Project POSEIDON

Introduction

A clean and conducive water supply is very important aspect especially in the places that
are far from the city. This concept paper aims to end the scarcity of water supply in the far flung
area.

Purpose/Need

The project is aimed to sustain the scarcity of water in the far flung area so that the
people there will live in a tired less way. The project also aimed to develop enough and
conducive water supply to the people living.

Goals/Objectives:

 To implement a permanent water supply in the far flung area.


 To help in producing clean and distilled water in that specific area to prevent
water borne diseases that may cause great harm to the individuals.
 This project is aim to finish within 90 days.

a. Expected Accomplishments

1. To lessen the water borne diseases in that area.

2. The people in the far flung area will finally own a clean, distilled and enough

water system supply.

b. Indicators of Achievements

1. They can already use a clean and enough water system supply in their area.

2. They will have a convenient way of fetching water.


Methodologies, Operation, or Procedure

1. Asking the Local Government Unit on where the researchers can possibly get the entire map
of the far flung area that the researchers chose.

2. After getting the information from the LGU’s, the researchers will make a humble request
letter to the barangay in which situated in the far flung area.

3. Next, the researchers will have a thorough observation of the place and start to choose the
right spot to where the water system will be put.

4. Third, the researchers will proceed to the planning and lay outing of the water system supply.

5. Then, the researchers will visit the Barangay and ask the permission of the Barangay officials,
and after visiting, the researchers will start to gather all the possible materials and equipment of
the water system supply.

6. Finally, after gathering all the materials and equipments needed, the researchers will now
build the desired water system supply in the far flung area.

Resources and Personnel Available

1. Civil Engineer

2. Electrical Engineer

3. Geodetic Engineer

4. Driver

5. Laborer

6. Water Expert.

Budget

Detailed Description for each budget line

a. Civil Engineer

Civil Engineer for the planning of the design and for the materials needed in the project.

Personnel No. Working Salary per Salary per Salary per Total salary in
Days per week Day Week Month 90 Days
1 5 ₱1,000.00 ₱5,000.00 ₱20,000.00 ₱1,800,000.00
b. Electrical Engineer

Electrical Engineer is task to decide about the design of proper electricity distribution of
the water system and to check the equipment needed.
Personnel No. Working Salary per Salary per Salary per Total salary in
Days per week Day Week Month 90 Days
1 5 ₱1,000.00 ₱5,000.00 ₱20,000.00 ₱1,800,000.00

c. Geodetic Engineer

This is task to test the soil before, during and after, for confirming if the soil is really
good for the construction of the water system supply.
Personnel No. Working Salary per Total salary
Days in 90 Day
Days
1 3 ₱1,000.00 ₱3,000.00

d. Driver

This person is hired to drive for the delivery of materials, the researchers and the
personnel to the site.
Personnel No. Working Salary per Salary per Salary per Total salary
Days per Day week Month in 36 Days
week
1 3 ₱450.00 ₱1,350.00 ₱16,200.00 ₱583,200.00

e. Labourers

These people are hired to do the design project.

Personnel No. Working Salary per Salary per Salary per Total salary in
Days per Day week Month 90 Days
week
5 5 ₱500.00 ₱3,500.00 ₱14,000.00 ₱1,260,000.00
f. Water Expert

This personnel is task to test the cleanliness of the water in the project area.

Personnel No. Working Salary per Total salary


Days in 90 Day
Days
1 3 ₱850.00 ₱2,550.00

Resources:

Materials Qty. Unit Price Amount

PVC Pipe 2 length ₱ 1,500.00 ₱ 3,000.00

Water motor 1 ₱ 15,000.00 ₱15,000.00

Water Tank 1 ₱ 5,000.00 ₱5,000.00

Elbow Pipe 10 pcs ₱ 50.00 ₱500.00

Faucet 50 pcs ₱ 75.00 ₱3,750.00

Shovel 5 pcs ₱ 500.00 ₱ 2,500.00

Teflon 2 dozen ₱ 35.00 ₱ 840.00

Hollow Blocks 2000 pcs ₱14.00 ₱ 28,000.00

Cement 300 pcs ₱250.00 ₱ 75,000.00

Nails 15 kgs ₱ 80.00 ₱ 1,200.00

Water Hose 200 meter ₱ 50.00 ₱ 10,000.00

Filter 2 pcs ₱ 1,500.00 ₱ 3,000.00

Reservoir 2 pcs ₱ 1,500.00 ₱ 3,000.00

Level Hose 20 meter ₱ 30.00 ₱ 600.00

Customise Funnel Tentative ₱875.00 ₱ 3,500.00


Customise Strainer 30 meters ₱ 50.00 ₱ 1,500.00
(Screen)
Plastic Pipe Tentative ₱36.00 ₱ 2,000.00

Coco Lumber (2x2) 100 length ₱15.00 ₱ 1,500.00

Switch 3 pcs ₱30.00 ₱ 90.00

TOTAL EXPENSES ₱ 159,980


FOR RESOURCES

Miscellaneous Expenses

Snacks ₱ 50,000.00

Extra Expenses in 90 days ₱ 30,000.00

TOTAL MISCELLANEOUS EXPENSES ₱ 80,000.00

OVER ALL TOTAL

TOTAL EXPENSES FOR RESOURCES ₱ 159,980.00

TOTAL EXPENSES FOR PERSONNEL ₱ 5, 448,750.00

TOTAL MISCELLANEOUS EXPENSES ₱ 80,000.00.00

OVER ALL TOTAL EXPENSES FOR ₱ 5,688,730.00


PROJECT POSEIDON

Key Words
Geodetic Engineer, Reservoir, Teflon

Contact
Project Poseidon, Brgy. Don Felipe Larrazabal, 09166209673, donna@gmail.com
Group 4

PROJECT POSEIDON

By:

Porcari, Loreto T.

Rom, Jocelyn

Rosales, Shyra Mae W.

Sabenorio, Mary Ann T.

Salinas, Clint Josinne

Santillan, Donnameir Y.

Serato, Reyna Mae G.

Trinidad, Uzziel Faith F.

Tudio, Sheena Mae M.

Ubay, Reynalyn A.