QUALITY MANAGEMENT SYSTEM

L&T CONSTRUCTION
WATER & EFFLUENT TREATMENT IC PROJECT QUALITY MANUAL
REQUEST FOR INSPECTION (RFI) LTCD/WET/PQM/CM/F01 Issue-J Rev-0

Request No: Rev Date:


Project No:
Project Name: Mega PWS to Boudh & Kandhamal District WSP

Inspection Date: Time: Location:


Reference Drawing/Document with revision number:
Inspection Details Like
Method statement
numbers & ITP Numbers:

(Tick as applicable) Civil / Mechanical / Electrical / Instrumentation / Precomissioning


Description of Inspection Activities:

Enclosures:

FOR LARSEN & TOUBRO - EXECUTION


Signature:
Name:

Designation: Contruction Manager / Site Engineer/Supervisor


For LARSEN & TOUBRO - QA&QC

Accepted Re Inspection Required

Accepted with comments Rejected


Comments:

Signature:

Name:
Designation: QA&QC Inspector / Engineer