Professional Documents
Culture Documents
TOTAL ₱ 135,405.00
LABOR COST ₱ 67,702.50
FOR CEILING
ITEM UNIT DESCRIPTION UNIT PRICE TOTAL PRICE
281 PCS METAL FURRING ₱ 150.00 ₱ 42,150.00
60 PCS WALL ANGLE ₱ 85.00 ₱ 5,100.00
250 PCS CARRYING CHANNEL ₱ 120.00 ₱ 30,000.00
700 PCS W-CLIP ₱ 8.00 ₱ 5,600.00
10 BOX BLIND RIVETS ₱ 350.00 ₱ 3,500.00
115 PCS PVC QUICK PANEL ₱ 585.00 ₱ 67,275.00
TOTAL ₱ 153,625.00
LABOR COST ₱ 76,812.50
FOR ELECTRICAL
TOTAL ₱ 40,830.00
LABOR COST ₱ 26,539.50
NOTE: PANEL BOARD
ENTRANCE CUP
BREAKER
(JAK AMMO PRICE NA GAMIN PO)
PAINT