Professional Documents
Culture Documents
TANGGAL DIMULAI
TANGGAL SELESAI
LANGKAH 1
PEMBENTUKAN TIM
KETUA
ANGGOTA
FASILITATOR
NOTULEN
SASARAN / GOAL
Project Status
Status COMPLETE
TOTAL FAILURE MODE……….
ALUR PROSES
PROSES
1 2 3 4 5 6
a
f
8 9
LANGKAH 3,4,5,6
Likelihood
Detection
Likelihood
Detection
RPN
Severity
New RPN
Severity
Failure Mode Causes for Effects of Controls Action
Failure Failure
3 2 4 24 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
LANGKAH 3,4,5,6
Likelihood
Detection
Likelihood
Detection
RPN
Severity
New RPN
Severity
Failure Mode Causes for Effects of Controls Action
Failure Failure
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Severity
Detection
RPN
Likelihood
Potential Failure Potential Potential Current
Mode Effects for Causes of Controls
Failure Failure
Recommended Action
Reassessment
Date
Likelihood
Severity
Detection
New RPN
Action Plan :………………………
Failure CAUSE Recommen Action(s) to Implement Implemen Implementatio Resourc Resource Evidence Monitoring Sign- Sign-
Mode dation(s) achieve ation by tation by n of the place e required of & off by off
recommendati Whom when (Where) required (Money) completio evaluation Date
ons (How) (Time) n arrangemen
ts