You are on page 1of 12
1S) 0). Write down the detailed specification for(i) plastering with cement mortar and (i) damp 120 couras 2.5m thik with 1:2.5:3 concrete, (0), Work aut the unit rate for brickwork in cement mortar 1:6 using country burnt bricks for foundation and basement (For 1m*; brick $00nas; 0.24m® sand; S8ke cement; Labour0.7 brick ‘atone; 0.3Sman,0.7worman: rate: brick Rs-830/- per 1000Nor.; sand Rs7S0/- per 3.0m; cement ‘Rs4000/- per tonne; mason-Rs550/-; man-Rs4?5/-; woman Rs400/:). (25 marks) (b). Workout the unit rate for the following works: AK masonry In cement mortar 2:8, 10m or bavement. ‘Material ‘Guaniiey ate, Re Rubble 20m? a 200/m* sand ant Ragso/n® ‘cement 120g Rs. 350/bag abour mason | 3.8men Rs550/person [Menjwomen | 8 Roa (25 marks) 1V.(9).(a). Hows the-rent fora building foeed? (0). A newly constructed building stands on plot costing Rs.130,000/-. The construction cost of the building Is Rs.270,000/- and estimated life is 70 years. The Investor decides to have 82% returns on his, ‘outlay. Annual repairs may be taken ax 25% and the interest for sinking fund may be taken as 49% Calculate the monthly rent that will have to be charged for the building (25 marks) OR (10) (a). What is depreciation? Explain the various methods of calculating depreciation (0). Wate short notes on (i) scrap value (i) salvage value (i) outgoings and (lv) obsolescence. (25 marks) (2), Describe briety the necessity ofan estimate ane ist the diferent types of estates. (2). Explain the purpose of valuation (2). What are the uses of ‘data book’ and schedule of rates. (2). What is meant by Sinking Fund? (20 merks) a) How is detailed estimate different from preliminary estimate ? b) Explain the use of data book and schedule of rates. ©) Explain what do you mean by valuation of a property and how does it differ from the cost ? ©) What is depreciation ? List the methods of calculating depreciation. (4x5=20 Marks) a) Write down the detailed specification wood work for frames of doors and windows. 5 b) Work out the unit rate for rooting with M.P. tile of 320 mm or nearest available size. [For 10m2, M.P. tile - 145 Nos. @ Rs. 6,000/1,000 Nos., Mason — 0.35 @ As, 450/E, Man ~ 0.35 @ As. 350/E] 40 a) Write down the detailed specification tor Random Rubble masonry in cement mortar 1 : 6 for foundation. 5 b) Workout the unit rate for P.C.C. 1:3: 6, using 40 mm broken stone. [For 1 m9, 0.95 m? 40 mm broken stone @ Rs. 1,100/m?, 0.48 m? sand @ Rs. 1,200/m3, 228 kg cement @ As, 5.000/, 0,1 mason @ Rs. 450/E, 1.0 man @ Rs. 350/E and 1.4 woman @ Rs. 325/E) —_—_—_—_ 10 IV. Estimate the quantities and prepare the abstract of estimate of the following item of a building shown in Fig. 1. (Assume prevailing market rates) i) P.C.C. 1:4: 8 for foundation ) Brick work for super structure iil) Wood work for frames of doors and windows iv) Plastering with C.M. 1: 4, 12 mm thick for walls v) Painting for doors and windows. ae es 1 4° / fs ‘ at a e ci] SECTION X=» mot ota a ' 1 ' b 12 Py i i T a a 1 \ ! a ' ee E we a ou ant JOINERY DETAILS ITEM SIZE 1 1 x 209 n 90 x 200 ¥ ren x 4. ws 160 x 40 VL. a) Whatis outgoing ? Explain the various outgoings. 7 b) Write short note on i) Bookvalue ii) Year's purchase 8 oR wu ‘A Govt. accommodation is built at the cost of Rs. 6,00,000/. The water supply, sanitary and electrical installation expenditure is Rs. 1,50,000/- calculate the standard rent of the building if the following rate of return are fixed (i) 8% on construction cost (i) 1.5% towards maintenance of building work (ii) 4.5% on installation expenditure (iv) 4% on maintenance of installation (v) Rs. 1,200/-as property tax per year (vi) cost of land is to be neglected 15 1a) Explain the provisions of carriage of material calculation stipulated in CPWD schedule (6) ofrate, b) Write the unit of measurement of (i) DPC using waterproofing compound Gi) Iron (4) ‘work for window (iii) Water proof painting above roof slab iv) Wood work for frames of doors, 2 a) Calculate the amount required for carriage of 2500kg of steel reinforcement to be (6) brought from a source of 7km away from the site. The vehicle will reach at 75m away from the construction site CPWD data are as follows for mechanical transport of 1 tonne of steel at Ikm@Rs.69.93: 2km@Rs.79.29: Skm@Rs.106.07: beyond Skm upto 10km per km @Rs.7.72 ; and for transport of | tonne of steel by manual labour Rs.144.20/- for first ‘SOmeters and Rs.21.16/- for every additional Sometre or part thereof (All rate given are inclusive of profit & overhead). 'b) What are the factors considered for calculating the “cost of conveyance” for material? (4) 3 a) Work out the unit rate for the following work. ‘Cement Conerete work, mix 1:5:10 . using 40 mm broken stone. 'SLNo | Material Quantity Rate. 1_| Broken Stone 0.95 Cum Rs 650/ Cum 2_| Sand 0.48 Cum Rs 800/ Cum 3_| Cement 137 ke Rs 7500/Ton 4_| Mason C10 No. Rs 7S0/No. 3_[ Men/Women T.00No. Rs 650No. ‘Quantity one Cubic meter (I Cum) » 8 a) ») 9 a) ») ‘Discuss about freehold and lease hold property. In a plot of land costing Rs. 50,000 a building has been newly constructed at a total cost of Rs.120,000 including sanitary and water supply works . electrical installation, etc. The building consists of four flats for four tenants. The owner expects 7% retum on the cost of construction and 5% return on the cost of the land. Calculate the standard rent for each flat of the building assuming: The life of the building as 60 years and the sinking fond will be created on 4% interest basis. L 2 3. Annual repairs cost at 1% cost of the construction ter outgoings including taxes at 30% of the net retum on the building, ‘Explain about anmuity and depreciation. ‘Explain in detail the method of fixation of standard rent of a building. ‘Write short note on sinking find method and years of purchase. ‘Wht are outgoings? What are the various types of outgoings? (ao) 33 8338 on lee Prepare a detailed estimate of the following items (a) Earth work excavation, Width of ‘vase Concrete 75cm (b) Foundation (60cm x 60cm) and basement (45em x 45xm) with RR masonry (©) Brick work for super structures, CMI6 (4) RCC work for roof and sunshade (©) Wood work for door frame aad shutters of docr and windows (Door Di 100x210 ; D2 -80x?10 -W2 -1208140 -V1- 90x60; KW2- 120390; FW1- 60x180) All dimensions are in centimeters. (Any missing data may be suitably assumed) Q@ 1 a) Briefly explain the detailed specification of Earthwork excavation for (6) foundation in ordinary soil b) Write the unit of measurement of (i) Carpentry fittings (i) Pointing of Brick (4) wall 2 Work out the unit rate for P.C.C work in 1:6 Cement sand mortar For 10 m* (10) (Broken stone 12.5 m> @800/ m}, river sand 4.2 m> @1200/ m’. Cement 1000kg @ Rs $000/ ton, 12.$ mason @ Rs. 750/Each, 10.5 man @ Rs. 650 (Each and 11 woman @ Rs. $50/ Each). 3. (@) Calculate the amount required for carriage of 1500n0’s brick to be brought 7 9 » » » a » » » from a source of 12km away from the site, The vehicle access to the construction site is 60m away. CPWD data are as follows for mechanical transport of 1000nos of bricks at tkm@Rs.209.80; 2km@Rs.237.86; Skm@Rs.318.22; beyond Skm upto 10km_ per km @Rs.23.15; beyond 10km upto 20km per km @ Rs.19.0 ; and for transport of 1000n0s of brick by manual labour Rs.216.40/- for first SOmeters and Rs.47.12/- for every additional SOmetre or part thereof. (All rate given are inclusive of profit & overhead) What is mean by overhead charges? Give the percentage adopted for the contractor's profit and overhead in CPWD DSR 2016 rate analysis. Discuss about different methods for finding valuation oO A building is situated by the side of 2 main road of Mumbai city on a land of 300 (10) ‘sq m. The built up portion is 20m x 15 m. ‘The building is first class type and provided with water supply, sanitary and electrical fittings, and the age of the building is 30 years. Workout the valuation of the property. Discuss about the different types of values and the term obsolescence An old building has been purchased by 2 person at a cost of Rs. 30.000 ‘excluding the cost of the land. Calculate the amount of anmual sinking find at 4% interest assuming the future life of the building as 20 years and the scrap ‘value ofthe building as 10% of the cost of purchase. Discuss the importance of valuation in civil engineering. A three storied building is standing on a plot of land measuring 800 sq m. The plinth area of each storey is 400 sq m The is on RCC framed structure and the ‘fue life may taken as 70 years , The building fetches a gross rent of Rs 1500 per month , work out the capitalized value ofthe property on the basis of 6% met ‘yield For sinking find 3% compound interest may be assumed . Cost ofthe land ‘may betakenas Rs 40 per sqm. The other data may assumed suitably 33 33 6) @ a) Explain the use of CPWD schedule of rates and how it is applied for the (7) construction work in the different states of India. 1b) Write the unit of measurement of (i) DPC using waterproofing compound (ji) Iron (3) ‘work for window (iii) Water proof Painting above roof slab a) Calculate the amount required for carriage of 2500kg of steel reinforcement to be (5) brought from a source of 6km away from the site, The vehicle access is only upto 75un away from the construction site. CPWD data are as follows for mechanical transport of 1 tonne of steel at tkm@Rs 69.93: 2kan@Rs.79.29: Skim@Rs. 106.07: beyond Skm upto 1okm per km @Rs.7.72 ; and for transport of 1 tonne of steel by manual labour Rs.144.20/- for first SOmeters and Rs.21.16/- for every additional SOmetre or part thereof. bv) Reproduce detailed specification of Earthwork excavation for foundation in (5) ordinary soil. a) Develop rate analysis for DSR item No.5.3, Reinforced cement concrete work with (8) 1:1.5:3 G graded stone aggregate 20 mm nominal size) in beams, suspended floors, roofs having slope up to 15° landings, above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement. Material : 20mm Agareaate 0. ‘S7mv'@213001m", 10mm 0.28m'@ 21300/m*, ‘coarse sand (Zone IIT) 0.425m'@21200/m’, Portland cement 400kg@25700/tonne, Labour : Mason 0.24@2467/day. Beldat 2.75@368/day. Bhisti 0.90@2407/day. Coolie 1.88@2368/day Carriage provisions : Stone agaregate below 40mm 0.85m°@2103.77im’ Coarse sand 425m? @ € 103.77/n, Portland cement 0.A0tonne@E.92.24/tonne Hire Charges for concrete mixer 0.08@2800day. Vibrator needle type X0.08@350/day Sundries (LS) 14.30@31.73. Adopt water charges, contractor profit and overheads as per the CPWD DSR2016 provisions, ) List any four item generally considered under overhead charges. 2 7 a) List diferent ype of Value Give ef description of my thre pe. o ) Thecos of. newiy constructed building wes £25,000,00-.The lif ofthe building 10) 1s TSyeus. Determine the depreciated cost im te 50* year of life by suaigt line rnetiod and constant percentage method. The scrap vue ofthe bldg i 10% of ts consmactio cost. 8 8) Inaplorotiand costings. 49 Laks, biting ns teen newiy consmucted st 12) total cost of Rs 70 Lakhs. The banding const of 8 fits for 8 tenants. The owner ‘expects 8% retum onthe cest of consrucion and 6% return on the cos of land. Caleate te standard rent forthe each fat ofthe bulding assuming lie of ‘ulin is 70 years, sinking fund 4Yetnteres, 1% anal repair cos and 30% of ‘the outgoings of the net return. 1b) Write the difference between deprecistioa and obsolescence @ 9 a) Explain valuation and its importance. @ 1b) Workout the valuation of » commercial balding withthe following dats: Cost of (12) land for lifetime period of building is 75,20,000/. Gross income per year is £8,50,000/-Expencesraquized per your (a taf salary, electric charges, municipal taxes inching Hoeases fees, sttionery and printing at. ic 20% of the grote income (b) For epair and maintenance of Fi, famine ete @) 5% oftheir capital ‘cost of &.10,50,(00/. © sinking find for the items considered in capital cost, ‘whove life is I5years @1% after allowing 10% serp value. (Q) Incarance premiaaa {is £25,000/_ per your. Take yours purchase @8% and annul repair of the building @2% oa groee income. 1a) List different type of estimates b) Work out the quantity of given materials required for 1: analyse the unit rate using the details given below: 5:3 concrete and Description ‘Quantity | unit) RateRs. | unit 2Omm (nominal size)[ 7 ~~ [m® —[ 1300.00 |m™ broken stone ‘Sand z PM 1200.00 [m? ‘Cement 2 | Tome | 5700 Tome ‘Mason 0.200 [Nos | 500.00 | Each ‘Man 1,000 | Nos [450.00 | Bach Women 3.500 [Nos | 450.00 | Each ‘Man for lifiing materials [0.200 [Nos | 450.00 | Each 2 a)_List the essential documents to be accompanied with the detailed estimate b) What is mean by overhead charges? Give the percentage adopted for the contractor's profit and overhead in CPWD DSR 2016 rate analysis. @ © oO @ PART-A |. a) What do you understand by an approximate estimate and what purpose does, it serve ? b) Whats schedule of rates ? c) What is Market value and Book value ? ) Whatis sinking fund ? How will you calculate sinking fund. (4x5=20 Marks) II. a) Write down the detailed specification of R.C.C. for root slab. 5 b) Work out unit rate for R.R. masonry for foundation in cement & mortar 1 : 6 [for 1m3, rubble 1m? @ Rs. 600/m’, river sand 0.3m3 @ Rs. 1,200/m°,cement 72kg @ Rs. 5,000/t, mason —0,7/m3 @ Rs. 450/E, man —0.35/m? @ 350/E and woman —0.7/m? @ Rs. 325/E] 10 OR Ill. a) Write down the detailed specitication of rooting with A.C. Sheet 5 b) Work out the unit rate for P.C.C. 1 : 4: 8 using 40 mm broken stone. [For 1m3 — 40 mm broken stone 0.95 m® @ Rs. 1,100/m%, river sand 0.48 m3 @ Rs. 1,200/m?, cement 171 kg @ Rs. 5,000, mason 0.1 @ Rs. 450/E, Man ~ 1.0@ Rs. 350/E, and woman 1.4 @ Rs. 325/€]. 10 Pr0. IV, Estimate the quantities of the following items for a building shown in Fig. 1. i) Earth work excavation for foundation ii) R.C.C. for lintel, sunshade and roof slab il) Plastering of walls iv) Wood work for frames of doors and windows. v) Flooring with cement plastering over G:C 1:4: 8, 75 mm thick. 50 wii BL —_d YOINERY DETAILS Trem] Size wm | mx v. vil ‘@) Whatis depreciation ? Explain the various method for calculating depreciation, 'b) Explain in detail the method of fixation of standard rent of buildings. OR A three-storied building is standing on a plot of land measuring 800 m®. The plinth area of each storey is 400 m?, The building is of R.C.C. framed structure and the future life may be taken as 70 years. The building fetches rent of Rs. 15,000/- per month. Work out the capitalized value of the property on the basis 016% net yield, For sinking fund 3% compound interest may be assumed. Costof land may be taken Fis. 400/m?. Other data requited for working out the oulgoings per annum be assumed suitably 5

You might also like