Professional Documents
Culture Documents
Existing Frame Reinforcement at Grid 3 (A-E)
Existing Frame Reinforcement at Grid 3 (A-E)
A B C D E
E F G H I
D
H
H
-
CHECK /
0
STS703
NPT FINSH FLOOR LEVEL PROJECT MANAGEMENT, S.A DE C.V. TEL:8I28-8400 PROJECTED / PROYECTO:
I INDISE I
NNT NATURAL SURVEY LEVEL DRAWING NAME / NOMBRE DE PLANO
NSC SHEET ASPHALT UPPER LEVEL NTC CONCRETE UPPER LEVEL PROJECT /
STATUS:
NCTr EARTHWORK CUT LEVEL NDG CURB LEVEL NIP CEILING BOTTOM LEVEL
APPROVED
EXISTING FRAME REINFORCEMENT
NTrC ADJUSTED GROUND LEVEL NDB SIDEWALK LEVEL NDE STRUCTURE LEVEL GUANAJUATO PUERTO INTERIOR SPECIALITY / ESPECIALIDAD: REFUERZO DE MARCO EXISTENTE
SILAO, GUANAJUATO STRUCTURAL
3
1 2 4 5 6 7 8 9 10 11 12