BSP has embarked upon implementation of 5-S workplace management system since year 2009. Five
departments in works area and seventeen BSP schools have received 5-S certification till date.
As per the approved roadmap more areas of works, non- works & mines will be taken up for 5-S
implementation.
Any suggestion / feedback to improve the 5-S workplace management system implementation may
be sent to BE Department.
( Ȫ ȯ ȡèğȢ
` ¡ ȡĤ Ȳ
Ȣ_
Distribution:
1. GM(TA)/GM I/C (Mills)/ GM (Quality)/ GM (Plate Mill)/ GM(MM & WRM)/GM (SMS2 &
CCS)/GM (Shops)/DGM(ETL)/DGM (Education)
2. All 5-S Champions of concerned shops
3. DGM (Tech), CEO’s Sectt.
4. Sr. TA to ED (Works)
5. TA to ED (P & A )
6. ED(Mines) Sectt.
Annexure-A
3. Implementation:
3.1 Implementation shall start with doing 1S activities followed by 2S. After completing the 1S
and 2S activities remaining 3Ss will be taken up. HoD and Steering Committee shall lead and
oversee the implementation process, 5-S champion shall co-ordinate all activities and BE
shall provide necessary help and guidance. Zone/Sub zone heads shall be responsible for 5-S
implementation in their respective zones/ sub zones.
3.2 Photographs shall be taken before and after implementation of 5-S and during further
improvements in such a fashion so as to facilitate like to like comparisons. (Photographs
shall also be taken during 5-S Audits-Please see clause 4 below). All photographs shall be
taken by a Photographer from our Public Relations Department only. These photographs will
be used as documentary evidence of improvement and for assessment of progress. 5-S
champion or 5-S Zonal Head shall be responsible for communicating the requirement of
photographer to the PRD well in advance and shall follow set procedures of PRD. The
photographs shall be obtained from PRD by 5-S Champion and shall be shared with BE.
3.3 Documentation, Rough Audit, Management Audit and Steering Committee Meetings shall be
done as mentioned in Annexure-B. Detailed Roles and Responsibilities of various
functionaries of 5-S workplace management system are also mentioned in Annexure-B.
4. Audit: All audit activities (excluding Management Audit and Rough Audit) shall be
coordinated by BE. Requirement of PRD photographer during Internal and External Audits
shall also be taken care of by BE.
4.1 Internal Audit: The 5-S internal audit shall be conducted by 5-S certified auditors of
BSP. Audit dates shall be finalized jointly by BE and respective HoD.
4.2 External Audit: The 5-S external audit shall be conducted by an external agency
having a service agreement with BSP. At present we are having an agreement with M/s QCFI.
There shall be 4 types of external audit:
4.2a. First Audit (or Preliminary Audit): After making substantial progress
by department, First audit shall be conducted.
4.2b. Pre Certification Audit : This audit shall be conducted after
compliance of all points of First Audit and Internal Audits conducted so far.
4.2c. Certification Audit: After compliance of all points of First Audit, Pre
Certification audit and Internal Audits a shop/department shall go for certification audit.
4.2d. Surveillance Audit: After receiving certificate there shall be a
surveillance audit conducted in every 6 months.
4.3 Audit Reports: Internal auditors shall submit audit reports to respective HoD within
2 days of conducting Audit and a copy of the report is to be sent to BE. The report of
external audit shall be obtained and forwarded to HoD by BE after completion of audit.
• Divide entire shop/ department into suitable number of Zones. (If required zones can be further divided into
Sub-zones for the ease of implementation.)
• Visit best and worst zones (based on Management audit scores) every month
5-S Champion:
A person in Executive cadre (preferably in the grade E5 and above) nominated by HoD of the shop/ department shall
function as 5-S Champion.
• Ensure formation of Steering committee and arrange to send a Copy of the order to Head of BE
STEERING COMMITTEE:
A five to seven members committee headed by HoD, sectional in- charges and representative from BE department
will be the members and 5-S Champion will work as convener of this committee. A written order in this regard,
signed by HoD, should be issued to all concerned and a copy should be sent to Business Excellence Department for
the purpose of records.
• Ensure Management audit, analyze the score and findings of the audit and take necessary corrective actions,
if any.
• Shields to all zones scoring more than target score (initially to be set at 70% and subsequently to be raised
to 72,74, 76 and so on to reach at subsequent target scores if most of the zones achieve the set target score
consistently) should be given
• The shield will remain with the zone till they continue to achieve target score and will be taken back
whenever they fail to reach target score.
ZONAL HEAD:
A person nominated by HoD in Executive cadre, who will be responsible for all activities of 5-S in his/her zone.
• Taking pictures before and after 5-S implementation (Photographer from PRD is to be arranged by 5-S
Champion)
• Standard Practices:
The team will visit entire shop/department between 10th and 20th day of the month and shall audit each zone as per
AUDIT SHEET (Annexure-II). Separate Audit sheets will be used for different zones.
Scores in column “B” of AUDIT SHEET should be given in whole numbers (1, 2, 3, 4 or 5) and not in decimals.
Score in the sheet will be entered by the 5-S Champion with the consent of other members of the Management
Audit Team for the month.
All Audit sheets should be signed by all members and submitted to the HoD immediately after audit.
Shields shall be given to all zones scoring > 70% in this audit and shall remain with the zone till they keep scoring
>70%. If the trend shows that almost all zones are consistently scoring >70% then HoD may take a decision to raise
the bar (e.g. 72 or 74 % and so on).
JAGRUTI GROUP:
A team comprising 10% of the total shift strength pooled from all sections of the factory. Leader of the team will
be from supervisory level. A badge will be provided to members of the group. Group will work for 1 month, after
that 90% new members will be induced along with 10% old members. New leader will be chosen every month.
The group will check all points as per check list (Annexure-VII), self-discipline aspects and shall counsel fellow
employees.
Annexure-C
CHECK LIST OF RESPONSIBILITY FOR 5-S WORKPLACE MANAGEMENT
FUNCTIONARY
ROUGH
STEERING ZONAL AUDIT MANAGEMENT JAGRUTI
Actions FREQUENCY BE HOD CHAMPION COMMITTEE HEAD TEAM AUDIT TEAM IRP GROUP
Initially + as
Training of IRPs/Auditors required √
Providing 5-S shields One time √
Conducting Internal audits As required √
Arranging audits by QCFI As required √
Co-ordinate ED(W) review Bi monthly √
Organize interdepartmental 5-S
competitions Annual √
Steering committee formation One
/monthly meeting time/Monthly * √ √
Making zones/subzones One time * √ *
Oversee & lead 5-S
implementation Continuos √ *
Jagruti group formation Monthly √ *
Visit best/worst zones Monthly √
Link between BE & shop Continuos √
Issuing MoM of Steering
committee meeting Monthly √
Implement & maintain 5-S in
offices Continuos * * √ *
Ensure proper documentation Continuous * √
Facilitate 5-S training Continuous * √
Organise 5-S competitions Quarterly * √
Maintain scoreboard Monthly * √
Oversee 5-S implementation &
apprise steering committee Continuous √
Arrange PRD photographer As required √
Facilitate 5-S implementation Continuous √ √
Ensure Management audit Monthly * √ √
Meet monthly Monthly √ √ √ √
Compliance reports of audits As required √
Implement 5-S in zone Continuous * * √
Distribution of responsibility Continuous √
Prepare & update check list Continuous √
Maintain documentation Continuous * * √
Weekly(Pre
certification)/Bi
weekly(Post
Ensure timely rough audits certification) √
Take pictures before,after
improvements (through PRD) As required * √
Follow up of action to be
taken/jobs to be done As required √
Making standard practices As required √
Weekly(Pre
certification)/Bi
weekly(Post
Check each point of check list certification) √
Give marks & remarks do √
Give sugestions do √
Point out anything very good/bad
observed do √
Note action to be taken/ jobs to
be done do √
Monthly Management Audit of
each zone Monthly * √ * √
Attend 5-S training As required √
SN Marks Remarks
ANNEXURE-II
ZONE
NO.
1 System of Audit 4
2 Regularity of Audit 4
Action taken on remarks in
3 5
rough audit sheet
Regularity of council
4 4
meeting
5 Awareness about 5S 3
6 Status of 1S 4
7 Status of 2S 4
8 Status of Cleanliness 4
9 Individual responsibility 3
Action on lowest marks in
10 3
self audit
Status of "Action to be
11 3
taken/job to be done"
Status of Standard
12 3
practices
Follow-up of Standard
13 4
practices
14 Visual Management 4
General Feeling about
15 3
benefit from 5S
Before & After status
16 4
Photograph
Zone/Sub zone Leader
17 4
room
18 HOD’s Room 5
19 Special Activity 2
5. ………………………………………………………………………………………………….
ANNEXURE-III
Left Hand side page of register Right hand side page of register
S. Date Action to be taken / Job WC/ Responsibility Time of completion Remarks
No to be done OC Target Actual
ZONE NAME:
ZONE LEADER:
This will be displayed near the office of Chairman, Steering Committee or inside his
office. On the Board scores of zones, average for the month should be written. Use
Red pen for scores less than 70%, Green pen for 70% to 80% and Blue pen for 80%
and above.
ANNEXURE-VII
a. Nails
b. Hair
c. Shave – a well shaven face (except in the case of religious norms)
e. Uniform condition – neat and clean
f. Cap – neat and clean
g. Shoe/Chappals – In good condition
h. No gutka/Beedi/Cigarettes
i. Habits such as spitting, smoking etc changed through counseling ?
Personal Hygiene to be checked on every starting day of the week in every shift at
the beginning of the shift and record of short comings has to be maintained in the
“Jagruti Group Register”.
Apart from the personal hygiene the following things have to be checked on a daily
basis and the findings have to be recorded through the group leader in the register.
The above list contains some of the salient features for the Jagruti Group to take into
account for its functions.
Unit may add few more check points, specific to their units as they may deem fit.