1-Main Building
1 D1 Swing-Double Leaf SFT 6'-0"x7'-0" 1 9 9 6 25 1050 Vision Panel Flush Door
13 D10 Double Leaf SFT 6'-0"x7'-0" 0 0 Solid Wood Vision Panel Door
14 D10 Swing Double Leaf SFT 6'-0"x7'-0" 1 1 42 Solid Wood Vision Panel Door
METERING ROOM
1 D1 Double Leaf
SFT
6'-0"x8'-0" 1 1 48 MS Door
1 D1 Double Leaf
SFT
8'-0"x8'-0" 1 1 64 MS Door
2 D2 Double Leaf
SFT
7'-0"x8'-0" 1 1 56 MS Door
H.T ROOM
1 D1 Double Leaf
SFT
7'-0"x8'-0" 1 1 56 MS Louvared Door
YELLOW/SHREDER ROOM
3 D3 Single Leaf
SFT 3'-0"X7'-0"
1 1 21 Wooden Door
4 D4 Single Leaf
SFT 3'-0"X7'-0"
1 1 21 MS Door
5 D5 Single Leaf
SFT 2'-6"X7'-0"
3 3 52.5 PVC Door
6 D6 Single Leaf
SFT 3'-0"X7'-0"
1 1 21 Aluminum Glass Door
TUBE-WELL ROOM
TOTAL 0 20 0 0 0 0 20 562
1-Main Building
1 D1 Swing-Double Leaf SFT 6'-0"x7'-0" 1 9 11 6 1 28 1176 Vision Panel Flush Door
2 D2 Double Leaf SFT 6'-0"x7'-0" 1 1 1 1 1 5 210 Vision Panel Flush Door
3 D3 Swing-Double Leaf SFT 5'-0"x7'-0" 4 2 6 210 Vision Panel Flush Door
D10 Double Leaf SFT 6'-0"x7'-0" 0 0 Solid Wood Vision Panel Door
D25 Automatic Sliding Double Leaf SFT 6'-0"x8'-0" 2 2 96 Automatic Glass Door
METERING ROOM
1 D1 Double Leaf SFT 6'-0"x8'-0" 1 1 48 MS Door
H.T ROOM
1 D1 Double Leaf SFT 7'-0"x8'-0" 1 1 56 MS Louvared Door
YELLOW/SHREDER ROOM
1 D1 Double Leaf SFT 6'-0"x8'-0" 1 1 48 MS Door
TUBE-WELL ROOM
1 D2 Single Leaf SFT 2'-6"X 1 1 0 NO add
TOTAL 0 20 0 0 0 0 20 570
1-Main Building
1 D25 SFT 6'-0"x8'-0" 2 2 96 Automatic Glass Door
TOTAL 5 17 0 10 28 0 60 1699
2-CANTEEN BUILDING
1 1 12mm Glass Door (Tempered
GD01 SFT 6'-0"X7'-0" 1 42.00 with Beveled Edges
2 2 12mm Glass Door (Tempered
GD02 SFT 4'-0"X7'-0" 2 56.00 with Beveled Edges
3 1 12mm Glass Door (Tempered
GD03 SFT 3'-6"X7'-0" 1 24.50 with Beveled Edges
TOTAL 0 4 0 0 0 0 4 122.5
4-ANCILARY BUILDINGS
1 D1 Guard Room 1&2 SFT 3'-0"X7'-0" 2 2 42 Aluminum Glass Door
TOTAL 0 5 0 0 0 0 5 84
1-Main Building
1 D17 Double Leaf SFT 6'-0"x7'-0" 10 1 11 462 Plain Metal Door
TOTAL 25 11 6 6 7 5 60 2320
4-ANCILARY BUILDINGS
METERING ROOM
1 D1 Double Leaf SFT 6'-0"x8'-0" 1 1 48 MS Door
H.T ROOM
1 D1 Double Leaf SFT 7'-0"x8'-0" 1 1 56 MS Louvared Door
TOTAL 0 8 0 0 0 0 8 377
1-Main Building
1 D1 Swing-Double Leaf SFT 6'-0"x7'-0" 1 9 11 6 1 28 1176 Vision Panel Flush Door
2 D2 Double Leaf SFT 6'-0"x7'-0" 1 1 1 1 1 5 210 Vision Panel Flush Door
3 D3 Swing-Double Leaf SFT 5'-0"x7'-0" 4 3 7 245 Vision Panel Flush Door
10 D10 Double Leaf SFT 6'-0"x7'-0" 0 0 Solid Wood Vision Panel Door
TOTAL 0 1 0 0 0 0 1 21
1-Main Building
1 D1 SFT 6'-0"x7'-0" 1 9 11 6 1 28 1176 Vision Panel Flush Door
2 D2 SFT 6'-0"x7'-0" 2 1 1 1 1 6 252 Vision Panel Flush Door
3 D3 SFT 5'-0"x7'-0" 4 3 7 245 Vision Panel Flush Door
TOTAL 0 19 0 0 0 0 19 570
1-Main Building
1 SFT 6'-0"x7'-0" 0
2 SFT 6'-0"x7'-0" 0
3 SFT 5'-0"x7'-0" 0
4 SFT 5'-0"x7'-0" 0
5 SFT 3'-6"x7'-0" 0
6 SFT 4'-0"x7'-0" 0
7 SFT 3'-6"x7'-0" 0
8 SFT 3'-0"x7'-0" 0
9 SFT 3'-0"x7'-0" 0
10 SFT 6'-0"x7'-0" 0
11 SFT 6'-0"x7'-0" 0
12 SFT 5'-0"x7'-0" 0
13 SFT 4'-0"x7'-0" 0
14 SFT 3'-6"x7'-0" 0
15 SFT 3'-0"x7'-0" 0
16 SFT 3'-0"x7'-0" 0
17 SFT 2'-6"x7'-0" 0
18 SFT 6'-0"x7'-0" 0
19 SFT 6'-0"x7'-0" 0
20 SFT 5'-0"x7'-0" 0
21 SFT 4'-6"x7'-0" 0
22 SFT 3'-6"x7'-0" 0
23 SFT 3'-0"x7'-0" 0
24 SFT 3'-6"x7'-0" 0
25 SFT 3'-0"x7'-0" 0
26 SFT 2'-6"x7'-0" 0
27 SFT 6'-0"x8'-0" 0
28 SFT 6'-0"x7'-0" 0
29 SFT 6'-0"x7'-0" 0
30 SFT 5'-0"x7'-0" 0
31 SFT 5'-0"x7'-0" 0
32 SFT 3'-0"x7'-0" 0
33 SFT 18'-0"x10'-0" 0
34 SFT 5'-0"x7'-0" 0
TOTAL 0 0 0 0 0 0 0 0
2-Canteen Building
Solid Core Flushed
door With Ply VISION
1 SFT 3'-6"X7'-0" 0 0.00 PANEL
Demand Summary
Main Building
2 DARK Beige Tile 90-1013-30md =24" x 24" SFT 6834.56 15587.00 Master/Chinees imported
3 Dark Grey tile 65-001-40md=24" x 24" SFT 1990.80 370.00 1620.80 Master/master 16" x16"
30 Enamel Paint All floor SFT 16256.00 5700.00 10556.00 1 Coat Area
35 Aluminum & Glass Door NOS 35.00 35.00 Swing Double Leaf
38 Vison Glass For flush Door (10"x31") No.s 60.00 60.00 5mm Thick
42 Door Aluminum Kick Plate 6" 22SWG RFT 907.00 907.00 6" H (22-SWG)
46 Marble Boticena 3/4" Thick All stair SFT 3894.00 3894.00 Tread and Riser
External works
Main Building
S.No Description Unit No. Total QTY Received Amount REMARKS
Basement Floor
Porcelain Tile
1 Stile Beige Tile snd-62-001-t21=24"x24" SFT 1 16241.55 Shabir
2 DARK Beige Tile 90-1013-30md =24" x 24" SFT 1 3318.65 Master/Chinees imported
3 Dark Grey tile 65-001-40md=24" x 24" SFT 1 1488.35 Master/master 16" x16"
Terrazo Tile
1 4" Marble Pati SFT 1 25
Demand Summary
Main Building
S.No Description Unit Total QTY Basement Ground Ist Floor 2nd floor 3rd Floor Mumty Waiting Area Canteen Ancillary REMARKS
1 Stile Beige Tile snd-62-001- SFT 54288.15 3631.11 12827.01 11372.03 13472.45 12985.56 Shabir
t21=24"x24"
2 DARK Beige Tile 90-1013-30md =24" x SFT 15587.36 517.13 2801.19 2811.27 5941.53 3516.24 Master/Chinees imported
3 Dark Grey tile 65-001-40md=24" x 24" SFT 2471.70 132.83 1355.03 184.28 296.63 502.95 Master/master 16" x16"
4 Light Biege Tile 24"x24" GT-01 SFT 25939.31 6656.69 4936.16 5540.01 6133.05 2673.41 Granito/RAK
5 Dark Beige Tile 24"x24" GT-05 SFT 10392.48 619.92 2360.40 2723.18 3272.33 1416.66 Granito/RAK
6 16"x16" VFT-1616-017-AI Grey SFT 28388.58 1219.58 8189.48 5736.36 4849.43 4616.75 2071.00 1706.00 Vetrified
7 16"x16" VFT-1616-017-AI Rustic Brow SFT 10497.65 262.71 3460.28 1350.93 1735.86 1710.87 653.00 1324.00 Vetrified
9 Kitchen Shelf Tile SFT 495.92 70.67 51.45 143.33 230.48 ceramic
Tile Filler
12 DARK Beige Tile 90-1013-30md Kg 194.84 6.46 35.01 35.14 74.27 43.95 0.00 0.00 0.00 0.00 Master
13 Dark Grey tile 65-001-40md Kg 30.90 1.66 16.94 2.30 3.71 6.29 0.00 0.00 0.00 0.00 Master
14 Light Biege Tile 24"x24" GT-01 Kg 324.24 83.21 61.70 69.25 76.66 33.42 0.00 0.00 0.00 0.00 Granito
15 Dark Beige Tile 24"x24" GT-05 Kg 129.91 7.75 29.51 34.04 40.90 17.71 0.00 0.00 0.00 0.00 Granito
16 16"x16" VFT-1616-017-AI Grey Kg 354.86 15.24 102.37 71.70 60.62 57.71 0.00 25.89 21.33 0.00 Vetrified
17 16"x16" VFT-1616-017-AI Rustic Brow Kg 131.22 3.28 43.25 16.89 21.70 21.39 0.00 8.16 16.55 0.00 Vetrified
18 External Tile Gm-011 Kg 70.92 70.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 GM-011
19 Kitchen Shelf Tile Kg 6.20 0.00 0.88 0.64 1.79 2.88 0.00 0.00 0.00 0.00 ceramic
21 Tile BOND floor Bages 1274.54 70 315 242 330 288 0 10 20 0 Shabir
22 Tile BOND Dado Bages 3591.99 708 778 703 720 494 0 104 85 0 Shabir
Ceiling
23 Gypsum Board 24"x24" SFT 77059.74 9696 17283.47 15181.27 20318 14581
27 Emulsion Paint Wall SFT 237393.00 49546 40200 38545 36129 46754 17672 4926 3621 Wall
28 Emaulsion Paint ceiling SFT 54040.00 18417 5338 5627 4998 6444 6383 4218 2615 Ceiling
30 Enamel Paint All floor SFT 16256.00 3114 3382 3704 2324 2465 528 738 1 Coat Area
38 Vison Glass For flush Door (10"x31") No.s 138.00 14 34 44 26 12 6 2 5mm Thick
41 Door Hinges 4" No.s 830.00 90 219 152 153 168 3 24 18 3 4" L
42 Door Aluminum Kick Plate 6" 22SWG RFT 1796.00 182 441 497 300 284 6 52 28 6 6" H (22-SWG)
44 Fixed Partition Wall SFT 5100.00 427 200 1447 3026 Without Door
46 Marble Boticena 3/4" Thick All stair SFT 3894.00 Tread and Riser
48 """"""Ditto"""""" Door Sill SFT 1150.14 168.00 176.00 163.00 189.14 454.00
49 Marble Boticena 3/4" Thick Vanity SFT 753.50 20.00 218.00 95.16 174.82 245.52
54 Wooden Bupmer Rail RFT 1737.00 67.00 440.00 555.00 435.00 240.00
55 Column Corner Guard 2" x 2" Angle RFT 1381.24 300.6 266.44 328.74 384.18 101.28
External works
81 Nos
82 Nos
ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF
CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS
Main Building
S.No Description Unit No. Total QTY Received Amount REMARKS
Basement Floor
Porcelain Tile
1 Stile Beige Tile snd-62-001-t21=24"x24" SFT 1 16241.55 Shabir
Terrazo Tile
1 Skirting Tile SFT 1 83 TFT-01 White (L)
Ground Floor
Porcelain Tile
1 Stile Beige Tile snd-62-001-t21=24"x24" SFT 1 12826.80 Shabir
Terrazo Tile
1 Cove Skirting Tile SFT 1 14 TFT-01 White (L)
Main Building
S.No Description Unit No. Total QTY Received Amount REMARKS
Basement Floor
1 Gypsum Board 24"x24" SFT 1 27519.6
Ground Floor
1 Gypsum Board 24"x24" SFT 1 17629.68
Demand Summary
Main Building
Work done
S.No Description Unit Total QTY Basement Ground 3rd Floor
upto Eid
Amount REMARKS
1 Stile Beige Tile snd-62-001-t21=24"x24" SFT 27259.68 3631.11 10643.01 12985.56 Shabir
2 DARK Beige Tile 90-1013-30md =24" x 24" SFT 6834.56 517.13 2801.19 3516.24 Master/Chinees imported
3 Dark Grey tile 65-001-40md=24" x 24" SFT 1990.80 132.83 1355.03 502.95 Master/master 16" x16"
4 Light Biege Tile 24"x24" GT-01 SFT 14266.25 6656.69 4936.16 2673.41 Granito/RAK
5 Dark Beige Tile 24"x24" GT-05 SFT 4396.98 619.92 2360.40 1416.66 Granito/RAK
7 16"x16" VFT-1616-017-AI Rustic Brown SFT 5433.86 262.71 3460.28 1710.87 Vetrified
Tile Filler
14 Light Biege Tile 24"x24" GT-01 Kg 178.33 83.21 61.70 33.42 Granito
15 Dark Beige Tile 24"x24" GT-05 Kg 54.96 7.75 29.51 17.71 Granito
Ceiling
29 Weather Sheild
30 Enamel Paint All floor SFT 16256.00 3114 3382 2465 1 Coat Area
38 Vison Glass For flush Door (10"x31") No.s 60.00 14 34 12 5mm Thick
42 Door Aluminum Kick Plate 6" 22SWG RFT 907.00 182 441 284 not required yet 6" H (22-SWG)
44 Fixed Partition Wall SFT 3653.00 427 200 3026 Without Door
Work done
46 Marble Boticena 3/4" Thick All stair SFT 3894.00 after Eid Tread and Riser
49 Marble Boticena 3/4" Thick Vanity SFT 483.52 20.00 218.00 245.52
External works
20% work done
69 Color Crete SFT 75943.00 75943 before eid
30% work done
70 Clad Stone SFT 7850.85 7850.85 before eid
Basement
Stair No-01 Grid 3-4/D-E
Basement
A1 Stair No-01 Grid 3-4/D-E
1 Basement To Ground Floor RFT 1 39.50 39.5
A2 Stair No-02 Grid 12-13/M-N 0
1 Basement To Ground Floor RFT 1 41.34 41.34
A3 Extra Stairs 0
1 Basement To Ground Floor RFT 2 63.00 126.00 No Mention
Ground Floor
A1 Stair No-01 Grid 3-4/D-E
1 Ground Floor To First Floor RFT 1 39.50 39.5
A2 Stair No-02 Grid 12-13/M-N 0
1 Ground Floor To First Floor RFT 1 41.34 41.34
1 Main Entrance Stair RFT 1 30.00 30 3ft Height
Basement Floor
A Stair No-02 Grid 12-13/M-N
1 Basement To Ground Floor RFT 1 27.50 27.5
B Stair No-03 Grid 3-4/H-J
1 Basement To Ground Floor RFT 1 64.00 64.00
B Stair No-03 Grid 3-4/D-E
1 Basement To Ground Floor RFT 1 28.00 28.00
C Ramp Grid 2~7/A~C
1 Basement To Ground Floor RFT 1 203.37 175.99 379.36 Inside & outside
Ground Floor
A Stair No-02 Grid 12-13/M-N
1 Ground Floor To First Floor RFT 1 27.50 27.5
B Stair No-03 Grid 3-4/H-J
1 Ground Floor To First Floor RFT 1 94.00 94.00
B Stair No-03 Grid 3-4/D-E
1 Ground Floor To First Floor RFT 1 28.00 28.00
C Ramp Grid 2~7/A~C
1 Ground Floor To First Floor RFT 1 203.37 175.99 203.37 Inside & outside
2 Emergency Entrance Ramp RFT 1 80.66 52.00 132.66 Inside & outside
Demand Summary
36 Tuff Pavers For Walk Way Circular Area SFT 1 9300 60mm
58 Fauset No.s 1 1
59 T-Cock No.s 1 1
Tandoor
33 W30 SFT 3'-0"X4'-0" 1 1.705 3 5.115 5.115 1
Area
Retaining
37 V1 SFT 6'-0"X2'-0" 4 0 0 4
Wall
Total 0.00 16.00 0.00 0.00 0.00 0.00 10.41 22.50 34.88 55.80 18.00
3-WAITING AREA BUILDING
1 W-1 SFT 3'-0"X5'-0" 6 A 0.88 3 2.64 15.84 6 8"
Total 0.00 16.00 0.00 0.00 0.00 0.00 1.76 5.00 4.40 33.44 16.00
4-Ancillary Buildings
Guard Room
1 W-1 SFT 9'-6"X3'-6" 1 0.88 9.50 8.36 8.36 1.00
HT Room
LT Room
Mettering Room
Total 0.00 9.00 0.00 0.00 0.00 0.00 4.40 13.67 12.03 12.03 9.00 0.00
Total 1251.37
ESTABLISHMENT OF DERA GHAZI KHAN INSTITUTE OF CARDIOLOGY
CONTRACTOR: M/S ZAHIR KHAN & BROTHERS
DEMAND FOR DOORS
S.N Door name Description Unit Size Basement G.F 1st F 2nd F 3rd F Remarks Mumty
Total QTY Type
no.s
1-Main Building
1 D23 Single Leaf SFT 3'-0"x7'-0" 4 2 6 2 14 294 PVC Door
2 D24 Single Leaf SFT 2'-6"x7'-0" 4 25 14 11 4 58 1015 PVC Door
TOTAL 4 29 16 17 6 0 0 72 1309
2-CANTEEN BUILDING
1 D1
Single Leaf
SFT 3'-0"X7'-0"
2 2 42.00 PVC Door
2 D2
Single Leaf
SFT 2'-6"X7'-0"
6 6 105.00 PVC Door
TOTAL 0.00 8.00 0.00 0.00 0.00 0.00 0.00 8.00 147.00
3-WAITING AREA BUILDING
1 D1
Single Leaf
SFT 3'-6"X7'-0"
2 2 49.00 PVC Door
2 D2
Single Leaf
SFT 2'-6"X7'-0"
8 8 140.00 PVC Door
3 D3
Single Leaf
SFT 2'-3"X7'-0"
2 2 31.50 PVC Door
TOTAL 0 12 0 0 0 0 0 12 221
4-ANCILARY BUILDINGS
YELLOW/SHREDER ROOM
1 D5 Single Leaf
SFT 2'-6"X7'-0"
3 3 52.5 PVC Door
PUBLIC PARKING TOILETS