Total ₱ 21,450.00
Note:
12 Samples required by FTAP (per Rogelio Lera) for Monolithic
Tower Pad Structure Only
Remarks DP % Amout Requested
0.00% ₱ -
0.00% ₱ -
0.00% ₱ -
0.00% ₱ -
100.00% ₱ 1,400.00
12 Sample 100.00% ₱ 1,000.00
28days 100.00% ₱ 1,750.00
in day 7, in day 14, in day 28
100.00% ₱ 3,500.00
(Bugasong to San Jose is 37kms)
1 day during Sample Preparation; 3
100.00% ₱ 1,200.00
days during Testing
₱ -
0.00% ₱ -
0.00% ₱ -
100.00% ₱ 2,800.00
100.00% ₱ 1,000.00
100.00% ₱ 1,750.00
in day 7, in day 14, in day 28
100.00% ₱ 5,250.00
(Bugasong to San Jose is 37kms)
1 day during Sample Preparation; 3 100.00% ₱ 1,800.00
days during Testing
₱ 21,450.00
100 km 37
10 liter 3.7 lit
203.5
2 407
8 0.5 4 4
3x 24
1.95075 0.85 0.85 2.7
3x 5.85225
1.236 0.4 0.6 5.15
3x 3.708
33.56025
4.7943214 say 5 baches