Professional Documents
Culture Documents
Smart DCR Sample Drawing Tamil
Smart DCR Sample Drawing Tamil
FLOOR-STILT 550.5109 -
Flat Numbers
Floor Name (2 TIES) (2 TIES)
COLUMN COLUMN
1 2 3 4 5 6
B
B
1'9" 1'9"
x x 50Ø x x 50Ø
Typical Floor - First, Second (0.53) (0.53)
RAIN WATER
83.66 SQ.MT 81.36 SQ.MT 72.76 SQ.MT 72.99 SQ.MT 72.89 SQ.MT 72.94 SQ.MT
Third, Fourth & Fifth Floor HARVESTING
6"
6"
L L
S.F NO:51
P.C.C 1:5:10
SECTION x - x
P.C.C 1:5:10
SECTION x - x
PEBBLE BED
PLAN PLAN
23.20
COLUMN & FOOTING DETAILS COLUMN & FOOTING DETAILS
1.20
DRUM DRUM
3.42
3.07
SOLAR CELL SOLAR CELL
3.07
3.20
4'0"
4'0"
5'0"
5'0"
0.23
0.23
TREAD : 0.28 m TREAD : 0.28 m 2'6" x 7'0" (0.76 x 2.13) 10 AREA OF STILT FLOOR 5926.00 550.51
D1 DOOR
KITCHEN TOILET 3'6" x 7'0" (1.06 x 2.13)
D2 DOOR
6.10
KITCHEN 4'9"X6'3" 0.30 WIDTH : 1.18 m SCHEDULE OF JOINERY FT. MT. 0.30 WIDTH : 1.18 m 4.11 AREA OF FIRST FLOOR 5768.00 535.83
3.05
3.05
0.15
S.F NO:65A/3
0.15
3.05
11
KITCHEN D1 D1 10'0"X10'0" RISE : 0.15 m 4'0" x 7'0" (1.22 x 2.13) RISE : 0.15 m O1 OPEN 2'9" x 7'0" (0.84 x 2.13)
8'0"X10'0" BED ROOM W ED ENTRANCE DOOR
14'6"X10'0" D
5'0" x 7'0" (1.52 x 2.13) OPEN TERRACE O2 OPEN 3'3" x 7'0" (0.99 x 2.13) 4.27 AREA OF THIRD FLOOR 5768.00 535.83
KW O ED1 ENTRANCE DOOR 14
5'0" x 7'0" (1.52 x 2.13)
0.23
0.23
O1 D
3'0" x 7'0" (0.91 x 2.13) O3 OPEN
9.37
0.23
D
20'0"X10'0" UP TO
1.2m HIGHT D2 DOOR 3'6" x 7'0" (1.06 x 2.13) 4.50 AREA OF FIFTH FLOOR 5768.00 535.83
4.45
2.82
2.82
W2
72.76 SQ.MT 3'6"X10'0" O2 OPEN LIFT SW
0.23
0.11
HANDRAIL
UP TO ED D 5'0" x 7'0" (1.52 x 2.13) W4 WINDOW 6'0" x 6'0" (1.83 x 1.83) 10'0"X6'0" LD
SCHEDULE OF JOINERY FT. MT.
1.2m HIGHT O3 OPEN OTS-2
0.23
0.23
W S.F NO:65A/1
4.50
0.23
14
OTS-2 BED ROOM D1 W1 WINDOW 6'0" x 4'6" (1.83 x 1.37) SW STAIRCASE WINDOW ED1 ENTRANCE DOOR 5'0" x 7'0" (1.52 x 2.13)
0.23
5'6"X8'7½" 15'9"X10'0"
6'0" x 4'6" (1.83 x 1.37)
3.05
3.05
9 W BED ROOM
W2 WINDOW 5'0" x 4'6" (1.52 x 1.37) SW SLIDING WINDOW 2.00
15 D DOOR 3'0" x 7'0" (0.91 x 2.13)
1.45
TOILET TOILET
1.50
11'3"X10'0" V W1 3'6" x 4'6" (1.06 x 1.37) 8
2.36
V LOBBY -1
4'7½"X9'0" 7'3"X4'9"
W3 WINDOW 4'6" x 6'0" (1.37 x 1.83) LIFT SW SW1 SLIDING WINDOW D1 DOOR 2'6" x 7'0" (0.76 x 2.13)
1.83
11'0"X7'9" 3.05
3'0" x 2'0" (0.91 x 0.60)
37.00
LD
V VENTILATOR 3'6" x 7'0" (1.06 x 2.13)
0.23
10'0"X6'0"
0.23
0.23
0.23
UP UP D2 3.05
FW FRENCH WINDOW 2'0" x 4'6" (0.60 x 1.37) O1 OPEN 2'9" x 7'0" (0.84 x 2.13)
2.36
2.36
1.83
1.52
0.23
0.23
0.23
FW
SW1 SLIDING WINDOW 3'6" x 4'6" (1.06 x 1.37) LD LIFT DOOR
3'0" x 2'0" (0.91 x 0.60) W WINDOW 4'0" x 4'6" (1.22 x 1.37)
1.30
V VENTILATOR
5'6" WIDE CORRIDOR
1.52
TOILET OTS-3
2.00
V
8'1½"X5'0" 5'9"X8'0" EF EXHAUST FAN W W1 WINDOW 6'0" x 4'6" (1.83 x 1.37)
0.23
TOILET
15 A A 5'0" x 4'6" (1.52 x 1.37)
2.93
W1 V W2 WINDOW
3.05
1.50
8 D1
BED ROOM
W1
32.54
9.11
0.23
0.23
A A A HANDRAIL
D D
A N FW FRENCH WINDOW 2'0" x 4'6" (0.60 x 1.37)
35.17
32.54
32.54
UP TO LIVING/DINING HANDRAIL
16 1.2m HIGHT
LIVING/DINING 21'3"X10'6" UP TO
SW STAIRCASE WINDOW 4'0" x 4'6" (1.22 x 1.37)
7 W RAIN WATER HARVESTING
1.84
1.2m HIGHT
20'0"X10'6" OPEN TERRACE 4.92
W4 FLAT-5
5 W2 5 PEBBLE BED SW SLIDING WINDOW 6'0" x 4'6" (1.83 x 1.37)
18
2.97
3.01
3'6"X9'9" BALCONY
0.23
ED
3'0" x 2'0" (0.91 x 0.60)
35.17
35.17
0.23
54.80
3.62
0.23
1.20
W
10'0"X10'0"
D1 WEATHERING COURSE 4 19
D1 KITCHEN
O1 1180.93 SQM
2.59
TOILET
5.23
1.22
KITCHEN SW
4'4½"X6'0" 7'3"X8'6"
UTILITY
8'0"X10'0"
OTS-1 FSI : 2679.15
TOILET 3'0"X8'6" SUNSHADE 3.05 = 2.268
0.23
5.07
0.23
5 ROOM
2.92
20
1.41
BALCONY BALCONY
1.50
FORUTH
0.23
W AEAR
10'9"X5'10½" RCC ROOF SLAB/BEAM
0.13
W W
0.23
TOILET
SUNSHADE
1.41
3.05
19 D1 W2
2.92
5.25
14''9"X10'0" 5.45
D THIRD FLOOR RCC ROOF SLAB/BEAM
0.13
1.30
HANDRAIL
LIVING/DINING SUNSHADE
0.23
3 W3 UP TO
VISITOR CAR PARKING 20 D 21'9"X10'3" 1.2m HIGHT TOTAL NO. OF TWO WHEELER REQUIRED : 20 + 2 = 22 NOS
2.40
FLAT-6 1
BALCONY TOTAL No. OF TWO WHEELER PROVIDED : 22 Nos
2.92
3.42
6 HANDRAIL UP TO HANDRAIL UP TO
785 SQ.FT
3'6"X9'3" ED BALCONY 1.2m HIGHT
3.48
1.2m HIGHT
72.94 SQ.MT D 4'9"X7'10½"
HAND RAIL
0.23
W4
0.23
0.23
33.3
20'0"X10'0" O BALCONY BALCONY
HANDRAIL
PEBBLE BED
.366
SECOND
0.88
0.23
18.29
UP TO
RCC ROOF SLAB/BEAM
8.00
0.13
2 SUNSHADE 0 HARVESTING
21 10.8
ED
0.23
BED ROOM
10'3"X10'6"
7'3"X7'9" UTILITY
3.05 PEBBLE BED
2.92
7.6
D 3'1½"X7'3" HANDRAIL UP TO
HANDRAIL UP TO
0.11
TOILET
5.24
6
W
APPLICANT APPLICANT
0.23 0.23
FIRST
10'0"X11'6" RCC ROOF SLAB/BEAM
0.13
FLOOR
1 8'0"X8'6" W V
TOILET
4'9"X6'3" SUNSHADE
0.23
O
0.23
0.23
2.92
9.2
D UTILITY HANDRAIL UP TO HANDRAIL UP TO
1.2m HIGHT
1.2m HIGHT
FW V 8'0"X3'4½"
8
0.23 0.21 0.23 0.23 0.23 0.23 0.23 0.23 HAND RAIL
7.00
1.45
1.45
HANDRAIL BALCONY
UP TO 1.2m W2 3.05 1.35 2.32 1.68 4.69 2.10 LIVING/DINING CORRIDOR LIVING/DINING
AR D
10
ER Y
11'6"X4'9" BALCONY
FIRST
BALCONY
HIGHT 0.84 RCC ROOF SLAB/BEAM ORM
.70
0.13
FLOOR
NSF X 5m
TRA 5m
STP 7.2m X 3m
17.83 S.F NO:65A/2A
0.46 0.23 0.46 0.46 0.23 0.23 0.23 0.23 0.23 7.50
0.11 0.23 0.11 0.23
14.9
2.21 4.72 3.12 4.95 1.22 3.05 1.33 2.44 1.68 3.12 1.45 2.10
TERRACE FLOOR PLAN
2.92
0.84
FLOOR FINISHING
2
17.83
REGISTERED STRUCTURAL ENGINEER REGISTERED STRUCTURAL ENGINEER
17.83 PCC 1:4:8
SOIL FILLING
G.L STILT FLOOR G.L
TYPICAL FIRST,SECOND,THIRD,FOURTH & FIFTH FLOOR PLAN
STILT FLOOR PLAN RCC COLUMN Rain Water Pipe
1.83
1.83
1.83
1.83
FLOOR01, FLOOR02, FLOOR03, FLOOR04, FLOOR05-TYPICAL RCC FOOTING 115 thk. brick wall
(19
5.7 0")
PCC 1:5:10
9
'-
1.83 1.83 1.83 1.83
Building Line INSIDE
REFERENCE:
SECTION - AA Slope 1 in 20
0
REGISTERED ENGINEER 1 7.2 5 to 7.5 c.m. * EXISTING ROAD
1.50
REGISTERED ENGINEER rounded size pebbles
te
ga E
Perculation pit 1.00
* SITE BOUNDARY (DEVELOPED)
18.9 0")
(62
SHEET NO:02/03 SHEET NO:03/03 ain IN
m
GL
'-
0
ide
"w NIN DRUM * AREA OF ROAD WIDENING
DE
TI
'9
26
WI
SOLAR CELL
RO
AD
P AT * DRIVE WAY
DA
VA * PROPOSED BUILDING
(19
5.7 0")
'-
9
r
eA
i foa mt.qs05.97
4'0"
o
a
d
dR * PEBBLE BED
5'0"
:n e
iW
gn 40 S.F NO:515 PLAN
17.
SOLAR WATER HEATER
AD
RO
DETAIL (NTS) SIDE ELEVATION
4.20
DE
(PROVIDED ON THE TERRACE)
WI
0'
10
(14
4.2 ")
AM
'-0
7
Y
LA
PA
A RI
OS
PO SITE PLAN
21.9 0")
(72
APPLICANT
'-
5'0"
(14
4.2 ")
GL GL
'-0
7
LOOSE SOIL 9" 1'6" 9" 100" 9" 1'6" 9"
0.6 m
C 9" C
LOOSE GRAVEL 0.6 m 4'
JOINT REINFORCEMENT
PLAN OF SEWAGE TREATMENT PLANT & HYDRAULIC FLOW DIAGRAM (NTS) MIN 2BARS FOR FULL LENGTH
ALONG TOP AND BOTTOM FACE
AS > MIN. Bd
(2 TIES) 50mm MAX AS > MAX. Bd50mm MAX
15" COLUMN
G.L G.L
lo
9" 7200 d
300
1'9"
450
x 10- 16 TOR x (0.53) 50Ø 200 1000 200 1000 200 2000 200 1000 200 1000 200
db
8 mm TOR @ 9" C/C HOOP SPACING
200 200
(2 TIES) 2d 2d
AERATION AERATION > D/2
6"
2050
2500
REGISTERED STRUCTURAL ENGINEER
lo
500
TANK TANK Bar screen ROLLING SHUTTER SLUDGE DRYING SLUDGE DRYING
EQUALISATION chamber
BED BED
L
TANK
P.C.C 1:5:10 HOOP SPACING HOOP SPACING
1900
PLAN SECTION x - x < d/6 AND 8db < d/6 AND 8db
1000
750
BEAM REINFORCEMENT
3000
TRANSVERSE REINFORCEMENT
SPECIAL CONFINNING REINFORCEMENT
200
700
900
> 300mm
AERATION TANK FINAL SUMP
200
2500
TRANSVERSE
PERFORATED R.C.C SLA1 7200 REINFORCEMENT hc
15cm
SEWAGE TREATMENT PLANT PLAN
SECTION ON A-A [ SCALE : 1:50 ] PROVISION OF CONFINING REIN FORCEMENT
COURSE SAND [ SCALE : 1:50 ]
SLUDGE DRYING BED
IN FOOTINGS
> hc/4
1.5M
G.L G.L B = BREADTH OF BEAM
135cm
G.L G.L db = DIAMETER OF LONGITUDINAL BAR
lo = (a) Larger lateral dimention of the member at the section where yielding occures,
300
PE11LES (7.5cm SIZE)
COARSE SAND,300TK.
(b) 1/6 of clear span of the member,
lo
PUMP
2500
TANK TANK Drying Bed Drying Bed
RAIN WATER
WATER TANK
FINAL SUMP
PRESSURE
CLARIFIED FINAL SUMP MEDIA
REGISTERED ENGINEER
RAW SEWAGE FILTER ACTIVATED
CARBON PRESSURE
INLET WATER TANK
FILTER FILTER
CONFINED JOINT WITH BEAM
WINDOW OPENING
lo
HARVESTING
BAR SCREEN DRAIN BEAMS FRAMING INTO
CHAMBER EQUALISATION HOLE ALL FOR SIDES
TANK
PCC BED CONFINING REINFIRCEMENT SEISMIC REINFORCEMENT DETAILING FOR FRAMED STRUCTURES
DOMESTIC EFFLUENT TREATMENT PLANT
PERCULATION PEBBLE BED HYDRAULIC FLOW DIAGRAM [ Not to Scale]
SECTION ON B-B
[ SCALE : 1:50 ] COLUMN AND JOINT DETAILING
SHEET NO:01/03