You are on page 1of 92

PERHITU

UKURAN
NO JENIS/TYPE PAGAR Diameter
Melintang Panjang

A. PANEL PAGAR ELEKTROPLATING

1 Pagar BRC FP 90 EP 1,5 5,5 mm 90 cm 240 cm


2 Pagar BRC FP 90 EP 2,0 6,0 mm 90 cm 240 cm
3 Pagar BRC FP 120 EP 1,5 5,5 mm 120 cm 240 cm
4 Pagar BRC FP 120 EP 2,0 6,0 mm 120 cm 240 cm
5 Pagar BRC FP 150 EP 1,5 5,5 mm 150 cm 240 cm
6 Pagar BRC FP 150 EP 2,0 6,0 mm 150 cm 240 cm
7 Pagar BRC FP 175 EP 2,0 6,0 mm 175 cm 240 cm
8 Pagar BRC FP 175 EP 2,5 6,5 mm 175 cm 240 cm
9 Pagar BRC FP 190 EP 2,5 6,5 mm 190 cm 240 cm

B. TIANG ELEKTROPLATING TERMASUK MUR, BAUT DAN PENUTUP ATAS


NO TYPE TINGGI TIANG (M') TINGGI PANEL

1 P90 EP dia.1,5" 1.2 0.018 0,90 M'


2 P90 EP dia.2" 1.2 0.024 0,90 M'
3 P120 EP dia.1,5" 1.5 0.018 1,20 M'
4 P120 EP dia.2" 1.5 0.024 1,20 M'
5 P150 EP dia.1,5" 1.8 0.018 1,50 M'
6 P150 EP dia.2,0" 1.8 0.024 1,50 M'
7 P175 EP dia.2,0" 2.25 0.024 1,75 M'
8 P190 EP dia.1,0" 2.4 0.012 1,90 M'
PERHITUNGAN PAGAR BRC

HARGA PER PANEL DI TOKO SARANA MATERIAL SURABAYA Expedisi (SBI Jl. Demak Surabaya)

Jl. Gemblong Surabaya Telp. 031-3737649, Fax. 031-3710189 m3 Harga/m3

Rp 270,000 0.216 Rp 950,000


Rp 321,500 0.216 Rp 950,000
Rp 334,000 0.288 Rp 950,000
Rp 397,500 0.288 Rp 950,000
Rp 347,000 0.360 Rp 950,000
Rp 412,500 0.360 Rp 950,000
Rp 449,500 0.420 Rp 950,000
Rp 527,500 0.420 Rp 950,000
Rp 565,000 0.456 Rp 950,000

Harga Per Batang

119,500.00 0.0012 Rp 950,000


148,500.00 0.0022 Rp 950,000
143,000.00 0.0015 Rp 950,000
165,000.00 0.0027 Rp 950,000
164,500.00 0.0018 Rp 950,000
205,000.00 0.0033 Rp 950,000
246,000.00 0.0041 Rp 950,000
259,500.00 0.0011 Rp 950,000
Expedisi (SBI Jl. Demak Surabaya)
HARGA
Ongkos Kirim port to door +transport dan pikul

Rp 205,200 Rp 475,200.00
Rp 205,200 Rp 526,700.00
Rp 273,600 Rp 607,600.00
Rp 273,600 Rp 671,100.00
Rp 342,000 Rp 689,000.00
Rp 342,000 Rp 754,500.00
Rp 399,000 Rp 848,500.00
Rp 399,000 Rp 926,500.00
Rp 433,200 Rp 998,200.00

Rp 1,160 120,659.79
Rp 2,062 150,561.85
Rp 1,450 144,449.74
Rp 2,577 167,577.31
Rp 1,740 166,239.69
Rp 3,093 208,092.77
Rp 3,866 249,865.97
Rp 1,031 260,530.92
1/4 6" 0.222 KG/M' 2.442 11.00
5/16 8" 0.395 KG/M' 4.345 11.00
3/8 10" 0.617 KG/M' 6.787 11.00
1/2 12" 0.888 KG/M' 9.768 11.00
9/16 14" 1.208 KG/M' 13.288 11.00
5/8 16" 1.578 KG/M' 17.358 11.00
18" 2 KG/M' 22.000 11.00
3/4 19" 2.226 KG/M' 24.486 11.00

9.00

20" 2.464 KG/M' 27.104 11.00 ###


7/8 22" 2.984 KG/M' 32.824 11.00
24,000.00 9,828.01 9,828.01
43,000.00 9,896.43 9,896.43
67,500.00 9,945.48 9,945.48
89,000.00 9,111.38 9,111.38
- 10,053.00
174,500.00 10,053.00 7,363.64
162,000.00 7,363.64 6,641.09
- 62,839.03
8,977.00

6,641.09
-
PERHITUNGAN BESI BETON

TOKO SUMBER
NO JENIS BESI ISTILAH UKURAN KOEFISIEN PANJANG 1 PANJANG 2 PANJANG 3 PANJANG 4 PANJANG 5 TOKO DUTA JAYA TOKO KALIURANG TOKO IDAMAN TOKO MANDIRI
BARU
1 BAJA BULAT 1/4 6' 0.222 11 11 11 11 11 Rp - Rp 30,000 Rp 30,000 Rp 29,000 Rp 29,000
3/8 10" 0.617 11 11 11 11 11 Rp 77,000 Rp 75,000 Rp 85,000 Rp 77,000 Rp 77,000
1/2 12" 0.888 11 11 11 11 11 Rp 102,000 Rp 115,000 Rp 125,000 Rp 107,000 Rp 107,000
13" 1.034 11 11 11 11 11
9/16 14" 1.208 11 11 11 11 11
15" 1.37 11 11 11 11 11
5/8 16" 1.578 11 11 11 11 11 Rp 180,000 Rp 200,000 Rp 200,000
18" 2 11 11 11 11 11
3/4 19" 2.226 11 11 11 11 11
20" 2.464 11 11 11 11 11
7/8 22" 2.984 11 11 11 11 11
24" 3.551 11 11 11 11 11
25" 3.853 11 11 11 11 11
1 26" 4.168 11 11 11 11 11

2 BATANG ULIR 10 0.56


13 0.995 11 11 Rp -
16 1.56 11 11 Rp -
19 2.25 11 11 Rp -
22 3.04
25 3.98
29 5.04

HARGA RATA-RATA PER KG


DEPO YOS SUDARSO KARYA PERKASA SURYA MAS HARGA PER KG

Rp 25,000 Rp 28,000 Rp - Rp 11,670.76


Rp 72,000 Rp 72,000 Rp 70,000 Rp 11,142.63
Rp 102,000 Rp 105,000 Rp 100,000 Rp 11,043.71

Rp 175,000 Rp 183,000 Rp 10,807.70

Rp -
Rp -
Rp -

Rp 11,166.20
3/4 19" 2.226 KG/M' 24.486 11.00 - -
3/8 10" 0.617 KG/M' 6.787 11.00 80,000.00 11,787.24 11,787.24
1/2 12" 0.888 KG/M' 9.768 11.00 114,000.00 11,670.76 11,670.76
9/16 14" 1.208 KG/M' 13.288 11.00 - 10,945.96
5/8 16" 1.578 KG/M' 17.358 11.00 190,000.00 10,945.96 -
18" 2 KG/M' 22.000 11.00 - 6,641.09
3/4 19" 2.226 KG/M' 24.486 11.00 - 41,045.05
#REF! 5,863.58

11.95

20" 2.464 KG/M' 27.104 11.00 180,000.00 6,641.09


7/8 22" 2.984 KG/M' 32.824 11.00 -
24" 3.551 KG/M' 39.061 11.00 -
25" 3.853 KG/M' 42.383 11.00 -
1 26" 4.168 KG/M' 45.848 11.00 -

average = Rp
DAFTAR HARGA SATUAN BAHAN DAN UPAH
#REF!
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3


1 2 3

FINISHING
1 Amplas lbr
2 Cat besi kg
3 Cat dasar kg
4 Cat emco kg
5 Cat menie besi kg
6 Cat menie kayu kg
7 Cat tembok Decolith kg
8 Cat tembok Dulux kg
9 Cat tembok Emco kg
10 Cat tembok Paragon kg
11 Cat tembok Toyopaint kg
12 Cat tembok Vinilex kg
13 Cat tembok Vinippaint kg
14 Dempul ltr
15 Kuas bh
16 Mild zak
17 Minyak cat ltr
18 Plamir kayu kg
19 Plamir tembok kg
20 Politur ultra ltr
21 Politur vernis ltr
22 Thiner A Bonanza ltr
23 Thiner B Spesial ltr

PENUTUP ATAP
24 Alang-alang panjang 2,4 meter lbr
25 Alluminium foil m2
26 Asbes Bubungan lbr
27 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr
28 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr
29 Asbes Rata 2 m x 1 m x 4 mm lbr
28 Atap metal Toratora 1 x 4 Extra m2
29 Atap metal Toratora 1 x 4 Premium m2
30 Atap metal Toratora 2 x 4 Extra m2
31 Atap metal Toratora 2 x 4 Premium m2
32 Atap metal Toratora 3 x 4 Extra m2
33 Atap metal Toratora 3 x 4 Premium m2
34 Atap metal Toratora 4 x 4 Extra m2
35 Atap metal Toratora 4 x 4 Premium m2
36 Bentala paras bh
37 Bentala tanah liat bh
38 Besi profil WF kg
39 Besi strip kg
40 Bubungan Biasa bj
41 Bubungan Karang Pilang (glazur) isi 3,5/m bj
42 Bubungan Karang Pilang isi 3,5/m bj
43 Bubungan Ngalayur isi 3,5/m bj
44 Bubungan Plentong bj
45 Bubungan Utama isi 3,5/m bj
46 Genteng Kanmuri (glazur) isi 14/m2 bj
47 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj
48 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj
49 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj
50 Genteng Morando Abadi isi 18/m2 bj
51 Genteng Morando Jatiwangi isi 18/m2 bj
52 Genteng Morando Ngalayur isi 20/m2 bj
53 Genteng Plentong bj
54 Genteng plentong dicat bj
55 Genteng Plentong Jatiwangi isi 24/m2 bj
56 Ijuk kg
57 Ikut celedu paras bh
58 Ikut celedu tanah liat bh
59 Murda paras bh

Harga Barang dan Upah Hal. 9


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
60 Murda tanah liat bh
61 Seng BJLS 0,20 gelombang lbr
62 Seng BJLS 0,25 gelombang lbr
63 Seng BJLS 0,28 gelombang lbr
64 Seng BJLS 0,32 gelombang lbr
65 Seng Plat 3" x 6" BJLS 28 lbr
66 Sirap Jati bh
67 Tali Ijuk kg
68 Tali pengikat alang-alang ikat

PENGGANTUNG
69 Engsel kupu-kupu ps
70 Engsel nylon ps
71 Espagnoleth set
72 Grendel biasa bh
73 Grendel hararo bh
74 Kaca 3 mm bening m2
75 Kaca 5 mm bening m2
76 Kaca 6 mm bening m2
77 Kaca 8 mm bening m2
78 Kaca 10 mm bening m2
79 Kaca 12 mm bening m2
80 Kaca Es/Kapur 3 mm m2
81 Kaca Es/Kapur 5 mm m2
82 Kaca nako daun
83 Kaca nako teralis bening m2
84 Kaca ryben 3 mm m2
85 Kaca ryben 5 mm m2
86 Kait angin biasa bh
87 Kunci pintu TOP bh
88 Kunci pintu Union bh
89 Kunci pintu Vanesa bh
90 Kunci pintu Yale bh
91 Kunci pintu YURI bh
92 Kunci slot bh
93 Kunci tanam 2 slag bh

KAYU DAN PLAFOND


94 Bambu besar btg
95 Bambu sedang btg
96 Bambu kecil btg
97 Celling teak (0,62 x 2,40) m2 lbr
98 Eternit lbr
99 Formika lbr
100 Gedeg kulit kelas I m2
101 Gypsum Old lbr
102 Hard board MDF lbr
103 Kalsiboard 4,5 mm lbr
104 Kayu bekesting m3
105 Kayu bingkirai m3
106 Kayu bingkirai papan m3
107 Kayu dolken (pekerjaan sementara) btg
108 Kayu jati m3
109 Kayu jati papan m3
110 Kayu kamper balok m3
111 Kayu kamper usuk/reng m3
112 Kayu kamper papan m3
113 Kayu kruing balok m3
114 Kayu kruing usuk/reng m3
115 Kayu kruing papan m3
116 Kayu meranti balok m3
117 Kayu meranti usuk/reng m3
118 Kayu meranti papan m3
119 Kayu merbau m3
120 Kayu merbau papan m3
121 Kayu profil m1
122 Kayu seseh balok m3
123 Kayu seseh dolken m3
124 Lem Aibond kg
125 Lem Kayu ltr
126 List Gypsum standar m'

Harga Barang dan Upah Hal. 10


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
127 Minyak bekisting ltr
128 Multiplek 12 mm lbr
129 Multiplek 18 mm lbr
130 Multiplek 6 mm lbr
131 Multiplek 9 mm lbr
132 Plywood 12 mm lbr
133 Plywood 3 mm lbr
134 Plywood 4 mm lbr
135 Plywood 6 mm lbr
136 Plywood 9 mm lbr
137 Plywood aluminium lbr
138 Teak wood (0,9x2,00) m2 lbr
139 Teak wood (1,20x2,40) m2 lbr

KERAMIK
IKAD
140 Ikad (Keramik) Kw. I 10 x 20 cm m2
141 Ikad (Keramik) Kw. I 20 x 20 cm m2
142 Ikad (Keramik) Kw. I 20 x 30 cm m2
143 Ikad (Keramik) Kw. I 30 x 30 cm m2
144 Ikad (Keramik) Kw. I 40 x 40 cm m2
145 Ikad (Keramik) Kw. II 10 x 20 cm m2
146 Ikad (Keramik) Kw. II 20 x 20 cm m2
147 Ikad (Keramik) Kw. II 20 x 30 cm m2
148 Ikad (Keramik) Kw. II 30 x 30 cm m2
149 Ikad (Keramik) Kw. II 40 x 40 cm m2

INESA
150 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2
151 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
152 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2
153 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2
154 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2
155 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2
156 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2
157 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
158 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2
159 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2
160 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2

ESSENZA
161 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2
162 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2
163 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
164 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2
165 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
166 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2
167 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
168 Keramik Kelas I Domus m2
169 Keramik Kelas I Granity Imperiali m2
170 Keramik Kelas I Lavagna m2
171 Keramik Kelas I Mountain Peak m2

GARUDA
172 Keramik 20 x 20 kelas I Emboss Dasar Muda m2
173 Keramik 20 x 20 kelas I Emboss Dasar Tua m2
174 Keramik 20 x 20 kelas I Tesia m2
175 Keramik 20 x 20 kelas II Emboss Dasar Muda m2
176 Keramik 20 x 20 kelas II Emboss Dasar Tua m2
177 Keramik 20 x 20 kelas II Tesia m2
178 Keramik 20 x 25 kelas I Motif Dasar Medium m2
179 Keramik 20 x 25 kelas I Motif Dasar Muda m2
180 Keramik 20 x 25 kelas I Nuri Dark m2
181 Keramik 20 x 25 kelas I Polos m2
182 Keramik 30 x 30 kelas I Granity m2
183 Keramik 30 x 30 kelas I Motif Embose m2
184 Keramik 30 x 30 kelas II Granity m2
185 Keramik 30 x 30 kelas II Motif Embose m2
186 Keramik 40 x 40 kelas I Motif Dasar Muda m2
187 Keramik 40 x 40 kelas I Motif Dasar Muda m2

Harga Barang dan Upah Hal. 11


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
188 Keramik 40 x 40 kelas I Motif Embose m2
189 Keramik 40 x 40 kelas I Motif Granity Tua m2
190 Keramik 40 x 40 kelas I Motif Medium Color m2
191 Keramik 40 x 40 kelas I Motif Spesial Color m2
192 Keramik 50 x 50 kelas I m2

ASIA
193 Keramik 10 x 20 kelas I warna muda m2
194 Keramik 20 x 20 kelas I warna muda m2
195 Keramik 20 x 20 kelas I warna tua m2
196 Keramik 20 x 25 kelas I warna tua m2
197 Keramik 20 x 30 kelas I warna muda m2
198 Keramik 30 x 30 kelas I warna muda m2
199 Keramik 30 x 30 kelas I warna tua m2
200 Keramik 40 x 40 kelas I warna muda m2
201 Keramik 10 x 20 kelas II m2
202 Keramik 20 x 20 kelas II m2
203 Keramik 20 x 30 kelas II m2
204 Keramik 30 x 30 kelas II m2
205 Keramik 40 x 40 kelas II m2

MULIA
206 Keramik 10 x 20 cm kelas I m2
207 Keramik 20 x 20 cm kelas I m2
208 Keramik 20 x 30 cm kelas I m2
209 Keramik 30 x 30 cm kelas I m2
210 Keramik 40 x 40 cm kelas I m2
211 Keramik 10 x 20 cm kelas II m2
212 Keramik 20 x 20 cm kelas II m2
213 Keramik 20 x 30 cm kelas II m2
214 Keramik 30 x 30 cm kelas II m2
215 Keramik 40 x 40 cm kelas II m2

SANITAIR
201 Bak mandi fibre glass 70x70x66 cm bh
202 Bak mandi keramik bh
203 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh
204 Floor drain plastik bh
205 Floor drain stainless bh
206 Kloset duduk INA bh
207 Kloset duduk Amerika Standar bh
208 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh
209 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh
210 Kloset duduk " TOTO Type AVANTE CW 823 J bh
211 Kloset duduk " TOTO Type CW 660J bh
212 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh
213 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh
214 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh
215 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh
216 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
217 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
218 Kloset jongkok " TOTO Type CE 6 COMPLIT bh
219 Kloset jongkok " TOTO Type CE 7 COMPLIT bh
220 Kloset porselin jongkok Kia (standar) bh
221 Kloset porselin jongkok Ina (standar) bh
222 Kran biasa bh
223 Kran SunEi bh
224 Kran TOTO T 205 LCSC bh
225 Kran TOTO T 205 MC bh
226 Kran TOTO T 23 B13 bh
227 Kran TOTO T 23 B13V7N bh
228 Kran TOTO T 26 - 13 bh
229 Kran TOTO TX 109 LH bh
230 Penyekat Urinoir " TOTO " Type A 100 " bh
231 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh
232 Soap holder " TOTO " Type S 6 N " bh
233 Seal tape bh
234 Urinoir " TOTO U 57 M bh
235 Urinoir " TOTO U 57 M BODI bh
236 Urinoir " TOTO UW 447 JT 1 " bh
237 Urinoir " TOTO UW 447 JT 1 BODI bh

Harga Barang dan Upah Hal. 12


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
238 Urinoir " TOTO UW 447 JT 1,M " bh
239 Urinoir " TOTO UW 447 JT 1,M "BODI bh
240 Wastagel KIA Standard bh
241 Wastagel KIA Warna bh
242 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh
243 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh

PAKU
244 Paku 10 cm kg
245 Paku kalsiboard kg
246 Paku list SQ kg
247 Paku pancing 60 x 230 kg
248 Paku reng/usuk SQ kg
249 Paku seng kg
250 Paku seng import bj
251 Paku skrup 1/2" kg
252 Paku skrup 2" kg
253 Paku skrup 3.5" kg
254 Paku sumbat 1/2" kg

PASIR, BATU, KERIKIL, BATA DAN PARAS


255 Bata gosok ex Tulikup bj
256 Bata pasang klas I bj
257 Batako kelas I bj
258 Batu kali m3
259 Batu karang m3
260 Batu lahar Singaraja m3
261 Batu pecah 5-7 cm (manual) m3
262 Batu pipih Singaraja m3
263 Glass block bj
264 Kerawang bh
265 Koral Beton m3
266 Limestone m3
267 Paras Batik bh
268 Paras Buahan bh
269 Paras Karang Bukit bh
270 Paras Kerobokan bh
271 Paras Malem bh
272 Paras Putih Bukit bh
273 Paras Silakarang tebal bh
274 Paras Silakarang tipis bh
275 Paras untuk pondasi bh
276 Pasir beton m3
277 Pasir pasang m3
278 Pasir urug m3
279 Sirtu m3
280 Tanah urug m3

PIPA
281 Pipa Galvanis 1/2" m1
282 Pipa Galvanis 3/4" m1
283 Pipa Galvanis 1 1/4" m1
284 Pipa Galvanis 1 1/2" m1
285 Pipa Galvanis 1" m1
286 Pipa Galvanis 1,5 BSA m1
287 Pipa Galvanis 2" m1
288 Pipa Galvanis 3" m1
289 Pipa Maspion AW 1 ljr
290 Pipa Maspion AW 1/2 ljr
291 Pipa Maspion AW 10 ljr
292 Pipa Maspion AW 1-1/2 ljr
293 Pipa Maspion AW 1-1/4 ljr
294 Pipa Maspion AW 12 ljr
295 Pipa Maspion AW 14 ljr
296 Pipa Maspion AW 16 ljr
297 Pipa Maspion AW 2 ljr
298 Pipa Maspion AW 2-1/2 ljr
299 Pipa Maspion AW 3 ljr
300 Pipa Maspion AW 3/4 ljr
301 Pipa Maspion AW 4 ljr
302 Pipa Maspion AW 5 ljr

Harga Barang dan Upah Hal. 13


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
303 Pipa Maspion AW 6 ljr
304 Pipa Maspion AW 8 ljr
305 Pipa Maspion C 1 ljr
306 Pipa Maspion C 1-1/2 ljr
307 Pipa Maspion C 1-1/4 ljr
308 Pipa Maspion C 2 ljr
309 Pipa Maspion C 2-1/2 ljr
310 Pipa Maspion C 3 ljr
311 Pipa Maspion C 3/4 ljr
312 Pipa Maspion C 4 ljr
313 Pipa Maspion C 5/8 ljr
314 Pipa Maspion D 10 ljr
315 Pipa Maspion D 1-1/2 ljr
316 Pipa Maspion D 1-1/4 ljr
317 Pipa Maspion D 12 ljr
318 Pipa Maspion D 14 ljr
319 Pipa Maspion D 16 ljr
320 Pipa Maspion D 2 ljr
321 Pipa Maspion D 2-1/2 ljr
322 Pipa Maspion D 3 ljr
323 Pipa Maspion D 4 ljr
324 Pipa Maspion D 5 ljr
325 Pipa Maspion D 6 ljr
326 Pipa Maspion D 8 ljr

SEMEN
327 Semen Bosowa 50 kg zak
328 Semen Gresik 40 kg zak
329 Semen Gresik 50 kg zak
330 Semen Tiga Roga 50 kg zak
331 Semen Tonasa 50 kg zak
332 Semen warna/semen grouting kg

BESI BETON DAN PAGAR


333 Besi beton kg
334 Kawat berduri roll
335 Kawat beton RRT kg
336 Pagar BRC asli T.120 diameter 6mm m'
337 Pagar BRC asli T.150 diameter 6mm m'
338 Pagar BRC asli T.175 diameter 7mm m'
339 Pagar BRC asli T.190 diameter 7mm m'
340 Pagar BRC asli T.90 diameter 6mm m'
341 Pagar HotDip Galvanized T.120 diameter 6mm m'
342 Pagar HotDip Galvanized T.150 diameter 7mm m'
343 Pagar HotDip Galvanized T.175 diameter 7mm m'
344 Pagar HotDip Galvanized T.190 diameter 7mm m'
345 Pagar HotDip Galvanized T.90 diameter 6mm m'
346 Tiang BRC asli T. 120 diameter 1 1/2" bh
347 Tiang BRC asli T. 150 diameter 2" bh
348 Tiang BRC asli T. 175 diameter 2" bh
349 Tiang BRC asli T. 190 diameter 2" bh
350 Tiang BRC asli T. 90 diameter 1 1/2" bh
351 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh
352 Tiang HotDip Galvanized T. 150 diameter 2" bh
353 Tiang HotDip Galvanized T. 175 diameter 2" bh
354 Tiang HotDip Galvanized T. 190 diameter 2" bh
355 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh

BAHAN LISTRIK
356 Saklar (Broco) bh
357 Stop Kontak bh
358 Fitting bh
359 Steker bh
360 Coaxial cable 5C - 75 ohm commscof m1
361 Kabel NYM 3 x 2.5 mm ex. Supreme m1
362 Kabel NYM 4 mm m1
363 Kabel telephone m1
364 Lampu pijar 10 Watt (Philip) bh
365 Lampu pijar 15 Watt (Philip) bh
366 Lampu pijar 25 Watt (Philip) bh
367 Lampu TL 10 Watt (10 Watt) bh

Harga Barang dan Upah Hal. 14


NO NAMA BARANG SATUAN HARGA 1 HARGA 2 HARGA 3
1 2 3
368 Lampu TL 20 Watt (10 Watt) bh
369 Lampu TL 25 Watt (10 Watt) bh
370 Pipa clipsal 20 mm bt
371 Pipa flexible clipsal 20 mm m1
372 Sock clipsal 20 mm bj
373 Tee dos clipsal 20 mm bh
374 Klem clipsal 20 mm bj
375 Inbow dos plastik clipsal E 157 P bj

BUIS BETON
376 Buis beton 10 x 75 bh
377 Buis beton 15 x 75 bh
378 Buis beton 20 x 75 bh
379 Buis beton 25 x 75 bh
380 Buis beton 30 x 75 bh
381 Buis beton 50 x 75 bh

PAVING
382 Paving 10 x 20 cm tebal 6 cm K225 m2
383 Paving 10 x 20 cm tebal 6 cm K300 m2
384 Paving 10 x 20 cm tebal 6 cm standard m2
385 Paving 10 x 20 cm tebal 8 cm K225 m2
386 Paving 10 x 20 cm tebal 8 cm K300 m2
387 Paving 10 x 20 cm tebal 8 cm standard m2
388 Paving Tiga Berlian tebal 6 cm K225 m2
389 Paving Tiga Berlian tebal 8 cm K225 m2
390 Kanstein Bulat 15x20x50 cm K225 m1
391 Kanstein Jumbo 15x30x50 cm K225 m1
392 Kanstein Super 17x25x60 cm K225 m1
393 Grass Block m2
394 Koral sikat zak

LAIN-LAIN
395 Dugul batu hitam 50 x 50 x 200 unit
396 Dugul batu hitam 60 x 70 x 250 unit
397 Dugul batu hitam 70 x 70 x 250 unit
398 Padmasari batu hitam 50 x 50 x 200 unit
399 Padmasari batu hitam 70 x 70 x 250 unit
400 Padmasari batu hitam 65 x 75 x 225 unit

Denpasar, April 2010


Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. I Dewa Made Apramana, MM


Pembina Tk. I
NIP. 195904211987111002

Harga Barang dan Upah Hal. 15


AN UPAH

HARGA 4 HARGA 5 RATA-RATA


4

Harga Barang dan Upah Hal. 16


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 17


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 18


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 19


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 20


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 21


HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 22


DAFTAR HARGA SATUAN BAHAN DAN UPAH
DAFTAR HARGA ALAT
TAHUN ANGGARAN 2015
SAMA PRIMA JAYA ATLANTIK ALAM SARI WAGOM
NO JENIS ALAT
NUR SYAFIRA INDAH KONST
1 2

1 Asphal Mixing Flant


Spesifikasi 60,00 Ton/jam OSP - 1000
Merk LB 800 Osaka
Tahun Pembelian 2012 2011
Harga Pembelian 5,250,000,000.00
Kondisi 90%
Harga Sewa 9700000/Jam 12,492,126.75

2 Aspal Finisher
Spesifikasi 10 ton Nigata NFB 6C
Merk Nanchai Nigata
Tahun Pembelian 2011 2008
Harga Pembelian 2,196,000,000.00
Kondisi 80%
Harga Sewa 500,000/jam 1,760,333.06

3 Asphal Sprayer
Spesifikasi 850 l
Merk Yanmar TF 55 R
Tahun Pembelian 2012 2007
Harga Pembelian 222,345,000.00
Kondisi 80%
Harga Sewa 150,000/jam 156,284.03

4 Bulldozer 100-150 HP
Spesifikasi 11 ton Cat D7G
Merk sakai Caterpilar
Tahun Pembelian 2004 2009
Harga Pembelian 2,978,325,000.00
Kondisi Baik 80%
Harga Sewa 155,000,000/bulan 1,783,008.36

5 Compressor 400-6500 L/M


Spesifikasi 5000 cpm(L/M)
Merk Airman Atlas Copo
Tahun Pembelian 2011 2008
Harga Pembelian 247,050,000.00
Kondisi 80%
Harga Sewa 250,000/jam 391,042.60

6 Concrete Mixer 0.3-0.6 m3


Spesifikasi
Merk Hercules

Harga Barang dan Upah Hal. 23


SAMA PRIMA JAYA ATLANTIK ALAM SARI WAGOM
NO JENIS ALAT
NUR SYAFIRA INDAH KONST
1 2
Tahun Pembelian 2009
Harga Pembelian 9,150,000.00
Kondisi 80%
Harga Sewa 120,482.56

7 Dump Truk 3-4 Ton


Spesifikasi 3.5 ton 5 ton Colt Diesel
Merk Hino hino 300 Mitsubishi
Tahun Pembelian 2013 2008 2008
Harga Pembelian 410,833,500.00
Kondisi Baik 80%
Harga Sewa 350,000/jam 20,000,000/bulan 613,886.20

8 Dump Truk
Spesifikasi 5 ton CWA 260 MX5
Merk hino 300 Nissan
Tahun Pembelian 2013 2008
Harga Pembelian 658,050,000.00
Kondisi Baik 80%
Harga Sewa 20,000,000/bulan 1,082,117.37

9 Exvator 80-140 HP
Spesifikasi 0,90 m3 Hitachi ZX 200
Merk Hitachi Hitachi Hitachi
Tahun Pembelian 2011 2014 2011
Harga Pembelian 1,650,000,000.00
Kondisi Baik 90%
Harga Sewa 937,000/jam 130,000,000/bulan 1,014,161.85

10 Flat Bed Truk 3-4 m3


Spesifikasi 10 ton Colt Diesel
Merk Hino Mitsubhisi
Tahun Pembelian 2012 2004
Harga Pembelian 410,833,500.00
Kondisi 75%
Harga Sewa 500,000/jam 620,314.78

11 Exvator + Breaker
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa

12 Generator Set
Spesifikasi 135 KVA Mitshubishi 8DC9-3A
Merk Denyo Mitsubhisi
Tahun Pembelian 2011 2012
Harga Pembelian 945,000,000.00
Kondisi 100%
Harga Sewa 500,000/jam 1,456,200.90

13 Motor Grader >100 HP

Harga Barang dan Upah Hal. 24


SAMA PRIMA JAYA ATLANTIK ALAM SARI WAGOM
NO JENIS ALAT
NUR SYAFIRA INDAH KONST
1 2
Spesifikasi Komatsu GD505A-2
Merk Komatsu
Tahun Pembelian 2012

Harga Barang dan Upah Hal. 25


SAMA PRIMA JAYA ATLANTIK ALAM SARI WAGOM
NO JENIS ALAT
NUR SYAFIRA INDAH KONST
1 2
Harga Pembelian 1,831,500,000.00
Kondisi 100%
Harga Sewa 900,000/jam 155,000,000/bulan 953,571.15

14 Wheel Loader 1.0-1.6 m3


Spesifikasi 1,50 m3 Cat 924 F
Merk Changling Catepilar
Tahun Pembelian 2011 2009
Harga Pembelian 1,235,250,000.00
Kondisi 80%
Harga Sewa 500,000/jam 708,934.95

15 Three Wheel Loader 6-8 T


Spesifikasi 8,00 Ton
Merk Sakai
Tahun Pembelian 2000
Harga Pembelian
Kondisi
Harga Sewa 400,000/jam

16 Tandem Roller 6-8 T


Spesifikasi 8,00 Ton Sakai SW 60
Merk Sakai Sakai
Tahun Pembelian 2,013 2010
Harga Pembelian 869,250,000.00
Kondisi 90%
Harga Sewa 600,000/jam 606,282.75

17 Tire Roller 8-10 T


Spesifikasi 9 ton Sakai TG 500
Merk Sakai Sakai
Tahun Pembelian 2012 2007
Harga Pembelian 1,464,000,000.00
Kondisi 80%
Harga Sewa 500,000 868,280.14

18 Vibrator Roller 5-8 T


Spesifikasi 7 ton Cat CS 533 E
Merk Sakai Catepilarr
Tahun Pembelian 2012 2010
Harga Pembelian 930,000,000.00
Kondisi 90%
Harga Sewa 400,000/jam 669,967.96

19 Concrete Vibrator
Spesifikasi
Merk Honda
Tahun Pembelian 2009
Harga Pembelian 27,450,000.00
Kondisi 80%
Harga Sewa 108,675.85

20 Stone Crusher
Spesifikasi
Merk

Harga Barang dan Upah Hal. 26


SAMA PRIMA JAYA ATLANTIK ALAM SARI WAGOM
NO JENIS ALAT
NUR SYAFIRA INDAH KONST
1 2
Tahun Pembelian 2010
Harga Pembelian 4,053,450,000.00
Kondisi 90%
Harga Sewa 1,689,829.27

21 Water Pump 70-100 mm


Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian 5,625,000.00
Kondisi
Harga Sewa 104,085.72

22 Water Tanker 3000-4500 l


Spesifikasi 4000 l
Merk Hino
Tahun Pembelian 2013
Harga Pembelian 320,250,000.00
Kondisi
Harga Sewa 350,000/jam 472,439.85

23 Jacj hammer
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian 52,500,000.00
Kondisi
Harga Sewa 50,000/jam 117,895.43

23 Rock Drill Breaker


Spesifikasi
Merk Soosan
Tahun Pembelian
Harga Pembelian
Kondisi
Harga Sewa 1,000,000/jam

Fakfak, 22 April 2015


PANITIA PENYUSUNAN STANDARD HARGA SATUAN TAHUN 2015
Sekretaris, ,Ketua

RIZAL MINGGELE, ST LIZA NEIRASARI, ST


NIP. 19820701 200909 1 001 NIP. 19751016 200111 2 001

Mengetahui,
Plh. Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,

ANTHON UBRA, SE
Harga Barang dan Upah NIP. 19580726 197807 1 001 Hal. 27
Mengetahui,
Plh. Kepala Dinas Pekerjaan Umum
SAMA PRIMA JAYA
Kabupaten Fakfak , ATLANTIK ALAM SARI WAGOM
NO JENIS ALAT
NUR SYAFIRA INDAH KONST
1 2

ANTHON UBRA, SE
NIP. 19580726 197807 1 001

Harga Barang dan Upah Hal. 28


PROSENTASE KOMPONEN BIAYA PEMBANGUNAN
GEDUNG NEGARA KLASIFIKASI SEDERHANA

Biaya Konstruksi Fisik


0 250 jt 500 jt 1m 2,5 m 5m 10 m 25 m
Komponen Kegiatan
s/d s/d s/d s/d s/d s/d s/d s/d
250 jt 500 jt 1m 2,5 m 5m 10 m 25 m 50 m

Perencanaan (% ) 8.23 8.23 s/d 6.83 6.83 s/d 5.63 5.63 s/d 4.65 4.65 s/d 3.9 3.9 s/d 3.28 3.28 s/d 2.82 2.82 s/d 2.44
Pengawasan (%) 5.35 5.35 s/d 4.62 4.62 s/d 3.9 3.9 s/d 3.27 3.27 s/d 2.73 2.73 s/d 2.27 2.27 s/d 1.92 1.92 s/d 1.65
Pengelolaan Proyek (%) 14 14 s/d 10 10 s/d 6.75 6.75 s/d 4.2 4.2 s/d 2.85 2.85 s/d 1.9 1.9 s/d 1.2 1.2 s/d 0.8

BERDASARKAN PERATURAN MENTERI PEKERJAAN UMUM


No. 45/PRT/M/2007 ( Tentang : PEDOMAN TEKNIS PEMBANGUNAN GEDUNG NEGARA )
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
#REF!

NO URAIAN PEKERJAAN HARGA


1 2 3
### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!
16 ### Rp. #REF!
17 ### Rp. #REF!
18 ### Rp. #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 #REF!
Rp. #REF!
9 #REF!
Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 #REF!
Rp. #REF!
13 #REF!
Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!
16 ### Rp. #REF!
17 ### Rp. #REF!
18 ### Rp. #REF!
19 ### Rp. #REF!
20 ### Rp. #REF!
21 ### Rp. #REF!
22 ### Rp. #REF!
23 ### Rp. #REF!

#REF!
24 Rp. #REF!
#REF!
25 Rp. #REF!
26 ### Rp. #REF!
27 ### Rp. #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!
16 ### Rp. #REF!
17 ### Rp. #REF!
18 ### Rp. #REF!
19 ### Rp. #REF!
20 ### Rp. #REF!
21 ### Rp. #REF!

### ###
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!

### ###
1 ### Rp. #REF!
###
2 ### Rp. #REF!
3 ### Rp. #REF!
###
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!
16 ### Rp. #REF!
17 ### Rp. #REF!
18 ### Rp. #REF!
19 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!

Fakfak, 16 Agustus 2012


Panitia Penyusunan Standard Harga Satuan
Tahun 2013
,Ketua
Sekretaris,

Ir. ARIEF HARTADI, MT


LIZA NEIRASARI, ST NIP. 19640121 199403 1 004
NIP. 19751016 200111 2 001

Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,

SAMAUN DAHLAN, S.Sos, MAP


NIP. 19681005 199108 1 002
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,

NO URAIAN PEKERJAAN HARGA


SAMAUN DAHLAN, S.Sos, MAP
1 2 199108 1 002
NIP. 19681005 3
RAB
PEMBANGUNAN RUMAH T.70
Lokasi : Kampung Homorkokma Distrik Kramamongga

Harga Satuan Jumlah Harga


No Uraian pekerjaan Sat Volume
(Rp) (Rp)
I. Pekerjaan Pendahuluan
1 Pengukuran/pas.bouwplak M' 49.00 #REF! #REF!
2 Papan nama proyek Bh 1.00 1,000,000.00 1,000,000.00
3 Pembersihan lokasi M2 100.00 #REF! #REF!
4 Barak Kerja M2 12.00 #REF! #REF!
#REF!
II. Pekerjaan Tanah
1 Galian tanah/batu pondasi M3 32.63 #REF! #REF!
2 Urugan tanah kembali M3 10.88 #REF! #REF!
3 Timbunan tanah bawah lantai M3 31.20 #REF! #REF!
4 Urugan pasir bawah lantai t=7 cm M3 3.90 #REF! #REF!
#REF!
III. Pekerjaan Pasangan
1 Pas. Batu kosong M3 8.70 #REF! #REF!
2 Pasang pondasi batu belah 1:4 M3 38.32 #REF! #REF!
3 Sloef beton tanpa tulang 1:2:3, 20/25 M3 3.55 #REF! #REF!
4 Pas. Dinding coor 1:4 M3 13.79 #REF! #REF!
5 Plester dinding 1:4 M2 275.80 #REF! #REF!
6 Coor lantai beton tumbuk 1:3:5, t=7 cm di- M3 7.80 #REF! #REF!
plester 1:3 dan difloor -
7 Keramik lantai 30x30 M2 78.00 #REF! #REF!
8 Coor bak air 75x50x50 Bh 1.00 #REF! #REF!
9 Closet jongkok porcelen Bh 1.00 #REF! #REF!
10 Coor beton tulang plat dapur M3 0.02 #REF! #REF!
11 Septictank + rembesan Bh 1.00 9,469,302.09 9,469,302.09
#REF!
IV. Pekerjaan Kayu
1 Tiang ky. Besi 10/10 M3 0.63 4,768,150.00 3,003,934.50
2 Mirplat ky. Besi 10/10 M3 0.70 4,768,150.00 3,337,705.00
3 Kosen pintu/jendela/regel ky. Besi 5/10 M3 0.90 #REF! #REF!
4 Kuda -kuda + pengapit + skoor ky. Besi 5/10 M3 0.88 #REF! #REF!
5 Gording ky. Matoa 5/10 M3 1.14 #REF! #REF!
6 Plafond tripleks 4 mm + rangka M2 109.09 #REF! #REF!
7 Jalusi datar papan kayu besi M2 5.94 #REF! #REF!
8 Listplank papan ky. Besi 2,5/30 M1 105.60 #REF! #REF!
9 Papan gewel kayu matoa M2 18.31 #REF! #REF!
10 Pintu panil kayu besi M2 9.45 #REF! #REF!
11 Pintu double tripleks kayu besi lapis seng plat M2 1.68 #REF! #REF!
12 Jendela split M2 0.32 #REF! #REF!
13 Jendela kaca mati (1,2x0,4) M2 0.48 #REF! #REF!
14 Jendela kaca mati (1,9x0,4) M2 0.76 #REF! #REF!
15 Jendela kaca jungkit (1,9x0,7) M2 2.66 #REF! #REF!
16 Jendela nako 8 klips Zet 12.00 483,098.00 5,797,176.00
#REF!
V. Pekerjaan Atap
1 Atap seng gelombang Bjls 0,30 M2 126.50 #REF! #REF!
2 Bubungan seng plat Bjls 0,30 M' 16.00 #REF! #REF!
#REF!
VI. Pekerjaan Pengecatan
1 Cat kilap kayu M2 61.60 #REF! #REF!
2 Sigmatex plafond baru 3x M2 109.09 #REF! #REF!
3 Sigmatex dinding baru 3x M2 275.97 #REF! #REF!
#REF!
1 2 3 4 5 6
VII. Pekerjaan Instalasi
1 Pasang lampu TL 40 Watt Bh 6.00 #REF! #REF!
2 Pasang lampu pijar 25 Watt Bh 3.00 #REF! #REF!
3 Zekering kast 1 group otomatis Bh 1.00 #REF! #REF!
4 Pasang saklar tunggal Bh 5.00 #REF! #REF!
5 Pasang saklar ganda Bh 2.00 #REF! #REF!
6 Pasang stop kontak Bh 6.00 #REF! #REF!
7 Penyambungan listrik Ls 1.00 2,500,000.00 2,500,000.00
8 Instalasi air Ls 1.00 2,000,000.00 2,000,000.00
9 Dokumentasi (0%,50%,100%) Ls 1.00 1,000,000.00 1,000,000.00
#REF!

REKAPITULASI

I Pekerjaan Pendahuluan …………………… Rp #REF!


II Pekerjaan Tanah …………………… Rp #REF!
III Pekerjaan Pasangan …………………… Rp #REF!
IV Pekerjaan Kayu …………………… Rp #REF!
V Pekerjaan Atap …………………… Rp #REF!
VI Pekerjaan Pengecatan …………………… Rp #REF!
VII Pekerjaan Instalasi …………………… Rp #REF!
Real Cost Rp #REF!
Di Bulatkan Rp #REF!
Harga Bangunan per M2 Kons. Rangka Kayu Besi Rp #REF!
RAB
PEMBANGUNAN RUMAH T.70
Lokasi : Kampung Homorkokma Distrik Kramamongga

Harga Satuan
No Uraian pekerjaan Sat Volume
(Rp)
I. Pekerjaan Pendahuluan
1 Pengukuran/pas.bouwplak M' 49.00 #REF!
2 Papan nama proyek Bh 1.00 1,000,000.00
3 Pembersihan lokasi M2 100.00 #REF!
4 Barak Kerja M2 12.00 #REF!

II. Pekerjaan Tanah


1 Galian tanah/batu pondasi M3 32.63 #REF!
2 Urugan tanah kembali M3 10.88 #REF!
3 Timbunan tanah bawah lantai M3 31.20 #REF!
4 Urugan pasir bawah lantai t=7 cm M3 3.90 #REF!

III. Pekerjaan Pasangan


1 Pas. Batu kosong M3 8.70 #REF!
2 Pasang pondasi batu belah 1:4 M3 38.32 #REF!
3 Sloef beton tulang 1:2:3, 20/25 M3 3.55 #REF!
4 Pas. Dinding coor 1:4 M3 13.79 #REF!
5 Plester dinding 1:4 M2 275.80 #REF!
6 Coor lantai beton tumbuk 1:3:5, t=7 cm di- M3 7.80 #REF!
plester 1:3 dan difloor
7 Keramik lantai 30x30 M2 78.00 #REF!
8 Coor bak air 75x50x50 Bh 1.00 #REF!
9 Closet jongkok porcelen Bh 1.00 #REF!
10 Coor beton tulang plat dapur M3 0.02 #REF!
11 Septictank + rembesan Bh 1.00 9,469,302.09

IV. Pekerjaan Kayu


1 Kolom beton tulang 10/10 M3 0.63 #REF!
2 Ringbalk beton tulang 10/10 M3 0.70 #REF!
3 Kosen pintu/jendela/regel ky. Besi 5/10 M3 0.90 #REF!
4 Kuda -kuda + pengapit + skoor ky. Besi 5/10 M3 0.88 #REF!
5 Gording ky. Matoa 5/10 M3 1.14 #REF!
6 Plafond tripleks 4 mm + rangka M2 109.09 #REF!
7 Jalusi datar papan kayu besi M2 5.94 #REF!
8 Listplank papan ky. Besi 2,5/30 M1 105.60 #REF!
9 Papan gewel kayu matoa M2 18.31 #REF!
10 Pintu panil kayu besi M2 9.45 #REF!
11 Pintu double tripleks kayu besi lapis seng plat M2 1.68 #REF!
12 Jendela split M2 0.32 #REF!
13 Jendela kaca mati (1,2x0,4) M2 0.48 #REF!
14 Jendela kaca mati (1,9x0,4) M2 0.76 #REF!
15 Jendela kaca jungkit (1,9x0,7) M2 2.66 #REF!
16 Jendela nako 8 klips Zet 12.00 483,098.00

V. Pekerjaan Atap
1 Atap seng gelombang Bjls 0,30 M2 126.50 #REF!
2 Bubungan seng plat Bjls 0,30 M' 16.00 #REF!

VI. Pekerjaan Pengecatan


1 Cat kilap kayu M2 61.60 #REF!
2 Sigmatex plafond baru 3x M2 109.09 #REF!
3 Sigmatex dinding baru 3x M2 275.97 #REF!

1 2 3 4 5
VII. Pekerjaan Instalasi
1 Pasang lampu TL 40 Watt Bh 6.00 #REF!
2 Pasang lampu pijar 25 Watt Bh 3.00 #REF!
3 Zekering kast 1 group otomatis Bh 1.00 #REF!
4 Pasang saklar tunggal Bh 5.00 #REF!
5 Pasang saklar ganda Bh 2.00 #REF!
6 Pasang stop kontak Bh 6.00 #REF!
7 Penyambungan listrik Ls 1.00 2,500,000.00
8 Instalasi air Ls 1.00 2,000,000.00
9 Dokumentasi (0%,50%,100%) Ls 1.00 1,000,000.00

REKAPITULASI

I Pekerjaan Pendahuluan …………………… Rp


II Pekerjaan Tanah …………………… Rp
III Pekerjaan Pasangan …………………… Rp
IV Pekerjaan Kayu …………………… Rp
V Pekerjaan Atap …………………… Rp
VI Pekerjaan Pengecatan …………………… Rp
VII Pekerjaan Instalasi …………………… Rp
Real Cost Rp
Di Bulatkan Rp
Harga Bangunan per M2 Kons. Beton Bertulang Rp
ga

Jumlah Harga
(Rp)

#REF!
1,000,000.00
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
9,469,302.09
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
5,797,176.00
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2,500,000.00
2,000,000.00
1,000,000.00
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
44.04

275.80
37.6
6.8
4.42 275.80
6.15
5.7
2.15
3.15
5
70.97 4.435625
0.9
10.08
RAB
PEMBANGUNAN PASAR EKS KIOS LAMA THUMBURUNI
KONSTRUKSI BETON TULANG BERLANTAI
LOKASI : FAKFAK KOTA
Harga Satuan Jumlah Harga
No URAIAN KEGIATAN Sat Volume
(Rp) (Rp)
1 2 3 4 5 6
I. PEKERJAAN PENDAHULUAN
1 Dokumentasi 0%,50%,100% LS 1.00 1,000,000.00 1,000,000.00
2 Pasang bouwplank M' 128.00 #REF! #REF!
3 Papan nama proyek Bh 1.00 1,000,000.00 1,000,000.00
4 Barak Kerja M2 12.00 #REF! #REF!
#REF!
II. PEKERJAAN TANAH
1 Galian pondasi berbatu M3 150.21 #REF! #REF!
2 Urugan tanah kembali M3 50.07 #REF! #REF!
3 Timbunan tanah bawah lantai M3 123.20 #REF! #REF!
4 Urugan pasir M3 15.40 #REF! #REF!
#REF!
III. Pekerjaan Pasangan
1 Pasang pondasi batu belah 1:4 M3 98.80 #REF! #REF!
2 Pasang talud batu belah 1:4 M3 24.00 #REF! #REF!
3 Pasang batu saluran 1:4 M3 9.00 #REF! #REF!
4 Cor lantai kerja t=10 cm M3 6.22 #REF! #REF!
5 Pasang poer beton tulang 1:2:3 (1x1x0.4) M3 14.40 #REF! #REF!
6 Sloof beton tulang 1:2:3, 20/30 (arah X) M3 4.44 #REF! #REF!
7 Sloof beton tulang 1:2:3, 20/30 (arah Y) M3 5.33 #REF! #REF!
8 Sloof beton tulang 1:2:3,15/20 (arah X) M3 1.03 #REF! #REF!
9 Sloof beton tulang 1:2:3,15/20 (arah Y) M3 2.28 #REF! #REF!
10 Kolom beton tulang 1:2:3, 30/30 ( X,Y) M3 28.84 #REF! #REF!
11 Kolom beton tulang 1:2:3, 20/20 (Teras Lt 1) M3 3.60 #REF! #REF!
12 Kolom beton tulang 1:2:3, 20/20 (Teras Lt 2) M3 1.70 #REF! #REF!
13 Balok beton tulang 1:2:3, 25/35 (Arah X)LT 2 M3 4.63 #REF! #REF!
14 Balok beton tulang 1:2:3, 25/35 (Arah Y)LT 2 M3 5.55 #REF! #REF!
15 Balok beton tulang 1:2:3, 15/25 (Arah X)LT 2 M3 0.84 #REF! #REF!
16 Balok beton tulang 1:2:3, 15/25 (Arah Y)LT 2 M3 2.05 #REF! #REF!
17 Ringbalk plat atap beton tulang 1:2:3, 15/20 (Arah X) M3 0.44 #REF! #REF!
18 Ringbalk plat atap beton tulang 1:2:3, 15/20 (Arah Y) M3 0.66 #REF! #REF!
19 Cor lantai beton tulang 1:2:3, T=10CM (LT 2) M3 47.16 #REF! #REF!
20 Kolom praktis beton tulang 1:2:3, 10/10 (LT 2) M3 1.60 #REF! #REF!
21 Cor plat atap beton tulang 1:2:3, T=9 cm M3 8.03 #REF! #REF!
22 Listplankbeton plat atap t=10 cm M3 2.40 #REF! #REF!
23 Kuda -kuda beton tulang 10/10 M3 1.12 #REF! #REF!
24 Talang beton T= 10CM ( depan dan belakang) M3 6.00 #REF! #REF!
25 Canopi beton atap (depan + belakang) t= 10 cm M3 1.73 #REF! #REF!
26 Canopi ventilasi depan t= 10 cm M3 2.10 #REF! #REF!
27 Canopi jendela t 5 mm M3 0.79 #REF! #REF!
28 Kolom pagar beton bertulang 15/15 M3 0.41 #REF! #REF!
29 Sloofpagar beton bertulang 15/20 M3 0.55 #REF! #REF!
30 Coor lantai tumbuk 1:3:6, t=7 cm M3 30.80 #REF! #REF!
31 Keramik lantai 30/30 M2 778.00 #REF! #REF!
32 Pasang kaca blok M2 10.00 #REF! #REF!
33 Pas batu cetak 1:4 LT1 M3 35.57 #REF! #REF!
34 Pas batu cetak 1:4 LT2 M3 38.46 #REF! #REF!
35 Plester dinding 1:4 M2 2,000.64 #REF! #REF!
36 Plester dinding 1:2 M2 225.64 #REF! #REF!
37 Acian dinding M2 2,226.28 #REF! #REF!
#REF!
1 2 3 4 5 6
IV. Pekerjaan KAYU/ALUMINIUM/PAGAR
1 Kusen Kayu besi 5/10 M3 1.07 #REF! #REF!
2 Kusen kayu besi 5/10 M3 0.42 #REF! #REF!
3 Gording kayu matoa 5/10 M3 2.00 #REF! #REF!
4 Kasau 5/5 M3 0.80 #REF! #REF!
5 Reng 2/3 M3 0.67 #REF! #REF!
6 Plafond tripleks 3 mm M2 840.00 #REF! #REF!
7 Jendela kaca riben M2 46.30 #REF! #REF!
8 Jendela panil kaca riben (1,2x0,7) M2 16.80 #REF! #REF!
9 Pintu toko (lipat dan besi) M2 175.00 1,100,000.00 192,500,000.00
10 Pagar BRC t= 1,2 m' Panil 26.00 #REF! #REF!
11 Tiang BRC Bh 27.00 #REF! #REF!
#REF!
V. Pekerjaan Atap
1 Atap multiroof M2 344.00 #REF! #REF!
2 Bubungan multiroof M' 40.00 #REF! #REF!
#REF!
VI. Pekerjaan Pengecatan
1 Sigmatex dinding baru 3x M2 2,226.28 #REF! #REF!
2 Cat plafond M2 840.00 #REF! #REF!
#REF!
VII Pekerjaan Instalasi
1 Penyambungan listrik 900 watt Pkt 20.00 1,000,000.00 20,000,000.00
2 Pipa air hujan 3" M' 139.20 #REF! #REF!
3 Pasang lampu XL 8 Watt Ttk 80.00 #REF! #REF!
4 Pas. Saklar ganda Ttk 40.00 #REF! #REF!
5 Pas. Stop kontak Ttk 40.00 #REF! #REF!
6 Pas. Sekring kast Group 20.00 #REF! #REF!
#REF!

REKAPITULASI
I PEKERJAAN PENDAHULUAN Rp. #REF!
II PEKERJAAN TANAH Rp. #REF!
III Pekerjaan Pasangan Rp. #REF!
IV Pekerjaan KAYU/ALUMINIUM/PAGAR Rp. #REF!
V Pekerjaan Atap Rp. #REF!
VI Pekerjaan Pengecatan Rp. #REF!
VII Pekerjaan Instalasi Rp. #REF!
JUMLAH Rp #REF!
DIBULATKAN Rp #REF!

Harga Bangunan per M2 Kons. Beton tulang berlantai Rp #REF!


TYPE 640 M2 Rp #REF!
PEMERINTAH KABUPATEN FAKFAK
DINAS PEKERJAAN UMUM
Jl. Achmad Yani No. 08 Fakfak, Telp. (0956) 22320 - 22709

HARGA SATUAN PER M2


PEMBANGUNAN BANGUNAN GEDUNG DAN RUMAH NEGARA
TAHUN ANGGARAN 2015 DI DISTRIK FAKFAK KABUPATEN FAKFAK

Untuk Tahun Anggaran 2015 Triwulan ke - 1, Dinas Pekerjaan Umum menetapkan harga satuan
per meter persegi untuk pembangunan gedung dan rumah dinas sebagai berikut:

1 Bang. Gedung/Rumah Konstruksi Rangka Beton Bertulang Rp #REF!


2 Bang. Gedung/Rumah Konstruksi Rangka Beton Bertulang Rp #REF!
Bertingkat
2 Bang. Gedung/Rumah Konstruksi Rangka Rp #REF!
Kayu Besi

Dengan dasar perhitungan =

I Harga material didapat dari beberapa toko material di Fakfak, ditambahkan dengan
biaya pikul, biaya transport, dan keuntungan/overhead ( 15% )
II Upah tenaga berdasarkan UMP Prop. Papua Barat Sektor Konstruksi = Rp. 2.266.875,- per bulan.
dan hasil survey/wawancara bersama pekerja di lokasi proyek.
III Analisa harga satuan pekerjaan menggunakan analisa SNI, kecuali untuk yang tidak ada dalam
SNI masih mengacu pada BOW
IV Analisa/asumsi bangunan sebagai berikut
- Pondasi tinggi rata2 1,00 m s/d 1.50 m
- Timbunan menggunakan tanah+batu
- Galian tanah berbatu
- Rangka bangunan dengan kayu besi dan beton bertulang
- Lantai beton tumbuk

Fakfak, 22 April 2015


PANITIA PENYUSUNAN STANDARD HARGA SATUAN TAHUN 2015

Sekretaris, ,Ketua

RIZAL MINGGELE, ST LIZA NEIRASARI, ST


NIP. 19820701 200909 1 001 NIP. 19751016 200111 2 001

Mengetahui,
Plh. Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,

ANTHON UBRA, SE
NIP. 19580726 197807 1 001
DAFTAR ANALISA PEKERJAAN SWAKLOLA
#REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2
METER
1.2500 btg Bambu Sedang #REF! #REF!
2.5000 kg Semen Portland #REF! #REF!
1.2000 lbr Seng gelombang 3" - 5" #REF! #REF!
0.0050 m3 Pasir Beton #REF! #REF!
0.0090 m3 Koral beton #REF! #REF!
0.0720 m3 Kayu Meranti Usuk 5/7 #REF! #REF!
0.0600 kg Paku biasa 2" - 5" #REF! #REF!
0.4500 kg Meni Besi #REF! #REF!
0.2000 oh Tukang Kayu #REF! #REF!
0.4000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7 #REF! #REF!
0.0200 kg Paku Biasa 2" - 5" #REF! #REF!
0.0070 m3 Kayu Papan Meranti 3/20 #REF! #REF!
0.1000 oh Tukang Kayu #REF! #REF!
0.1000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI


PLESTERAN
1.2500 btg Dolken Kayu Ø 8 - 10/4m #REF! #REF!
0.1800 m3 Kayu Meranti #REF! #REF!
0.8500 kg Paku Biasa 2" - 5" #REF! #REF!
1.1000 kg Besi Strip #REF! #REF!
35.0000 kg Semen Portland #REF! #REF!
0.1500 m3 Pasir Pasang #REF! #REF!
0.1000 m3 Pasir Beton #REF! #REF!
0.1500 m3 Koral Beton #REF! #REF!
30.0000 bh Bata Merah #REF! #REF!
0.2500 lbr Seng Plat #REF! #REF!
2.0000 bh Jendela Nako #REF! #REF!
0.0800 m2 Kaca Polos #REF! #REF!
0.1500 bh Kunci Tanam #REF! #REF!
0.0600 lbr Plywood 4 mm #REF! #REF!
2.0000 oh Tukang Kayu #REF! #REF!
1.0000 oh Tukang Batu #REF! #REF!
2.0000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang #REF! #REF!
0.2100 m3 Kayu Meranti #REF! #REF!
0.3000 kg Paku Biasa 2" - 5" #REF! #REF!
10.5000 kg Semen Portland #REF! #REF!
0.0300 m3 Pasir Beton #REF! #REF!
0.0500 m3 Koral Beton #REF! #REF!
1.5000 lbr Seng gelombang BJLS 28 #REF! #REF!
2.0000 oh Tukang Kayu #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang #REF! #REF!
0.2760 m3 Kayu Meranti #REF! #REF!
0.7000 kg Paku biasa 2" - 5" #REF! #REF!
1.5000 lbr Seng gelombang BJLS 28 #REF! #REF!
1.5000 oh Tukang Kayu #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja #REF! #REF!
Total : #REF! #REF!

7 1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang #REF! #REF!
0.1860 m3 Kayu Meranti #REF! #REF!
0.3000 kg Paku Biasa 2" - 5" #REF! #REF!
18.0000 kg Semen Portland #REF! #REF!
0.0300 m3 Pasir Beton #REF! #REF!
0.0500 m3 Koral Beton #REF! #REF!
1.5000 lbr Seng gelombang BJLS 28 #REF! #REF!
1.3500 lbr Plywood 4 mm #REF! #REF!
2.0000 oh Tukang Kayu #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang #REF! #REF!
0.0800 kg Paku Biasa 2" - 5" #REF! #REF!
1.0000 btg Kaso 5/7 #REF! #REF!
0.3000 oh Tukang kayu #REF! #REF!
Total : #REF! #REF! #REF!

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu #REF! #REF!
0.2500 kg Tali Ijuk #REF! #REF!
0.0170 oh Tukang Kayu #REF! #REF!
0.0020 oh Pekerja #REF! #REF!
#REF! #REF! #REF!

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20 #REF! #REF!
0.0900 m3 Batu Pecah 5 - 7 #REF! #REF!
0.0100 m3 Pasir Pasang #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja #REF! #REF!
Total : #REF! #REF!

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja #REF! #REF!
Total : #REF! #REF!

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja #REF! #REF!
Total : #REF! #REF!
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
0.9000 oh Pekerja #REF! #REF!
Total : #REF! #REF!

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja #REF! #REF!
Total : #REF! #REF!

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja #REF! #REF!
Total : #REF! #REF!

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja #REF! #REF!
Total : #REF! #REF!

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja #REF! #REF!
Total : #REF! #REF!

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja #REF! #REF!
Total : #REF! #REF!

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja #REF! #REF!
Total : #REF! #REF!

9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja #REF! #REF!
Total : #REF! #REF!

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu #REF! #REF!
0.2500 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN
1.2000 m3 Tanah Urug #REF! #REF!
0.5000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

14 1 M3 URUGAN LIMESTONE PADAT


1.2000 m3 Limestone #REF! #REF!
0.2500 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 #REF! #REF!
202.0000 kg Semen Portland #REF! #REF!
0.4850 m3 Pasir Pasang #REF! #REF!
1.5000 oh Pekerja #REF! #REF!
0.7500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 #REF! #REF!
163.0000 kg Semen Portland #REF! #REF!
0.5200 m3 Pasir Pasang #REF! #REF!
1.5000 oh Pekerja #REF! #REF!
0.7500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 #REF! #REF!
136.0000 kg Semen Portland #REF! #REF!
0.5440 m3 Pasir Pasang #REF! #REF!
1.5000 oh Pekerja #REF! #REF!
0.7500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 #REF! #REF!
117.0000 kg Semen Portland #REF! #REF!
0.5610 m3 Pasir Pasang #REF! #REF!
1.5000 oh Pekerja #REF! #REF!
0.7500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 #REF! #REF!
91.0000 kg Semen Portland #REF! #REF!
0.5840 m3 Pasir Pasang #REF! #REF!
1.5000 oh Pekerja #REF! #REF!
0.7500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20 #REF! #REF!
194.0000 kg Semen Portland #REF! #REF!
0.3120 m3 Pasir Beton #REF! #REF!
0.4680 m3 Koral Beton #REF! #REF!
126.0000 kg Besi Beton #REF! #REF!
1.8000 kg Kawat Beton #REF! #REF!
3.4000 oh Pekerja #REF! #REF!
0.8500 oh Tukang Batu #REF! #REF!
#REF! #REF! #REF!

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20 #REF! #REF!
194.0000 kg Semen Portland #REF! #REF!
0.3120 m3 Pasir Beton #REF! #REF!
0.4680 m3 Koral Beton #REF! #REF!
2.4000 oh Pekerja #REF! #REF!
0.8000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

8 1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 #REF! #REF!
0.4320 m3 Pasir Urug #REF! #REF!
0.7800 oh Pekerja #REF! #REF!
0.3900 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

IV PEKERJAAN DINDING (SNI 6897 : 2008)

1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
43.5000 kg Semen Portland #REF! #REF!
0.0800 m3 Pasir Pasang #REF! #REF!
0.6000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
#REF! #REF! #REF!

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
32.9500 kg Semen Portland #REF! #REF!
0.0910 m3 Pasir Pasang #REF! #REF!
0.6000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
#REF! #REF! #REF!

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
26.5500 kg Semen Portland #REF! #REF!
0.0930 m3 Pasir Pasang #REF! #REF!
0.6000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
#REF! #REF! #REF!

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
22.2000 kg Semen Portland #REF! #REF!
0.1020 m3 Pasir Pasang #REF! #REF!
0.6000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
#REF! #REF! #REF!

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
18.5000 kg Semen Portland #REF! #REF!
0.1220 m3 Pasir Pasang #REF! #REF!
0.6000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
#REF! #REF! #REF!

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
18.9500 kg Semen Portland #REF! #REF!
0.0380 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
#REF! #REF! #REF!

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
14.3700 kg Semen Portland #REF! #REF!
0.0400 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
11.5000 kg Semen Portland #REF! #REF!
0.0430 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
9.6800 kg Semen Portland #REF! #REF!
0.0450 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
70.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
8.3200 kg Semen Portland #REF! #REF!
0.0490 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm #REF! #REF!
6.5000 kg Semen Portland #REF! #REF!
0.0500 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)


12.5000 bh Batako #REF! #REF!
7.5000 kg Semen Portland #REF! #REF!
0.0270 m3 Pasir Pasang #REF! #REF!
1.9500 kg Besi Beton 8 mm #REF! #REF!
0.3200 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako #REF! #REF!
7.5000 kg Semen Portland #REF! #REF!
0.0270 m3 Pasir Pasang #REF! #REF!
0.3200 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik #REF! #REF!
11.0000 kg Semen Portland #REF! #REF!
0.0350 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I #REF! #REF!
0.0140 m3 Kayu kamper usuk/reng #REF! #REF!
0.0120 kg Paku Biasa #REF! #REF!
0.0030 m3 List Kayu 2/4 #REF! #REF!
0.1000 oh Pekerja #REF! #REF!
0.0500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland #REF! #REF!
0.0160 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland #REF! #REF!
0.0200 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland #REF! #REF!
0.0230 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


6.2400 kg Semen Portland #REF! #REF!
0.0240 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


5.1840 kg Semen Portland #REF! #REF!
0.0260 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland #REF! #REF!
0.0270 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1500 oh Tukang Batu #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland #REF! #REF!
0.0290 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland #REF! #REF!
0.0270 m3 Pasir Pasang #REF! #REF!
0.4000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland #REF! #REF!
0.0310 m3 Pasir Pasang #REF! #REF!
0.4000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


8.3200 kg Semen Portland #REF! #REF!
0.0320 m3 Pasir Pasang #REF! #REF!
0.4000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland #REF! #REF!
0.0350 m3 Pasir Pasang #REF! #REF!
0.4000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland #REF! #REF!
0.0360 m3 Pasir Pasang #REF! #REF!
0.4000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland #REF! #REF!
0.0130 m3 Pasir Pasang #REF! #REF!
0.0800 oh Pekerja #REF! #REF!
0.4000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland #REF! #REF!
0.0060 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

15
1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
3.1080 kg Semen Portland #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.0750 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK


EKSPOSE (= 8 M')
1.6000 kg Semen Portland #REF! #REF!
0.0700 oh Pekerja #REF! #REF!
0.0350 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland #REF! #REF!
0.0120 m3 Pasir Pasang #REF! #REF!
0.3000 oh Pekerja #REF! #REF!
0.1500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg #REF! #REF!
0.2000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Labur/Cat #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
VI PEKERJAAN KAYU (SNI 3434 : 2008)

1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS I
1.1000 m3 Balok Kayu Kamper #REF! #REF!
1.2500 Kg Paku 10 Cm #REF! #REF!
1.0000 Kg Lem Kayu #REF! #REF!
7.0000 oh Pekerja #REF! #REF!
21.0000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing #REF! #REF!
1.2500 Kg Paku 10 Cm #REF! #REF!
1.0000 Kg Lem Kayu #REF! #REF!
6.0000 oh Pekerja #REF! #REF!
18.0000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II
0.0400 m3 Papan Kayu Kamper #REF! #REF!
0.0500 Kg Paku 5-7 Cm #REF! #REF!
0.3500 oh Pekerja #REF! #REF!
1.0500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III
0.0400 m3 Papan Kayu Kruing #REF! #REF!
0.0500 Kg Paku 5-7 Cm #REF! #REF!
0.3500 oh Pekerja #REF! #REF!
1.0500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II
0.0400 m3 Papan Kayu Kamper #REF! #REF!
0.5000 Kg Lem Kayu #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
3.0000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA,


KAYU KELAS I/II
0.0240 m3 Papan Kayu Kamper #REF! #REF!
0.3000 Kg Lem Kayu #REF! #REF!
0.8000 oh Pekerja #REF! #REF!
2.4000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,


KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper #REF! #REF!
0.5000 Kg Lem Kayu #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
3.0000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper #REF! #REF!
0.0300 Kg Paku 1-2,5 Cm #REF! #REF!
0.5000 Kg Lem Kayu #REF! #REF!
1.0000 Lbr Plywood 4 mm #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
3.0000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper #REF! #REF!
0.0300 Kg Paku 1-2,5 Cm #REF! #REF!
0.5000 Kg Lem Kayu #REF! #REF!
1.0000 Lbr Plywood 4 mm #REF! #REF!
0.8000 oh Pekerja #REF! #REF!
2.4000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600 m3 Papan Kayu Kamper #REF! #REF!
0.1500 Kg Paku 1-2,5 Cm #REF! #REF!
0.6700 oh Pekerja #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
2.0000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Kamper #REF! #REF!
0.0300 Kg Paku 1-2,5 Cm #REF! #REF!
0.5000 Kg Lem Kayu #REF! #REF!
1.0000 Lbr Teakwood 4 mm uk 90x220 cm #REF! #REF!
0.8000 oh Pekerja #REF! #REF!
2.4000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA


EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper #REF! #REF!
0.0300 Kg Paku 1-2,5 Cm #REF! #REF!
0.8000 Kg Lem Kayu #REF! #REF!
1.0000 Lbr Teakwood 4 mm uk 90x220 cm #REF! #REF!
0.5000 Lbr Formika #REF! #REF!
0.8000 oh Pekerja #REF! #REF!
2.4000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000 m3 Balok Kayu Kamper #REF! #REF!
15.0000 Kg Besi Strip Tebal 5 cm #REF! #REF!
5.6000 Kg Paku 12 Cm #REF! #REF!
4.0000 oh Pekerja #REF! #REF!
12.0000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000 m3 Balok Kayu Kamper #REF! #REF!
15.0000 Kg Besi Strip Tebal 5 cm #REF! #REF!
5.6000 Kg Paku 12 Cm #REF! #REF!
6.7000 oh Pekerja #REF! #REF!
20.1000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

1.1000 m3 Balok Kayu Kamper #REF! #REF!


15.0000 Kg Besi Strip Tebal 5 cm #REF! #REF!
3.0000 Kg Paku 12 Cm #REF! #REF!
2.4000 oh Pekerja #REF! #REF!
7.2000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm #REF! #REF!
0.0036 m3 Reng ( 2 x 3 ) Cm #REF! #REF!
0.2500 Kg Paku 5 Cm dan 10 Cm #REF! #REF!
0.1000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm #REF! #REF!
0.0072 m3 Reng ( 2 x 3 ) Cm #REF! #REF!
0.2500 Kg Paku 5 Cm dan 10 Cm #REF! #REF!
0.1000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

0.1650 m3 Balok Kayu Kamper #REF! #REF!


0.2000 Kg Paku 5 Cm dan 10 Cm #REF! #REF!
0.1200 oh Pekerja #REF! #REF!
0.1200 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm #REF! #REF!
0.2000 Kg Paku 7 Cm dan 10 Cm #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.3000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm #REF! #REF!
0.2500 Kg Paku 7 Cm dan 10 Cm #REF! #REF!
0.2000 oh Pekerja #REF! #REF!
0.3000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

0.0108 m3 Papan Kayu Kamper #REF! #REF!


0.1000 Kg Paku 5 Cm dan 7 Cm #REF! #REF!
0.1000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

0.0110 m3 Papan Kayu Kamper #REF! #REF!


0.0500 Kg Paku 5 Cm dan 7 Cm #REF! #REF!
0.1000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM,


KAYU KELAS II/III
0.0280 m3 Balok Kayu Kamper #REF! #REF!
0.1500 Kg Paku 5 Cm dan 7 Cm #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.4500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper #REF! #REF!
0.1500 Kg Paku 5 Cm dan 7 Cm #REF! #REF!
0.8600 Lbr Teakwood 4 mm uk 90x220 cm #REF! #REF!
0.5600 Kg Lem Kayu #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.4500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper #REF! #REF!
0.1500 Kg Paku 5 Cm dan 7 Cm #REF! #REF!
0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm #REF! #REF!
0.5600 Kg Lem Kayu #REF! #REF!
0.2000 oh Pekerja #REF! #REF!
0.6000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Kamper #REF! #REF!


0.1000 Kg Paku 5 Cm dan 10 Cm #REF! #REF!
0.1500 Kg Paku Skrup 10 cm #REF! #REF!
0.6000 oh Pekerja #REF! #REF!
1.8000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120


X 240) CM
0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm #REF! #REF!
0.0500 Kg Paku 1 Cm dan 2.5 Cm #REF! #REF!
0.0250 oh Pekerja #REF! #REF!
0.0750 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

VII PEKERJAAN BETON ( SNI 7394:2008)


1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
218.0000 kg Semen Portland #REF! #REF!
0.5200 m3 Pasir Beton #REF! #REF!
0.8700 m3 Koral Beton #REF! #REF!
1.6500 oh Pekerja #REF! #REF!
0.2500 oh Tukang Batu #REF! #REF!
#REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
232.0000 kg Semen Portland #REF! #REF!
0.5200 m3 Pasir Beton #REF! #REF!
0.7800 m3 Koral Beton #REF! #REF!
1.6500 oh Pekerja #REF! #REF!
0.2500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
280.0000 kg Semen Portland #REF! #REF!
0.4500 m3 Pasir Beton #REF! #REF!
0.9000 m3 Koral Beton #REF! #REF!
1.6500 oh Pekerja #REF! #REF!
0.2500 oh Tukang Batu #REF! #REF!
Total : #REF! #REF! #REF!

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir) #REF! #REF!
0.1500 kg Kawat Beton #REF! #REF!
0.0700 oh Pekerja #REF! #REF!
0.0700 oh Tukang Besi #REF! #REF!
Total : #REF! #REF! #REF!

5 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III #REF! #REF!
0.3000 kg Paku Biasa 5' - 10' #REF! #REF!
0.1000 ltr Minyak Bekisting #REF! #REF!
0.5200 oh Pekerja #REF! #REF!
0.2600 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

6 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III #REF! #REF!
0.3000 kg Paku Biasa 5' - 10' #REF! #REF!
0.1000 ltr Minyak Bekisting #REF! #REF!
0.5200 oh Pekerja #REF! #REF!
0.2600 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

7 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III #REF! #REF!
0.4000 kg Paku Biasa 5' - 12' #REF! #REF!
0.2000 ltr Minyak Bekisting #REF! #REF!
0.0150 m3 Kayu Usuk 4/6 #REF! #REF!
0.3500 lbr Plywood 9 mm #REF! #REF!
2.0000 btg Dolken Kayu 8" - 10"/4 m #REF! #REF!
0.6600 oh Pekerja #REF! #REF!
0.3300 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

8 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III #REF! #REF!
0.4000 kg Paku Biasa 5' - 12' #REF! #REF!
0.2000 ltr Minyak Bekisting #REF! #REF!
0.0180 m3 Kayu Usuk 4/6 #REF! #REF!
0.3500 lbr Plywood 9 mm #REF! #REF!
2.0000 btg Dolken Kayu 8" - 10"/4m #REF! #REF!
0.6600 oh Pekerja #REF! #REF!
0.3300 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

9 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III #REF! #REF!
0.4000 kg Paku Biasa 5' - 12' #REF! #REF!
0.2000 ltr Minyak Bekisting #REF! #REF!
0.0150 m3 Kayu Usuk 4/6 #REF! #REF!
0.3500 lbr Plywood 9 mm #REF! #REF!
6.0000 btg Dolken Kayu 8" - 10"/4m #REF! #REF!
0.6600 oh Pekerja #REF! #REF!
0.3300 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

10 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III #REF! #REF!
0.4000 Kg Paku Biasa 5' - 12' #REF! #REF!
0.2000 Ltr Minyak Bekisting #REF! #REF!
0.0200 M3 Kayu Usuk 4/6 #REF! #REF!
0.3500 Lbr Plywood 9 mm #REF! #REF!
3.0000 Btng Dolken Kayu 8" - 10"/4m #REF! #REF!
4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00 8,000.00
0.6600 Oh Pekerja #REF! #REF!
0.3300 Oh Tukang Kayu #REF! #REF!
#REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III #REF! #REF!
0.4000 kg Paku Biasa 5' - 12' #REF! #REF!
0.1500 ltr Minyak Bekisting #REF! #REF!
0.0150 m3 Kayu Usuk 4/6 #REF! #REF!
0.3500 lbr Plywood 9 mm #REF! #REF!
2.0000 btg Dolken Kayu 8" - 10"/4m #REF! #REF!
0.6600 oh Pekerja #REF! #REF!
0.3300 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan) #REF! #REF!
0.6000 kg Paku Biasa 5' - 12' #REF! #REF!
0.5000 btg Dolken Kayu 8" - 10"/4m #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.0500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III #REF! #REF!
1.5000 kg Paku Biasa 5' - 12' #REF! #REF!
0.4000 ltr Minyak Bekisting #REF! #REF!
157.0000 kg Besi Beton #REF! #REF!
2.2500 kg Kawat Beton #REF! #REF!
336.0000 kg Semen Portland #REF! #REF!
0.5400 m3 Pasir Beton #REF! #REF!
0.8100 m3 Koral Beton #REF! #REF!
5.3000 oh Pekerja #REF! #REF!
0.2750 oh Tukang Batu #REF! #REF!
1.3000 oh Tukang Kayu #REF! #REF!
1.0500 oh Tukang Besi #REF! #REF!
Total : #REF! #REF! #REF!

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III #REF! #REF!
2.0000 kg Paku Biasa 5' - 12' #REF! #REF!
0.6000 ltr Minyak Bekisting #REF! #REF!
210.0000 kg Besi Beton #REF! #REF!
3.0000 kg Kawat Beton #REF! #REF!
336.0000 kg Semen Portland #REF! #REF!
0.5400 m3 Pasir Beton #REF! #REF!
0.8100 m3 Koral Beton #REF! #REF!
5.6500 oh Pekerja #REF! #REF!
0.2750 oh Tukang Batu #REF! #REF!
1.5600 oh Tukang Kayu #REF! #REF!
1.4000 oh Tukang Besi #REF! #REF!
Total : #REF! #REF! #REF!

15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III #REF! #REF!
4.0000 kg Paku Biasa 5' - 12' #REF! #REF!
2.0000 ltr Minyak Bekisting #REF! #REF!
315.0000 kg Besi Beton #REF! #REF!
4.5000 kg Kawat Beton #REF! #REF!
336.0000 kg Semen Portland #REF! #REF!
0.5400 m3 Pasir Beton #REF! #REF!
0.8100 m3 Koral Beton #REF! #REF!
0.1500 m3 Kayu Kelas II balok #REF! #REF!
3.5000 lbr Plywood 9 mm #REF! #REF!
20.0000 btg Dolken Kayu 8" /4 m #REF! #REF!
7.0500 oh Pekerja #REF! #REF!
0.2750 oh Tukang Batu #REF! #REF!
1.6500 oh Tukang Kayu #REF! #REF!
2.1000 oh Tukang Besi #REF! #REF!
Total : #REF! #REF! #REF!

16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Kelas III #REF! #REF!
3.2000 kg Paku Biasa 5' - 12' #REF! #REF!
1.6000 ltr Minyak Bekisting #REF! #REF!
210.0000 kg Besi Beton #REF! #REF!
3.0000 kg Kawat Beton #REF! #REF!
336.0000 kg Semen Portland #REF! #REF!
0.5400 m3 Pasir Beton #REF! #REF!
0.8100 m3 Koral Beton #REF! #REF!
0.1400 m3 Kayu Kelas II balok #REF! #REF!
2.8000 lbr Plywood 9 mm #REF! #REF!
16.0000 btg Dolken Kayu 8" /4 m #REF! #REF!
6.3500 oh Pekerja #REF! #REF!
0.2750 oh Tukang Batu #REF! #REF!
1.6500 oh Tukang Kayu #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
1.4000 oh Tukang Besi #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Kelas III #REF! #REF!
3.2000 kg Paku Biasa 5' - 12' #REF! #REF!
1.6000 ltr Minyak Bekisting #REF! #REF!
157.5000 kg Besi Beton #REF! #REF!
2.2500 kg Kawat Beton #REF! #REF!
336.0000 kg Semen Portland #REF! #REF!
0.5400 m3 Pasir Beton #REF! #REF!
0.8100 m3 Koral Beton #REF! #REF!
0.1200 m3 Kayu Kelas II balok #REF! #REF!
2.8000 lbr Plywood 9 mm #REF! #REF!
32.0000 btg Dolken Kayu 8" /4 m #REF! #REF!
5.3000 oh Pekerja #REF! #REF!
0.2750 oh Tukang Batu #REF! #REF!
1.3000 oh Tukang Kayu #REF! #REF!
1.0500 oh Tukang Besi #REF! #REF!
#REF! #REF! #REF!
18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)
0.2400 m3 Kayu Kelas III #REF! #REF!
3.2000 kg Paku Biasa 5' - 12' #REF! #REF!
1.6000 ltr Minyak Bekisting #REF! #REF!
157.0000 kg Besi Beton #REF! #REF!
2.2500 kg Kawat Beton #REF! #REF!
336.0000 kg Semen Portland #REF! #REF!
0.5400 m3 Pasir Beton #REF! #REF!
0.8100 m3 Koral Beton #REF! #REF!
0.1600 m3 Kayu Kelas II balok #REF! #REF!
2.8000 lbr Plywood 9 mm #REF! #REF!
24.0000 btg Dolken Kayu 8" /4 m #REF! #REF!
5.3000 oh Pekerja #REF! #REF!
0.2750 oh Tukang Batu #REF! #REF!
1.3000 oh Tukang Kayu #REF! #REF!
1.0500 oh Tukang Besi #REF! #REF!
#REF! #REF! #REF!
19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +
BEKISTING)
0.2500 m3 Kayu Kelas III #REF! #REF!
3.0000 kg Paku Biasa 5' - 12' #REF! #REF!
1.2000 ltr Minyak Bekisting #REF! #REF!
210.0000 kg Besi Beton #REF! #REF!
3.0000 kg Kawat Beton #REF! #REF!
336.0000 kg Semen Portland #REF! #REF!
0.5400 m3 Pasir Beton #REF! #REF!
0.8100 m3 Koral Beton #REF! #REF!
0.1050 m3 Kayu Kelas II balok #REF! #REF!
2.5000 lbr Plywood 9 mm #REF! #REF!
14.0000 btg Dolken Kayu 8" /4 m #REF! #REF!
5.6500 oh Pekerja #REF! #REF!
0.2750 oh Tukang Batu #REF! #REF!
1.5600 oh Tukang Kayu #REF! #REF!
1.4000 oh Tukang Besi #REF! #REF!
#REF! #REF! #REF!

20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020 m3 Kayu Kelas III #REF! #REF!
0.0100 kg Paku Biasa 5' - 12' #REF! #REF!
3.0000 kg Besi Beton #REF! #REF!
0.0450 kg Kawat Beton #REF! #REF!
4.0000 kg Semen Portland #REF! #REF!
0.0060 m3 Pasir Beton #REF! #REF!
0.0090 m3 Koral Beton #REF! #REF!
0.1800 oh Pekerja #REF! #REF!
0.0200 oh Tukang Batu #REF! #REF!
0.0200 oh Tukang Kayu #REF! #REF!
0.0200 oh Tukang Besi #REF! #REF!
Total : #REF! #REF! #REF!
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15
CM)
0.0030 m3 Kayu Kelas III #REF! #REF!
0.0200 kg Paku Biasa 5' - 12' #REF! #REF!
3.6000 kg Besi Beton #REF! #REF!
0.0500 kg Kawat Beton #REF! #REF!
5.5000 kg Semen Portland #REF! #REF!
0.0090 m3 Pasir Beton #REF! #REF!
0.0150 m3 Koral Beton #REF! #REF!
0.2970 oh Pekerja #REF! #REF!
0.0330 oh Tukang Batu #REF! #REF!
0.0330 oh Tukang Kayu #REF! #REF!
0.0330 oh Tukang Besi #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
25.0000 bh Genteng Plentong #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.0600 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.0600 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong #REF! #REF!
8.0000 kg Semen Portland #REF! #REF!
0.0320 m3 Pasir Pasang #REF! #REF!
0.4000 oh Pekerja #REF! #REF!
0.2000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm #REF! #REF!
0.1200 kg Paku Pancing 60 x 230 #REF! #REF!
0.1400 oh Pekerja #REF! #REF!
0.0700 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


2.4000 lbr Bubungan Stel Gelombang #REF! #REF!
6.0000 kg Paku Skrup 3,5" #REF! #REF!
0.0840 oh Pekerja #REF! #REF!
0.1250 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!
6 1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap #REF! #REF!
0.2000 kg Paku Biasa 1/2" - 1" #REF! #REF!
0.1660 oh Pekerja #REF! #REF!
0.2500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

7 1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28 #REF! #REF!
0.0600 kg Paku biasa 1/2" - 1" #REF! #REF!
0.0500 kg Paku biasa 2" - 5" #REF! #REF!
0.0040 m3 Kayu papan 3 cm #REF! #REF!
0.1250 oh Pekerja #REF! #REF!
0.2500 oh Tukang kayu #REF! #REF!
Total : #REF! #REF! #REF!

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang #REF! #REF!
0.5000 glg Tali pengikat #REF! #REF!
0.2000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 #REF! #REF!
0.0200 kg Paku Biasa 1/2" - 1" #REF! #REF!
0.1200 oh Pekerja #REF! #REF!
0.0600 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.0500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28 #REF! #REF!
0.0400 kg Paku biasa 1/2" - 1" #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.0700 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM,
5 MM DAN 6 MM
1.1000 lbr Asbes semen #REF! #REF!
0.0100 kg Paku Biasa 1/2" - 1" #REF! #REF!
0.0300 oh Pekerja #REF! #REF!
0.0700 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr TRIPLEKS #REF! #REF!
0.0300 kg Paku Biasa 1/2" - 1" #REF! #REF!
0.1000 oh Pekerja #REF! #REF!
0.1000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan #REF! #REF!
0.0100 kg Paku Biasa 1/2" - 1" #REF! #REF!
0.8000 oh Pekerja #REF! #REF!
0.8000 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil #REF! #REF!
0.1000 kg Paku list SQ 15,840.00 1,584.00
0.0500 oh Pekerja #REF! #REF!
0.0500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm #REF! #REF!
0.0600 kg Paku Biasa 2" - 5" 15,840.00 950.40
1.1000 lbr Asbes #REF! #REF!
0.1800 oh Pekerja #REF! #REF!
0.3200 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup #REF! #REF!
0.3640 lbr Gypsum Board (120x240x9) #REF! #REF!
0.1000 oh Pekerja #REF! #REF!
0.0500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup #REF! #REF!
0.3640 lbr Kalsiboard 4.5 mm #REF! #REF!
0.1000 oh Pekerja #REF! #REF!
0.0500 oh Tukang Kayu #REF! #REF!
Total : #REF! #REF! #REF!

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
1.0000 bh Kloset duduk/ monoblok #REF! #REF!
6% x harga kloset Perlengkapan #REF!
3.3000 oh Pekerja #REF! #REF!
1.1000 oh Tukang batu #REF! #REF!
Total : #REF! #REF! #REF!

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen #REF! #REF!
6.0000 kg Semen Portland #REF! #REF!
0.0100 m3 Pasir Pasang #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
1.5000 oh Tukang batu #REF! #REF!
Total : #REF! #REF! #REF!

3 MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir #REF! #REF!
6% x harga Urin Perlengkapan #REF!
6.0000 kg Semen Portland #REF! #REF!
0.0100 m3 Pasir Pasang #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
1.0000 oh Tukang batu #REF! #REF!
Total : #REF! #REF! #REF!

4 MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel #REF! #REF!
12% x harga wast Perlengkapan #REF!
6.0000 kg Semen Portland #REF! #REF!
0.0100 m3 Pasir Pasang #REF! #REF!
1.2000 oh Pekerja #REF! #REF!
1.4500 oh Tukang batu #REF! #REF!
Total : #REF! #REF! #REF!

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass #REF! #REF!
18% x harga wast Perlengkapan #REF!
1.8000 oh Pekerja #REF! #REF!
2.7000 oh Tukang batu #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "


1.2000 m1 Pipa galvanis #REF! #REF!
35% x harga pipa Perlengkapan #REF!
0.0540 oh Pekerja #REF! #REF!
0.0900 oh Tukang Pipa #REF! #REF!
Total : #REF! #REF! #REF!

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"


1.2000 M' Pipa galvanis #REF! #REF!
35% x harga pipa Perlengkapan #REF!
0.1080 Oh Pekerja #REF! #REF!
0.1800 Oh Tukang Pipa #REF! #REF!
Total : #REF! #REF! #REF!

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


1.2000 m1 Pipa PVC #REF! #REF!
35% x harga pipa Perlengkapan #REF!
0.0360 oh Pekerja #REF! #REF!
0.0600 oh Tukang Pipa #REF! #REF!
Total : #REF! #REF! #REF!

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"


1.2000 m1 Pipa PVC #REF! #REF!
35% x harga pipa Perlengkapan #REF!
0.0540 oh Pekerja #REF! #REF!
0.0900 oh Tukang Pipa #REF! #REF!
Total : #REF! #REF! #REF!

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"


1.2000 m1 Pipa PVC #REF! #REF!
35% x harga pipa Perlengkapan #REF!
0.0810 oh Pekerja #REF! #REF!
0.1350 oh Tukang Pipa #REF! #REF!
Total : #REF! #REF! #REF!

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


1.0000 bh Kran air #REF! #REF!
0.0250 bh Seal tape #REF! #REF!
0.0100 oh Pekerja #REF! #REF!
0.1000 oh Tukang Pipa #REF! #REF!
Total : #REF! #REF! #REF!

XI PEKERJAAN BESI DAN ALUMINIUM


(SNI 7393:2008)
1 1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF #REF! #REF!
0.0060 oh Pekerja #REF! #REF!
0.0600 oh Tukang besi #REF! #REF!
Total : #REF! #REF! #REF!

2 1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako #REF! #REF!
10.0000 bh Paku biasa 1 cm - 2,5 cm #REF! #REF!
7.0000 m' Besi strip #REF! #REF!
0.2000 oh Pekerja #REF! #REF!
0.2000 oh Tukang besi #REF! #REF!
Total : #REF! #REF! #REF!

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat #REF! #REF!
0.0150 kg Paku biasa 0,5" - 1" #REF! #REF!
0.0190 m3 Kayu papan kelas II/III #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
0.4000 oh Tukang besi #REF! #REF!
Total : #REF! #REF! #REF!

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa #REF! #REF!
0.0100 oh Pekerja #REF! #REF!
0.5000 oh Tukang besi #REF! #REF!
Total : #REF! #REF! #REF!

2 1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu #REF! #REF!
0.0150 oh Pekerja #REF! #REF!
0.1500 oh Tukang besi #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela #REF! #REF!
0.0100 oh Pekerja #REF! #REF!
0.1000 oh Tukang besi #REF! #REF!
Total : #REF! #REF! #REF!

4 1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin #REF! #REF!
0.0150 oh Pekerja #REF! #REF!
0.1500 oh Tukang besi #REF! #REF!
Total : #REF! #REF! #REF!

5 1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot #REF! #REF!
0.0200 oh Pekerja #REF! #REF!
0.2000 oh Tukang besi #REF! #REF!
Total : #REF! #REF! #REF!

6 1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca #REF! #REF!
0.0150 oh Pekerja #REF! #REF!
0.1500 oh Tukang besi #REF! #REF!
Total : #REF! #REF! #REF!

XIII PEK. PENUTUP LANTAI DAN DINDING


(SNI 7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


11.8700 bh Keramik 30 x 30 cm #REF! #REF!
10.0000 kg Semen Portland #REF! #REF!
0.0450 m3 Pasir Pasang #REF! #REF!
1.5000 kg Semen warna/semen grouting #REF! #REF!
0.7000 oh Pekerja #REF! #REF!
0.3500 oh Tukang batu #REF! #REF!
Total : #REF! #REF! #REF!

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm #REF! #REF!
10.4000 kg Semen Portland #REF! #REF!
0.0450 m3 Pasir Pasang #REF! #REF!
1.6200 kg Semen warna/semen grouting #REF! #REF!
0.7000 oh Pekerja #REF! #REF!
0.3500 oh Tukang batu #REF! #REF!
Total : #REF! #REF! #REF!

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm #REF! #REF!
1.1400 kg Semen Portland #REF! #REF!
0.0030 m3 Pasir Pasang #REF! #REF!
0.1000 kg Semen warna/semen grouting #REF! #REF!
0.0900 oh Pekerja #REF! #REF!
0.0900 oh Tukang batu #REF! #REF!
Total : #REF! #REF! #REF!
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
26.5000 bh Keramik 20 x 20 cm #REF! #REF!
9.3000 kg Semen Portland #REF! #REF!
0.0180 m3 Pasir Pasang #REF! #REF!
1.9400 kg Semen warna/semen grouting #REF! #REF!
0.9000 oh Pekerja #REF! #REF!
0.4500 oh Tukang batu #REF! #REF!
Total : #REF! #REF! #REF!

5 1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II #REF! #REF!
0.0500 kg Paku sekrup 3,5' #REF! #REF!
0.1200 oh Pekerja #REF! #REF!
0.1200 oh Tukang kayu #REF! #REF!
Total : #REF! #REF! #REF!

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni #REF! #REF!
0.1500 kg Dempul #REF! #REF!
0.1700 kg Cat dasar #REF! #REF!
0.2600 kg Cat Penutup 2x #REF! #REF!
0.0700 oh Pekerja #REF! #REF!
0.0090 oh Tukang cat #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis #REF! #REF!
0.0500 kg Dempul #REF! #REF!
0.1000 lbr Amplas #REF! #REF!
0.0100 bh Kuas #REF! #REF!
0.1600 oh Pekerja #REF! #REF!
0.1600 oh Tukang cat #REF! #REF!
Total : #REF! #REF! #REF!
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir #REF! #REF!
0.1000 kg Cat dasar #REF! #REF!
0.2600 kg Cat Penutup 2x #REF! #REF!
0.0200 oh Pekerja #REF! #REF!
0.0630 oh Tukang cat #REF! #REF!
Total : #REF! #REF! #REF!

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar #REF! #REF!
0.1800 kg Cat Penutup 2x #REF! #REF!
0.0280 oh Pekerja #REF! #REF!
0.0420 oh Tukang cat #REF! #REF!
Total : #REF! #REF! #REF!

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi #REF! #REF!
0.0100 lbr Kuas #REF! #REF!
0.0200 oh Pekerja #REF! #REF!
0.2000 oh Tukang cat #REF! #REF!
Total : #REF! #REF! #REF!

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi #REF! #REF!
0.0060 oh Pekerja #REF! #REF!
0.0600 oh Tukang cat #REF! #REF!
Total : #REF! #REF! #REF!

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur #REF! #REF!
2.0000 lbr Amplas #REF! #REF!
0.0600 oh Pekerja #REF! #REF!
0.0600 oh Tukang cat #REF! #REF!

Total : #REF! #REF! #REF!

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok #REF! #REF!
8.4000 kg Semen 50 Kg #REF! #REF!
Upah Kerja ( Lumpsum) #REF! #REF!
Total : #REF! #REF! #REF!

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan #REF! #REF!
8.4000 kg Semen 50 Kg #REF! #REF!
Upah Kerja ( Lumpsum) #REF! #REF!
Total : #REF! #REF! #REF!

3 1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan #REF! #REF!
4.2000 kg Semen 50 Kg #REF! #REF!
Upah Kerja ( Lumpsum) #REF! #REF!
Total : #REF! #REF! #REF!

4 1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras #REF! #REF!
4.2000 kg Semen 50 Kg #REF! #REF!
Upah Kerja ( Lumpsum) #REF! #REF!
Total : #REF! #REF! #REF!

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok #REF! #REF!
4.4917 bh Batu paras #REF! #REF!
5.2500 kg Semen 50 Kg #REF! #REF!
Upah Kerja ( Lumpsum) #REF! #REF!
Total : #REF! #REF! #REF!

6 1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok #REF! #REF!
4.2000 kg Semen 50 Kg #REF! #REF!
Upah Kerja ( Lumpsum) #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

7 1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras #REF! #REF!
4.2000 kg Semen 50 Kg #REF! #REF!
Upah Kerja ( Lumpsum) #REF! #REF!
Total : #REF! #REF! #REF!

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok #REF! #REF!
4.4917 bh Batu paras #REF! #REF!
5.2500 kg Semen 50 Kg #REF! #REF!
Upah Kerja ( Lumpsum) 280,000.00 280,000.00
Total : 280,000.00 #REF! #REF!

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 #REF! #REF!
0.2500 oh Tukang Batu #REF! #REF!
0.5000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!
2 Paving 10 x 20 cm tebal 6 cm K350 #REF! #REF! #REF! #REF!
4 Paving 10 x 20 cm tebal 8 cm K225 #REF! #REF! #REF! #REF!
5 Paving 10 x 20 cm tebal 8 cm K350 #REF! #REF! #REF! #REF!
7 Paving 20 x 20 cm tebal 6 cm K225 #REF! #REF! #REF! #REF!
8 Paving 20 x 20 cm tebal 6 cm K350 #REF! #REF! #REF! #REF!
10 Paving 20 x 20 cm tebal 8 cm K225 #REF! #REF! #REF! #REF!
11 Paving 20 x 20 cm tebal 8 cm K350 #REF! #REF! #REF! #REF!
12 Paving 20 x 20 cm tebal 8 cm K425 #REF! #REF! #REF! #REF!
14 Paving 20 x 20 cm tebal 10 cm K225 #REF! #REF! #REF! #REF!
15 Paving 20 x 20 cm tebal 10 cm K350 #REF! #REF! #REF! #REF!
16 Paving 20 x 20 cm tebal 10 cm K425 #REF! #REF! #REF! #REF!
18 Paving Tiga Berlian tebal 6 cm K225 #REF! #REF! #REF! #REF!
19 Paving Tiga Berlian tebal 6 cm Standar #REF! #REF! #REF! #REF!

20 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block #REF! #REF!
0.0690 m3 Pasir Urug #REF! #REF!
0.5000 oh Tukang Batu #REF! #REF!
1.0000 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!

21 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat #REF! #REF!
9.2800 zak Semen #REF! #REF!
0.2000 m3 Pasir pasang #REF! #REF!
0.2500 oh Tukang Batu #REF! #REF!
0.6250 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!
22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 #REF! #REF!
0.4500 zak Semen 50 Kg #REF! #REF!
0.0023 m3 Pasir Pasang #REF! #REF!
0.3500 oh Tukang Batu #REF! #REF!
0.9500 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!
23 Kanstein Jumbo (P:50,L:15,T:30 cm K225) #REF! #REF! #REF! #REF!
24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) #REF! #REF! #REF! #REF!

25 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat #REF! #REF!
0.0710 kg Thiner #REF! #REF!
0.0300 oh Tukang Cat #REF! #REF!
0.1500 oh Pekerja #REF! #REF!
Total : #REF! #REF! #REF!
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme #REF! #REF!
3.0000 bt Pipa Clipsal 20 mm hitam #REF! #REF!
2.0000 bh Tee dos clipsal 20 mm hitam #REF! #REF!
15.0000 bj Klem clipsal 20 mm hitam #REF! #REF!
3.0000 bj Sock clipsal 20 mm hitam #REF! #REF!
1.0000 bj Inbow dos plastik clipsal E 157 P #REF! #REF!
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 #REF! #REF!

2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme #REF! #REF!
3.0000 bt Pipa Clipsal 20 mm hitam #REF! #REF!
1.0000 bh Tee dos clipsal 20 mm hitam #REF! #REF!
15.0000 bj Klem clipsal 20 mm hitam #REF! #REF!
4.0000 bj Sock clipsal 20 mm hitam #REF! #REF!
1.0000 bj Inbow dos plastik clipsal E 157 P #REF! #REF!
1.0000 m1 Pipa flexible clipsal 20 mm hitam #REF! #REF!
1.0000 ttk Biaya pasang 25,000.00 25,000.00 25,000.00
Total : 25,000.00 #REF! #REF!

3 1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone #REF! #REF!
8.0000 bt Pipa Clipsal 20 mm putih #REF! #REF!
1.0000 bh Tee dos clipsal 20 mm putih #REF! #REF!
25.0000 bj Klem clipsal 20 mm putih #REF! #REF!
5.0000 bj Sock clipsal 20 mm putih #REF! #REF!
1.0000 bj Inbow dos plastik clipsal E 157 P #REF! #REF!
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 #REF! #REF!

4 1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof #REF! #REF!
6.0000 bt Pipa Clipsal 20 mm putih #REF! #REF!
2.0000 bh Tee dos clipsal 20 mm putih #REF! #REF!
20.0000 bj Klem clipsal 20 mm putih #REF! #REF!
6.0000 bj Sock clipsal 20 mm putih #REF! #REF!
1.0000 bj Inbow dos plastik clipsal E 157 P #REF! #REF!
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 #REF! #REF!

Mengetahui
Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina
NIP. 196110101994032001
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN SWAKLOLA
#REF!

NO URAIAN PEKERJAAN HARGA


1 2 3
### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN Rp. #REF!
15 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!
16 ### Rp. #REF!
17 ### Rp. #REF!
18 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 #REF!
Rp. #REF!
9 #REF!
Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 #REF!
Rp. #REF!
13 #REF!
Rp. #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
14 ### Rp. #REF!
15 ### Rp. #REF!
16 ### Rp. #REF!
17 ### Rp. #REF!
18 ### Rp. #REF!
19 ### Rp. #REF!
20 ### Rp. #REF!
21 ### Rp. #REF!
22 ### Rp. #REF!
23 ### Rp. #REF!

#REF!
24 Rp. #REF!
#REF!
25 Rp. #REF!
26 ### Rp. #REF!
27 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!
16 ### Rp. #REF!
17 ### Rp. #REF!
18 ### Rp. #REF!
19 ### Rp. #REF!
20 ### Rp. #REF!
21 ### Rp. #REF!

### ###
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
### ### Rp. #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
### ### Rp. #REF!
### ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!

### ###
1 ### Rp. #REF!
###
2 ### Rp. #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
3 ### Rp. #REF!
###
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!
5 ### Rp. #REF!
6 ### Rp. #REF!
7 ### Rp. #REF!
8 ### Rp. #REF!
9 ### Rp. #REF!
10 ### Rp. #REF!
11 ### Rp. #REF!
12 ### Rp. #REF!
13 ### Rp. #REF!
14 ### Rp. #REF!
15 ### Rp. #REF!
16 ### Rp. #REF!
17 ### Rp. #REF!
18 ### Rp. #REF!
19 ### Rp. #REF!

### ###
1 ### Rp. #REF!
2 ### Rp. #REF!
3 ### Rp. #REF!
4 ### Rp. #REF!

Kepala Dinas Cipta Karya


Kabupaten Badung
NO URAIAN PEKERJAAN HARGA
1 2 3
Ir. Ni Luh Putu Dessy Dharmayanty, M.T
Pembina
NIP. 196110101994032001
DAFTAR HARGA SATUAN BAHAN TAMBAHAN
BULAN APRIL TAHUN 2010
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA SATUAN


1 2 3 4

BATU
Batu Candi
1 20x20x2 m2 78,000.00
2 15x30x2 m2 78,000.00
3 20x30x2 m2 78,000.00
4 20x40x2 m2 80,000.00
5 30x30x2 m2 80,000.00
6 40x40x2 m2 105,000.00
7 30x60x2 m2 115,000.00
8 20x40x3 m2 135,000.00
9 30x30x3 m2 135,000.00
10 30x30x5 m2 165,000.00
11 40x40x5 m2 185,000.00

Palimanan putih
1 20x20x2 m2 65,000.00
2 20x30x2 m2 67,000.00
3 20x40x2 m2 68,000.00
4 20x40x3 m2 110,000.00
5 30x30x3 m2 110,000.00

Palimanan Serat Kuning


1 20x30 m2 75,000.00
2 20x40 m2 75,000.00
3 15x30 m2 75,000.00

Palimanan Cirebon
1 15x30x2 m2 72,000.00
2 20x30x2 m2 73,000.00
3 20x40x2 m2 75,000.00
4 30x30x2 m2 80,000.00

Alur Bali Green Lurus


1 20x30 m2 105,000.00
2 20x40 m2 105,000.00

Alur Bali Green Cukil


1 20x30 m2 105,000.00
2 20x40 m2 105,000.00
3 20x20 m2 105,000.00

Batu Bali Green


1 15x30 m2 75,000.00
2 20x30 m2 75,000.00
3 20x40 m2 75,000.00
4 40x40 m2 80,000.00

PARAS
Paras Kerobokan
1 20x40x3 Bj 6,000.00
2 20x40x5 Bj 8,000.00

Paras Kelating
1 20x40x3 Bj 6,000.00
2 20x40x5 Bj 8,000.00

Alur Andesit Lurus


1 20x40 m3 135,000.00
2 30x60 m3 140,000.00

Alur and cukil


1 20x40 m2 135,000.00
2 15x30 m2 135,000.00

Harga Barang dan Upah Hal. 81


NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
Alur And Gelombang m2 140,000.00
Alur And Gelombang lurus m2 140,000.00

Random Singaraja m2 25,000.00


Random Cirebon m2 65,000.00
Random Jember m2 45,000.00

Harga Barang dan Upah Hal. 82


DAFTAR HARGA SATUAN UPAH

NO NAMA BARANG SATUAN HARGA

1 Mandor Hari Rp. 180,947.48


2 Kepala Tukang Hari Rp. 175,068.32
3 Tukang Batu Hari Rp. 162,003.52
4 Tukang kayu Hari Rp. 168,535.92
4 Tukang cat Hari Rp. 168,535.92
5 Pekerja Hari Rp. 130,648.00
DAFTAR HARGA SATUAN BAHAN
NO NAMA BARANG SATUAN

NO NAMA BARANG SATUAN HARGA

1 Amplas lbr Rp. 13,552.45


4 Dempul kayu (polibest) 0,8 Kg kg Rp. 46,621.92
5 Kuas Besar 4 inch bh Rp. 43,524.21
6 Bahan Plitur ltr Rp. 94,241.64
7 Besi strip 1kg kg Rp. 13,572.05
8 Seng plastik gelombang besar tebal lbr Rp. 119,105.17
9 Seng Plat BJLS 30 lebar 28 cm Bh Rp. 37,581.98
10 Kayu Besi Kelas I m3 Rp. 4,712,081.92
11 Papan Kayu besi Kelas I m3 Rp. 4,712,081.92
12 Kayu Putih m3 Rp. 3,153,550.40
13 Kayu Kelas II m3 Rp. 3,153,550.40
14 Bata Ringan/ Bataco 7 x 20 x 60 bj Rp. 26,266.00###
16 Kawat Harmonika Galvanis m Rp. 111,025.82
17 Paku 5 cm - 7 cm kg Rp. 37,529.86
18 Paku 8 cm - 12 cm kg Rp. 40,399.92
19 Paku reng/usuk SQ kg Rp. 40,399.92
20 Batu gunung/ belah m3 Rp. 724,534.72
21 Pasir Beton / Pasir Lokal m3 Rp. 1,204,082.88
22 Semen Tonasa 40 kg kg Rp. 3,655.25
DAFTAR ANALISA PEKERJAAN

NO URAIAN HARGA SATUAN (RP) JUMLAH HARGA (RP)

I PEKERJAAN PERSIAPAN

1 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


A. Bahan
0.0120 m3 Kayu putih 5/7 3,153,550.40 37,842.60
0.0200 kg 37,529.86 750.60
0.0070 m3 Kayu putih 3,153,550.40 22,074.85
Jumlah Harga Bahan 60,668.05
B. Tenaga
0.1000 oh Tukang Kayu 168,535.92 16,853.59
0.1000 oh Pekerja 130,648.00 13,064.80
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0050 oh Mandor 180,947.48 904.74
Jumlah Harga Tenaga 32,573.81

C. Jumlah A+B 93,241.87

2 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN

A. Tenaga
0.1000 oh Pekerja 130,648.00 13,064.80
0.0500 oh Mandor 180,947.48 9,047.37
B. Jumlah A 22,112.17

II PEKERJAAN TANAH

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja 130,648.00 97,986.00
0.0250 oh Mandor 180,947.48 4,523.69
B. Jumlah A 102,509.69

III PEKERJAAN PONDASI

1 1 M3 BATU KALI CAMP. 1 PC : 4 PS


A. Bahan
1.2000 m3 Batu Kali / Batu Belah / Batu Karang 724,534.72 869,441.66
163.0000 kg Semen Portland 3,655.25 595,806.01
0.5200 m3 Pasir Pasang 1,204,082.88 626,123.10
Jumlah Harga Bahan 2,091,370.77
B. Tenaga
1.5000 oh Pekerja 130,648.00 195,972.00
0.7500 oh Tukang Batu 162,003.52 121,502.64
0.0750 oh Kepala Tukang 175,068.32 13,130.12
0.0750 oh Mandor 180,947.48 13,571.06
Jumlah Harga Tenaga 344,175.83

C. Jumlah A+B 2,435,546.60

IV PEKERJAAN KAYU

1 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS


I/II (KAYU BESI)
A. Bahan
0.0400 m3 Papan Kayu Kelas I 4,712,081.92 188,483.28
Jumlah Harga Bahan 188,483.28
B. Tenaga
1.0000 oh Pekerja 162,003.52 162,003.52
3.0000 oh Tukang Kayu 175,068.32 525,204.96
0.3000 oh Kepala Tukang 180,947.48 54,284.24
0.0500 oh Mandor 180,947.48 9,047.37
Jumlah Harga Tenaga 750,540.10

C. Jumlah A+B 939,023.37

2 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I

A. Bahan
1.2 m3 Balok Kayu Besi 4712081.92 5654498.304
NO URAIAN HARGA SATUAN (RP) JUMLAH HARGA (RP)

15.0000 Kg Besi Strip Tebal 5 cm 13,572.05 203580.703872


5.6000 Kg Paku 12 Cm 40,399.92 226239.56992
Jumlah Harga Bahan 6,084,318.58
B. Tenaga
6.7000 oh Pekerja 130,648.00 875,341.60
20.1000 oh Tukang Kayu 168,535.92 3,387,571.99
2.0100 oh Kepala Tukang 175,068.32 351,887.32
0.3350 oh Mandor 180,947.48 60,617.41
Jumlah Harga Tenaga 4,675,418.32

C. Jumlah A+B 10,759,736.90

3 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

A. Bahan
1.1000 m3 Balok Kayu Kelas II 3,153,550.40 3,468,905.44
15.0000 Kg Besi Strip Tebal 5 cm 40,399.92 605,998.85
3.0000 Kg Paku 8 cm - 12 cm 27,626.14 82,878.43
Jumlah Harga Bahan 4,157,782.72
NO URAIAN HARGA SATUAN (RP) JUMLAH HARGA (RP)

B. Tenaga
2.4000 oh Pekerja 130,648.00 313,555.20
7.2000 oh Tukang Kayu 168,535.92 1,213,458.62
0.7200 oh Kepala Tukang 175,068.32 126,049.19
0.1200 oh Mandor 180,947.48 21,713.70
Jumlah Harga Tenaga 1,674,776.71

C. Jumlah A+B 5,832,559.43

4 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

A. Bahan
0.0108 m3 Papan Kayu Besi 4,712,081.92 50,890.48
0.1000 Kg Paku 5 Cm dan 7 Cm 37,529.86 3,752.99
Jumlah Harga Bahan 54,643.47
B. Tenaga
0.1000 oh Pekerja 130,648.00 13,064.80
0.2000 oh Tukang Kayu 168,535.92 33,707.18
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0050 oh Mandor 180,947.48 904.74
Jumlah Harga Tenaga 51,178.09

C. Jumlah A+B 105,821.56

5 MEMASANG 1 M2 DINDING PAPAN KAYU BESI 2,5/25

A. Bahan
0.0070 m3 Papan Kayu Besi 4,712,081.92 32,984.57
0.1000 Kg Paku 5 Cm dan 10 Cm 40,399.92 4,039.99
0.1500 Kg Paku Skrup 10 cm 26,000.00 3,900.00
Jumlah Harga Bahan 40,924.57
B. Tenaga
0.6000 oh Pekerja 130,648.00 78,388.80
1.8000 oh Tukang Kayu 168,535.92 303,364.66
0.1800 oh Kepala Tukang 175,068.32 31,512.30
0.0300 oh Mandor 180,947.48 5,428.42
Jumlah Harga Tenaga 418,694.18

C. Jumlah A+B 459,618.74

6 MEMASANG 1 M3 KONSTRUKSI KOLOM KAYU BESI


A. Bahan
1.1000 m3 Balok Kayu Besi 4,712,081.92 5,183,290.11
15.0000 Kg Besi Strip Tebal 5 cm 13,572.05 203,580.70
3.0000 Kg Paku 12 Cm 27,626.14 82,878.43
Jumlah Harga Bahan 5,469,749.25
B. Tenaga
2.4000 oh Pekerja 130,648.00 313,555.20
7.2000 oh Tukang Kayu 168,535.92 1,213,458.62
0.7200 oh Kepala Tukang 175,068.32 126,049.19
0.1200 oh Mandor 180,947.48 21,713.70
Jumlah Harga Tenaga 1,674,776.71

C. Jumlah A+B 7,144,525.96

7 MEMASANG 1 M3 KONSTRUKSI BALOK KAYU BESI


A. Bahan
1.1000 m3 Balok Kayu Besi 4,712,081.92 5,183,290.11
15.0000 Kg Besi Strip Tebal 5 cm 13,572.05 203,580.70
3.0000 Kg Paku 12 Cm 27,626.14 82,878.43
Jumlah Harga Bahan 5,469,749.25
B. Tenaga
2.4000 oh Pekerja 130,648.00 313,555.20
7.2000 oh Tukang Kayu 168,535.92 1,213,458.62
0.7200 oh Kepala Tukang 175,068.32 126,049.19
0.1200 oh Mandor 180,947.48 21,713.70
Jumlah Harga Tenaga 1,674,776.71

C. Jumlah A+B 7,144,525.96


NO URAIAN HARGA SATUAN (RP) JUMLAH HARGA (RP)

8 MEMASANG 1 M3 KONSTRUKSI GELAGAR KAYU BESI


A. Bahan
1.1000 m3 Balok Kayu Besi 4,712,081.92 5,183,290.11
15.0000 Kg Besi Strip Tebal 5 cm 13,572.05 203,580.70
3.0000 Kg Paku 12 Cm 27,626.14 82,878.43
Jumlah Harga Bahan 5,469,749.25
B. Tenaga
2.4000 oh Pekerja 130,648.00 313,555.20
7.2000 oh Tukang Kayu 168,535.92 1,213,458.62
0.7200 oh Kepala Tukang 175,068.32 126,049.19
0.1200 oh Mandor 180,947.48 21,713.70
Jumlah Harga Tenaga 1,674,776.71

C. Jumlah A+B 7,144,525.96


V PEKERJAAN PENUTUP ATAP
1 1 M2 PEKERJAAN ATAP SENG PLASTIK GELOMBANG
A. Bahan
0.7000 lbr Seng plastik gelombang besar tebal 119,105.17 83,373.62
0.0200 kg Paku Biasa 1/2" - 1" 40,399.92 808.00
Jumlah Harga Bahan 84,181.62
B. Tenaga
0.2000 oh Pekerja 130,648.00 26,129.60
0.1000 oh Tukang Kayu 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0100 oh Mandor 180,947.48 1,809.47
Jumlah Harga Tenaga 46,543.35

C. Jumlah A+B 130,724.97

2 1 M1 PASANG NOK SENG GELOMBANG


A. Bahan
0.3000 lbr Seng Plat 3" x 6" BJLS 28 37,581.98 11,274.59
0.0400 kg Paku biasa 1/2" - 1" 130,648.00 5,225.92
Jumlah Harga Bahan 16,500.51
B. Tenaga
0.2000 oh Tukang Kayu 168,535.92 33,707.18
0.0200 oh Kepala Tukang 175,068.32 3,501.37
0.0020 oh Mandor 180,947.48 361.89
Jumlah Harga Tenaga 37,570.45

C. Jumlah A+B 54,070.96


VI PEKERJAAN DINDING

1 1 M2 PASANGAN BATA RINGAN 7X20X60 CM TEBAL 1 TELA CAMP. 1 PC : 4 PS


A. Bahan
8.3333 bh Bata Ringan/ Bataco 7 x 20 x 60 26,266.00 218,883.34
11.5000 kg Semen Portland 3,655.25 42,035.39
0.0430 m3 Pasir Pasang 1,204,082.88 51,775.56
Jumlah Harga Bahan 312,694.30
B. Tenaga
0.3000 oh Pekerja 130,648.00 39,194.40
0.1000 oh Tukang Batu 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0150 oh Mandor 180,947.48 2,714.21
Jumlah Harga Tenaga 60,512.89

C. Jumlah A+B 373,207.18

2 1 M2 PASANGAN KAWAT HARMONIKA


A. Bahan
1.1000 bh Kawat Harminka 111,025.82 122,128.41
0.1000 kg Paku 5 -7 cm 37,529.86 3,752.99
Jumlah Harga Bahan 125,881.39
B. Tenaga
1.0000 oh Pekerja 130,648.00 130,648.00
0.0050 oh Tukang Batu 168,535.92 842.68
0.3000 oh Kepala Tukang 175,068.32 52,520.50
0.0300 oh Mandor 180,947.48 5,428.42
Jumlah Harga Tenaga 189,439.60

C. Jumlah A+B 315,320.99


NO URAIAN HARGA SATUAN (RP) JUMLAH HARGA (RP)

VI PEKERJAAN PLESTERAN

1 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


A. Bahan
6.2400 kg Semen Portland 3,655.25 22,808.77
0.0240 m3 Pasir Pasang 1,204,082.88 28,897.99
Jumlah Harga Bahan 51,706.76
B. Tenaga
0.3000 oh Pekerja 130,648.00 39,194.40
0.1500 oh Tukang Batu 168,535.92 25,280.39
0.0150 oh Kepala Tukang 175,068.32 2,626.02
0.0150 oh Mandor 180,947.48 2,714.21
Jumlah Harga Tenaga 69,815.03

C. Jumlah A+B 121,521.78

2 1 M2 PEKERJAAN ACIAN
A. Bahan
3.2500 zak Semen Portland 3,655.25 11,879.57
0.2000 oh Pekerja 130,648.00 26,129.60
Jumlah Harga Bahan 38,009.17
B. Tenaga
0.1000 oh Tukang Labur/Cat 168,535.92 16,853.59
0.0100 oh Kepala Tukang 175,068.32 1,750.68
0.0100 oh Mandor 180,947.48 1,809.47
Jumlah Harga Tenaga 20,413.75

C. Jumlah A+B 58,422.92

VII PEKERJAAN PENGECATAN

1 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


A. Bahan
0.1500 kg Vernis 94,241.64 14,136.25
0.0500 kg Dempul 46,621.92 2,331.10
0.1000 lbr Amplas 13,552.45 1,355.24
0.0100 bh Kuas 43,524.21 435.24
Jumlah Harga Bahan 18,257.83
B. Tenaga
0.1600 oh Pekerja 130,648.00 20,903.68
0.1600 oh Tukang cat 162,003.52 25,920.56
0.0160 oh Kepala Tukang 175,068.32 2,801.09
0.0025 oh Mandor 180,947.48 452.37
Jumlah Harga Tenaga 50,077.71

C. Jumlah A+B 68,335.53


RENCANA ANGGARAN BIAYA
PEKERJAAN : PERENCANAAN PEMBUATAN GREEN HOUSE
LOKASI : KAMPUNG WERABUAN, DISTRIK WARTUTIN, KABUPATEN FAKFAK
TAHUN : 2022

HARGA SATUAN JML. HARGA


NO JENIS PEKERJAAN SATUAN VOL
(RP) (RP)

A PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan m2 63.00 Rp. 22,112.17 Rp. 1,393,066.96
2 Pengukuran dan Pasangan Bouwplank m' 32.00 Rp. 93,241.87 Rp. 2,983,739.75
3 Pemasangan Papan Nama Proyek ls 1.00 Rp. 1,000,000.00 Rp. 1,000,000.00

Jumlah Harga Rp. 5,376,806.72


B PEKERJAAN PONDASI
1 Galian Tanah m3 4.80 Rp. 102,509.69 Rp. 492,046.50
2 Memasang Pondasi Batu Belah camp. 1pc : 4ps m3 3.84 Rp. 2,435,546.60 Rp. 9,352,498.93

Jumlah Harga Rp. 9,844,545.43


C PEKERJAAN KAYU
1 Membuat Tiang Kayu Besi 10/10 cm m3 0.28 Rp. 7,144,525.96 Rp. 1,964,744.64
2 Memasang Kayu Kelas I 5/10 cm m3 0.13 Rp. 7,144,525.96 Rp. 928,788.37
3 Memasang Pintu Kayu Besi m2 3.80 Rp. 939,023.37 Rp. 3,568,288.82
4 Memasang Kontruksi Kuda-Kuda Kayu Kelas I 5/10 m3 0.42 Rp. 10,759,736.90 Rp. 4,562,128.45
5 Memasang Gording Kayu Kelas II 5/5 m3 0.20 Rp. 5,832,559.43 Rp. 1,166,511.89
6 Memasang Listplank 3/20 cm Kayu Kelas I m' 30.00 Rp. 105,821.56 Rp. 3,174,646.74

Jumlah Harga Rp. 15,365,108.91


D PEKERJAAN DINDING
1 Memasang Dinding Bata Ringan (7x20x60)cm, camp. 1pc ; 4ps m2 24.00 Rp. 373,207.18 Rp. 8,956,972.42
2 Memasang Plesteran 1pc ; 4pp Tebal. 15mm m2 48.00 Rp. 121,521.78 Rp. 5,833,045.64
3 Memasang Acian m2 48.00 Rp. 58,422.92 Rp. 2,804,300.05
4 Mesang Dinding Kawat Harmonika m2 36.00 Rp. 315,320.99 Rp. 11,351,555.71

Jumlah Harga Rp. 28,945,873.81


E PEKERJAAN PENUTUP ATAP
1 Memasang Atap Seng Plastik m2 60.12 Rp. 130,724.97 Rp. 7,859,184.96
2 Memasang Bumbungan Atap Multiroof m' 8.35 Rp. 54,070.96 Rp. 451,492.51

Jumlah Harga Rp. 8,310,677.47


F PEKERJAAN PENGECATAN
1 Pengecatan Bidang Kayu Politur ex. Mowilex m2 14.20 Rp. 68,335.53 Rp. 970,364.58

Jumlah Harga Rp. 970,364.58


G PEKERJAAN LAINNYA
1 Pembersihan Akhir ls 1.00 Rp. 1,000,000.00 Rp. 1,000,000.00
2 Pelaporan dan Dokumentasi ls 1.00 Rp. 2,000,000.00 Rp. 2,000,000.00

Jumlah Harga Rp. 3,000,000.00


RENCANA ANGGARAN BIAYA
PEKERJAAN : PERENCANAAN PEMBUATAN GREEN HOUSE

LOKASI : KAMPUNG WERABUAN, DISTRIK WARTUTIN, KABUPATEN FAKFAK

TAHUN : 2022

NO URAIAN JUMLAH

A PEKERJAAN PERSIAPAN Rp 5,376,806.72

B PEKERJAAN PONDASI Rp 9,844,545.43

C PEKERJAAN KAYU Rp 15,365,108.91

D PEKERJAAN DINDING Rp 28,945,873.81

E PEKERJAAN PENUTUP ATAP Rp 8,310,677.47

F PEKERJAAN PENGECATAN Rp 970,364.58

G PEKERJAAN LAINNYA Rp 3,000,000.00

REAL COST Rp 71,813,376.93

PPN 10% Rp 7,181,337.69

TOTAL Rp 78,994,714.62

DI BULATKAN Rp 78,900,000.00

Terbilang:
Tujuh Puluh Delapan Juta Sembilan
Ratus Ribu Rupiah

Fakfak, ...................... 2021


,Dibuat Oleh
Konsultan Perencana
PT. SOLID KONSULTAN

,HENDHY WALUYO
Dikrektur Cabang