CEE Relays ..
87C Whitby Road, Slough, Berks, SL1 SDR ir
. 7 legistered Office!
Telephone: (01753) 576477 Fax: (0175G) G25001
Website: www.ceerelays.co.uk
INSTRUCTIONS, COMMISSIONING AND TESTING
OF CHECK SYNCHRONIZING RELAY
sTS 7041
L._ FUNCTIONS OF THE STS 7041 RELA’
.__ DESCRIPTION OF RI
1) Identifying label
2) Presentation of the face-plate and ajustments
3) Auxiliary unit
ILI. COMMISSIONING OF THE STS 7041 RELAY
Iv. TESTS
1) Preliminary checks
2) Equipment required
3} Testing the relay
a) General tests
b) Checking level Sv
c) Checking level AY
d) Checking level AF
V..__ANALYSIS OF ABNO! JATION!
M.1748/B.XE
03/31I = FUNCTIONS OF THE STS 7041 RELAY
the St$ 704! is a relay which checks the synchronism between two sources. Thus
the relay is part of a chain of authorization designed to give the closing command
to a breaker separating :
- 2 independent sources, in order to couple the two together (coupling of 2
networks, of an alternator to a network, of 2 alternators together, etc...)(type A).
— 2 parts of the same network in order to reciose them (type 8).
Authorization for operation is given when all of the conditions below are satis~
ds
Adjusting
elements
Ranges and values
Conditions of
operation
absolute values of | — None Fixed 3 80% nominal voltage (Un) fo!
voltages t both voltages
= voltage di 1 aucsun< #3, 5, 10, 20 or 30% Un
= Froquency | arias £0.01, 0.02, 0.04, 0.08 oF 0.16H2
= angular i AYE? )< + 10, 20 or 40 degrees
this ¢ 5, from top to bottom, the following information +
= the type of relay, followed by the number of the connection diagram,
~ its application ; standard (a), or special (b).
coupling and reclose functicns with instantaneous operation for
coupling function and time-delayed by 6, 12 or 24 sec according
to the position (10, 20 or 40°) of the AY switch for reclose
function.
Application b : reciose function only
=a the operating time is reduced to 3 sec independent of the setting
of the Afswitch.
= the nominal value of the auxiliary supply followed by the value of the external
resistor for voltages above 125V,
~ the serial number of the relay and the CEE order acknowledgment number (the
serial number will also be found inside the right-hand side-plate of
the relay with the face-plate removed).
Application a:
2) FACE-PLATE AND ADJUSTMENTS
- 3 setting switches are accessible after removal of the face-plate. These
provide adjustment for the three parameters :
Au(%un) «+ Switch marked 3, 5, 10, 20 and 30, corzesponding to the absolute
voltage difference between the two input voltages as a percentage
of Un, ie + 3% Un to + 30% Un.
authorization of operation is given when this difference is below
the setting value.
whew—
Lhd.
A(z) : Switch marked 0.01, 0.02, 0.04, 0.08 and 0.16, corresponding to
absolute value of the frequency difference in Hz of the two input
voltages, ie + 0.01 Hz to + 0.16 Ha.
Authorization of operation is given when this difference is below
setting value
AY(2)< + Switch marked 10, 20, and 40, corresponding to the absolute value
the angle between the two input voltages in degrees, ie + 10° to
Authorization of operation is given when the difference is below
setting value.
- 3 green LED indicators, visible without removal of the face-plate, provide
visualization of the paranecersAu,A'f and S$ :
AU: The green LEDAU is lit when the difference AU is below the setzin
value.
AY + The green LEDAfis lit when the difference Af is below the setting
value.
fs : The green LED S brightens and dims progressively at the rythm of
slip between the angles of the two input voltages. when the 5
difference is zero the LED is at maximum brightness, when it is
the LED is not lit, and at + and -90° the LED is partially lit
provides a visual evaluation of the phase difference which is p
tional to the AF of the two input voltages).
- 1 red LED
8]: the indicator $l is a red LED which is permanently lit, and which
goes out only when the output unit is picked up, ie when all of
Gperacing conditions of voltage, phase-angle, and frequency are
combined.
Remark : When the relay operates (all conditions for coupling satisfied) the 2
LEDs are lit, and the red one is extinguished.
The auxiliary unit has no mechanical operation indicator, as it picks up
whenever all the measured conditions are satisfied.
IIT - COMMISSIONING OF THE STS 7041 RELAY
Inportant recomendations
All of our relays are delivered sealed, after calibration and final inspectic
in our works. These seals should only be broken when they are being commissioned :
duly qualified personnel.
It is essential to check that the relay is correctly connected according to
diagram 9848, particularly concerning the direction of the voltage transformers a
the connections to the relay measuring inputs. An inversion of one of the inputs
would cause the STS 7041 relay to give an authorization when the two voltages are
phase opposition.
The green LEDAfis lit in the angular zone where coupling is allowed and
extinguished in the blocking zone. WE STRONGLY ADVISE CHECKING THE ANGULAR
CORRESPONDENCE WITH OTHER EXTERNAL SYSTEMS, SUCH AS 2 SYNCAROSCOPE, LAMP OR
VOLIMETER CONNECTED IN THE DIFFERENTIAL MODE, ETC
cheeortant to check
~ that the voltage transfor
identifying label,
= that the auxiliary supply voltage is that which is indicated on the relay (operation
is ensured within the range Un 20% to Un +1°%) and that the external resistor, if
required (voltages above 125¥), is correctly connected,
the relay has not been mechanically damaged,
- that it is correctly plugged in, the fixing rods being screwed tight hone.
ers have a nominal outgut corresponding to that on the
WE STRONGLY ADVISE AGAINST TESTING THE RELAY WITHOUT ITS BASE BY
PLUGGING STANDARD COMMERCIALLY AVAILABLE PLUGS INTO THE FEMALE
TERMINALS OF THE RELAY.
EQUTDMENT.
REQUIRED
It is possible t test the relay provided that two variable single-phase
sources of voltage are available. These two sources may be of the same frequency but
variable phase-angle to check the levels of Sfand Ou. The two sources must be of
different frequency for testson theAF level, witha frequency difference F which is
variable. For these tests, the TRE/F test set may be used.
THE_RELAY
TE
3) General test
ary supply to'terminals 4 and 5 of the STS 704i (positive pola:
= Connect the auxi.
on terminal 4).
= Connect the two inputs in parallel (terminals 3 and 7 together, and 2 and 6 together}
- Apply the auxiliary supply at its nominal voltage.
. The red top SL must be lit (output unit not picked up).
The green LED AU will also be lit as the input voltages are equal (both at zero).
= Now appiy this nominal value of input voltage. The green LED AU will remain lit, and
after a time-delay given below, the two other green LEDSAQ and $ will also light up,
the red LED 8) will go out, and the output unit will pick up.
Time-delay : approximately 8 sec if A® setting is 10°,
14 sec if AP setting is 20°,
26 sec if A setting is 40°.
= Slowly reduce the input voltage voltage : the output unit will drop out (and the red
zap 31 will light) at a value of approximately 80% un.
- Connect each input circuit to a source ac voltage : one input should be set to and
maintained at nominal voltage and frequency during the following tests ; the amplitude
of the other will be varied, but must have the same phase-angle as the first.
- vary slowly the amplitude of voltage on this second source. The green LED AW should
light at a value of voltage approximately equal to Un -AU setting.
Note : if the OU setting is less than 20%, the red LED $1 will go out and the output
unit will pick up simultaneously with the green LED AU.
¢) Checking Ag level
- The second voltage source must be capable of phase-shift compared to the first.
~ The amplitudes of both sources must be set of Un.-5-
- It is advisable, for this test, to set OF at 0.16 in order to avoid inte:
from the frequency difference eiement.
- Apply tne intput voltages with a phase-angle between them which is above the
Ap sectiag (for example 60°). The green LED AP should not be lit, and che red
LED 3 should be 2it.
= Slowly reduce the phase-angle d.
reached the output relay
green L£3s should be lit
ference
fference, and when the angular setting O 0 is
ould pick up, the red LED $3 should go out, and all thres
Note : when a continuously variable phase-angle source is not available, apply
Guccessively voltages which have an angle above and below the Ad setting.
To check in this manner, it is necessary to wait the 8, 14, or 26 sec
mentioned in a), depending on the M@ setting.
ed out when the mains source is extremely stable, and
‘requency generater which must also be extremely stable. a
accurate to 1/100th Hz must also be available (it is also possible
\chroscoxe, measuring .the rotation type, which will give a reasonable
frequency:
accuracy).
- As a general rule the test should be carried out on AF setting = 0.16 Hz.
- The two input voltages must be set at Un. The network frequency should be checked
(F), then the variable frequency source set at Fe! Hz.
= the green LAD indscacing slip [2] should Deagaten and din at a rychm of one seca
the red LED shculd be lit, and the_output unit should not be picked up. Slowly
{nerease the Frequoncy : the LED |S] will brighcen and dim at a lower race and cho
Groen LSD 09 will start ¢0 flash.
~ Gose tne frequency F - AF setting, the red 220 Swill be extinguished and che
Sueput unit will pick up each time the vectors pass into the correct angular zone
{at the same time lighting the green LED Ag}. The rythm will be 1/MF sec.
If it is act possible co carry out this test, ic is feasible to check the operat
oF the rele againet that of the sunchroscope during commissioning of the
alternaror
In the event of "abnormal" behaviour of the relay on site, check that :
- The auxiliary voltage is supplying the relay correctiy. To this end, insert a
milliameter fon 100mA range) in series with the auxiliary supply input to check
that current is drawn.
= The input voltages are correctly connected and present on the input terminais.
- The relay is correctly plugged in (all fixing rods screwed tight home)
ne wiring on the relay terminais
is correct and according to the relay connection diagram,
is continuous (lugs correctly crimped, screws tightened, fuses in order).TEST OF STS 7041 RELAY WITN OUR TEST SET TYPE TREE
ion of switches
32 ~ Automatic
18 = automatic
ae 40 ~ Over
- Opened or closed accor-
ding nature of contact ¢
on
Forward
|
STS 7061