Manual Excavation Variation
Manual Excavation Variation
worker
6 550
6 400
AMOUNT
₱57,763.13 Dec 13-25, 2021
₱11,552.63
₱69,315.75 per cubic (Manual)
₱6,350.00
₱75,665.75
3300
2400
5700
11 days
₱62,700.00
Manual Excavation for Left Side Tower Footing Manual Exacavtion for Right Side TowerFooting
Manual Excavation for Center Side Tower Footing Central View of Manual Excavation
Slope Protection During Rainy Season Slope Protection During Rainy Season
Slope Protection During Rainy Season Slope Protection During Rainy Season