Kilinto_Industrial_Parks Fact sheet

 Contract amount: 250M $

 Contractor: CTCE

 Financed by The World Bank

 Total area Covers:279ha

 Cut to spoil: 1.8m m3

 Backfill: 1.52 m m3 (equivalent to 210,000 Sinotruck Volume )

 19 Km internal Road length and 3 bridges

 13 Km Total fence length

 6 deep wells with pump houses

 45 Km large diameter pipeline

 40 km sewage drainage system

 14,000 m3/day state-of-the-art waste treatment plant

 152 solid waste containers

 190 states of the art ring main Unite/RMU

 66 km Telecom cable

 57 Km length 33 KVA cable

 732 street light

 14,000 m2 G+4 Administrative and One-Stop Service building

 3800 m2 Logistic shade

 1045 m2 Police station

 1639 m2 Fire Station

 1880 m2 Health Center

 Elegant and Grand main Gate, and so on