You are on page 1of 1
‘Note: (i) The dimensions of reference pillars. back pias and 00 plers 219 88 per fgurette conctons. The above items oe covered ‘under different Chapters of MORD Specsicetons for payment (i) Tre marking of centre ine, seting out, curves. reconsing of levels, etc By the surveyor wil be indent fo work and nO ‘xtra payment shall be made forthe same 83 16008300 Earthwork in Hil Rosa (@) Excavation in Hy Areas in Sol by manual means. ‘AY Excavation in soll in Hil Area by manual means including culting and timming o side slopes and Gsposing of excavated earth wih a upto 1.8m tnd a ead upto 20 m as per drawing and Techalcal ‘Specification Clause 1603.1 ” vnteon nnn 4) ta we a soe ning tose b) Overheads @ 10% on (a) 793.20 2) corcers ot @ in me cot tte aoe ein Ie ami na 2 oo nm Pt cute vite ‘aout Dan a) Labour sr it a 0) ovate @ than “s 6) onc lt @ oot vs ont tr =n an Ie pomnt os = ae Tm x | See mein wm] a | 5h] anos (es Ane Ste mn 1 Scent ty by men ae sag vient tents ssunsage sam pen cn eaarait vtrom Teron 2) ae we eee Macedon smith dy 3088) 0 ey On @ 482k amp foram namo namaen rotetie foam 18a 6) Omens @ Phen) asus 4 comer rt @ Hon i aan cut rca saci Ie om ns so Wen ryt it cP et sents vnaren gaat on 4) a sere oy os tea © wince @ ont «Coma ah @ to cot tree hap on nt “2 \Note: ()_in.case the land on the valley side is barren and ther is no Cbjecton for disposing of excavated earth onthe vale side, {ne provision of front end ioador and tpper shal be deleted 3s. ‘excavated earth shai be isposed off on the vale side. (For disposal of excavated suplus earth beyond 20m, the ‘elevantitems of cariage be flowed > hee chicentinticintietctien

You might also like