Table 1

BILL OF QUANTITIES

PROJECT TITLE: PROPOSED RENOVATION OF BUNGALOW AND CONSTRUCTION OF TWO-STOREY RESIDENTIAL BUILDING

CLIENT/OWNER: MRS. AND MR. GEERT MAES

LOCATION: PINAGBAYANAN, PUROK 3, FOREST PARK VILLE ST., PILA LAGUNA

DIRECT COST MATERIAL: ₱1,530,151.50

DIRECT COST LABOR: ₱767,629.18

CONTRACTOR’S PROFIT AND MUN. TAX. ₱183,618.18

LOGISTICS: INCLUDING (CONTINGENCIES) ₱30,603.03

TOTAL PROJECT COST ₱2,512,001.89

MATERIALS LABOR TOTAL

ITEM NO. DESCRIPTION QTY UNIT UNIT COST TOTAL COST UNIT COST TOTAL COST AMOUNT

I. CIVIL WORKS

A. SITE WORK

1 MOBILIZATION 1.00 LOT ₱5,000.00 ₱5,000.00 ₱0.00 ₱0.00 ₱5000.00

2 TEMPORARY FACILITIES 1.00 LOT ₱20,000.00 ₱20,000.00 ₱9,000.00 ₱9,000.00 ₱29,000.00

3 ENCLOSURE 4.00 M ₱0.00 ₱0.00 ₱0.00 ₱0.00 ₱0.00

4 DEMOLITION 1.00 LOT ₱7,500.00 ₱7,500.00 ₱3,375.00 ₱3,375.00 ₱10,875.00

5 OTHER

SUB-TOTAL ₱32,500.00 ₱12,375.00 ₱44,875.00

B. EARTHWORKS

1 EXCAVATION

1.1 FOOTINGS 30.24 CU.M. ₱0.00 ₱0.00 ₱1,400.00 ₱42,336.00 ₱42,336.00

1.2 TIE BEAMS 8.50 CU.M. ₱0.00 ₱0.00 ₱500.00 ₱4,250.00 ₱4,250.00

1.3 SEPTIC TANK 11.25 CU.M. ₱0.00 ₱0.00 ₱2,500.00 ₱28,125.00 ₱28,125.00

2 SOIL TREATMENT (1L) 1.00 BOTTLE ₱4,000.00 ₱4,000.00 ₱1,800.00 ₱1,800.00 ₱5,800.00

3 GRADING AND TAMPERING 0.00 SQM ₱0.00 ₱0.00 ₱250.00 ₱0.00 ₱0.00

4 FILL AND BACKFILL 26.40 CU.M. ₱0.00 ₱0.00 ₱250.00 ₱6,600.00 ₱6,600.00

5 OTHER (LAYOUT) 1.00 LOT ₱5,000.00 ₱5,000.00 ₱2,250.00 ₱2,250.00 ₱7,250.00

SUB-TOTAL ₱9,000.00 ₱85,361.00 ₱94,361.00

C. CONCRETE AND PLASTERING


WORKS
CONCRETING WORKS (COLUMN, BEAMS ETC.
FOOTINGS

1 PORTLAND CEMENT 78.00 BAGS ₱235.00 ₱18,330.00 ₱105.75 ₱8,248.50 ₱26,578.50

2 S1-SAND 39.00 BAGS ₱55.00 ₱2,145.00 ₱24.75 ₱965.25 ₱3,110.25

3 GRAVEL 3/4” 78.00 BAGS ₱55.00 ₱4,290.00 ₱24.75 ₱1,930.50 ₱6,220.50

COLUMNS

1 PORTLAND CEMENT 102.00 BAGS ₱235.00 ₱23,970.00 ₱105.75 ₱10,786.50 ₱34,756.50

2 S1-SAND 51.00 BAGS ₱55.00 ₱2,805.00 ₱24.75 ₱1,262.25 ₱4,067.25

3 GRAVEL 3/4” 102.00 BAGS ₱55.00 ₱5,610.00 ₱24.75 ₱2,524.50 ₱8,134.50

BEAMS

1 PORTLAND CEMENT 49.00 BAGS ₱235.00 ₱11,515.00 ₱105.75 ₱5,181.75 ₱16,696.75

2 S1-SAND 24.50 BAGS ₱55.00 ₱1,347.50 ₱24.75 ₱606.38 ₱1,953.88

3 GRAVEL 3/4” 49.00 BAGS ₱55.00 ₱2,695.00 ₱24.75 ₱1,212.75 ₱3,907.75

ROOF BEAMS

1 PORTLAND CEMENT 35.00 BAGS ₱235.00 ₱8,225.00 ₱105.75 ₱3,701.25 ₱11,926.25

2 S1-SAND 17.50 BAGS ₱55.00 ₱962.50 ₱24.75 ₱433.13 ₱1,395.63

3 GRAVEL 3/4” 35.00 BAGS ₱55.00 ₱1,925.00 ₱24.75 ₱866.25 ₱2,791.25

1
PLASTERING WORKS

1 PORTLAND CEMENT 120.00 BAGS ₱235.00 ₱28,200.00 ₱105.75 ₱12,690.00 ₱40,890.00

2 WHITE SAND 240.00 BAGS ₱65.00 ₱15,600.00 ₱29.25 ₱7,020.00 ₱22,620.00

SLAB ON FILL (INCLUDING GRAVEL BEDDING)

1 PORTLAND CEMENT 116.00 BAGS ₱235.00 ₱27,260.00 ₱105.75 ₱12,267.00 ₱39,527.00

2 S1-SAND 58.00 BAGS ₱55.00 ₱3,190.00 ₱24.75 ₱1,435.50 ₱4,625.50

3 GRAVEL 3/4” 116.00 BAGS ₱55.00 ₱6,380.00 ₱24.75 ₱2,871.00 ₱9,251.00

4 10mm X 6.0m DEFORMED BARS 75.00 PCS ₱155.00 ₱11,625.00 ₱69.75 ₱5,231.25 ₱16,856.25

5 #16 TIE WIRES 7.50 KGS ₱90.00 ₱675.00 ₱40.50 ₱303.75 ₱978.75

SUSPENDED SLAB (INCLUDING BEAM)

1 PORTLAND CEMENT 140.00 BAGS ₱235.00 ₱32,900.00 ₱105.75 ₱14,805.00 ₱47,705.00

2 S1-SAND 70.00 BAGS ₱55.00 ₱3,850.00 ₱24.75 ₱1,732.50 ₱5,582.50

3 GRAVEL 3/4” 140.00 BAGS ₱55.00 ₱7,700.00 ₱24.75 ₱3,465.00 ₱11,165.00

4 10mm X 6.0m DEFORMED BARS 161.00 PCS ₱155.00 ₱24,955.00 ₱69.75 ₱11,229.75 ₱36,184.75

5 #16 TIE WIRES 16.10 KGS ₱90.00 ₱1,449.00 ₱40.50 ₱652.05 ₱2,101.05

WALL FOOTING

1 PORTLAND CEMENT 39.00 BAGS ₱235.00 ₱9,165.00 ₱105.75 ₱4,124.25 ₱13,289.25

2 S1-SAND 19.50 BAGS ₱55.00 ₱1,072.50 ₱24.75 ₱482.63 ₱1,555.13

3 GRAVEL 3/4” 39.00 BAGS ₱55.00 ₱2,145.00 ₱24.75 ₱965.25 ₱3,110.25

4 10mm X 6.0m DEFORMED BARS 74.00 PCS ₱155.00 ₱11,470.00 ₱69.75 ₱5,161.50 ₱16,631.50

5 #16 TIE WIRES 7.40 KGS ₱90.00 ₱666.00 ₱40.50 ₱299.70 ₱965.70

SEPTIC TANK

1 PORTLAND CEMENT 23.00 BAGS ₱235.00 ₱5,405.00 ₱105.75 ₱2,432.25 ₱7,837.25

2 S1-SAND 15.00 BAGS ₱55.00 ₱825.00 ₱24.75 ₱371.25 ₱1,196.25

3 GRAVEL 3/4” 23.00 BAGS ₱55.00 ₱1,265.00 ₱24.75 ₱569.25 ₱1,834.25

4 10mm X 6.0m DEFORMED BARS 105.00 PCS ₱155.00 ₱16,275.00 ₱69.75 ₱7,323.75 ₱23,598.75

5 6” THK (NON-LOAD BEARING) 343.00 PCS ₱21.00 ₱7,203.00 ₱9.45 ₱3,241.35 ₱10,444.35

6 #16 TIE WIRES 10.50 KGS ₱90.00 ₱945.00 ₱40.50 ₱425.25 ₱1,370.25

SUB-TOTAL ₱304,040.50 ₱136,818.23 ₱440,858.73

D. FORM WORKS
COCO LUMBER (ASSORTED) 1,148.00 BD FT ₱40.00 ₱45,920.00 ₱18.00 ₱20,664.00 ₱66,584.00
3/4” MARINE- STA. CLARA 33.00 PCS ₱2,400.00 ₱79,200.00 ₱1,080.00 ₱35,640.00 ₱114,840.00
CWN, ASSORTED 18.00 KGS ₱110.00 ₱1,980.00 ₱49.50 ₱891.00 ₱2,871.00
#16 G.I TIE WIRE 94.00 KGS ₱90.00 ₱8,460.00 ₱40.50 ₱3,807.00 ₱12,267.00
SUB-TOTAL ₱135,560.00 ₱61,002.00 ₱196,562.00

E. REBARWORKS

1 16mm X 6.0m DEFORMED BARS 394.00 PCS ₱377.00 ₱148,538.00 ₱169.65 ₱66,842.10 ₱215,380.10

2 12mm X 6.0m DEFORMED BARS 54.00 PCS ₱217.00 ₱11,718.00 ₱97.65 ₱5,273.10 ₱16,991.10

3 10mm X 6.0m DEFORMED BARS 365.00 PCS ₱155.00 ₱56,575.00 ₱69.75 ₱25,458.75 ₱82,033.75

4 #16 TIE WIRES 147.00 KGS ₱90.00 ₱13,230.00 ₱40.50 ₱5,953.50 ₱19,183.50

5 OTHER

SUB-TOTAL ₱230,061.00 ₱103,527.45 ₱333,588.45

F. MASONRY WORKS

1 CHB #5 (NON-LOAD BEARING) 1,684.00 PCS ₱21.00 ₱35,364.00 ₱9.45 ₱15,913.80 ₱51,277.80

2 CHB #4 (NON-LOAD BEARING) 763.00 PCS ₱17.00 ₱12,971.00 ₱7.65 ₱5,836.95 ₱18,807.95

3 PORTLAND CEMENT 98.00 BAGS ₱235.00 ₱23,030.00 ₱105.75 ₱10,363.50 ₱33,393.50

4 S1-SAND 294.00 BAGS ₱55.00 ₱16,170.00 ₱24.75 ₱7,276.50 ₱23,446.50

5 #16 TIE WIRES 9.00 BAGS ₱90.00 ₱810.00 ₱40.50 ₱364.50 ₱1,174.50

2
6 10mm X 6.0m DEFORMED BARS 236.00 PCS ₱155.00 ₱36,580.00 ₱69.75 ₱16,461.00 ₱53,041.00

SUB-TOTAL ₱87,535.00 ₱39,390.75 ₱126,925.75

G. ROOFING WORKS/SKY LIGHT

2 BUILDING

7 4mm THK. 12’ CORRUGATED GI 80.00 PCS ₱1,150.00 ₱92,000.00 ₱517.50 ₱41,400.00 ₱133,400.00
SHEET

8 5mm X 8FT BOX TYPE GUTTER 29.00 PCS ₱600.00 ₱17,400.00 ₱270.00 ₱7,830.00 ₱25,230.00

9 5mm X 8FT BOX TYPE INSIDE 0.00 PCS ₱600.00 ₱0.00 ₱270.00 ₱0.00 ₱0.00
GUTTER

10 BLIND RIVET 4.00 BOX ₱280.00 ₱1,120.00 ₱126.00 ₱504.00 ₱1,624.00

11 SILICON SEALANT 12.00 PCS ₱145.00 ₱1,740.00 ₱65.25 ₱783.00 ₱2,523.00

12 3” PVC ORANGE PIPE- DOWN 12.00 PCS ₱450.00 5,400.00 ₱202.50 2,430.00 ₱7,830.00
SPOUT

13 NELTEX PVC SOLVENT CEMENT 5.00 ₱300.00 1,500.00 ₱135.00 675.00 ₱2,175.00
400CC
14 2x6 G.I TUBULAR 24.00 PCS ₱1,701.00 ₱40,824.00 ₱765.45 ₱18,370.80 ₱59,194.80

15 2x4 G.I TUBULAR 18.00 PCS ₱1,166.00 ₱20,988.00 ₱524.70 ₱9,444.60 ₱30,432.60

16 #2 METAL TECHSCREW 1,680.00 PCS ₱2.00 ₱3,360.00 ₱0.90 ₱1,512.00 ₱4,872.00

17 WELDING ROD 50.00 KGS ₱90.00 ₱4,500.00 ₱40.50 ₱2,025.00 ₱6,525.00

18 WELDING MACHINE (RENTAL) 1.00 LOT ₱2,000.00 ₱2,000.00 ₱900.00 ₱900.00 ₱2,900.00

SUB-TOTAL ₱190,832.00 ₱85,874.40 ₱276,706.40

II. PLUMBING WORKS (WATER AND SEWER LINE ONLY)

JET-MATIC 1.00 LOT OSM 15% LABOR FOR INSTALLTION

KITCHEN SINK 4.00 LOT ₱4,500.00 ₱18,000.00 ₱2,025.00 ₱8,100.00 ₱26,100.00

SHOWER 2.00 LOT ₱4,500.00 ₱9,000.00 ₱2,025.00 ₱4,050.00 ₱13,050.00

WATER CLOSET 2.00 LOT ₱4,500.00 ₱9,000.00 ₱2,025.00 ₱4,050.00 ₱13,050.00

WASHING MACHINE 1.00 LOT ₱3,000.00 ₱3,000.00 ₱1,350.00 ₱1,350.00 ₱4,350.00

LAVATORY 2.00 LOT ₱4,500.00 ₱9,000.00 ₱2,025.00 ₱4,050.00 ₱13,050.00

GARDEN HOSE 2.00 LOT ₱3,000.00 ₱6,000.00 ₱1,350.00 ₱2,700.00 ₱8,700.00

TRENCH CANAL WITH GRILLS 28.00 M ₱450.00 ₱12,600.00 ₱202.50 ₱5,670.00 ₱18,270.00

TOILET FIXTURES

KITCHEN SINK 4.00 LOT OSM 15% LABOR FOR INSTALLTION

SHOWER 2.00 LOT OSM

WATER CLOSET 2.00 LOT OSM

WASHING MACHINE 1.00 LOT OSM

LAVATORY 2.00 LOT OSM

GARDEN HOSE 2.00 LOT OSM

SUB-TOTAL ₱66,600.00 ₱29,970.00 ₱96,570.00

III. ELECTRICAL WORKS (ROUGH INS AND ELECTRICAL LINE ONLY)

PANEL BOARD WITH BREAKERS 13.00 SET ₱1,550.00 ₱20,150.00 ₱697.50 ₱9,067.50 ₱29,217.50

PANEL BOARD WITH BREAKERS 6.00 SET ₱1,550.00 ₱9,300.00 ₱697.50 ₱4,185.00 ₱13,485.00

AIRCON ROUGH IN 3.00 SET ₱2,500.00 ₱7,500.00 ₱1,125.00 ₱3,375.00 ₱10,875.00

CONVENIENCE OUTLET 29.00 SET ₱750.00 ₱21,750.00 ₱337.50 ₱9,787.50 ₱31,537.50


(UNIVERSAL)

LIGHTING OUTLET 34.00 SET ₱750.00 ₱25,500.00 ₱337.50 ₱11,475.00 ₱36,975.00


(RECEPTABLES-ORDINARY)

** ALL LIGHTING FIXTURES ARE OSM

SUB-TOTAL ₱84,200.00 ₱37,890.00 ₱122,090.00

IV. TILE WORKS (WILCON)

3
RENOVATION

GEN. FLOOR AREA 60X60 CERAMIC TILES- GLOSS 175.00 PCS OSM 45% LABOR FOR INSTALLTION

T&B FLOOR 60X60 CERAMIC TILES- SKID 18.00 PCS OSM

T&B WALL 60X60 CERAMIC TILES- NON-SKID 72.00 PCS OSM

BED ROOM 1 60X60 CERAMIC TILES- GLOSS 58.00 PCS OSM

NEW CONSTRUCTION

MASTER BEDROOM 60X60 CERAMIC TILES- GLOSS 140.00 PCS OSM

T&B FLOOR 60X60 CERAMIC TILES- SKID 16.00 PCS OSM

T&B WALL 60X60 CERAMIC TILES- NON-SKID 64.00 PCS OSM

TILE ADHESIVE 30.00 BAGS ₱250.00 ₱7,500.00 ₱112.50 ₱3,375.00 ₱10,875.00

PORTLAND CEMENT 15.00 BAGS ₱235.00 ₱3,525.00 ₱105.75 ₱1,586.25 ₱5,111.25

DIAMOND BLADE 5.00 PCS ₱400.00 ₱2,000.00 ₱180.00 ₱900.00 ₱2,900.00

GRINDER (RENTAL) 1.00 LOT ₱1,500.00 ₱1,500.00 ₱675.00 ₱675.00 ₱2,175.00

SUB-TOTAL ₱14,525.00 ₱6,536.25 ₱21,061.25

V. PAINTING WORKS

EXTERIOR AND INTERIOR 591.00 SQM ₱350.00 ₱206,850.00 ₱157.50 ₱93,082.50 ₱299,932.50

SUB-TOTAL ₱206,850.00 ₱93,082.50 ₱299,932.50

VII. TINSMITH

GATE 2x4 G.I TUBULAR 18.00 PCS ₱1,166.00 ₱20,988.00 ₱524.70 ₱9,444.60 ₱30,432.60

16MM ROUND BAR 28.00 GAL ₱490.00 ₱13,720.00 ₱220.50 ₱6,174.00 ₱19,894.00

RED OXIDE 4.00 GAL ₱476.00 ₱1,904.00 ₱214.20 ₱856.80 ₱2,760.80

WELDING ROD 15.00 KGS ₱90.00 ₱1,350.00 ₱40.50 ₱607.50 ₱1,957.50

WELDING MACHINE (RENTAL) 1.00 LOT ₱2,000.00 ₱2,000.00 ₱900.00 ₱900.00 ₱2,900.00

CYLINDRICAL HINGE 28.00 PCS ₱200.00 ₱5,600.00 ₱90.00 ₱2,520.00 ₱8,120.00

MADE-SHIFT LOCK SET 4.00 SET ₱1,500.00 ₱6,000.00 ₱675.00 ₱2,700.00 ₱8,700.00

BALCONY BALUSTERS (STAINLESS STEEL) 1.00 SET OSM 45% LABOR FOR INSTALLTION

STAIRCASE BALUSTERS (STAINLESS STEEL) 1.00 SET OSM 45% LABOR FOR INSTALLTION

STAIRCASE 2X4 CHANNEL BAR 6.00 PCS ₱1,650.00 ₱9,900.00 ₱742.50 ₱4,455.00 ₱14,355.00

2X2X1/4 ANGLE BAR 15.00 PCS ₱480.00 ₱7,200.00 ₱216.00 ₱3,240.00 ₱10,440.00

1.2X0.3X2” THK WOODEN PLANK 17.00 PCS ₱400.00 ₱6,800.00 ₱180.00 ₱3,060.00 ₱9,860.00

WELDING ROD 10.00 KGS ₱90.00 ₱900.00 ₱40.50 ₱405.00 ₱1,305.00

WELDING MACHINE (RENTAL) 1.00 LOT ₱2,000.00 ₱2,000.00 ₱900.00 ₱900.00 ₱2,900.00

SCREWS 1.00 LOT ₱1,500.00 ₱1,500.00 ₱675.00 ₱675.00 ₱2,175.00

SUB-TOTAL ₱79,862.00 ₱35,937.90 ₱115,799.90

VIII. CEILING WORKS

RENOVATION 10MM THK FIBER CEMENT 35.00 PCS ₱410.00 ₱14,350.00 ₱184.50 ₱6,457.50 ₱20,807.50
BOARD M.R

METAL FURRING 105.00 PCS ₱140.00 ₱14,700.00 ₱63.00 ₱6,615.00 ₱21,315.00

CARRYING CHANNEL 140.00 PCS ₱136.00 ₱19,040.00 ₱61.20 ₱8,568.00 ₱27,608.00

BLIND RIVET 5.00 BOX ₱280.00 ₱1,400.00 ₱126.00 ₱630.00 ₱2,030.00

CONSUMABLES 1.00 LOT ₱2,500.00 ₱2,500.00 ₱1,125.00 ₱1,125.00 ₱3,625.00


MASTER BEDROOM 10MM THK FIBER CEMENT 24.00 PCS ₱410.00 ₱9,840.00 ₱184.50 ₱4,428.00 ₱14,268.00
BOARD M.R

METAL FURRING 72.00 PCS ₱140.00 ₱10,080.00 ₱63.00 ₱4,536.00 ₱14,616.00

CARRYING CHANNEL 96.00 PCS ₱136.00 ₱13,056.00 ₱61.20 ₱5,875.20 ₱18,931.20

BLIND RIVET 4.00 BOX ₱280.00 ₱1,120.00 ₱126.00 ₱504.00 ₱1,624.00

CONSUMABLES 1.00 LOT ₱2,500.00 ₱2,500.00 ₱1,125.00 ₱1,125.00 ₱3,625.00

SUB-TOTAL ₱88,586.00 ₱39,863.70 ₱128,449.70

4
5
Table 1
SPECIFICATIONS

₱2,297,780.68

DESCRIPTION

SITE WORK

MOBILIZATION

TEMPORARY FACILITIES

ENCLOSURE

DEMOLITION

OTHER

EARTHWORKS

EXCAVATION

SOIL TREATMENT (1L)

GRADING AND TAMPERING

FILL AND BACKFILL

OTHER (LAYOUT)

CONCRETE AND PLASTERING


WORKS

CONCRETING WORKS

PORTLAND CEMENT

S1-SAND

GRAVEL 3/4”

6
PLASTERING WORKS

PORTLAND CEMENT

WHITE SAND

FORM WORKS/SCAFFOLDINGS/
INSTALLTIONS/DISMANTLING

REBARWORKS

16mm X 6.0m DEFORMED BARS

12mm X 6.0m DEFORMED BARS

10mm X 6.0m DEFORMED BARS

#16 TIE WIRES

OTHER

MASONRY WORKS

6” THK 700PSI

4” THK 700PSI

PORTLAND CEMENT

S1-SAND

7
ROOFING WORKS/SKY LIGHT

HOUSING UNIT

5mm THK. LONG SPAN RIB TYPE


GI SHEET

5mm X 8FT BOX TYPE END CAP


FLASHING

5mm X 8FT BOX TYPE INSIDE


GUTTER

BLIND RIVET

SILICON SEALANT

3” PVC ORANGE PIPE- DOWN


SPOUT

NELTEX PVC SOLVENT CEMENT

2x6 G.I TUBULAR

2x4 G.I TUBULAR

3.5” METAL TECHSCREW

WELDING ROD

WELDING MACHINE (RENTAL)

PLUMBING WORKS

KITCHEN SINK

SHOWER

WATER CLOSET

WASHING MACHINE

LAVATORY

GARDEN HOSE

TRENCH CANAL WITH GRILLS

ELECTRICAL WORKS

PANEL BOARD WITH BREAKERS

AIRCON ROUGH IN

CONVENIENCE OUTLET
(UNIVERSAL)

LIGHTING OUTLET
(RECEPTABLES-ORDINARY)

CONDUIT PIPE

TILE WORKS (WILCON)

8
60X60 CERAMIC TILES- GLOSS

60X60 CERAMIC TILES- SKID

60X60 CERAMIC TILES- NON-SKID

30X30 VINYL TILE

30X30 VINYL TILE

PATTERNED FLOOR

TILE ADHESIVE

PORTLAND CEMENT

DIAMOND BLADE

GRINDER (RENTAL)

PAINTING WORKS

INTERIOR PAINT

TINSMITH

2x6 G.I TUBULAR (BLUE)

EPOXY PAINT- GUILDER GREY

ENAMEL PAINT - DARK GREY

WELDING ROD

WELDING MACHINE (RENTAL)

CYLINDRICAL HINGE

MADE-SHIFT LOCK SET

CEILING WORKS

10MM THK FIBER CEMENT BOARD


M.R

METAL FURRING

CARRYING CHANNEL

BLIND RIVET

10MM THK FIBER CEMENT BOARD


M.R

METAL FURRING

CARRYING CHANNEL

BLIND RIVET

9
10
PROPOSED RENOVATION OF BUNGALOW WITH MEZZANINE

SPS. EDGAR AND ARLENE YAMSON

BLOCK 3 AND 4 WEST GOVERNOR HEIGHTS 2 BARANGAY CABUCO, TRESE MARTIRES, CAVITE
PROVINCE

PHASE 1

SPECIFICATIONS:

SITE WORK: MOBILIZATION INCLUDES TRANSPORTATION FOR MAN POWER, TOOLS AND
EQUIPMENT, AND SCAFFOLDING (RENTAL ONLY); TEMPORARY FACILITIES SUCH AS WATER BILL
AND ELECTRICITY BILL WILL BE SHOULDERED BY THE CLIENT; SITE ENCLOSURE WILL NO
LONGER BE NECESSARY; DEMOLITION INCLUDES DISMANTLING OF EXISTING ROOF AND
PURLINS, PARTITION WALL AND EXISTING TOILET AND BATH.

OTHERS ARE UNLESS DEEMED NECESSARY

EARTHWORKS: EXCAVATE 2- 60CM X 60CM X 100CM FOR THE GARAGE GATE COLUMN; POUR
SOIL TREAT 30 MINUTES BEFORE CONCRETING; BACK FILL AND TAMPER GARAGE COLUMN
AFTER CONCRETING OF FOOTING AND PEDESTAL; GRADE TO APPROPRIATE SLOPE GARAGE
AREA (20CM SLOPE TO ROAD).

CONCRETING: USE ONE-BAGGER MIXER; RATIO 1:3:5 MIX FOR GARAGE, TOILET ETC.;

11
PLASTERING: FINISH COAT ON ALL INTERIOR WALLS

PLASTERING: FINISH COAT ON ALL INTERIOR WALLS

INSTALLATION: SCAFFOLDING ON ALL WORKS WITH MORE THAN 1.10M IN HEIGHT

REBAR WORKS: ASSEMBLE 16MM- MAIN BAR FOR ROOF BEAM AND COLUMN 1- A&B;
ASSEMBLE 16MM- MAIN BARS FOR LINTEL BEAM AT 2.75METERS HEIGHT WITH TOTAL
PERIMETER OF MORE OR LESS 13METERS; ASSEMBLE 12MM- TEMPERATURE BAR SPACING @
10CM ON SUSPENDED SLAB/MEZZANINE; ASSEMBLE 10MM- TENSILE BAR SPACING @ 10CM
ON SUSPENDED SLAB/MEZZANINE; ASSEMBLE 10MM- FOR VERTICAL TIES AND STIRRUPS ON
COLUMN 1-A&B, MORE OR LESS 13 METERS LINTEL BEAM AND MORE OR LESS 21METERS
ROOF BEAM; TIE WIRE TO CONNECT.

MASONRY: INSTALL 8” THK CHB FROM NGL TO 3.10M HT. WITH TOTAL PERIMETER OF MORE OR
LESS 16METERS, AND 6.75M HT WITH TOTAL WIDTH OF 4METERS; INSTALL 6” THK CHB FROM
SECOND FLR LINE TO SOFFIT OF ROOF BEAM BEAM WITH TOTAL PERIMETER OF MORE OR
LESS 21METERS; INSTALL 4” THK CHB FROM NGL TO 4.0M HT WITH TOTAL PERIMETER OF
MORE OR LESS 12METERS; USE RATIO 1 (CEMENT) : 3 (SAND-S1) FOR MORTAR BED. PROVIDE
10MM REBAR AT 600MM SPACING FOR DOWELS AND 10MM REBAR HORIZONTAL SUPPORT AT
EVERY 3 COURSE OF CHB REGARDLESS OF THICKNESS.

12
ROOFING: INSTALL 5MM THK. LONG SPAN RIB TYPE GI SHEET WITH 2 1/2 LAPPING ON TOP OF
2X6 GI TUBULAR (LONGER SPAN) AND 2X4 GI TUBULAR (SHORTER SPAN) WITH MAXIMUM
SPACING OF 60CM BOTH WAYS, OBSERVE SEAM WELD FOR LAPPING AND FILLET WELD FOR
CORNER CONNECTION; FASTEN SHEETS WITH METAL TECH SCREW AT 12’ TO 18” DISTANCE;
INSTALL 5MM X 8FEET END CAPS ON CORNER EDGES AND SEAL GAPS WITH SILICON SEALANT
(ROOFING USE); CONNECT ROOFING ACCESSORIES WITH BLIND RIVET; PROVIDE 3” ROUND
HOLE ON ONE SIDE (SLOPE) OF INSIDE GUTTER; ATTACH MADE-SHIFT TALE PIECE TO 3” PVC
PIPE TO DOWN SPOUT; NELTEX SOLVENT CEMENT TO CONNECT PVC.

PLUMBING: INSTALL ALL WATER LINE AND SEWER LINE INCLUDING TAPPING TO EXISTING
SEPTIC TANK; ALL FIXTURES AND FURNITURES SHALL BE PURCHASED BY THE CLIENT;
SHOWER INCLUDES SHOWER HEAD, SHOWER VALVE, FAUCET, FLOOR DRAIN; WASHING
MACHINE INCLUDES FLOOR DRAIN; WATER CLOSET INCLUDES FLOOR DRAIN; CONCRETED
TRENCH CANAL WITH REMOVABLE GRILL COVER MEASURING 3.87METERS LONG, 30CM WIDE
AND 50CM DEEP.

ELECTRICAL: INSTALL PANEL BOARD WITH COMPLETE CIRCUIT BREAKER (ACCORDING TO


PLAN); INSTALL ALL ROUGH INS, SWITCHES, OUTLETS (CONVENIENCE AND LIGHTING; ALL
LIGHTING FIXTURES SHALL BE PURCHASED BY THE CLIENT.

13
TILING: ALL 60X60 CERAMIC TILES PLACED 0-0 GAP AND FASTENED TO WALL USING PORTLAND
CEMENT WITH ADHESIVE; WALL VINYL TILES FASTENED TO FLOOR USING NO-MORE NAIL OR
RUGBY (CONTACT CEMENT).

PAINTING: INTERIOR WALL BE PREPARED WITH NEUTRALIZER, PAINT FLAT LATEX PRIMER,
BEFORE 2 COATS OF ELASTOMERIC PAINT; INTERIOR PAINT INCLUDES CEILING OF MEZZANINE
AND TOILET AND BATH; EXTERIOR WALL NO TREATMENT, PAINT WITH VERSATEX PAINT FOR
ANAY FINISH LOOK AND TOP COAT WITH 1 COAT OF DESIRED COLOR FINISH.

TINSMITH WORKS:PAINT STEEL MATERIALS WITH EPOXY GREY BEFORE WELDING AND
ASSEMBLING; USE 2X6 G.I TUBULAR STEEL AS BODY FRAME, CUT AT 45DEGREED USING MITER
BOX AND SEAM WELD TOGETHER; PLACE G.I PLAIN SHEET ON TOP OF EACH WING USING
TUCK WELD; TO LOCK, LOCK WITH MADE SHIFT LOCK SET; TO FASTEN TO GATE COLUMN, USE
CYLINDRICAL HINGE 3 PCS PER PANEL/SWING.
TINSMITH WORKS (DESIGN ON THAT LEDGE): PAINT STEEL MATERIALS WITH EPOXY GREY
BEFORE WELDING AND ASSEMBLING; USE 2 X2 G.I. TUBULAR STEEL, CUTTED WITH 45
DEGREES ON CORNER AND FASTENED TOGETHER USING SEAM WELD AS BODY FRAME; WELD
1X3 FLAT BARS PLACED VERTICALLY 10MM APART ; TO MAKE ACCESSIBLE, PROVIDE 1M X
DETERMINED WIDTH AS OPERABLE DOOR FOR AIRCON MAINTENANCE.

CEILING WORKS: FOR CEILING FRAME, USE METAL FURRING AT .60M SPACING BOTH WAYS
ATTACHED TO CARRYING CHANNEL WITH W-CLIP AT 1.20M SPACING ON SHORTER SPAN; FOR
HANGERS, USE CARRYING CHANNEL 1 FOOT AWAY FROM INTERSECTION; FASTENED METAL
UNITS USING BLIND RIVET; FASTENED 10MM THK FIBER CEMENT BOARD TO CEILING FRAME
WITH 21PCS OF BLIND RIVET EACH PANEL; SAME PROCESS TO MEZZANINE CEILING.

14
15
Table 1
Ar. Dona Kristle Boado Purchase Order No. 001

Supplier: Payment Thru: Bank Transfer

Address: Gcash Name: -

Date: Date Paid:

Ref. No.:

Project: PROPOSED RENOVATION OF BUNGALOW AND CONSTRUCTION OF TWO-STOREY RESIDENTIAL BUILDING

Location: PINAGBAYANAN, PUROK 3, FOREST PARK VILLE ST., PILA LAGUNA

Delivery Address: PINAGBAYANAN, PUROK 3, FOREST PARK VILLE ST., PILA LAGUNA

Pick up: -

Terms: -

Qty: Unit: Description: Unit Cost

1 bag PORTLAND CEMENT

1 bag S1-SAND

1 bag WS-WHITE SAND

1 bag GRAVEL 3/4”

1 pcs 10mm X 6.0m DEFORMED BARS

1 pcs 12mm X 6.0m DEFORMED BARS

1 pcs 16mm X 6.0m DEFORMED BARS

1 kilo #16 TIE WIRES

1 pcs COCO LUMBER (10’)

1 pcs 3/4” MARINE

1 kilo CWN, ASSORTED

1 pcs CHB #5 (NON-LOAD BEARING)

1 pcs CHB #4 (NON-LOAD BEARING)

1 pcs 4mm THK. 12’ CORRUGATED GI SHEET

1 pcs 5mm X 8FT BOX TYPE GUTTER

1 pcs 5mm X 8FT BOX TYPE INSIDE GUTTER

1 box BLIND RIVET

1 tube SILICON SEALANT

1 pcs 3” PVC ORANGE PIPE- DOWN SPOUT


1 can NELTEX PVC SOLVENT CEMENT 400CC
1 pcs 2x6 G.I TUBULAR
1 pcs 2x4 G.I TUBULAR
1 pcs #2 METAL TECHSCREW
1 pcs WELDING ROD
1 bag TILE ADHESIVE
1 bag 16MM ROUND BAR
1 gal RED OXIDE
1 pcs 2X4 CHANNEL BAR
1 pcs 2X2X1/4 ANGLE BAR
1 pcs 10MM THK FIBER CEMENT BOARD M.R
1 pcs METAL FURRING
1 pcs CARRYING CHANNEL
1 box BLIND RIVET