MUNICIPALITY OF OAS
OAS, ALBAY
PROJECT TITLE:
PROJECT COST:
I . MATERIALS
RESTORATION OF PAVEMENT
MACHINERIES
PARTICULARS UNITS TOTAL COST
1 JACKHAMMER 2
2 CONCRETE CUTTER 2
3 GENERATOR SET 2
TOTAL ₱ 231,000.00
ITEM-I REMOVAL OF EXISTING PAV
Estd. Qty.
Length (m)
Along Manuel Roxas St. (2" Pipe) 270.00
Along Manuel Roxas St. (1" Pipe) 5.00
Along J.P. Rizal St. (1" Pipe, Longitudinal) 245.00
Along J.P. Rizal St. (1" Pipe, Transverse) 6.00
TOTAL
ITEM-II EXCAVATIO
Estd. Qty.
Length (m)
Along Manuel Roxas St. (2" Pipe) 270.00
Along Manuel Roxas St. (1" Pipe) 5.00
Along J.P. Rizal St. (1" Pipe, Longitudinal) 245.00
Along J.P. Rizal St. (1" Pipe, Transverse) 6.00
SUMMARY
MATERIALS ₱ 169,352.40
LABOR ₱ 92,500.00
RESTORATION ₱ 138,500.00
MACHINERIES
TOTAL ₱ 400,352.40
REMOVAL OF EXISTING PAVEMENT (ROAD/SHOULDER)
167.70 sq.m.
EXCAVATION WORKS
67.71 cu.m.
Volume (m3)
40.50
3.00
22.05
2.16
67.71
OAS WATER SYSTEM
MUNICIPALITY OF OAS
OAS, ALBAY
WORK PROGRAM
VOLUME OF
2
Length (m) Width (m) Depth (m) Qty. Total Area (m ) CONCRETE PAVEMENT
(m3)
Along Manuel Roxas St. (2"
Pipe) 270.00 0.30 0.20 1.00 81.00 15.90
Along J.P. Rizal St. (1" Pipe, 245.00 0.30 0.20 1.00 73.50 14.70
Longitudinal)
Along J.P. Rizal St. (1" Pipe,
Transverse) 6.00 0.30 0.20 4.00 7.20 1.44
Length (m) Width (m) Depth (m) Qty. Total Length (m) Volume (m3)
Along Manuel Roxas St. (2" 270.00 0.30 0.50 1.00 270 40.50
Pipe)
Along Manuel Roxas St. (1" 5.00 0.30 0.50 4.00 20 3.00
Pipe)
Along J.P. Rizal St. (1" Pipe, 245.00 0.30 0.30 1.00 245 22.05
Longitudinal)
Along J.P. Rizal St. (1" Pipe,
Transverse) 6.00 0.30 0.30 4.00 24 2.16
559 67.71
VOLUME
50.31 SAND 49.24
0.84 PIPE 2" 0.063
0.23 PIPE 1" 0.032
III – PIPELAYING
IV – RESTORATION
Size of Pipe (diameter in meters)
COMPACTED SOIL
PAVEMENT
2" DIAMETER PIPE
ME OF PIPES