You are on page 1of 1

FILE NO.

1
1. Drawing Master List (Form)
2. Design Input List (Form)
3. Kick Off Meeting (Form)
4. LOA
------------- Index Divider -------------
5. Schedule H - Primary
------------- Index Divider -------------
6. Schedule H - Secondary
------------- Index Divider -------------
7. Schedule E
------------- Index Divider -------------
8. Schedule G/7
------------- Index Divider -------------
9. Tender Drawing
------------- Index Divider -------------
10. Correspondence – e.g., Earthing Calc. & Calc.
------------- Index Divider -------------

FILE NO. 3
1. Transmittal Note - for every submission
------------- Index Divider -------------
2. Design Assessment Form - for every 1st submission (rev.0)
------------- Index Divider -------------
3. Design Change Form - for every revised submission (dwg to be attached)
------------- Index Divider -------------

FILE NO. 4
1. Approved dwg – follow the sequence as in drawing master list.
1.1 Revision dwg – for every revised dwg, the approved dwg shall be superseded (chop n sign)