
Stair No-02 Grid 12-13/M-N

1 Riser SFT 28 5.00 0.50 70

2 Treads SFT 28 5.00 1.08 151.2


Marble size
3 Marble on landing Area SFT 1 119.53 Area 119.53 12"X12"
Marble size
4 " " Ditto " " SFT 1 13.50 4.00 54 12"X12"
Marble size
5 " " Ditto " " SFT 1 8.50 1.00 8.5 12"X12"

Stair No-03 Grid 3-4/H'-J

1 Riser SFT 28 7.00 0.50 98

2 Treads SFT 28 7.00 1.08 211.68


Marble size
3 Marble on landing Area SFT 2 49.00 Area 98.00 12"X12"
Unloading Deck Stair

1 Treads SFT 10 6.00 1.08 64.8

2 Riser SFT 10 6.00 0.50 30

Main Vestibule Area

1 Vestibule +1 Step SFT 1 207.14 Area 207.14

Emergency Entrance Landing

1 Marble on landing Area SFT 1 244.26 Area 244.26

Total Qty= 1364.64 468.53


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CONTRACTOR: M/SCARDIOLOGY
ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS
Construction of Main Building
SS Railing
S.no Description Unit Nos 2' 3' 3'-3" 3'-6" Total Qty Remarks

Basement
A1 Stair No-01 Grid 3-4/D-E
1 Basement To Ground Floor RFT 1 39.50 39.5
A2 Stair No-02 Grid 12-13/M-N 0
1 Basement To Ground Floor RFT 1 41.34 41.34
A3 Extra Stairs 0
1 Basement To Ground Floor RFT 2 63.00 126.00 No Mention

Total Qty= - 143.84 - - 206.84

Ground Floor
A1 Stair No-01 Grid 3-4/D-E
1 Ground Floor To First Floor RFT 1 39.50 39.5
A2 Stair No-02 Grid 12-13/M-N 0
1 Ground Floor To First Floor RFT 1 41.34 41.34
1 Main Entrance Stair RFT 1 30.00 30 3ft Height

2 Emergency Entrance Stair RFT 1 16.88 16.88 3.25ft Height

3 Unloading Deck RFT 1 36.00 36 3.5ft Height

4 Basement Open Sky Area RFT 1 48.75 48.75 3.5ft Height

Total Qty= - 110.84 16.88 84.75 212.47


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CONTRACTOR: M/SCARDIOLOGY
ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS
Construction of Main Building
Grab Bar
S/Nos Description Unit Nos L B H Total Qty Remarks

Basement Floor
A Stair No-02 Grid 12-13/M-N
1 Basement To Ground Floor RFT 1 27.50 27.5
B Stair No-03 Grid 3-4/H-J
1 Basement To Ground Floor RFT 1 64.00 64.00
B Stair No-03 Grid 3-4/D-E
1 Basement To Ground Floor RFT 1 28.00 28.00
C Ramp Grid 2~7/A~C
1 Basement To Ground Floor RFT 1 203.37 175.99 379.36 Inside & outside

Total Qty= 498.86

Ground Floor
A Stair No-02 Grid 12-13/M-N
1 Ground Floor To First Floor RFT 1 27.50 27.5
B Stair No-03 Grid 3-4/H-J
1 Ground Floor To First Floor RFT 1 94.00 94.00
B Stair No-03 Grid 3-4/D-E
1 Ground Floor To First Floor RFT 1 28.00 28.00
C Ramp Grid 2~7/A~C
1 Ground Floor To First Floor RFT 1 203.37 175.99 203.37 Inside & outside

2 Emergency Entrance Ramp RFT 1 80.66 52.00 132.66 Inside & outside

Total Qty= 485.53


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CONTRACTOR: M/SCARDIOLOGY
ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS
Construction of Main Building

S.no Description Unit Nos L B H Total Qty Remarks


Bumper Rail
Basement
1 BF-13 RFT 1 67.00 67.00

Total Qty= 67.00


GROUND FLOOR
1 GF-01 RFT 1 178.09 178.09
2 GF-14 RFT 1 58.83 58.83
3 GF-15 RFT 1 49.08 49.08
4 GF-37 RFT 1 89.18 89.18
5 GF-51 RFT 1 63.91 63.91
Total Qty= 439.1
OPD
1 GF-74 RFT 1 203.03 203.03
2 GF-92 RFT 1 57.79 57.79
Total Qty= 260.8
FIRST FLOOR
1 FF-01 RFT 1 86.33 86.33
2 FF-02 RFT 1 221.67 221.67
3 FF-05 RFT 1 101.88 101.88
4 FF-27 RFT 1 121.50 121.5
5 FF-60 RFT 1 22.75 22.75
Total Qty= 554.13
2nd Floor
1 SF-02 RFT 1 13.25 13.25
2 NS-Area (Grid J~K) RFT 1 58.17 58.17
3 SF-15 RFT 1 33.12 33.12
4 SF-31 RFT 1 155.59 155.59
5 SF-39 RFT 1 88.26 88.26
6 SF-50 RFT 1 86.33 86.33
Total Qty= 434.72
THIRD FLOOR
1 TF-1 RFT 1 91.69 91.69
2 TF-28 RFT 1 51.58 51.58
3 TF-31 Corridor RFT 1 95.83 95.83
Total QTY= 239.10
Grand Total Qty= 1555.8
ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS

Demand Summary

OPD BUILDING and EXTERNAL DEVELOPMENT


S.No Description Unit No. Total QTY Received Amount REMARKS

1 Tile Spacer Packet 1 300 2mm

2 Tile Filler No.s 1 110 Shabir

3 """"""Ditto"""""" No.s 1 40 Master

4 """"""Ditto"""""" No.s 1 35 Granito

5 """"""Ditto"""""" No.s 1 45 Vetrified

6 """"""Ditto"""""" No.s 1 50 GM-011

7 Tile BOND Bages 1 500 Shabir

8 Epoxy SFT 1 849 Floor+Wall

9 False Ceiling SFT 1 8200 24"x24"

10 """"""Ditto"""""" SFT 1 315 Seamless

11 """"""Ditto"""""" SFT 1 2300 Wooden Texture

12 Wall Paint SFT 1 18000

13 Color Crete SFT 1 2500

14 Weather Sheild SFT 1 5850

15 Enamel Paint SFT 1 3530 1 Coat Area

16 Glass Door D-30 SFT 1 42

17 Aluminum Glass Door D-26 SFT 1 126 Swing Double Leaf

18 Vison Panel Door SFT 1 1765 Vision Panel

19 Vison Glass For Door SFT 1 60 5mm Thick

20 Door Mortice Lock No.s 1 42

21 Door Sliding Bolt No.s 1 55 Chitkhni

22 Door Hinges No.s 1 160 4" L

23 Door Aluminum Kick Plate RFT 1 300 6" H (22-SWG)

24 Door Finger Plate No.s 1 84 6"x6"

25 Aluminum Windows SFT 1 1144 Double Glazed

26 Marble Boticena SFT 1 3987

27 Curtain Wall SFT 1 2564

28 Clad Stone SFT 1 1500

29 Column Corner Guard RFT 1 200

30 Wooden Bumper Rail RFT 1 320

31 Reception Counter No.s 1 4

32 Geomatric Structure No.s 1 1 Job

33 Internal Signage No.s 1 52

34 Road Signage No.s 1 17

35 Curb Stone RFT 1 3025

36 Tuff Pavers For Walk Way Circular Area SFT 1 9300 60mm

37 Tuff Pavers For Foot Path SFT 1 11865 60mm

38 Tuff Pavers Rectangular SFT 1 8800 80mm


40 Sloping Curb Stone RFT 1 1100

41 WBM 8" Thick SFT 1 21500

42 Wearing Course Asphalt 2" Thick SFT 1 21500

43 Main Gates No.s 1 2

44 Drain Removeable Cover No.s 1 20

45 Catch Basin Cover Complete Set No.s 1 1

46 Looking Mirror For Wash Basin SFT 1 104 Size=2'x4'

47 Looking Mirror For Bath Vanity SFT 1 37.5 Size=3'-9"x5'

48 Coat Hook SS No.s 1 1

49 Muslim Shower No.s 1 1

50 Soap Dish No.s 1 1

51 Tissu Role Holder No.s 1 1

52 Towel Bar No.s 1 1 SS 1.5" Dia

53 Wash basin Half Padistel No.s 1 1

54 Bath Vanity No.s 1 1

55 W.C English No.s 1 1 Comode

56 Basin Mixer No.s 1 1

57 Vanity Mixer No.s 1 1

58 Fauset No.s 1 1

59 T-Cock No.s 1 1

60 Floor Drain No.s 1 1

61 Basin Waste Jali No.s 1 1

62 Basin Flexible Pipe No.s 1 1

63 Vanity Steel Waste Pipe No.s 1 1

64 Basin Bolt Kit No.s 1 1

65 Comode Bolt Kit No.s 1 1


ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CONTRACTOR:CARDIOLOGY
M/S ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS

1-MAIN and OPD BUILDING


Ground First 2nd Third Marble Length Area of Total
S.No Type Unit Size Basement Floor Floor Floor Floor Wall type Width Of Sill unit sill Total Area of sill No.s Remarks

1 W1 SFT 13'-6"X3'-0" 2 6 6 1 A 1.33 13.5 17.955 269.325 15

2 W2 SFT 4'-0"X3'-0" 1 4 2 5 A 1.33 4 5.32 63.84 12

3 W3 SFT 2'-0"X3'-0" 1 A 1.33 2 2.66 2.66 1

4 W4 SFT 7'-9"X3'-0" 1 A 1.33 7.75 10.3075 10.3075 1

5 W5 SFT 6'-0"X3'-0" 1 1 2 A 1.33 6 7.98 31.92 4

6 W6 SFT 8'-0"X3'-0" 1 A 1.33 8 10.64 10.64 1

7 W7 SFT 7'-6"X3'-0" 1 A 1.33 7.5 9.975 9.975 1

8 W8 SFT 8'-6"X3'-0" 1 A 1.33 8.5 11.305 11.305 1

9 W9 SFT 5'-0"X2'-0" 6 5 6 A 0.71 5 3.55 60.35 17

10 W9A SFT 4'-0"X7'-6" 7 A 1.65 4 6.6 46.2 7 2 Piece

11 W10 SFT 5'-0"X3'-0" 2 3 A 1.33 5 6.65 33.25 5

12 W11 SFT 3'-0"X11'-0" 6 A 1.67 3 5.01 30.06 6 2 Piece

13 W12 SFT 6'-0"X11'-0" 4 A 1.67 6 10.02 40.08 4 2 Piece

14 W13 SFT 7'-0"X11'-0" 4 A 1.67 7 11.69 46.76 4 2 Piece

15 W14 SFT 4'-0"X11'-0" 4 A 1.67 4 6.68 26.72 4 2 Piece

16 W15 SFT 8'-0"X11'-0" 1 A 1.67 8 13.36 13.36 1 2 Piece

17 W16 SFT 10'-0"X11'-0" 1 A 1.67 10 16.7 16.7 1 2 Piece

18 W17 SFT 5'-0"X3'-6" 3 B 0.705 5 3.525 10.575 3

19 W19 SFT 4'-0"X7'-6" 14 A 1.55 4 6.2 86.8 14 2 Piece

20 W19 SFT 4'-0"X7'-6" 1 B 0.72 4 2.88 2.88 1

21 W20 SFT 9'-0"X7'-6" 4 A 1.55 9 13.95 55.8 4

22 W21 SFT 3'-6"X7'-6" 5 B 0.72 3.5 2.52 12.6 5

23 W22 SFT 2'-6"X2'-6" 6 J 0.88 2.5 2.2 13.2 6

24 W23 SFT 7'-0"X7'-6" 2 A 1.55 7 10.85 21.7 2

25 W24 SFT 3'-0"X3'-0" 4 3 2 A 1.33 3 3.99 35.91 9

26 W24 SFT 3'-0"X3'-0" 3 J 0.66 3 1.98 5.94 3

27 W25 SFT 7'-0"X3'-0" 1 A 1.33 7 9.31 9.31 1

28 W25 A SFT 7'-0"X7'-6" 2 A 1.55 7 10.85 21.7 2 2 Piece

29 W26 SFT 10'-0"X4'-0" B 0.5 10 5 0 0

30 W27 SFT 5'-0"X4'-0" 1 A 1.55 5 7.75 7.75 1 2 Piece

31 W28 SFT 4'-0"X4'-0" 2 A 1.55 4 6.2 12.4 2 2 Piece

32 W29 SFT 4'-0"X4'-0" 1 B 0.71 4 2.84 2.84 1

Tandoor
33 W30 SFT 3'-0"X4'-0" 1 1.705 3 5.115 5.115 1
Area

34 W SFT 4'-0"X3'-0" 1 B 0.71 4 2.84 2.84 1 name not given

35 W SFT 8'-0"X4'-0" 1 B 0.71 8 5.68 5.68 1 name not given

36 W SFT 12'-0"X3' 2 B 0.71 12 8.52 17.04 2 name not given

Retaining
37 V1 SFT 6'-0"X2'-0" 4 0 0 4
Wall

38 CW1 SFT 54'-3'1/2"X54'-6" 0 0 1

39 CW2 SFT 30'-0"X54'-6" 0 0 1

40 CW3 SFT 49'-9"X13'-0" 0.87 55.5 48.285 96.57 1

41 CW4 SFT 86'-9"X13'-0" 0 0 1

42 CW5 SFT 23'-0"X54'-6" 1

Total 6 46 23 21 52 46 270 317 1150 153


2-CANTEEN BUILDING
1 W-1 SFT 8'-0"X3'-6" 1 A 1.55 8.0 12.40 12.4 1.0

2 W-2 SFT 6'-0"X3'-6" 1 A 1.55 6.0 9.30 9.3 1.0

3 W-3 SFT 4'-0"X6'-6" 1 A 1.55 4.0 6.20 6.2 1.0

4 W-4 SFT 3'-0"X6'-6" 3 A 1.55 3.0 4.65 13.95 3.0

5 W-5 SFT 1'-6"X6'-6" 6 A 1.55 1.5 2.33 13.95 6.0

6 V-1 SFT 2'-0"X2'-0" 3 A 1.33 3.0

7 V-2 SFT 4'-0"X2'-0" 1 A 1.33 1.0

8 CW-1 SFT 40'-4"X9'-0" 1.0

9 CW-2 SFT 14'-0"X9'-0" 1.0

Total 0.00 16.00 0.00 0.00 0.00 0.00 10.41 22.50 34.88 55.80 18.00
3-WAITING AREA BUILDING
1 W-1 SFT 3'-0"X5'-0" 6 A 0.88 3 2.64 15.84 6 8"

2 W-2 SFT 2'-0"X2'-0" 10 A 0.88 2 1.76 17.6 10 8"

Total 0.00 16.00 0.00 0.00 0.00 0.00 1.76 5.00 4.40 33.44 16.00
4-Ancillary Buildings
Guard Room
1 W-1 SFT 9'-6"X3'-6" 1 0.88 9.50 8.36 8.36 1.00

HT Room

1 V-1 SFT 1'-6"X1'-6" 3 0.88 - 0 3.00

LT Room

1 V-1 SFT 2'-0"X2'-0" 3 0.88 - 0 3.00

Mettering Room

2 V-1 SFT 1'-6"X1'-6" 1 0.88 - 0 1.00

Yellow And Waste Shredder

3 W-1 SFT 4'-2"X3'-6" 1 0.88 4.17 3.67 3.6696 1.00

Total 0.00 9.00 0.00 0.00 0.00 0.00 4.40 13.67 12.03 12.03 9.00 0.00
Total 1251.37
ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
DEMAND FOR DOORS
S.N Door name Description Unit Size Basement G.F 1st F 2nd F 3rd F Remarks Mumty
Total QTY Type
no.s
1-Main Building
1 D23 Single Leaf SFT 3'-0"x7'-0" 4 2 6 2 14 294 PVC Door
2 D24 Single Leaf SFT 2'-6"x7'-0" 4 25 14 11 4 58 1015 PVC Door
TOTAL 4 29 16 17 6 0 0 72 1309
2-CANTEEN BUILDING
1 D1
Single Leaf
SFT 3'-0"X7'-0"
2 2 42.00 PVC Door

2 D2
Single Leaf
SFT 2'-6"X7'-0"
6 6 105.00 PVC Door
TOTAL 0.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 147.00
3-WAITING AREA BUILDING
1 D1
Single Leaf
SFT 3'-6"X7'-0"
2 2 49.00 PVC Door

2 D2
Single Leaf
SFT 2'-6"X7'-0"
8 8 140.00 PVC Door

3 D3
Single Leaf
SFT 2'-3"X7'-0"
2 2 31.50 PVC Door
TOTAL 0 12 0 0 0 0 0 12 221
4-ANCILARY BUILDINGS
YELLOW/SHREDER ROOM

1 D5 Single Leaf
SFT 2'-6"X7'-0"
3 3 52.5 PVC Door
PUBLIC PARKING TOILETS

2 D2 Single Leaf SFT 2'-6"X7'-0"


2 2 35 PVC Door
TOTAL 0 5 0 0 0 0 5 88

GRAND TOTAL DOORS 97 1764