You are on page 1of 2

PT PowerGen Jawa Timur

Operation Department

AP Training – Isolation Exercise No.15

Plant/Apparatus:
50LCB11AP001 CONDENSATE EXTRACTION PUMP 1 UNIT 50

Task:
Internal inspection

Status:
There is abnormal noise inside pump casing unit still on load

Particular Aspects:
 Agreement from Control Person to release the plant/apparatus
 Basic safety rule A3.2 when internal access required shall purged if residue content could cause
danger.
 Danger : 1. asphyxiation from residue of chemical
2. falling.
3. noise ( when unit on load ).

Interface with others people:


 SAP will prepare the safety document
 Authorised Person will apply safety precautions
 Competent Person will receipt safety document and do internal inspection

Considerations in the application of safety precautions:


 SAP prepare safety precaution sheet (all isolation points are identified) and give instruction
to AP to do isolation.
 AP will apply safety precautions as SAP instruction to achieve safety from the system
 AP will check the adequacy and integrity of the isolation and then confirm by sign
 CP do internal inspection
 NS establish general safety and CP during work commences

Safety Document to be used:


1. PFW preparation work : install scafolding and lighting
2. PFW split motor and pump
3. PFW internal inspection
4. PFW remove scafolding and lighting
5. PFW coupling motor and pump

Reference:
 Powergen safety rules A3.2

Isolation List:
1. 50LCB11AP001-MM01 CEP 1 MOTOR 10 KV : SWITCHOFF,RACKEDOUT
EARTHING,LOCKED
2. 50LCA11AA003 CEP 1 DISCH. VALVES : SWICTH OFF, SHUT, LOCKED
3. 50LCA11AA004 CEP 1 DISCH. BY PASS VALVES : SHUT LOCKED
4. 50LCA11AA001 CEP 1 SUCT. VALVES : SHUT LOCKED
5. 50LCA11AA501 CEP 1 VENT VALVES : SHUT LOCKED
6. 50LCA11AA502 CEP 1 VENT VALVES : SHUT LOCKED
7. 50LCA11AA401 CEP 1 DRAIN VALVES : OPEN LOCKED
8. 50LCA11AA402 CEP 1 DRAIN VALVES : OPEN LOCKED
9. 50LCW13A001 CEP 1 SEALING CONDENSATE VALVES : SHUT LOCKED

Paiton II Power Station – Indonesia Didik Ari P/M:/Authorisation/SAP Training Isolation Exercise 1
PT PowerGen Jawa Timur
Operation Department

Candidate Remarks
Date of exercise

Name ……………………………………………. …………………………………….

Assessor Remarks

Name ……………………………………………. …………………………………….

Paiton II Power Station – Indonesia Didik Ari P/M:/Authorisation/SAP Training Isolation Exercise 1

You might also like