Concreting Works Variation
Miscellaeous
Grand Total
AMOUNT Remarks
₱43,800.00 40 Cubic
Dec 18-21, 2021
3 Footings; 3 Columns; 3 Tie-beams
₱15,330.00
₱15,330.00
₱2,690.00
₱77,150.00 ₱1,928.75 per cubic (Manual)
₱4,000.00 Padugo
Meal Subsidy (For Continous Pouring
₱8,000.00 Operation)
₱108,200.00
Acquiring of Empty Sacks for Site Mixing Concreting Transport of Materials to be used for Concreting