You are on page 1of 1

1 2 3 4 5 6 7 8 9 10

44'-6" GENERAL NOTES :


4'-1012" 3'-412"
16'-9" 11' 16'-9" PARKING BUILDING BOUNDARY LINE SITE BOUNDARY LINE 1. ALL DIMENSIONS ARE IN FEET & INCHES, UNLESS OTHERWISE
30'-6"
3'-412" 4'-812" SPECIFIED.
412"
4'-1012"
412" 412"

MAIN BUILDING BOUNDARY LINE


412"
15'-3" 15'-3" 2. DRAWING SHOULD NOT BE SCALED, FOLLOW FIGURED DIMENSIONS.
3. ANY DISCREPANCY IN DRAWING SHALL BE BRING TO NOTICE OF
1 412"
6 412" 42" 412" STRUCTURAL CONSULTANT BEFORE EXECUTION OF WORK.

4'-1012"
F
C4 C4 C4 C4 412" 6" 712" N 4. THIS DRAWING SHOULD BE READ ALONG WITH THE RELEVANT F
ARCHITECTURAL DRAWING.
13 412" 412" 412" 5. IF THERE IS ANY REVISION IN DRAWING, FURTHER CONSTRUCTION
C5 C4 C5 SHALL BE EXECUTED AS PER THE LATEST REVISED DRAWING, ON THE
ISSUE OF LATEST REVISION.
6. GRADE OF CONCRETE SHALL BE M20.GRADE OF STEEL SHALL BE Fe500

16'-9"

10'-9"
7. CLEAR COVER FOR
FOOTING :2"(50mm)
GROUND BEAM :1 1/2"(40mm)
412" 6" 712" COLUMN :1 1/2"(40mm)
BEAM :1"(25mm)
412" 712" 412" 412" 12 412" 412" 412" SLAB :3/4"(20mm)
C4 C4 C4
712" 412" 412" 712"
8. LAP LENGTH OF BARS : 50Ø, AT COLUMN LAPPING PROVIDE 4"
5

27'-6"
SPACING OF TIES, NO LAPPING ALLOWED AT BEAM-COLUMN JOINT.
C3 C3 C3 C4 9. DEVELOPMENT LENGTH (Ld) FOR REINFORCEMENT BARS

5'-6"
IN COMPRESSION : 40Ø
6" 6" IN TENSION : 50Ø
E 4 412" 412" 10. IN CASE OF BEAM REINFORCEMENT, NO LAPPING SHALL BE ALLOWED E

16'-9"
C1 C1 IN FOLLOWING PLACES
(a) TOP ROD NEAR COLUMN, L/4 ON EITHER SIDES OF COLUMN
(b) TOP ROD OF CANTILEVER BEAM ALONG THE LENGTH AND
ALSO DEVELOPMENT LENGTH, BEYOND COLUMN

55'-412"
11'
412" 1'-412"
(c) BOTTOM ROD AT MID SPAN OF BEAM
11. REMOVAL OF SHUTTERING / FORM WORK
412" 6" 6" 412" 11 412" 412" (a) COLUMN : 24 HOURS
C2 C2 (b) BEAM SIDES : 24 HOURS
3 712" 712" 712" 712" (c) BEAM BOTTOM : LESS THAN 20' SPAN : 14 DAYS
C4 C1 C1 C5 : MORE THAN 20' SPAN : 28 DAYS
A1 B1 C1 (d) SLAB : LESS THAN 20'SPAN : 14 DAYS
: MORE THAN 20'SPAN : 28 DAYS
HOWEVER 7 DAYS STRENGTH OF CONCRETE SHOULD BE 65% OF THE
CENTRE LINE AND COLUMN LAYOUT

11'-3"
TARGET STRENGTH, TO REMOVE FORM WORK.
12. THIS BUILDING IS DESIGNED FOR GROUND + 1 FLOORS.
412" 412" 412" 412"
D D
2 712" 712" 412" 712"
C4 C4 C4 C5
LEGENDS :

10'-1012"
STIRRUPS @ 4" C/C
STIRRUPS @ 6" C/C
412" 712" 412" 712"
FLOOR LV.
1 6" 6" 6" 6"
C1 C1 C1 C1
A B C D

CENTRE LINE AND COLUMN LAYOUT

2'-0"
C C

REV NO Date REVISION REMARKS

9" 9" ER.JAGATHEESH KANNAN, KARUR


1'

LAPPING ZONE

L
NOTE: PROJECT
CONSULTANT
- Larger dia bar
1'
1'

- Smaller dia bar

COLUMN C3 & C5 COLUMN C4 DETAILS CLIENT


G+1 RESIDENTIAL BULIDING ,KARUR
COLUMN C1
B
DETAILS DETAILS B

CENTER LINE, COLUMN LAYOUT &


DETAIL REINFORCEMENT DETAILS
FLOOR LV.

2'-0"
SCHEDULE OF COLUMNS
FOUNDATION TO HEADROOM FLOOR LVL Er.Y.BOOPATHI M.E(Struct), M.I.S.T.E,
9" COLUMN LICENSED STRUCTURAL ENGINEER-GRADE-1
REMARKS STRUCTURAL
TYPE PYRAMID STRUCTURAL CONSULTANT
SIZE REINFORCEMENT DETAILS RINGS CONSULTANT
Contact No : +91 9597691155
Mail id :pyramidstrconsultant@gmail.com
C1 12" DIA 3Y16+3Y12 A Y8@7" -
1'-9"

C2 9" x 21" 4Y20+4Y16 B Y8@7" -


Scale 1:150
C3 9"x 12" 6Y16 C Y8@7" -
Typical L/S of Column DRAWN CHECKED APPR3VED
A Date 01-06-2022 A
C4 9"x 12" 4Y16+2Y12 D Y8@7" - BT KR YB Paper A3
Size
C5 9"x 12" 6Y12 E Y8@7" -
Rev.no R1
COLUMN C2 DETAILS DRAWING NO:- YB22032-ST01
Sheet.no (01 OF 11)

1 2 3 4 5 6 7 8 9 10