You are on page 1of 1
ant +1600 & 200 Fasmyaré manure @ 0.18 cum per 100 sqm t ite of work water ) Overheads @ 10% on (arb+<) 1 Contractors profit @ 10% on (avb+cea) Cost for 100 sqm = arbrevdre Rate per sqm = (arbctdvey 100 ‘Seeding and Mulching Propartion of seod bed on previously lad top scl furnishing and placing of seeds, fertizer,ultching material, applying bturanous ‘Emulson atthe rte of 0231 per sam and lying and fing ate heting, including watering for 3 months all as por Clause 310, Unit= sam “Toking output = 240 sqm @) Labour Mate Mazdoor (Unstales) b) Machinery Water tanker 6X capasty incusing watering for 3 months (for ‘ona hour per woek). ‘Tractor wth Trey ©) Materials ry) day ay hout hour 018 2400 060 15.00 13.00 240 270.00 100.00 00.00 125.00 341.00 259.00 4860 2400.00 480.04 506.04 5.06.48 58.86 108.00 1.878.0 4439.00 e210 se] Reference to ts = ‘MORO Description Unit | uantty | fats | Amount (Rs) Specifications ts) Seeds "0 360 60200 © 2,167.20 Staiger arm yard manure @ 0.18 cum per 100 sqm eum 04327000 116.10 Buren Emuision t 0.085 40,1100 © 2.20608, Jule retina, open weave, 25 mm square opering sam 264.90 15000 39,600.00 Wieter for months " 8400 10000 © 8400.00 4) Overheads @ 10% on (arbec} 598270 1) Contractor's proft @ 10% on (asbrcva) 647.96 Coat for 240 sqm = arbrordto 7202781 Rate per sqm = (arbecrdvo}240 300.12 8-136

You might also like