LIBRARY OF STANDARD BQ
DESCRIPTION
FOR MALAYSIAN CIVIL
ENGINEERING
STANDARD METHOD OF
MEASUREMENT
DRAFT 03
MALAYSIAN
STANDARD
15D014R0
ICS: 91.010.01; 92.010
© Copyright 2017
PAGE 1
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
Contents
Preface iii
1.0 Introduction 1
Class F Earthworks BQ F1 - BQ F7 54
PREFACE
This document, Library of Standard BQ Malaysian Standard Civil Engineering Standard Method of Measurement, is to be read in
conjunction with the Malaysian Standard Civil Engineering – Standard Method of Measurement or MyCESMM. The development of
this library is in response to a common need to assist measurers in simplying their tasks when describing the work items found in
MSCESMM.
This library features a standard library of descriptions in a BQ template and is structured according to the work classification
covering all the classes of work in MSCESMM. Each standard BQ descriptions has been assigned a standard code number consisting
of a letter and not more than three digits. The letter corresponds to the class in the work classification in which the item occurs and
the digits depict the position of the item in thefirst division o, second division and third dividion of the respective classes of work.
The unit of measurement for each standard BQ description is also stated in accordance with MSCESMM. The standard BQ
descriptions coupled with the standard code number is expected to contribute towards future initiatives in computerizing the
preperation of the bill of quantities for civil engineering works.
The library would ease the user of MSCESMM in preparing the bill of quantities and at the same time it can also be used as a
checklist as it contains a comprehensive listing of standard BQ description that can be easily referenced by measurers for extracting
item description. Users of MSCESMM can confidently source from the library, standard BQ description together with the standard
code number and undertake minor editing to suit the project. A softcopy of the library of standard BQ descriptions is also provided to
complement this document.
Measurers will appreciate the library and the corresponding softcopy as an additional reference to simplify the measurements work,
particurlarly in describing work items, thus mitigating any potential contractual disputes over work items descriptions which can
happen in the field.
The MSCESMM Technical Working Group has been invaluable in its contribution towards the development of this library. The work
of analysing the comments, suggestions and drafting of this dokumen was undertaken by Sr Hajjah Sabaria Datuk Haji Hassan and Sr
Haji Jailani Jasmani from JUB Central Sdn Bhd. CIDB would like to take this opportunity to acknowledge and extend its sincere
appreciation to the Group for its guidance , suggestions and comments.
Page iii
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
In preparing a BQ ,the normal way is for the user to write the items description and then
search for the corresponding code numbers from the MSCESMM. Different users will have
different ways and styles of writing the item description and from feedback elsewhere,
the most difficult part is to allocate the code number for the item. This Library of standard BQ
description for MSCESMM is prepared in a standard s[readsheet format where every relevant
item in the MSCESMM is listed together with the code numbers. All the user needs to do is to
copy out the items together with the code numbers and carry out minor editing to suit the
project in hand.
The first column "Item No." has been added to allow the user to number the BQ items in series
and synchronice with the sections of the work as described in clause 3.2 of this MSCESMM.
The "sen" has been deleted from the amount column as in this era of computer technology the
amount column will be formatted with formulas and the "sen" column will be redundant.
The library of standard BQ description is in one spreadsheet file and the contain multiple
sheets for all the classes of work in MSCESMM for ease of file management.
The procedure to use the library are as follows:
a) Open up a standard spreedsheet file and format it to the library column spacing.
b) Click on the relevant class of work and scroll down until the desired item is seen. The user
may need to refer to the MSCESMM for a quick reference on the item number in the first
division of each class;
d) The item description serves only as a guide and is with '[.....]' or '(.....)' which requires the
user to carry out some form of editing to suit the particular project;
PAGE 4
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
f) Multiple items with the same code numbers are indicated by e.g D525.1, D525.2 and D525.3.
When only the second and third items D525.2 and D525.3 are required the code numbers should
also be changed to D525.1, D525.2 as example below.
g) In the above example, if only [100 mm square] direct shear box test is required,
the code number shall be changed to D525 and not D525.1
h) Specification clause to be included in the description of items when and when necessary.
The way to build up a BQ using this library is best illustrated using an example of construction
of an open top water tank as shown below:
PAGE 5
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
PART 2: OPEN TOP WATER TANK
I500 FORMWORK
Sides,
I600 REINFORCEMENT
2.13
2.14 I844 Linings and coatings, sodium silicate solution as per m2
Specification clause 4.15
to internal surfaces in contact with water of open top
water tank.
------------------------------------
PAGE 6
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
PAGE 7
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS A
General Items
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Bond
Insurances
Statutory obligation
Stamp duty
Facilities
PAGE 9+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA10 of BQA288
STANDARD METHOD OF MEASUREMENT
Facilities (cont'd)
Equipment
A225.2 Surveying equipment [with type and quantity as per the sum
specification ( Clause no....) ( In no…). Equipment to
be reverted to the contractor after completion].
Services.
PAGE 10+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA11 of BQA288
STANDARD METHOD OF MEASUREMENT
Services (cont'd)
Attendance
A241.1 Drivers [... Nos.] for [Type A and Type B vehicle]. man-mth
Submission of documents
Miscellaneous
PAGE 11+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA12 of BQA288
STANDARD METHOD OF MEASUREMENT
A322
Testing of materials; [concrete test cubes; samples and
sum
method of testing as per Specification clause no….].
Utility cost
Maintenance
PAGE 12+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA13 of BQA288
STANDARD METHOD OF MEASUREMENT
Maintenance of road
Temporary works
Access to site
PAGE 13+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA14 of BQA288
STANDARD METHOD OF MEASUREMENT
A420 Permits and fees [to KTMB for pipe jacking work sum
across railway tracks at (…….)].
Deposit.
A430 Deposit [to JKR for pipelaying work along road verge sum
from (……..) to (……………)].
License to contravene.
PAGE 14+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA15 of BQA288
STANDARD METHOD OF MEASUREMENT
Facilities
PAGE 15+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA16 of BQA288
STANDARD METHOD OF MEASUREMENT
Facilities (cont'd)
Temporary work
PAGE 16+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA17 of BQA288
STANDARD METHOD OF MEASUREMENT
A526.1 Construct temporary jetty [at Sg. (……)] ; fixed charge sum
(detail stated...).
PAGE 17+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA18 of BQA288
STANDARD METHOD OF MEASUREMENT
A527.1 Set-up staging over [Sg. (…….)] ; fixed charge (detail sum
stated...).
Temporary work
PAGE 18+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA19 of BQA288
STANDARD METHOD OF MEASUREMENT
A535.1 Construct shafts and pits as per detail stated […] ; fixed sum
charge (detail stated...).
A535.2 Remove shafts and pits as per detail stated […] ; fixed sum
charge (detail stated...).
A535.3 Maintain shafts and pits as per dwg no […] ; time- sum
related charge (detail stated...).
Services
PAGE 19+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA20 of BQA288
STANDARD METHOD OF MEASUREMENT
Services (cont'd)
Site management
PAGE 20+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA21 of BQA288
STANDARD METHOD OF MEASUREMENT
Independent Checkers
PAGE 21+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA22 of BQA288
STANDARD METHOD OF MEASUREMENT
Supervision fees.
Page BQA1
Page BQA2
Page BQA3
Page BQA4
Page BQA5
Page BQA6
Page BQA7
Page BQA8
Page BQA9
Page BQA10
Page BQA11
Page BQA12
Page BQA13
PAGE 22+4
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS A: General Items
FOR MALAYSIAN CIVIL ENGINEERING
Page BQA23 of BQA288
STANDARD METHOD OF MEASUREMENT
PAGE 23+4
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS B
Environmental Protection and Enhancement
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Sediment basin
PAGE 25+18
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS B: Environmental Protection and Enhancement
FOR MALAYSIAN CIVIL ENGINEERING
Page BQB26 of BQB288
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Silt trap
Maintenance
PAGE 26+18
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS B: Environmental Protection and Enhancement
FOR MALAYSIAN CIVIL ENGINEERING
Page BQB27 of BQB288
STANDARD METHOD OF MEASUREMENT
B310 Skid tank bund [at workshop area in reinforced concrete sum
of size 6 m x 4 m x 1 m high] as per specification
clause (…..) and as shown in the drawing.
B320 Water treatment facilities for [effluent from tunnel work sum
to comply with Standard (A/B) of the Environmental
Quality Act].
B341 pH nr
B351 pH nr
PAGE 27+18
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS B: Environmental Protection and Enhancement
FOR MALAYSIAN CIVIL ENGINEERING
Page BQB28 of BQB288
STANDARD METHOD OF MEASUREMENT
B361 pH nr
PAGE 28+18
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS B: Environmental Protection and Enhancement
FOR MALAYSIAN CIVIL ENGINEERING
Page BQB29 of BQB288
STANDARD METHOD OF MEASUREMENT
PAGE 29+18
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS B: Environmental Protection and Enhancement
FOR MALAYSIAN CIVIL ENGINEERING
Page BQB30 of BQB288
STANDARD METHOD OF MEASUREMENT
B700 CONSERVATION/PRESERVATION
Preservation of Flora
Preservation of Fauna
PAGE 30+18
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS B: Environmental Protection and Enhancement
FOR MALAYSIAN CIVIL ENGINEERING
Page BQB31 of BQB288
STANDARD METHOD OF MEASUREMENT
Preservation of Archeological/Heritage
B731 Report [in five sets], as per specification clause (…..). sum
PAGE 31+18
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS B: Environmental Protection and Enhancement
FOR MALAYSIAN CIVIL ENGINEERING
Page BQB32 of BQB288
STANDARD METHOD OF MEASUREMENT
Page BQB1
Page BQB2
Page BQB3
Page BQB4
Page BQB5
Page BQB6
Page BQB7
PAGE 32+18
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS B: Environmental Protection and Enhancement
FOR MALAYSIAN CIVIL ENGINEERING
Page BQB33 of BQB288
STANDARD METHOD OF MEASUREMENT
PAGE 33+18
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS C
Traffic Management and Control
Item No. Code No. Description Unit Qty. Rate Amount (RM)
PAGE 35+27
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS C: Traffic Management and Control
FOR MALAYSIAN CIVIL ENGINEERING
Page BQC36 of BQC288
STANDARD METHOD OF MEASUREMENT
Delineators
PAGE 36+27
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS C: Traffic Management and Control
FOR MALAYSIAN CIVIL ENGINEERING
Page BQC37 of BQC288
STANDARD METHOD OF MEASUREMENT
C320 Road safety audit report [on a quarterly basis in five sum
sets], as per specification (clause ….).
PAGE 37+27
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS C: Traffic Management and Control
FOR MALAYSIAN CIVIL ENGINEERING
Page BQC38 of BQC288
STANDARD METHOD OF MEASUREMENT
Page BQC1
Page BQC2
Page BQC3
PAGE 38+27
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS C: Traffic Management and Control
FOR MALAYSIAN CIVIL ENGINEERING
Page BQC39 of BQC288
STANDARD METHOD OF MEASUREMENT
PAGE 39+27
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS D
Site Investigation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Plant movement
D211 Land. nr
D212 Hillslopes. nr
Miscellaneous plant
D221 Land. nr
D222 Hillslopes. nr
Boring in soil
D231.2 10 – 20 m. m
D231.3 20 – 30 m. m
D231.4 30 – 40 m. m
D231.5 40 – 50 m. m
D231.6 Exceeding 50 m. m
PAGE 41+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD42 of BQD288
STANDARD METHOD OF MEASUREMENT
D232.2 10 – 20 m. m
D232.3 20 – 30 m. m
D232.4 30 – 40 m. m
D232.5 40 – 50 m. m
D232.6 Exceeding 50 m. m
D233.2 10 – 20 m. m
D233.3 20 – 30 m. m
D233.4 30 – 40 m. m
D233.5 40 – 50 m. m
D233.6 Exceeding 50 m. m
Drilling in rock
D241.2 10 – 20 m. m
D241.3 20 – 30 m. m
D241.4 30 – 40 m. m
D241.5 40 – 50 m. m
D241.6 Exceeding 50 m. m
PAGE 42+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD43 of BQD288
STANDARD METHOD OF MEASUREMENT
D242.2 10 – 20 m. m
D242.3 20 – 30 m. m
D242.4 30 – 40 m. m
D242.5 40 – 50 m. m
D242.6 Exceeding 50 m. m
D243.2 10 – 20 m. m
D243.3 20 – 30 m. m
D243.4 30 – 40 m. m
D243.5 40 – 50 m. m
D243.6 Exceeding 50 m. m
Reaming casing
D244.1 Not exceeding 10 m. m
D244.2 10 – 20 m. m
D244.3 20 – 30 m. m
D244.4 30 – 40 m. m
D244.5 40 – 50 m. m
D244.6 Exceeding 50 m. m
Grouting
D245.1 Not exceeding 10 m. m3
D245.2 10 – 20 m. m3
D245.3 20 – 30 m. m3
D245.4 30 – 40 m. m3
PAGE 43+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD44 of BQD288
STANDARD METHOD OF MEASUREMENT
D245.5 40 – 50 m. m3
D245.6 Exceeding 50 m. m3
Test
D251.2 10 – 20 m. nr
D251.3 20 – 30 m. nr
D251.4 30 – 40 m. nr
D251.5 40 – 50 m. nr
D251.6 Exceeding 50 m. nr
D252.2 10 – 20 m. nr
D252.3 20 – 30 m. nr
D252.4 30 – 40 m. nr
D252.5 40 – 50 m. nr
D252.6 Exceeding 50 m. nr
D253.2 10 – 20 m. nr
D253.3 20 – 30 m. nr
D253.4 30 – 40 m. nr
D253.5 40 – 50 m. nr
D253.6 Exceeding 50 m. nr
PAGE 44+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD45 of BQD288
STANDARD METHOD OF MEASUREMENT
Test (cont'd)
D254.2 10 – 20 m. nr
D254.3 20 – 30 m. nr
D254.4 30 – 40 m. nr
D254.5 40 – 50 m. nr
D254.6 Exceeding 50 m. nr
D255.2 10 – 20 m. nr
D255.3 20 – 30 m. nr
D255.4 30 – 40 m. nr
D255.5 40 – 50 m. nr
D255.6 Exceeding 50 m. nr
Sampling
D261.2 10 – 20 m. nr
D261.3 20 – 30 m. nr
D261.4 30 – 40 m. nr
D261.5 40 – 50 m. nr
D261.6 Exceeding 50 m. nr
PAGE 45+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD46 of BQD288
STANDARD METHOD OF MEASUREMENT
D262.2 10 – 20 m. nr
D262.3 20 – 30 m. nr
Sampling (cont'd)
Undisturbed sample using thin wall tube sampler, as per
specification clause [...] (cont'd)
D262.4 30 – 40 m. nr
D262.5 40 – 50 m. nr
D262.6 Exceeding 50 m. nr
D263.2 10 – 20 m. nr
D263.3 20 – 30 m. nr
D263.4 30 – 40 m. nr
D263.5 40 – 50 m. nr
D263.6 Exceeding 50 m. nr
D264.2 10 – 20 m. nr
D264.3 20 – 30 m. nr
D264.4 30 – 40 m. nr
D264.5 40 – 50 m. nr
D264.6 Exceeding 50 m. nr
D265.2 10 – 20 m. nr
D265.3 20 – 30 m. nr
D265.4 30 – 40 m. nr
PAGE 46+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD47 of BQD288
STANDARD METHOD OF MEASUREMENT
D265.5 40 – 50 m. nr
D265.6 Exceeding 50 m. nr
Sampling (cont'd)
D266.2 10 – 20 m. nr
D266.3 20 – 30 m. nr
D266.4 30 – 40 m. nr
D266.5 40 – 50 m. nr
D266.6 Exceeding 50 m. nr
Miscellaneous
Plant movement
D311 Land. nr
D312 Hillslopes. nr
Test
D321.2 10 – 20 m. m
D321.3 20 – 30 m. m
D321.4 30 – 40 m. m
D321.5 40 – 50 m. m
D321.6 Exceeding 50 m. m
PAGE 47+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD48 of BQD288
STANDARD METHOD OF MEASUREMENT
D322.2 10 – 20 m. m
D322.3 20 – 30 m. m
Test (cont'd)
D322.5 40 – 50 m. m
D322.6 Exceeding 50 m. m
D323.2 10 – 20 m. nr
D323.3 20 – 30 m. nr
D323.4 30 – 40 m. nr
D323.5 40 – 50 m. nr
D323.6 Exceeding 50 m. nr
Miscellaneous
Hand Auger
PAGE 48+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD49 of BQD288
STANDARD METHOD OF MEASUREMENT
Trial pit
Mackintosh probes
Vane
Plate bearing
In situ CBR
Pocket penetrometer
Field density
PAGE 49+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD50 of BQD288
STANDARD METHOD OF MEASUREMENT
Sampling
Classification test
PAGE 50+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD51 of BQD288
STANDARD METHOD OF MEASUREMENT
PAGE 51+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD52 of BQD288
STANDARD METHOD OF MEASUREMENT
D646 pH value. nr
D711 Setting out [ sets of seismic lines, rentising and produce sum
geophone, reduce levels, and topographical profile of
each seismic line using EDM ].
PAGE 52+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD53 of BQD288
STANDARD METHOD OF MEASUREMENT
D713 Prepare of bedrock and soil contour maps [of the site as sum
per specification clause (……), based on rock levels
obtained from seismic refraction survey].
Resistivity profiling
D741 Locate, detect, and map all utilities and services as per sum
specification (clause ...) , for area as shown in drawings.
D800 REPORT
Preliminary report
PAGE 53+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD54 of BQD288
STANDARD METHOD OF MEASUREMENT
Final report
PAGE 54+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD55 of BQD288
STANDARD METHOD OF MEASUREMENT
Page BQD1
Page BQD2
Page BQD3
Page BQD4
Page BQD5
Page BQD6
Page BQD7
Page BQD8
Page BQD9
Page BQD10
Page BQD11
Page BQD12
Page BQD13
Page BQD14
PAGE 55+32
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS D: Site Investigation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQD56 of BQD288
STANDARD METHOD OF MEASUREMENT
PAGE 56+32
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS E
Demolition and Site Clearance
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Above ground
Water bodies
E200 TREES
E300 BUILDING
Concrete
PAGE 58+48
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS E: Demolition and Site Clearance
FOR MALAYSIAN CIVIL ENGINEERING
Page BQE59 of BQE288
STANDARD METHOD OF MEASUREMENT
Timber
Metal
No predominant material
E400 STRUCTURES
Concrete
Timber
PAGE 59+48
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS E: Demolition and Site Clearance
FOR MALAYSIAN CIVIL ENGINEERING
Page BQE60 of BQE288
STANDARD METHOD OF MEASUREMENT
Metal
No Predominant Material
Concrete
Timber
Metal
No Predominant Material
PAGE 60+48
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS E: Demolition and Site Clearance
FOR MALAYSIAN CIVIL ENGINEERING
Page BQE61 of BQE288
STANDARD METHOD OF MEASUREMENT
E700 PIPELINES
PAGE 61+48
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS E: Demolition and Site Clearance
FOR MALAYSIAN CIVIL ENGINEERING
Page BQE62 of BQE288
STANDARD METHOD OF MEASUREMENT
Page BQE1
Page BQE2
Page BQE3
Page BQE4
PAGE 62+48
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS E: Demolition and Site Clearance
FOR MALAYSIAN CIVIL ENGINEERING
Page BQE63 of BQE288
STANDARD METHOD OF MEASUREMENT
PAGE 63+48
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS F: Earthworks
LIBRARY OF STANDARD BQ DESCRIPTION CLASS F: Earthworks
FOR MALAYSIAN CIVIL ENGINEERING Page BQF65 of BQF288
STANDARD METHOD OF MEASUREMENT
CLASS F
Earthworks
Item No. Code No. Description Unit Qty. Rate Amount (RM)
F100 EXCAVATION
Stripping
Cut to Fill
PAGE 65+54
LIBRARY OF STANDARD BQ DESCRIPTION CLASS F: Earthworks
FOR MALAYSIAN CIVIL ENGINEERING Page BQF66 of BQF288
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Foundation
PAGE 66+54
LIBRARY OF STANDARD BQ DESCRIPTION CLASS F: Earthworks
FOR MALAYSIAN CIVIL ENGINEERING Page BQF67 of BQF288
STANDARD METHOD OF MEASUREMENT
Under water
Dredging
F300 FILLING
General
PAGE 67+54
LIBRARY OF STANDARD BQ DESCRIPTION CLASS F: Earthworks
FOR MALAYSIAN CIVIL ENGINEERING Page BQF68 of BQF288
STANDARD METHOD OF MEASUREMENT
General (cont'd)
Embankments
Replacement
PAGE 68+54
LIBRARY OF STANDARD BQ DESCRIPTION CLASS F: Earthworks
FOR MALAYSIAN CIVIL ENGINEERING Page BQF69 of BQF288
STANDARD METHOD OF MEASUREMENT
To structures
Below water
PAGE 69+54
LIBRARY OF STANDARD BQ DESCRIPTION CLASS F: Earthworks
FOR MALAYSIAN CIVIL ENGINEERING Page BQF70 of BQF288
STANDARD METHOD OF MEASUREMENT
F400 LANDSCAPING
F450 Trees [of the (….) species with minimum girth of (200 nr
mm) and (3 m) tall].
PAGE 70+54
LIBRARY OF STANDARD BQ DESCRIPTION CLASS F: Earthworks
FOR MALAYSIAN CIVIL ENGINEERING Page BQF71 of BQF288
STANDARD METHOD OF MEASUREMENT
Page BQF1
Page BQF2
Page BQF3
Page BQF4
Page BQF5
Page BQF6
PAGE 71+54
LIBRARY OF STANDARD BQ DESCRIPTION CLASS F: Earthworks
FOR MALAYSIAN CIVIL ENGINEERING Page BQF72 of BQF288
STANDARD METHOD OF MEASUREMENT
PAGE 72+54
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS G
Geotechnical Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
G120 Moving and handling all necessary plant and equipment sum
within the site and from location to location as often as
is and whenever necessary for the execution of whole
operation.
Gabion
PAGE 74+62
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS G: Geotechnical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQG75 of BQG288
STANDARD METHOD OF MEASUREMENT
Cribwall
PAGE 75+62
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS G: Geotechnical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQG76 of BQG288
STANDARD METHOD OF MEASUREMENT
Soil nailing
G311.1 [6 m] long. nr
G311.2 [9 m] long. nr
Rock bolt
G321.1 [2 m] long. nr
G321.2 [4 m] long. nr
PAGE 76+62
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS G: Geotechnical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQG77 of BQG288
STANDARD METHOD OF MEASUREMENT
Ground anchor
G331 In earth. m
G333 In rock. m
Concrete buttress
Horizontal drain
G351 Earth. m
G353 In rock. m
PAGE 77+62
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS G: Geotechnical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQG78 of BQG288
STANDARD METHOD OF MEASUREMENT
G611 Earth. m
G613 In rock. m
PAGE 78+62
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS G: Geotechnical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQG79 of BQG288
STANDARD METHOD OF MEASUREMENT
Sleeve pipes
G620 uPVC sleeve pipes for [50 mm] diameter grout hole. m
Injection
G632 Sand. t
Excavation
PAGE 79+62
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS G: Geotechnical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQG80 of BQG288
STANDARD METHOD OF MEASUREMENT
Excavation (cont'd)
Concrete
Reinforcement
Waterproof joints
Guide walls
PAGE 80+62
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS G: Geotechnical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQG81 of BQG288
STANDARD METHOD OF MEASUREMENT
G800 INSTRUMENTATION
Monitoring
PAGE 81+62
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS G: Geotechnical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQG82 of BQG288
STANDARD METHOD OF MEASUREMENT
Page BQG1
Page BQG2
Page BQG3
Page BQG4
Page BQG5
Page BQG6
Page BQG7
Page BQG8
PAGE 82+62
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS G: Geotechnical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQG83 of BQG288
STANDARD METHOD OF MEASUREMENT
PAGE 83+62
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS H
Piling Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
H120 Moving and handling of all piling plant and equipment sum
within the site and from location to location as often as
is, and whenever necessary for the execution of the
whole piling operation.
H130 Temporary staging [for piling work at the banks of Sg. sum
(…..)].
H200 PILES
Bored piles
PAGE 85+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH86 of BQH288
STANDARD METHOD OF MEASUREMENT
H221 Depth driven [12 mm] thick mild steel casing in earth m
for [50] nos. of pile points.
Barrette piles
PAGE 86+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH87 of BQH288
STANDARD METHOD OF MEASUREMENT
Caisson piles
PAGE 87+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH88 of BQH288
STANDARD METHOD OF MEASUREMENT
Micropiles
Supply and install [200 mm] diameter micropiles as
working piles (in no..)].
H251 Depth boring in [ earth, up to [20 m] for [30] nos. of m
pile points ].
PAGE 88+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH89 of BQH288
STANDARD METHOD OF MEASUREMENT
Steel H-Piles
PAGE 89+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH90 of BQH288
STANDARD METHOD OF MEASUREMENT
H300 PILES
Timber Piles
H327 Jetting. m
PAGE 90+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH91 of BQH288
STANDARD METHOD OF MEASUREMENT
PAGE 91+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH92 of BQH288
STANDARD METHOD OF MEASUREMENT
H347 Jetting. m
H354 Jetting. m
H355.1 Special piles [for 90o corners with mass of 14.4 kg/m]. m
Obstructions
PAGE 92+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH93 of BQH288
STANDARD METHOD OF MEASUREMENT
PAGE 93+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH94 of BQH288
STANDARD METHOD OF MEASUREMENT
Page BQH1
Page BQH2
Page BQH3
Page BQH4
Page BQH5
Page BQH6
Page BQH7
Page BQH8
Page BQH9
PAGE 94+72
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS H: Piling Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQH95 of BQH288
STANDARD METHOD OF MEASUREMENT
PAGE 95+72
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS I
Concrete Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Grade: C20
Mass concrete
I121 Blinding ; [75 mm] thick [to clear water tank]. m2
Grade: C25
Reinforced concrete
PAGE 97+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI98 of BQI288
STANDARD METHOD OF MEASUREMENT
Grade: C30
Reinforced concrete
Grade: C35
Reinforced concrete
PAGE 98+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI99 of BQI288
STANDARD METHOD OF MEASUREMENT
Grade: C35A
Reinforced concrete
Grade: C40
Reinforced concrete
PAGE 99+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI100 of BQI288
STANDARD METHOD OF MEASUREMENT
Grade: C50
Reinforced concrete
I182.1 Bases to [location ....] m3
PAGE 100+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI101 of BQI288
STANDARD METHOD OF MEASUREMENT
1:3:6
1:2:4
Reinforced concrete
PAGE 101+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI102 of BQI288
STANDARD METHOD OF MEASUREMENT
1: 1 1/2: 3
Reinforced concrete
I332.1 Base to [trenches]. m3
1:1:2
Reinforced concrete
I342.1 Base to [elevated water tank]. m3
PAGE 102+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI103 of BQI288
STANDARD METHOD OF MEASUREMENT
I500 FORMWORK
Sides
PAGE 103+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI104 of BQI288
STANDARD METHOD OF MEASUREMENT
Sides (cont'd)
Soffit
Sloping
I541 F2: fair finish to upper surface to base, [height 0.3 – 0.5 m2
m].
PAGE 104+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI105 of BQI288
STANDARD METHOD OF MEASUREMENT
Other curve
For voids
I600 REINFORCEMENT
PAGE 105+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI106 of BQI288
STANDARD METHOD OF MEASUREMENT
PAGE 106+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI107 of BQI288
STANDARD METHOD OF MEASUREMENT
Special joints
Steel fabric
PAGE 107+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI108 of BQI288
STANDARD METHOD OF MEASUREMENT
Joints
Post-tensioned prestressing
PAGE 108+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI109 of BQI288
STANDARD METHOD OF MEASUREMENT
Inserts
PAGE 109+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI110 of BQI288
STANDARD METHOD OF MEASUREMENT
PAGE 110+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI111 of BQI288
STANDARD METHOD OF MEASUREMENT
Page BQI1
Page BQI2
Page BQI3
Page BQI4
Page BQI5
Page BQI6
Page BQI7
Page BQI8
Page BQI9
Page BQI10
Page BQI11
Page BQI12
Page BQI13
Page BQI14
PAGE 111+83
LIBRARY OF STANDARD BQ DESCRIPTION CLASS I: Concrete Work
FOR MALAYSIAN CIVIL ENGINEERING Page BQI112 of BQI288
STANDARD METHOD OF MEASUREMENT
PAGE 112+83
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS J
Brickwork, Blockwork, and Masonry
Item No. Code No. Description Unit Qty. Rate Amount (RM)
J100 BRICKWORK
PAGE 114+99
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS J: Brickwork, Blockwork, and Masonry
FOR MALAYSIAN CIVIL ENGINEERING
Page BQJ115 of BQJ288
STANDARD METHOD OF MEASUREMENT
J200 BLOCKWORK
PAGE 115+99
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS J: Brickwork, Blockwork, and Masonry
FOR MALAYSIAN CIVIL ENGINEERING
Page BQJ116 of BQJ288
STANDARD METHOD OF MEASUREMENT
PAGE 116+99
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS J: Brickwork, Blockwork, and Masonry
FOR MALAYSIAN CIVIL ENGINEERING
Page BQJ117 of BQJ288
STANDARD METHOD OF MEASUREMENT
J300 MASONRY
PAGE 117+99
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS J: Brickwork, Blockwork, and Masonry
FOR MALAYSIAN CIVIL ENGINEERING
Page BQJ118 of BQJ288
STANDARD METHOD OF MEASUREMENT
Surface features
Ancillaries
PAGE 118+99
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS J: Brickwork, Blockwork, and Masonry
FOR MALAYSIAN CIVIL ENGINEERING
Page BQJ119 of BQJ288
STANDARD METHOD OF MEASUREMENT
Ancillaries (cont'd)
PAGE 119+99
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS J: Brickwork, Blockwork, and Masonry
FOR MALAYSIAN CIVIL ENGINEERING
Page BQJ120 of BQJ288
STANDARD METHOD OF MEASUREMENT
Page BQJ1
Page BQJ2
Page BQJ3
Page BQJ4
Page BQJ5
Page BQJ6
PAGE 120+99
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS J: Brickwork, Blockwork, and Masonry
FOR MALAYSIAN CIVIL ENGINEERING
Page BQJ121 of BQJ288
STANDARD METHOD OF MEASUREMENT
PAGE 121+99
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS K
Timber Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
PAGE 123+107
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS K: Timber Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQK124 of BQK288
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
K200 DECKING
PAGE 124+107
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS K: Timber Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQK125 of BQK288
STANDARD METHOD OF MEASUREMENT
K300 BOARDING
PAGE 125+107
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS K: Timber Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQK126 of BQK288
STANDARD METHOD OF MEASUREMENT
K412 [Cengal] hand rails with [75 mm x 75 mm] post and [75 m
mm x 50 mm] rails as shown in Drawing No. (………).
PAGE 126+107
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS K: Timber Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQK127 of BQK288
STANDARD METHOD OF MEASUREMENT
PAGE 127+107
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS K: Timber Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQK128 of BQK288
STANDARD METHOD OF MEASUREMENT
Page BQK1
Page BQK2
Page BQK3
Page BQK4
Page BQK5
PAGE 128+107
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS K: Timber Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQK129 of BQK288
STANDARD METHOD OF MEASUREMENT
PAGE 129+107
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS L
Metal Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Hot-rolled sections
PAGE 131+114
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS L: Metal Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQL132 of BQL288
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Cold-rolled sections
PAGE 132+114
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS L: Metal Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQL133 of BQL288
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Extruded sections
PAGE 133+114
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS L: Metal Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQL134 of BQL288
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Black bolts
PAGE 134+114
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS L: Metal Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQL135 of BQL288
STANDARD METHOD OF MEASUREMENT
Decking
Cladding
PAGE 135+114
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS L: Metal Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQL136 of BQL288
STANDARD METHOD OF MEASUREMENT
Waling
Miscellaneous framing
Tie rod
Uncovered tanks
PAGE 136+114
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS L: Metal Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQL137 of BQL288
STANDARD METHOD OF MEASUREMENT
Covered tanks
PAGE 137+114
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS L: Metal Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQL138 of BQL288
STANDARD METHOD OF MEASUREMENT
Page BQL1
Page BQL2
Page BQL3
Page BQL4
Page BQL5
Page BQL6
Page BQL7
PAGE 138+114
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS L: Metal Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQL139 of BQL288
STANDARD METHOD OF MEASUREMENT
PAGE 139+114
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS M
Building Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Roof structure
M114.1 Mild steel, Grade 43A to BS 4360 roof truss system and m2
components as per specification (clause ….) including
all connecting plates, bolts, nuts and other fastening .
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Roof covering
Underlay
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Insulation
Roofing Ancillaries
Timber
M151.1 Eave ;[180 mm x 25 mm thick ] . m
Metal
M151.3 Eave ;[180 mm x 25 mm thick ] . m
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Tiles components
[uPVC pipes]
M211 Rainwater gutters ;[150 mm half round]. m
Asphalt
Bituminous
Sheet metal
Waterproofing sheeting
Waterproof coating
Butyl rubber
EPDM rubber
PVC
Polypropylene
Polyethylene
Polyurethane (cont'd)
Proprietary system
Timber
Timber (cont')
Metal
Plastics
M600 GLAZING
M700 FINISHES
Floor Finishes
Skirting to Floor
Wall finishes
Ceiling Finishes
M744 Cornices. m
Wall Partition
M813 [10 mm] thick half board with 6 mm thick fixed float m2
glass
Page BQM1
Page BQM2
Page BQM3
Page BQM4
Page BQM5
Page BQM6
Page BQM7
Page BQM8
Page BQM9
Page BQM10
Page BQM11
Page BQM12
Page BQM13
Page BQM14
Page BQM15
Page BQM16
Page BQM17
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS M: Building Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQM159 of BQM288
STANDARD METHOD OF MEASUREMENT
CLASS N
Painting Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Timber
Smooth surfaces
Rough surfaces
Masonary
PAGE 161+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN162 of BQN288
STANDARD METHOD OF MEASUREMENT
Metal Sections
Pipework
Timber
Smooth Surfaces
PAGE 162+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN163 of BQN288
STANDARD METHOD OF MEASUREMENT
Rough Surfaces
Masonary
Metal sections
Pipework
PAGE 163+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN164 of BQN288
STANDARD METHOD OF MEASUREMENT
Timber
Smooth surfaces
Rough surfaces
Masonary
Metal sections
PAGE 164+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN165 of BQN288
STANDARD METHOD OF MEASUREMENT
Pipework
Timber
Smooth surfaces
Rough surfaces
PAGE 165+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN166 of BQN288
STANDARD METHOD OF MEASUREMENT
Masonary
Metal sections
Pipework
PAGE 166+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN167 of BQN288
STANDARD METHOD OF MEASUREMENT
Timber
Smooth surfaces
Rough surfaces
Masonary
PAGE 167+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN168 of BQN288
STANDARD METHOD OF MEASUREMENT
Metal sections
Pipework
Timber
Smooth surfaces
PAGE 168+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN169 of BQN288
STANDARD METHOD OF MEASUREMENT
Rough surfaces
Masonary
Metal sections
Pipework
PAGE 169+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN170 of BQN288
STANDARD METHOD OF MEASUREMENT
Timber
Smooth surfaces
Rough surfaces
Masonary
PAGE 170+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN171 of BQN288
STANDARD METHOD OF MEASUREMENT
Masonary
Metal sections
Pipework
PAGE 171+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN172 of BQN288
STANDARD METHOD OF MEASUREMENT
Timber
Smooth surfaces
Rough surfaces
Smooth surfaces
Rough surfaces
Masonary
PAGE 172+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN173 of BQN288
STANDARD METHOD OF MEASUREMENT
Metal sections
Pipework
PAGE 173+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN174 of BQN288
STANDARD METHOD OF MEASUREMENT
Page BQN1
Page BQN2
Page BQN3
Page BQN4
Page BQN5
Page BQN6
Page BQN7
Page BQN8
Page BQN9
Page BQN10
Page BQN11
Page BQN12
Page BQN13
PAGE 174+141
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS N: Painting Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQN175 of BQN288
STANDARD METHOD OF MEASUREMENT
PAGE 175+141
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS O: Pipework
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO177 of BQO288
STANDARD METHOD OF MEASUREMENT
CLASS O
Pipework
Item No. Code No. Description Unit Qty. Rate Amount (RM)
O100 EXCAVATION
Trench in Earth
Extra over
PAGE 177+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO178 of BQO288
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
PAGE 178+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO179 of BQO288
STANDARD METHOD OF MEASUREMENT
Backfilling with
Beds
PAGE 179+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO180 of BQO288
STANDARD METHOD OF MEASUREMENT
Beds (cont'd)
Surround
Haunches
PAGE 180+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO181 of BQO288
STANDARD METHOD OF MEASUREMENT
Beds (cont'd)
O400 PIPES
Sewerage Pipes
PAGE 181+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO182 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 182+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO183 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 183+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO184 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 184+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO185 of BQO288
STANDARD METHOD OF MEASUREMENT
O500 PIPES
PAGE 185+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO186 of BQO288
STANDARD METHOD OF MEASUREMENT
O512.2 150 mm DN . m
O512.3 200 mm DN . m
PAGE 186+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO187 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 187+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO188 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 188+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO189 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 189+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO190 of BQO288
STANDARD METHOD OF MEASUREMENT
O522.2 150 mm DN . m
O522.3 200 mm DN . m
PAGE 190+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO191 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 191+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO192 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 192+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO193 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 193+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO194 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 194+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO195 of BQO288
STANDARD METHOD OF MEASUREMENT
O500 PIPES
PAGE 195+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO196 of BQO288
STANDARD METHOD OF MEASUREMENT
O532.2 150 mm DN . m
O52.3 200 mm DN . m
PAGE 196+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO197 of BQO288
STANDARD METHOD OF MEASUREMENT
Straight Specials
O611 [300 mm DN] mild steel plain ended pipes, [2000 mm] nr
long.
O612 [300 mm DN] plain and flanged ended mild steel pipes, nr
[2000 mm] long. Flanges shall be [PN 16 to BS EN
1092-1].
PAGE 197+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO198 of BQO288
STANDARD METHOD OF MEASUREMENT
O614 [300 mm DN] plain ended mild steel pipe, [2000 mm] nr
long with puddle flange at [1000 mm] from one end.
Details of puddle flange shall be as shown in Drawing
No. (…).
O615 [300 mm DN] plain and flanged ended mild steel pipe, nr
[2000 mm] long with puddle flange at [1000 mm] from
flange end. Flange shall be [PN 16 to BS EN 1092-1]
and details of puddle flange shall be as shown in
Drawing No. (…).
Fittings
Bend.
PAGE 198+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO199 of BQO288
STANDARD METHOD OF MEASUREMENT
Fittings (cont'd)
Bend (cont'd) .
PAGE 199+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO200 of BQO288
STANDARD METHOD OF MEASUREMENT
Fittings (cont'd)
O627 Hydrant nr
Fittings Special
Bend.
PAGE 200+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO201 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 201+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO202 of BQO288
STANDARD METHOD OF MEASUREMENT
O637 Hydrant nr
Valves
Valves (cont'd)
PAGE 202+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO203 of BQO288
STANDARD METHOD OF MEASUREMENT
Joints
Joints (cont'd)
PAGE 203+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO204 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 204+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO205 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 205+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO206 of BQO288
STANDARD METHOD OF MEASUREMENT
PAGE 206+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO207 of BQO288
STANDARD METHOD OF MEASUREMENT
O767 Lay [300 mm DN] API grade steel pipes by float and m
sink method.
O768 Lay [300 mm DN] API grade steel pipes by bottom pull m
method.
O772 Carry out tie-in of riser pipe to land pipe as detailed in sum
approved method statement.
Slip Lining
Sewer Manholes
PAGE 207+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO208 of BQO288
STANDARD METHOD OF MEASUREMENT
O811 Brick manholes Type [A] with heavy duty cover and nr
frame for [2.5 m depth] as shown in Drawing No. (….).
Chamber
O821 Brick chamber Type [A] with heavy duty cover and nr
frame for [2.5 m depth] as shown in Drawing No. (….).
Chamber (cont'd)
PAGE 208+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO209 of BQO288
STANDARD METHOD OF MEASUREMENT
Temporary Diversion
PAGE 209+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO210 of BQO288
STANDARD METHOD OF MEASUREMENT
Pipework Ancillaries
O872 Ring girder for [1000 mm DN] mild steel pipe stream nr
crossing at Sg. (…) as shown in Drawing No. (….).
O874 Spike guard for [600 mm DN] mild steel pipe stream nr
crossing at Sg. (…) as shown in Drawing No. (….).
Page BQO1
Page BQO2
Page BQO3
Page BQO4
Page BQO5
Page BQO6
Page BQO7
PAGE 210+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO211 of BQO288
STANDARD METHOD OF MEASUREMENT
Page BQO8
Page BQO9
Page BQO10
Page BQO11
Page BQO12
Page BQO13
Page BQO14
Page BQO15
Page BQO16
Page BQO17
Page BQO18
Page BQO19
Page BQO20
Page BQO21
Page BQO22
Page BQO23
Page BQO24
Page BQO25
Page BQ26
Page BQ27
Page BQ28
Page BQ29
Page BQ30
Page BQ31
PAGE 211+156
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS O: Pipework
FOR MALAYSIAN CIVIL ENGINEERING
Page BQO212 of BQO288
STANDARD METHOD OF MEASUREMENT
Page BQ32
Page BQ33
Page BQ34
PAGE 212+156
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS P
Pipe Rehabilitation Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Cleaning
Removal of Intrusion
Survey
Pipe Bursting.
P160 Butt fusion welded HDPE pipe using the pipe bursting m
method [450mm OD, PE 80, PN 16] .
External Grouting.
PAGE 214+193
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS P: Pipe Rehabilitation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQP215 of BQP288
STANDARD METHOD OF MEASUREMENT
Pipeworks
PAGE 215+193
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS P: Pipe Rehabilitation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQP216 of BQP288
STANDARD METHOD OF MEASUREMENT
Marker post
Ring girder
Pipe strap
Spike guard
P400 DESILTING
PAGE 216+193
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS P: Pipe Rehabilitation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQP217 of BQP288
STANDARD METHOD OF MEASUREMENT
P500 INTERUPTION
Work on manhole.
PAGE 217+193
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS P: Pipe Rehabilitation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQP218 of BQP288
STANDARD METHOD OF MEASUREMENT
P600 REINSTATEMENT
Landscaping
Roads
Pavements
Other structure.
PAGE 218+193
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS P: Pipe Rehabilitation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQP219 of BQP288
STANDARD METHOD OF MEASUREMENT
Page BQP1
Page BQP2
Page BQP3
Page BQP4
Page BQP5
PAGE 219+193
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS P: Pipe Rehabilitation Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQP220 of BQP288
STANDARD METHOD OF MEASUREMENT
PAGE 220+193
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS Q
Drainage Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Q100 EXCAVATION
Extra Over
PAGE 222+200
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS Q: Drainage Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQQ223 of BQQ288
STANDARD METHOD OF MEASUREMENT
Sumps
Culvert.
PAGE 223+200
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS Q: Drainage Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQQ224 of BQQ288
STANDARD METHOD OF MEASUREMENT
Culvert (cont'd)
Interceptor drains
Roadside drain
Median drain
Toe drain
Cascade drains
PAGE 224+200
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS Q: Drainage Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQQ225 of BQQ288
STANDARD METHOD OF MEASUREMENT
Monsoon drain
Grass swale
Subsoil drains
Outlet drains
Drainage blanket
Scupper drains
Slotted drains
Downpipes
PAGE 225+200
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS Q: Drainage Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQQ226 of BQQ288
STANDARD METHOD OF MEASUREMENT
Precast concrete
Metal
Q600 CULVERTS
PAGE 226+200
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS Q: Drainage Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQQ227 of BQQ288
STANDARD METHOD OF MEASUREMENT
Plastic pipe
Q700 SUMPS
Bricks
Precast concrete
Q800 SUMPS
Bricks
Precast concrete
PAGE 227+200
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS Q: Drainage Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQQ228 of BQQ288
STANDARD METHOD OF MEASUREMENT
Page BQQ1
Page BQQ2
Page BQQ3
Page BQQ4
Page BQQ5
Page BQQ6
PAGE 228+200
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS Q: Drainage Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQQ229 of BQQ288
STANDARD METHOD OF MEASUREMENT
PAGE 229+200
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS R
Roads and Pavings
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Stabilised subgrade
R141 [300 mm; top layer of subgrade; using 100 kg] of lime m2
per cubic metre of soil]
R200 SUB-BASE
Drainage layer
Sub-base course
PAGE 231+208
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS R: Roads and Pavings
FOR MALAYSIAN CIVIL ENGINEERING
Page BQR232 of BQR288
STANDARD METHOD OF MEASUREMENT
R300 ROADBASE
PAGE 232+208
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS R: Roads and Pavings
FOR MALAYSIAN CIVIL ENGINEERING
Page BQR233 of BQR288
STANDARD METHOD OF MEASUREMENT
Porous Asphalt.
Reinforcement
PAGE 233+208
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS R: Roads and Pavings
FOR MALAYSIAN CIVIL ENGINEERING
Page BQR234 of BQR288
STANDARD METHOD OF MEASUREMENT
Reinforcement (cont'd)
Carriageway slab.
Pavers
PAGE 234+208
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS R: Roads and Pavings
FOR MALAYSIAN CIVIL ENGINEERING
Page BQR235 of BQR288
STANDARD METHOD OF MEASUREMENT
Pavers (cont'd)
Signage
PAGE 235+208
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS R: Roads and Pavings
FOR MALAYSIAN CIVIL ENGINEERING
Page BQR236 of BQR288
STANDARD METHOD OF MEASUREMENT
Signage (cont'd)
Pavement Markings
R823.2 [100 mm] wide intermittent [lane] line with [1000 mm] m
line and [1700 mm] gap.
PAGE 236+208
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS R: Roads and Pavings
FOR MALAYSIAN CIVIL ENGINEERING
Page BQR237 of BQR288
STANDARD METHOD OF MEASUREMENT
Delineators
Traffic barrier
PAGE 237+208
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS R: Roads and Pavings
FOR MALAYSIAN CIVIL ENGINEERING
Page BQR238 of BQR288
STANDARD METHOD OF MEASUREMENT
Miscellaneous
Miscellaneous (cont'd)
Gantry
PAGE 238+208
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS R: Roads and Pavings
FOR MALAYSIAN CIVIL ENGINEERING
Page BQR239 of BQR288
STANDARD METHOD OF MEASUREMENT
Page BQR1
Page BQR2
Page BQR3
Page BQR4
Page BQR5
Page BQR6
Page BQR7
Page BQR8
PAGE 239+208
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS R: Roads and Pavings
FOR MALAYSIAN CIVIL ENGINEERING
Page BQR240 of BQR288
STANDARD METHOD OF MEASUREMENT
PAGE 240+208
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS S
Tunnel Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Facilities
Launch shaft
Retrieval shaft
Launching facilities
PAGE 242+218
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS S: Tunnel Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQS243 of BQS288
STANDARD METHOD OF MEASUREMENT
Retrieval facilities
PAGE 243+218
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS S: Tunnel Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQS244 of BQS288
STANDARD METHOD OF MEASUREMENT
S235 Silo & storage tank as per specification (clause..) and as set
shown in Drawing No. (…).
Transportation system
S300 EXCAVATION
Tunnel
PAGE 244+218
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS S: Tunnel Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQS245 of BQS288
STANDARD METHOD OF MEASUREMENT
Shaft
Drilling
Grouting
PAGE 245+218
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS S: Tunnel Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQS246 of BQS288
STANDARD METHOD OF MEASUREMENT
Shotcrete
In situ Concrete
Reinforcement
S433 High tensile steel fabric [mesh A252 (A8), 3.95 kg/m2]. m2
Formwork
Water Proofing
PAGE 246+218
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS S: Tunnel Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQS247 of BQS288
STANDARD METHOD OF MEASUREMENT
Cross passage
Concrete Lining
Steel Suport
Lagging
Bolting
PAGE 247+218
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS S: Tunnel Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQS248 of BQS288
STANDARD METHOD OF MEASUREMENT
S633 Pull out test for [T25 mm dia. rock bolt x 3 m long] nr
with test load of [200 kN].
Shotcrete
Fibre Mortar
Fore poling
S661 Fore poling with [T25 mm] diameter dowel bar of [12 nr
m] long as shown in the drawings.
S700 BACKFILL
Invert
Behind lagging
PAGE 248+218
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS S: Tunnel Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQS249 of BQS288
STANDARD METHOD OF MEASUREMENT
Stress measurement
S833 Inclinometer. nr
PAGE 249+218
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS S: Tunnel Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQS250 of BQS288
STANDARD METHOD OF MEASUREMENT
Page BQS1
Page BQS2
Page BQS3
Page BQS4
Page BQS5
Page BQS6
Page BQS7
Page BQS8
PAGE 250+218
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS S: Tunnel Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQS251 of BQS288
STANDARD METHOD OF MEASUREMENT
PAGE 251+218
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS T
Rails Track
Item No. Code No. Description Unit Qty. Rate Amount (RM)
T100 SUPPLYING
Track foundation
Rails
Sleepers
Conductor rails
PAGE 253+228
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS T: Rail Track
FOR MALAYSIAN CIVIL ENGINEERING
Page BQT254 of BQT288
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Diamond crossing
T200 SUPPLYING
Sundries
PAGE 254+228
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS T: Rail Track
FOR MALAYSIAN CIVIL ENGINEERING
Page BQT255 of BQT288
STANDARD METHOD OF MEASUREMENT
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Sundries (cont'd)
Sundries
Rail furniture
Cable through
Emergency walkway
PAGE 255+228
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS T: Rail Track
FOR MALAYSIAN CIVIL ENGINEERING
Page BQT256 of BQT288
STANDARD METHOD OF MEASUREMENT
T300 LAYING
Track Foundation
Rails
Sleepers
Conductor Rails
PAGE 256+228
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS T: Rail Track
FOR MALAYSIAN CIVIL ENGINEERING
Page BQT257 of BQT288
STANDARD METHOD OF MEASUREMENT
Fittings
Welded joints
Turnouts
Diamond crossing
Sundries
PAGE 257+228
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS T: Rail Track
FOR MALAYSIAN CIVIL ENGINEERING
Page BQT258 of BQT288
STANDARD METHOD OF MEASUREMENT
Sundries (cont'd)
T413 Lubricators. nr
Sundries
Rail furniture
Cable through
T451 Insitu m
T452 Precast. m
Emergency walkway
PAGE 258+228
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS T: Rail Track
FOR MALAYSIAN CIVIL ENGINEERING
Page BQT259 of BQT288
STANDARD METHOD OF MEASUREMENT
T500 DISMANTLING
Conductor rails
Sundries
T543 Lubricators. nr
PAGE 259+228
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS T: Rail Track
FOR MALAYSIAN CIVIL ENGINEERING
Page BQT260 of BQT288
STANDARD METHOD OF MEASUREMENT
Page BQT1
Page BQT2
Page BQT3
Page BQT4
Page BQT5
Page BQT6
Page BQT7
PAGE 260+228
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS T: Rail Track
FOR MALAYSIAN CIVIL ENGINEERING
Page BQT261 of BQT288
STANDARD METHOD OF MEASUREMENT
PAGE 261+228
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS U
Mechanical and Electrical Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Circular ductwork
Rectangular ductwork
Flexible ducting
PAGE 263+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU264 of BQU288
STANDARD METHOD OF MEASUREMENT
Cables / conductors
Conduits
Final circuit.
Trunking
PAGE 264+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU265 of BQU288
STANDARD METHOD OF MEASUREMENT
Trunking (cont'd)
Accessories
PAGE 265+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU266 of BQU288
STANDARD METHOD OF MEASUREMENT
Fan
PAGE 266+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU267 of BQU288
STANDARD METHOD OF MEASUREMENT
Accessories
Dampers
PAGE 267+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU268 of BQU288
STANDARD METHOD OF MEASUREMENT
PAGE 268+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU269 of BQU288
STANDARD METHOD OF MEASUREMENT
Accessories
Accessories
PAGE 269+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU270 of BQU288
STANDARD METHOD OF MEASUREMENT
Accessories
Pipework
Septic tank
PAGE 270+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU271 of BQU288
STANDARD METHOD OF MEASUREMENT
PAGE 271+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU272 of BQU288
STANDARD METHOD OF MEASUREMENT
System
PAGE 272+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU273 of BQU288
STANDARD METHOD OF MEASUREMENT
Ascessories
Equipment
LV enclosure
U700 COMMUNICATION
Telephone System
PAGE 273+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU274 of BQU288
STANDARD METHOD OF MEASUREMENT
Telemetry system
PAGE 274+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU275 of BQU288
STANDARD METHOD OF MEASUREMENT
Miscellaneous
PAGE 275+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU276 of BQU288
STANDARD METHOD OF MEASUREMENT
Instrumentation
Instrumentation (cont'd)
Pumps
PAGE 276+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU277 of BQU288
STANDARD METHOD OF MEASUREMENT
Page BQU1
Page BQU2
Page BQU3
Page BQU4
Page BQU5
Page BQU6
Page BQU7
Page BQU8
Page BQU9
Page BQU10
Page BQU11
Page BQU12
Page BQU13
Page BQU14
PAGE 277+231
LIBRARY OF STANDARD BQ DESCRIPTION
Class U: Mechanical and Electrical Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQU278 of BQU288
STANDARD METHOD OF MEASUREMENT
PAGE 278+231
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS V
Miscellaneous Work
Item No. Code No. Description Unit Qty. Rate Amount (RM)
V100 FENCES
Barb/bladed wire
V200 GATES
PAGE 280+247
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS V: Miscellaneous Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQV281 of BQV288
STANDARD METHOD OF MEASUREMENT
V200 GATES
Painting of Logos
Internal Signage
V330.1 Laboratory. nr
PAGE 281+247
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS V: Miscellaneous Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQV282 of BQV288
STANDARD METHOD OF MEASUREMENT
Bridge bearing
PAGE 282+247
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS V: Miscellaneous Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQV283 of BQV288
STANDARD METHOD OF MEASUREMENT
Page BQV1
Page BQV2
Page BQV3
PAGE 283+247
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS V: Miscellaneous Work
FOR MALAYSIAN CIVIL ENGINEERING
Page BQV284 of BQV288
STANDARD METHOD OF MEASUREMENT
PAGE 284+247
LIBRARY OF STANDARD BQ DESCRIPTION
FOR MALAYSIAN CIVIL ENGINEERING
STANDARD METHOD OF MEASUREMENT
CLASS W
Provisional and Prime Cost Sum
Item No. Code No. Description Unit Qty. Rate Amount (RM)
Provisional sums
W210 Prime Cost Sum of [RM: One million only for sum
reinforced soil wall].
W230 Profit. %
PAGE 286+252
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS W: Provisional and Prime Cost Sum
FOR MALAYSIAN CIVIL ENGINEERING
Page BQW287 of BQW288
STANDARD METHOD OF MEASUREMENT
Page BQW1
PAGE 287+252
LIBRARY OF STANDARD BQ DESCRIPTION
CLASS W: Provisional and Prime Cost Sum
FOR MALAYSIAN CIVIL ENGINEERING
Page BQW288 of BQW288
STANDARD METHOD OF MEASUREMENT
PAGE 288+252